Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on...

34
Tender No. 09/Bridges/2014 DEN/Bridges/BZA Signature of Tenderer(s) Page 1 of 34 BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014, date of opening on 30.07.2014 for the work of Strengthening of exg corroded and perforated gussets, top lateral bracing angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.” 1 Registered Post-Ack.-Due” दिण मय रेऱवे / South Central Railway वजयवाडा मंडऱ / Vijayawada Division मंडऱ कायााऱय/Divisional Office, कायशाखा/Works Branch, वजयवाडा/Vijayawada, सं .No.बीB/डबयू W.496/I/4/T.No.09/Bridges/14/T.Bridges दनाँक/Dt.10.11.2014 To Sri T.Muralikrishna, Railway Contractors, D.No.36-12-14, Dr.Kilari Butchibabu Street, Shanthinagar Nagar, Moghalrajpuram, V I J A Y A W A D A - 520 010 . Sir, वषय/Sub:-Tender No.09/Bridges/2014 for the work of “SW- I) Strengthening of existing corroded and perforated gussets, top lateral bracing angles and cross frames of Br. No. 594 Dn (13x18.29) at Km. 300/12-22 between Karvadi - Ammanabrolu stations, SW-II) Replacement of corroded/slack rivets and top lateral bracings in SSE/Br/BTTR section, SW-III)Vijayawada - Visakhapatnam Section - Providing Protective guards to cross girders for bridge Nos. 248A, 544 Dn and 703 Up, SW-IV) Bridge No.248-A ( Rail cum road Godavari bridge) at Km. 572/35-575/41 Strengthening of Top floor system, cross frame, repairs to spalling locations in concrete deck slab/retainers, improvements in drainage arrangements.संदबा /Ref:- Your tender for the above work submitted on 30.07.2014 (extended upto 24.01.2015). *** 1. The competent authority has accepted your Tender for the above work for a total value of Rs.2,06,13,830/- (Rupees two crores, six lakhs, thirteen thousand, eight hundred and thirty only) at the following rates. Rates: (i) Schedule-A=(+)6.3% (Plus six point three percent only) on USSR-2010 (ii) Schedule-A1=(+)54% (Plus fifty four percent only) on USSR-2010 (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only) with restriction . 2. The work should be completed within 06 (Six) Months from the date of issue of letter of acceptance of tender with a maintenance period of 06 (SIX) Months. 3. The sum of Rs.2,19,680/- submitted vide FDR No.750197, dt.30.07.2014, issued by Punjab & Sind Bank, Vijayawada towards E.M.D has been adjusted as part amount of the security deposit. The balance security deposit of Rs.8,11,012/- shall be recovered at the rate of 10% of the bill amount till the full security deposit of Rs.10,30,692/- is recovered. 4. In terms of Special conditions of contract, you shall furnish a Performance Guarantee amounting to 5% of the contract value i.e., Rs.10,30,692/- before signing of the

Transcript of Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on...

Page 1: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 09/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 1 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system,

cross frame etc.”

1

Registered Post-Ack.-Due”

दक्षिण मध्य रेऱवे / South Central Railway

ववजयवाडा मंडऱ / Vijayawada Division

मंडऱ कायााऱय/Divisional Office,

काया शाखा/Works Branch,

ववजयवाडा/Vijayawada,

स.ंNo.बीB/डबल्यू W.496/I/4/T.No.09/Bridges/14/T.Bridges ददनाँक/Dt.10.11.2014

To Sri T.Muralikrishna,

Railway Contractors,

D.No.36-12-14, Dr.Kilari Butchibabu Street,

Shanthinagar Nagar, Moghalrajpuram,

V I J A Y A W A D A - 520 010.

Sir,

ववषय/Sub:-Tender No.09/Bridges/2014 for the work of “SW- I) Strengthening of existing

corroded and perforated gussets, top lateral bracing angles and cross frames of

Br. No. 594 Dn (13x18.29) at Km. 300/12-22 between Karvadi - Ammanabrolu

stations, SW-II) Replacement of corroded/slack rivets and top lateral bracings in

SSE/Br/BTTR section, SW-III)Vijayawada - Visakhapatnam Section -

Providing Protective guards to cross girders for bridge Nos. 248A, 544 Dn and

703 Up, SW-IV) Bridge No.248-A ( Rail cum road Godavari bridge) at Km.

572/35-575/41 Strengthening of Top floor system, cross frame, repairs to

spalling locations in concrete deck slab/retainers, improvements in drainage

arrangements.”

संदबा/Ref:- Your tender for the above work submitted on 30.07.2014 (extended upto

24.01.2015). ***

1. The competent authority has accepted your Tender for the above work for a total value of

Rs.2,06,13,830/- (Rupees two crores, six lakhs, thirteen thousand, eight hundred and

thirty only) at the following rates. Rates:

(i) Schedule-A=(+)6.3% (Plus six point three percent only) on USSR-2010

(ii) Schedule-A1=(+)54% (Plus fifty four percent only) on USSR-2010

(iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010

(iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only) with restriction.

2. The work should be completed within 06 (Six) Months from the date of issue of letter of

acceptance of tender with a maintenance period of 06 (SIX) Months.

3. The sum of Rs.2,19,680/- submitted vide FDR No.750197, dt.30.07.2014, issued by

Punjab & Sind Bank, Vijayawada towards E.M.D has been adjusted as part amount of

the security deposit. The balance security deposit of Rs.8,11,012/- shall be recovered at

the rate of 10% of the bill amount till the full security deposit of Rs.10,30,692/- is

recovered.

4. In terms of Special conditions of contract, you shall furnish a Performance Guarantee

amounting to 5% of the contract value i.e., Rs.10,30,692/- before signing of the

Page 2: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 09/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 2 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system,

cross frame etc.”

2

agreement. The performance guarantee should be initially valid up to the stipulated date

of completion plus 60 days beyond that. In terms of Special conditions of contract, you

shall submit the Performance Guarantee (PG) within 30 (thirty) days from the date of

issue of Letter of Acceptance (LOA) [excluding the date of LOA]. Extension of time for

submission of PG beyond 30(thirty) days and up to 60 days from the date of issue of

LOA [excluding the date of LOA] may be given by the Authority who is competent to

sign the contract agreement. However, a penal interest of 15% per annum shall be

charged for the delay beyond 30 (thirty) days, i.e. from 31st day after the date of issue of

LOA. The agreement should be signed within fifteen days after the issue this letter and

performance guarantee should also be submitted within this time of limit before signing

the agreement. In case of failure to submit the requisite PG even after 60 days from the

date of issue of LOA, the contract shall be terminated duly forfeiting EMD and other

dues, if any payable against the contract. The failed contractor shall be debarred from

participating in re-tender for that work.

5. Until a formal agreement is executed, acceptance of the Tender shall constitute a binding

contract between you and the administration.

6. You have to abide by the Contract Labour (Regulations and Abolition Act 1970) and

rules, regulations and amendments thereto that may be followed from time to time are

binding on you in respect of this contract. You have to submit the application in the

prescribed form (Form-V) in triplicate for license under Contract labour

(Regulation and Abolition) Act for 20 or more workers and under BOCW Act for

less than 20 Workers together with the demand draft towards security deposit and

license fee to the undersigned to forward the same to the concerned Licensing Officer for

issue of the license irrespective of the number of labour employed for the work. The

work should not be executed without a valid labour license.

7. Failure to start the work within ten days, the contractor is liable for penal action as per

clause 62 of the General conditions of contract.

Encl: 1) Tender schedule with special conditions & 2) Copy of Performance Guarantee

आपका / Yours faithfully,

(म.इंजीननयर/पऱु

Divisional Engineer/Bridges

द.म.रेऱवे/S.C.Railway, ववजयवाडा/Vijayawada

Copy to: Sr.DFM/BZA for information.

Copy to: ADEN/BR/South/BZA, ADEN/BR/N/BZA, SSE/BR/I/RJY, SSE/BR/I/BZA,

SSE/BR/BTTR, SSE(Drg)/Bridges & OS/WA-Bridges for information.

Copy to: Asst Labour Commissioner (Central), 5th floor, Central Govt. Office Complex, Plot No.G-

2, Industrial Estate, Auto Nagar, Vijayawada-520007 for information.

(TC : DEN/Bridges/BZA, DFM/BZA & DSTE/BZA – AA:Sr.DEN/Co-ord/BZA)

Page 3: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 09/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 3 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system,

cross frame etc.”

3

South Central Railway Vijayawada Division

Tender No.09/Bridges/2014

Name of

Work :

SW- I) Strengthening of existing corroded and perforated gussets, top lateral

bracing angles and cross frames of Br. No. 594 Dn (13x18.29) at Km.

300/12-22 between Karvadi - Ammanabrolu stations, SW-II) Replacement of

corroded/slack rivets and top lateral bracings in SSE/Br/BTTR section, SW-

III) Vijayawada - Visakhapatnam Section - Providing Protective guards to

cross girdes for bridge Nos. 248A, 544 Dn and 703 Up, SW-IV)Bridge

No.248-A (Rail cum road Godavari bridge) at Km. 572/35-575/41

Strengthening of Top floor system, cross frame, repairs to spalling locations

in concrete deck slab/retainers, improvements in drainage arrangements.

Similar nature of

work :-

Strengthening/fabrication of steel structures like steel girders, steel

FOBs, steel platform shelters, steel workshop structure, steel water

tanks, Fabrication & Fixing of steel height gauges, Replacement of

steel members on major bridges.

Appx. Value : Rs.1,39,35,322/-

Sanctioned by Sr. DEN/Co-ord/BZA

No.B/W.71/I/1427/Plg., Dt.29.08.2012,

No.B/W.71/I/1431/Plg, Dt.06.09.2012,

No.B/W.71/I/1417/Plg, Dt.20.01.2012,

No.B/W.71/I/1419/Plg., Dt.14.9.2012

04-310-32,

04-310-32,

21-3255-03,

04-340-32

Rs.1,39,35,322/

-

Completion Period (06) SIX months

Maintenance Period (06) SIX months

Name & address of the

Contractor:- Sri T.Muralikrishna,

Railway Contractor,

D.No.36-12-14, Dr.Kilari Butchibabu Street,

Shanthinagar Nagar, Moghalrajpuram,

V I J A Y A W A D A - 520 010

Page 4: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 09/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 4 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014, date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated

gussets, top lateral bracing angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up,

Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

4

SCHEDULE 'A'

List of items of works that are covered by USSR 2010 of S.C.Railway.

S.

No. SSR No. Description of work

SW -I

QTY.

SW -II

QTY.

SW -III

QTY.

SW - IV

Qty

Total

Qty.

Rate (`.P.)

Unit Amount in

`.

1. 222200 Supply, fabrication and erection of steel members to replace existing corroded members of built up section made up of MS plate, angles,

channels of different thickness and sizes incl. painting with red led priming to I.S: 102 and one heavy coat of ready mix red oxide

conforming to IS : 123, Structural steel should conform to IS: 2062-Gr 'B'. Fabrication and erection to be as per existing design initially by

bolts and nuts and finally by riveting during the sanctioned traffic block. Payment for rivets and riveting to be made separately. Rate

includes cutting of new steel work, drilling for riveting, dismantling of any existing members required for inserting fabricated members,

fixing of new fabricated built up members with all tools, plants, labour, consumables, machinery and accessories etc., Work will be executed

as per IRS : B 1-2001.

14.5 19 0 23 56.5 97758.27 MT 5523342

NOTE : 1. Shifting the existing sleepers to the required position as directed by the Engineer-in-charge to facilitate to carry out the above

works duly providing necessary packing under the sleepers and re-shifting them back to their original position after completion of work.

i.e., assembling and riveting, by using contractor's labour, tools, plant, lead, lift etc., complete and as directed by the Engineer-in-charge. No

extra payment will be paid.

2. Removing the exg. guard rails, footpath sheets, tie angles with fastenings for working and refixing them on the bridge in their original

position on completion by using bolts, nuts and washers etc., wherever necessary including all materials, labour, tools, plant, machinery,

lead, lift etc., complete and as directed by the Engineer-in-charge. No extra payment will be paid.

3. All the released materials of MS angles, channels, plates etc., to be handed over to the concerned SSE/Bridges stores including loading,

unloading, stacking temporarily by contractor's vehicles with all contractor's labour, tools, plant etc. complete and as directed by the

Engineer-in-charge.

2. 211015 Deduct for using steel conforming to Fe 410 A of IS :2062 instead of Fe 410 B

11 10 0 15 36 1161.5 MT -41814

(Items two only) Total of Schedule-A: 5481528

Percentage rate in figures (+)6.3%

Percentage rate in words Plus six point three percent only on USSR-2010

Page 5: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 09/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 5 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014, date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated

gussets, top lateral bracing angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up,

Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

5

SCHEDULE 'A1'

List of items of works that are covered by USSR 2010 of S.C.Railway.

S.

No. SSR No. Description of work

SW -I

QTY.

SW -II

QTY. SW -III

QTY.

SW - IV

Qty

Total

Qty.

Rate (`.P.)

Unit Amount in

`.

1. 211090 Providing, cutting, fabricating, treating, fixing, & painting structural steel confirming to I.S. 2062 in access ladders, Inspection platforms,

Trolley refugee, railing, etc., joints welded to neat finish including one coat of primer & two coats of synthetic enamel paints.

NOTE : Bolted connection wherever required shall be done by contractor using contractor's bolts, nuts & washers of required size complete.

0 0 40.27 0 40.27 58531.32 MT 2357056

(Item one only) Total of Schedule-A : 2357056

Percentage rate in figures (+)54%

Percentage rate in words Plus fifty four percent only on USSR-2010

Page 6: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 09/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 6 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014, date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated

gussets, top lateral bracing angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up,

Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

6

SCHEDULE 'A2'

List of items of works that are covered by USSR 2010 of S.C.Railway.

S.

No. SSR No. Description of work

SW -I

QTY.

SW -II

QTY.

SW -III

QTY.

SW - IV

Qty

Total

Qty.

Rate (`.P.)

Unit Amount in

`.

1. 021130+

021131

Loading/Unloading G.I.sheets, rails joists built up section angles, C.I. Ductile pipe, A.C.Pipes or G.I. pipes RCC/PCC beams/slabs and other

miscellaneous iron work or wood work including lead up to 50m and stacking properly into/from trucks trailors or wagons.

7 0 0 0 7 119.06 MT 833

2. 021150 Leading miscellaneous materials such as iron work, rails, fittings, fastenings, pipes, wooden logs, stones over pitching stone

size, RCC/PCC beams/slabs etc, and all similar articles (each individual article or bundle being not more than 3.5 meters long

in the longest direction) including all loading, unloading and stacking, lead over 500m and upto 10Km.

Note : Lead under this item is payable when the same exceeds 500m.

0 19 0 0 19 108.1 MT 2054

3. 021151 Additional lead of every subsequent km or part

thereof, over 10km and upto 100km over item

no. 021150.

0 19 0 0 19 4.95 MT/Km 94

4. 144020 Cutting holes up to 15x15cm in RCC floors and roofs for passing drain pipes etc. and repairing the hole after insertion of drain

pipe etc. with cement concrete 1:1.5:3 ( 1 cement, 1.5 coarse sand, 3 graded stone aggregate 20mm nominal size) including

finishing complete so as to make it leak proof ( In OLD work only when specially ordered)

0 0 0 128 128 107.2 Each 13722

5. 154010 Providing and fixing 110mm dia PVC soil, waste and vent pipes including jointing and cost of spun yarn and sand etc. complete

0 0 0 128 128 263.03 M 33668

Page 7: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 09/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 7 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014, date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated

gussets, top lateral bracing angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up,

Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

7

S.

No. SSR No. Description of work

SW -I

QTY.

SW -II

QTY.

SW -III

QTY.

SW - IV

Qty

Total

Qty.

Rate (`.P.)

Unit Amount in

`.

6. 222120 Providing and applying epoxy for bonding of new concrete to old concrete @0.80Kg/sqm with pot life not less than 60-90 minutes and as per

specification including cleaning the surface.

0 0 0 300 300 139.27 Sqm 41781

7. 222080 Patching of damaged concrete surface with pre packed polymer concrete with average thickness of 25mm Curing compounds, initiator and

promoter, available in the formulations to be applied as per instructions of manufactures and as approved by the engineer.

0 0 0 300 300 420.03 Sqm 126009

8. 133360+

133362

Providing and laying Double flanged pipe ( screwed/welded) centrifugally (spun) cast iron, class B ( I.S.1536), 150mm dia C.I.Double

flanged pipe.

0 0 0 200 200 2214.57 M 442914

9. 133040+

133041

Providing and laying flanged C.I. standard

specials such as tees, bends, collars, tapersm caps

etc., suitable for flanged jointing as per IS:1538,

upto 300mm dia.

0 0 0 4 4 5028.51 Quintal 20114

10. 137010 Supply, Fabricating and fixing MS flat angle iron

pipe clamps, stays, etc. including drilling holes,

welding if any including nuts and bolts etc.,

including all lifts.

0 0 0 1000 1000 105.87 Kg. 105870

(Items Ten only) SCHEDULE 'A2' TOTAL : 787059

Percentage rate in figures (+)54%

Percentage rate in words Plus fifty four percent only on USSR-2010

Page 8: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 09/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 8 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014, date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated

gussets, top lateral bracing angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up,

Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

8

SCHEDULE 'B'

List of items of works that are not covered by USSR 2010 of S.C.Railway.

S.

No. Description of work

SW -I

QTY.

SW -II

QTY. SW -III

QTY.

SW - IV

Qty

Total

Qty.

Rate (`.P.)

Unit Amount in

`.

NS

2010-

46

Supplying and changing of corroded worn out and loose rivets conforming to IS 1929 and riveting as per ' IRS - B1-2001' Indian Railway

Specifications, of any size at any location of the bridges, with or without traffic blocks ( under running condition) including materials for rivets, all

tools, plants, machinery complete in all respects as per specifications and as directed by Engineer-in-charge.

a) Rivets size up to 25mm dia.

4400 22500 0 17847 44747 118.66

Each

Rivet. 5309679

(One item only) SCHEDULE 'B' TOTAL : 5309679

Percentage rate in figures (+)87.30% with restriction

Percentage rate in words Plus eighty seven point three percent only with restriction

Page 9: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 9 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

9

CONDITIONS

1. The tenderers are required to quote a uniform percentage rate above or below/at par of USSR

2010 for the items included in the Schedule “A, A1, A2 and a separate percentage rate

above/below/at par for the items included in Schedule „B” separately both in figures and words.

If there is any difference between the percentage rate quoted in words and figures, the

percentage rate quoted in words will be taken as correct and final. The tenderer should not quote

different percentage rates for different items of Schedule and the offers with different percentage

rates for different items of the Schedule are liable to be rejected.

2. The quantities furnished in the schedule are approximate and the work will be carried out as

directed by the Engineer-in-charge. The payment will be made for the actual quantities executed.

3. The materials to be supplied and used by the Contractor should have specific prior approval of

the Engineer-in-charge and the work should be carried out in accordance with standard

specifications for materials and works of S.C.Railway.

4. The rate quoted by the contractor will be inclusive of the cost of all the materials, labour, tools &

plant etc., complete including transportation of the same at his own cost including loading and

unloading.

5. Any work shall be executed by the contractor on running track in a workman like manner to the

satisfaction of the Engineer-in-charge. In the event of an accident occurring wholly or partly due

to any act of tantamounts to the negligence on the part of the contractor or his labour, the

contractor shall render himself liable for the damages and also legal prosecution if loss of life is

involved.

6. The Railway reserves the right to reject or alter any part of the work executed by the contractor

which in the judgement of Rly. does not comply with the requirements of the specification. The

decision of Railway shall be final on conclusive for all proposes.

7. If any other items of works covered by USSR 2010 are required to be executed, the same are to

be carried out with the same percentage as quoted by the contractor (i.e.) above or below/at par

of USSR,2010.

8) Potable fresh water is only permitted for all concreting works and other machinery works.

9) (a) Use of Portland Pozollanna cement:

Usage of PPC Cement has been permitted in plain & RCC works subject to the following

conditions:

1. It shall not be used for PSC works.

2. It should be ensured that proper damp curing of the concrete at least for 14 days.

3. Supplementary shuttering/ form work shall not be removed till concrete attains at least 75% of

design strength.

4. Test Certificates of cement has to be kept on record to ensure quality accept.

5. The other specifications amend conditions on usage of port land pozollanna cement has to be

followed as per correction slip No.: 9 for IRS concrete bridge code which was circulated by

CE/P & D/SC under letter No.: W.351/FOB/PFs/Policy(W-II- dt: 31/5/07.)

Page 10: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 10 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

10

(b) General instructions to be followed for usage of cement:

a) The cement proposed to be used for all items of works should confirm to I.S specification

12269 – 1987 of 53 grade. And the agency executing should submit a test certificate for

standard properties of cement.

b) The quantity should be regulated to the actual requirement for each item of work.

c) Consumption register should be maintained by the SE/SSE In charge of the work.

d) Extracts of the consumption register should be enclosed with the bills to ensure the

consumption at par with the requirement.

e) Cement consumption register should be test checked by ADEN periodically.

10) Conservancy cess charges will be recovered from the contractor‟s bills as per Rules in force.

11) All rivet steel to comply with IS specification 1148/64.

12) Fabrication of steel work should comply with IRS specification B.I-79.

13) Welding should confirm to IS 823/64 if so wherever required.

14) The primer coat Zinc chromate primer should confirm to I.S. specification 104-1962 and

Zinc chrome red oxide to specifications I.S. 2074-92.

15) The painting with aluminum should confirm to I.S 2339-63.

16) The painting should be in accordance with the specifications for painting and the paints

proposed to be used on the work should be got tested at CMT/ Lalaguda before use.

17) The steel used for bridges including FOBs shall confirm to specification No. IS.2062-2006

grade „B‟ for plates & Grade „A‟ for rolled structural members and it is to be ensured that

the steel used for bridge works including FOB shall not be of rerolled variety and should be

from stock yards of SAIL/TISCO/IISCO/VIZAG steel or from any other ISI manufacturing

units. The necessary steel test certificate should be obtained from the

SAIL/TISCO/IISCO/VIZAG firms to the above specifications for the materials to be used

for this work.

18) The joints for main structural members such as ISMB/RSJ/Angles are not permitted. The

joints to be provided if any should be according to the specifications and as per approved

standard drawings only.

19) “No Work” shall be done above or with in 2 meters from the live OHE with out a “permit-

to-work”. The draft proceedings order (Annexure-B) to be followed where OHE/TRD is in

existence.

20) Painting work should be done under the supervision of competent Bridge engineering staff

only.

21) To carry out the painting/maintenance works on the girder bridges/Foot over bridges i.e.,

with in the vicinity of OHE (less than 2 Meters distance) a memo has to be sent to TRD

supervisor of the jurisdiction by the SSE/SE/BR duly mentioning the time period required to

arrange the „permit to work‟.

22) The accepted rates should be deemed to include all taxes direct or indirect leviable under

Central, State or Local bodies Act or rules, Octori, toll taxes, tools, royalties, seignorages,

cess and similar imposts that may be prevailing from time to time.

23) The work should be completed with in …6.. months after receipt of acceptance letter.

Page 11: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 11 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

11

ANNEXURE-B.

Draft proceeding order to be followed by TRD and Engineering supervisors/

Tenderer /Contractor with regard to maintenance works for the Bridges:

1. “No Work” shall be done above or with in 2 meters from the live OHE with out a “permit-

to-work”.

2. Use of steel measuring tapes or long metalising wires is prohibited in electrified sections.

3. Painting work should be done under the supervision of competent Bridge engineering staff

only.

4. To carry out the painting/maintenance works on the girder bridges i.e., with in the vicinity of

OHE (less than 2 Meters distance) a memo has to be sent to TRD supervisor of the

jurisdiction by the SSE/SE/BR mentioning the time period required to arrange the “Permit

to work”.

5. No Engineering (SSE/SE/BR) supervisor should allow the contractor staff or bridge staff to

carryout the works on bridges (Less than 2 meters from OHE) with out obtaining “permit-to-

work” from the authorized person of TRD Official.

6. After obtaining power-block on OHE, the TRD supervisor will then arrange two discharge

rods to OHE on either side of the Bridge work spot, and then issue permit –to-work to

engineering supervisor.

7. After completion of the work, the Engineering supervisor should give a clearance memo to

TRD supervisor and then only the two discharge rods will be removed from OHE and the

OHE will be charged.

8. Care should be taken when labour were engaged by contractor to do the painting on the

girder bridges i.e., they should be allowed to work after obtaining permit to work only.

9. While doing the painting/maintenance works beyond 2 meters distance to OHE the staff

must be counseled/watched not to come into the danger zone (i.e. below 2 meters distance to

OHE) during the course of working by SSE/SE/BR.

10. Responsible person from the SSE/SE/BR side should be available at the work spot of the

Bridge maintenance/painting works during the “power block” (permit to work) period to

avoid any untoward incidents.

SAFETY PRECAUTIONS TO BE TAKEN AT WORK SITE.

1.1. The Contractor shall not allow any road vehicle belonging to his or his suppliers etc. to

ply in railway land next to the running line. If for execution of certain works, viz.,

earthwork for parallel railway line, supply of ballast for new or existing railway line

etc. road vehicles are necessarily to be used in railway land next to the railway line, the

contractor shall apply to the Engineer-in-charge for granting permission giving the type

and number of individual vehicles, names and license particulars and permanent

addresses of drivers, location, duration and timings for such work/movement. The

Engineer-in-charge or his authorized representative will personally counsel, examine

and certify the road vehicle drivers, contractor‟s flagmen and his supervisors to be

deployed on the work, location, period and timing of the work.

Page 12: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 12 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

12

This permission will be subject to the following obligatory conditions:-

i) The Road vehicle will ply only between sunrise and sunset.

ii) Nominated vehicles and drivers will be utilized for work in the presence of at

least one flagmen and one supervisor or his representative certified for such work.

iii) The vehicles shall ply 6 Meters (from Centre of Track) away from track. Any

movement /work at less than 6 Meters and up to minimum 3.5 Meters clear of

track center shall only be done in presence of railway employees authorized by

the Engineer-in-charge . No part of road vehicle will be allowed at less than 3.5

Meters from track center.

iv) The Contractor shall remain fully responsible for ensuring safety and in case of

accident, shall bear the cost of all damages to the equipments and men and also

damages to railway and its passengers.

v) Engineer-in-charge may impose any other condition necessary for a particular

work or site.

1.2.1. The Contractor at all times shall adopt safe working methods to ensure safety of

structures, equipments and labour at site of works.

1.2.2. The contractor shall not start any work without the presence of Railway supervisor or

his representative authorized by ADEN-in-charge and Contractor‟s supervisor at site.

1.2.3. The methodology proposed to be adopted by the Contractor is to be approved by

Engineer-in-charge with a view to ensure of safety of trains, passengers and workers

and he shall also ensure that the methods and arrangements are actually available at site

before start of the work and the contractor‟s supervisors and the workers have clearly

understood the safety aspects and requirements to be adopted / followed while executing

the work.

1.2.4. There shall be an assurance Register kept at each site, which will have to be signed by

both, ie., Railway Supervisor or his representative as well as the contractor‟s supervisor

as a token of their having understood the safety precautions to be observed at site.

1.2.5. Survey of site by Supervisor of contractor and Railway‟s Supervisor is to be done to

assess precautions to be taken at site for working of trains and materials required for

protection.

1.2.6. The list of permissible / sanctioned infringements to moving dimensions for the section

shall be made available where work is to be done to execute the works without

infringing the moving dimensions.

1.2.7. Competency certificate issued by ADEN-in-charge with the Contractor‟s supervisor at

site should be available in the format given in Annexure-I.

1.2.8. The detailed plans for safe execution of works, duly approved by the Division should be

available for undertaking execution of such works which have bearing on moving

dimensions, especially those works close to the running lines and fixed structures on

brides, inside tunnels etc.,

1.2.9 Look-out caution, speed restrictions as well as traffic block shall be ensured where

necessary for execution of works affecting running lines.

1.2.10 Mobile phones or Walky-Talkie sets where necessary should be provided at work sites.

Page 13: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 13 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

13

1.3. Precautionary measures to be taken at work site away from the track:-

1.3.1. Trenches and foundation pits should be adequately and securely fenced, provided with

proper caution signs and marked with red lights at suitable intervals during night to

avoid accidents. Adequate protective measures should be taken to see that the

excavation operations do not affect or damage adjoining existing buildings.

1.3.2. Proper precautions should be taken for safety of persons and adjoining property before

undertaking any blasting operation. Red flags should be prominently displayed around

the area to be blasted. All the people on the work except those, who actually light the

fuses, should be withdrawn to a safe distance of not less than 300 meters from the

blasting site. Recommendations given in I.S. 4081:1986 should be followed for safety

during various operations involved in the process of blasting.

1.3.3. Suitable scaffold should be provided for workman for all works that cannot be safely

done from the ground or from solid constructions except such works which can be done

safely from ladders for a short period. When a ladder is used, extra labour should be

engaged for holding the ladder and if the ladder is used for carrying materials as well,

suitable foot holds and handholds should be provided on the ladder and ladder should be

given an inclination not steeper than 4 to 1 ( Four vertical to one Horizontal).

1.3.4. Workers employed on mixing asphalt materials, cement and lime mortars should be

provided with protective hand and footwear and protective goggles.

1.3.5. Workers employed in white washing and stacking of cement bags or any materials

which are injurious to the eyes should be provided with protective goggles.

1.3.6. Workers engaged in welding works should be provided with welder protective eye-

shields, single piece cotton cloth and shoes.

1.3.7. Stone breakers should be provided with protective goggles, leg-guards and protective

clothing and they should be seated at sufficiently safe distance from each other.

1.3.8. A fully equipped First-Aid Box should be maintained at site by the Agency with at least

one person fully trained to give First-Aid.

1.3.9. Inflammable articles such as Petrol, oil etc., should be stored separately from other

materials and all prescribed precautions as per the Indian Explosive Act should be

taken.

1.3.10. In the Bridge work, Track works, repairs to tunnel and demolition of structures through

contractual Agency, the safe working and ensuring safety of workman employed should

be specifically laid down in the contract itself.

1.4. Precautionary measures to be taken at work site in vicinity of track:-

1.4.1. Drivers of trains must be served with caution order to look out for any obstruction at the

place of work.

1.4.2. Arrangements should be made to protect the track in case of emergency at work site.

1.4.3. Before the start of the work, the land strip adjacent to the running track where road

vehicle / machinery is to ply for the work shall be demarcated by lime in advance at the

appropriate distance from the centre of existing track in consultation with the Railway

Supervisor[Annexure-IV(A)]. Sketch showing the location of marking and barricading

along the full length of the work area should be done as per the sketch given in

[Annexure-IV (B)]. This will enable the workmen posted at the site and also the lorry

drivers to have clear guidelines on the movement of vehicles.

Page 14: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 14 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

14

1.4.4. Movement of Lorries near the track should be prohibited during night. In case it is

unavoidable adequate protective measures including lighting must be ensured in the

complete work area for the safety of the Public and Passengers. Also additional staff

shall be posted as necessary for night working.

1.4.5. Work should not be allowed to progress without the prior approval of the Engineer-in-

charge in case movement of vehicles close to the track is involved.

1.4.6. Machines and vehicles should ply 6 meters (from Track centre) in case movement at

less than 6 meters away from the track is inescapable, it should be permitted in the

presence of Railway employee authorized by the Engineer-in-charge.

1.4.7. Contractor‟s representative should be issued a certificate by ADEN to the effect that

they have acquired sufficient knowledge about the safety precautions that are needed to

be followed while working near the track.

1.4.8. The worksite shall be suitably demarcated to keep public and passengers away from

work area. Necessary sign boards such as Work in progress etc. shall be provided at

appropriate locations to warn the Public / passengers.

1.4.9. Check lists given in Annexure-II and III shall be used to ensure that all the requisite

measures have been taken before start of work and work in progress.

1.4.10. All temporary arrangements required to be made during execution of work shall be

made in such a manner that moving dimensions do not infringe. Necessary checks shall

be exercised by Site in-charge from time to time.

WORKING OF CONTRACTOR’S VEHICLES AT SITE

1. When the contractor’s vehicles are to be worked closer to 6m but not less than 3.5m

from center line of the running track (Annexure-VA)

i) Drivers of vehicle shall be briefed about safety and precautions to be taken while

moving/working close to traffic.

ii) Demarcation of the land shall be done by bright coloured red ribbon/nylon rope of 12mm thick

suspended on 75cm high wooden/bamboo posts at a distance of 3.5m from center line of

nearest running track as shown in (Annexure-IVC)

iii) Contractor shall ensure the road vehicle/Machinery ply in a way so that these do not infringe

the line of demarcation.

iv) Presence of an authorized Railways representative shall be ensured before plying of vehicles

or working machinery.

v) Railway supervisor shall issue suitable caution order to drivers of approaching train about road

vehicles plying or machinery working close to running tracks. The train drivers shall be

advised to whistle freely to warn about the approaching train. Whistle boards shall be

provided wherever considered necessary.

vi) Lookout men shall be posted along the track at a distance of 800m from such locations, which

will carry red flag and whistles to warn to the road vehicles/machinery users about the

approaching trains.

vii) On curves where visibility is poor, additional lookout men shall be posted.

Page 15: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 15 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

15

viii) In unusual circumstances, where operator apprehends infringement to track while working

truck/machinery near running track, following action shall be taken:

a) The contractor /supervisor/vehicle operator immediately advise the situation to Railway

official and assist him in protecting the track.

b) Protection shall be done for other emergencies.

2. When the contractor’s vehicles are to be worked close to 3.5m from center line of

running track: i) Plying of vehicle or working of machinery closer to 3.5m of running track shall be done under

protection of track. Traffic block shall be imposed wherever considered necessary. The site

shall be protected as per the sketch given in (Annexure-VB) and the provisions of Para No.

806 & 807 of P-way Manual as the case may be.

ii) Presence of a Railway supervisor shall be ensured at work site.

iii) Railway supervisor shall issue suitable caution order to drivers of approaching train about road

vehicles plying or machinery working close to running tracks. The train drivers shall whistle

freely to warn about the approaching train.

3. Parking of vehicles or construction machinery: i) No vehicle or construction machinery shall be parked in unmanned condition on a gradient

sloping towards running track.

ii) Even on level ground or gradients sloping away from the track, vehicles or construction

machinery shall be parked in unmanned conditions at a minimum distance of 6m from nearest

track center in fully braked condition. In addition to brakes, suitable wedges shall also be

applied on all the wheels.

4. TRAINING Training in safe working methods for both along and on the track should be imparted to

supervisors /operators of the work executing agencies. Such training may be imparted at

zonal/divisional training schools for required duration as deemed fit, with a view to ensure that

the field staff engaged in such works get acquainted with the safety precautions that are

needed to be taken while executing the works.

ANNEXURE - I

COMPETENCY CERTIFICATE

Certified that Shri…………………………………………………. P.Way

supervisor of M/s. …………………………… has been examined regarding P.Way

working on …………………………. work.

His knowledge has been found satisfactory and he is capable of supervising the work

safely.

ASSISTANT ENGINEER

Page 16: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 16 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

16

ANNEXURE – II

CHECK LIST

(BEFORE STARTING THE WORK)

Name of the work : ……………………………………………………………………

Location …………………………………………………………………………………

Duration of the work : From …………………… To …………………………

Sl.N

o Details Yes No

1 Contractor‟s supervisor identified / Selected. Who is going to be site

in-charge?

2 Training imparted to contractors supervisor & Certificate issued?

3 Work site inspected by Constructions supervisor / other

department‟s supervisors along with contractor‟s supervisor?

4 Precautions to be taken identified and listed?

5 Plan of work, drawn out by contractor‟s supervisor in consultation

with Railway‟s supervisor?

6 Plan of work, brought to the knowledge of open line AEN/IOW &

PWI?

7 Before start of the work, proper lime marking / barricading had done

at site of work?

8 Men deputed for protection of track along with safety equipments?

9 Caution order issued for the train drivers in case work is being done

within 6mts of centre of running track?

10 Drivers of vehicles/machinery being used have been identified?

11 Drivers of vehicles/machinery briefed about the safe working?

12 Sufficient lighting provided at site of work for night working?

13 Infringements checked?

14 Sectional (Open line) AEN/PWI/IOW have satisfied themselves

regarding safety arrangements?

15 Availability of Walkie –Talkie sets for communication?

Signature of construction/

other departments Supervisor

Date:

Signature of Open line‟s Supervisor.

Page 17: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 17 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

17

ANNEXURE – III

CHECK LIST

( WHILE WORK IN PROGRESS )

Name of the work : ………………………………………………………………

Location ………………………………………………………………………………

Duration of the work : From ……………………… To ………………………………

Date of inspection ……………………………………………………

Sl.

No Details Yes No

1 Does the contractor‟s supervisor have the certificate?

2 Does the knowledge of contractor‟s supervisor on safety of track

& work site is up to the mark?

3 Is the Railway‟s supervisor of Construction Organisation/other

departments available at site?

4 Is knowledge of Railway‟s supervisor O.K.?

5 Is lime marking/barricading done?

6 Are adequate safety precaution taken?

7 Are communication facility (Walkie – Talkie sets) available at

site?

8 Are only identified drivers driving the vehicles/machinery?

9 Is whole work site safe for working of men/vehicles & trains?

10 Are adequate lighting arrangements done at site?

11 Are adequate protection equipment available at site?

12 Is caution order to trains being issued?

13 Are train drivers following the enforced temporary speed

restriction?

14 Has work permit been taken for working in Electrified

territory/Station yards (P &C areas)

Signature of inspecting officer

Designation

Page 18: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 18 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

18

ANNEXURE – IV

(A)Marking of Line with Lime

3500mm

150 mm wide white line with lime

Vehicle / trucks can ply in this` area

(B) Provision of Barricading

3500mm

Barricading

Luminous tape/Red Colour Nylon Rope 12 mm thick

Post (Bamboo / Steel / Concrete)

1200mm

3500mm 3500mm 3500 mm

C) Elevation of Barricading

Page 19: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 19 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

19

ANNEXURE –V

A) Plying of Vehicles/Machinery between 3.5 mts. to 6.0 mts from centre of track

3500mm

Contractor‟s supervisor Railway‟s supervisor

150 mm wide white line with lime

6000mm

B) Plying of Vehicles / Machinery within 3.5 mts from center of track

DN LINE

Banner flag in day time / HS lamps in night

detonators

UP LINE

1200 metres

3500mm

detonators

Contractor‟s supervisor Railway‟s supervisor

Page 20: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 20 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

20

SPECIAL CONDITIONS OF CONTRACT

1. The rates include all lead and if the materials obtained by rail all freight charges including

loading charges. 2. Sales tax, Royalties and Octroi duties, if any, that may be payable under Provincial

Government Sales Tax Act or Local Bodies Act or rules on any of the material that may be

used or supplied by the contractor will be payable by the contractor. The Railway will neither

pay the taxes or duties nor be bound to compensate the contractor for any amounts paid by him

by way of these taxes or duties.

Sales Tax at 4% on the materials portion of the contract will be deducted from each on account

bill where identifiable. Where the labour and material portion is not clearly identifiable, the

labour element shall be taken as 30%. On the balance 70% of the value of the work, 4% shall

be deducted pro-rata from each “on account bill” towards Sales tax.

Seigniorage charges recoverable from bills:-

Seigniorage charges for supply of earth, mooram, sand and other minerals as fixed by the State

Government and payable to them as revised from time to time during the currency of contract

will be recovered by Railway from the contractors “on account” and “final bills” and remitted

to the state government. The rates quoted by the Tenderer shall be inclusive of these charges.

Claims regarding revision of seigniorage charges and consequent enhancement of the accepted

rate will not be entertained. However, no seigniorage charges / fee shall be recovered from the

bills of the contractor, if the contractor produces documentary evidence e.g. “Transit Passes”

issued by State Govt. Officials in token of having paid seigniorage fee. In such cases, the

genuineness of such documentary evidence produced along with proof of payment of

seigniorage charges, shall be got verified by the Railway from the concerned Mining and

Geology Dept 3. WATER:- A charge of One percent will be made by the Railway for the supply by the

Railway of piped water from existing pipe lines and calculated on the amount of all items of

work (USSR/NS items) appearing in the bills payable to the contractor in respect of which

work such water has been issued to the Contractor and such charges should be deducted from

sums due or payable by the Railway to the Contractor from time to time.

4. In the event of water having to be brought by the Railway to the site of the work in traveling

tanks, the actual freight at Public Tariff rate and all other charges incurred therein including any

demurrage that may be levied shall be payable by the Contractor and deducted from sums due

or payable by the Railways to the Contractor from time to time.

In addition to the charges of one percent referred to above, if additional pipe lines to

those already existing are called for by the contractor, the cost of the same and all charges

incurred by the Railway in their laying including supervision charges will be paid by the

contractor or the contractor provides and lay his own piping at the discretion of Divisional

Engineer.

5. The Railway does not guarantee work under each items of the Master Schedule. For example if

a gate-lodge or gang huts are to be built between stations and the work order issued to the

sectional contractors additional payment on account of lead or freight charges for the materials

that may have to be brought by rail or by road, will not be admissible.

Page 21: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 21 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

21

6. If there arises any discrepancy between the printed Unified Standard Schedule of Rates 2010 as

amended by addendum and corrigendum slips issued from time to time upto date and the

schedule attached to the Tender pertaining to this work, the former shall be treated as

authentative and binding in all purposes.

7. Rubble masonry shall be first sum of Railways Specification No 503 according to South

Central Railway Specification for materials and works. Contractors attention is particularly

invited to dressing of stone as laid down in the Railway‟s specification.

8. The Special conditions supplemented to the conditions of Tender and contracts the General

conditions of contract and the notes appearing under the relevant chapter and sub chapters of

the Unified Standard Schedule of Rates 2010 should be considered as part of the contract

papers where the provisions of these conditions are at variance with General Conditions of

Contract these special conditions.

9. Performance Guarantee (P.G.):-

a. The successful bidder shall have to submit a Performance Guarantee (PG) within 30

(thirty) days from the date of issue of Letter of Acceptance (LOA). Extension of time

for submission of PG beyond 30(thirty) days and upto 60 days from the date of issue of

LOA may be given by the Authority who is competent to sign the contract agreement.

However, a penal interest of 15% per annum shall be charged for the delay beyond 30

(thirty) days, ie., from 31st day after the date of issue of LOA. In case the contractor

fails to submit the requisite PG even after 60 days from the date of issue of LOA, the

contract shall be terminated duly forfeiting EMD and other dues, if any payable against

that contract. The failed contractor shall be debarred from participating in re-tender for

that work.

b. The successful bidder shall submit a Performance Guarantee (PG) in any of the

following forms, amounting to 5% of the contract value:-

(i) A deposit of Cash,

(ii) Irrevocable Bank Guarantee,

(iii) Government Securities including State Loan Bonds at 5 percent below the

market value

(iv) Deposit receipts, Pay orders, Demand Drafts and Guarantee Bonds. These

forms of Performance Guarantee could be either of the State Bank of India or

of any of the Nationalized Banks;

(v) Guarantee Bonds executed or Deposits Receipts tendered by all Scheduled

Banks;

(vi) A Deposit in the Post Office Saving Bank;

(vii) A Deposit in the National Savings Certificates;

(viii) Twelve years National Defence Certificates;

(ix) Ten years Defence Deposits;

(x) National Defence Bonds; and

(xi) Unit Trust Certificates at 5 percent below market value or at the face value

whichever is less.

Also FDR in favour of Senior Divisional Finance Manager, S. C. Railway, Vijayawada

(free from any encumbrance) may be accepted.

Page 22: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 22 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

22

1. The Performance Guarantee shall be submitted by the successful bidder after the Letter

Of Acceptance (LOA) has been issued, but before signing of the contract agreement.

This P.G. shall be initially valid up to the stipulated date of completion plus 60 days

beyond that. In case, the time for completion of work gets extended, the contractor

shall get the validity of P.G. extended to cover such extended time for completion of

work plus 60 days.

1.0 The value of PG to be submitted by the contractor will not change for variation upto

25% (either increase or decrease). In case during the course of execution, value of the

contract increases by more than 25% of the original contract value, an additional

Performance Guarantee amounting to 5%(five percent) for the excess value over the

original contract value should be deposited by the Contractor.

1.1 The Performance Guarantee (PG) shall be released after physical completion of the

work based on the „Completion Certificate‟ issued by the competent authority stating

that the contractor has completed the work in all respects satisfactorily. The security

deposit, however, shall be released only after the expiry of the maintenance period

and after passing the final bill based on „No Claim Certificate’ from the contractor.

1.2 Whenever the contract is rescinded, the security deposit shall be forfeited and the

Performance Guarantee shall be encashed. The balance work shall be got done

independently without risk and cost of the failed contractor. The failed contractor

shall be debarred from participating in the tender for executing the balance work. If

the failed contractor is a JV or a partnership firm, then every member/ partner of such

a firm shall be debarred from participating in the tender for the balance work either in

his / her individual capacity or as a partner of any other JV / partnership firm.

1.3 The Engineer shall not make a claim under the Performance Guarantee except for

amounts to which the President of India is entitled under the contract (not

withstanding and / or without prejudice to any other provisions in the contract

agreement) and this shall be in the event of:

i) Failure of the contractor to extend the validity of the Performance Guarantee as

described herein above, in which event the Engineer may claim the full amount

of the Performance Guarantee.

ii) Failure of the contractor to pay President of India any amount due, either as

agreed by the contractor or determined under any of the Clauses / Conditions of

the agreement, within 30 days of the service of notice to this effect by Engineer.

iii) The contract being determined or rescinded under provision of the GCC the

Performance Guarantee shall be forfeited in full and shall be absolutely at the

disposal of the President of India

10. Security Deposit:-

The scale of Security Deposit that is to be recovered from the contractor shall be as follows.

i) Security Deposit should be 5% of the contract value.

ii) The rate of recovery will be at the rate of 10% of the bill amount till the full

Security Deposit is recovered.

iii) Security Deposit will be recovered only from the running bills of the contract and no

other mode of collecting SD such as SD in the form of instruments like Bank

Guarantee, Fixed Deposit Receipt etc., shall be accepted towards Security deposit.

Page 23: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 23 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

23

iv) Conversion of Security Deposit into FDR after recovery of full stipulated SD

(FA& CAO/SC letter No.AFX/EMD/Policy/ Vol.I dt.26.8.2010 circulated vide

PCE/SC lr. No.W.148/ SCRCA dt.30.9..2010):- If the contractor so desires, the cash

deposits in the form of security deposit may be allowed to be converted into FDRs (in

favour of respective Accounts Officers and on account of contractor), after full

recovery, at the discretion of the Railway, duly collecting necessary charges of

conversion by the Railway Administration.

The security deposit shall be released only after the expiry of the maintenance period and

after passing the final bill based on „No Claim Certificate‟.

After the work is physically completed, security deposit recovered from the running bills

of a contractor can be returned to him if he so desires, in lieu of FDR/irrevocable bank

guarantee for equivalent amount to be submitted by him.

In case of contracts of value Rs.50 crores and above, irrevocable bank guarantee can also

be accepted as a mode of obtaining security deposit.

11. REVISED COMPREHENSIVE CLAUSE 46A OF GCC–PRICE VARIATION

CLAUSE: As per Railway Board Letter No.2007/CE-CT/18/Pt.19

dt.14.12.2012- Price Variation Clause shall be applicable only for tenders of

value Rs.50 lakh and more, irrespective of the contract completion period: Clause 46A-Price Variation clause:

46A.1. Price Variation clause shall be applicable only for tenders of value as prescribed by

the Ministry of Railways through instructions/circulars issued from time to time and

irrespective of the contract completion period. Materials supplied free of cost by

Railway to the contractors shall fall outside the purview of Price Variation clause. If,

in any case, accepted offer includes some specific payment to be made to consultants

or some materials supplied by Railway free or at fixed rate, such payments shall be

excluded from the gross value of the work for the purpose of payment/recovery of

price variation.

46A.2. The Base Month for „Price Variation clause‟ shall be taken as month of opening of

tender including extensions. If any, unless otherwise stated elsewhere. The quarter

for applicability of PVC shall commence from the month following the month of

opening of tender. The Price Variation shall be based on the average Price Index of

the quarter under consideration.

46A.3. Rates accepted by Railway Administration shall hold good till completion of work

and no additional individual claim shall be admissible on account of fluctuations in

market rates, increase in taxes/any other levies/tolls etc., except that

payment/recovery for overall market situation shall be made as per Price Variation

Clause given hereunder.

46A.4. Adjustment for variation in prices of material, labour, fuel, explosives detonators,

steel, concreting, ferrous, non-ferrous, insulators, zinc and cement shall be

determined in the manner prescribed.

46A.5. Components of various items in a contract on which variation in prices be admissible

, shall be Material, Labour, Fuel, Explosives, Detonators, Steel, Cement, concreting,

Ferrous, Non-ferrous, Insulator, Zinc, erection etc., However, for fixed components,

no price variation shall be admissible.

46A.6. The percentages of labour component, material component, fuel component etc., in

various types of Engineering Works shall be as under:

Page 24: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 24 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

24

Component Percentage Component Percentage

A) Earthwork contracts:

Labour

component

50% Other material

components

15%

Fuel

component

20% Fixed

component*

15%

B) Ballast and Quarry Products contracts

Labour

component

55% Other material

components

15%

Fuel

component

15% Fixed

component*

15%

C) Tunnelling Contracts

Labour

component

45% Detonators

component

5%

Fuel

component

15% Other material

components

5%

Explosive

component

15% Fixed

component*

15%

D) Other Works Contracts

Labour

component

30% Fuel component 15%

Material

component

40% Fixed

component*

15%

*it shall not be considered for any price variation.

46A.7. The Amount of variation in prices in several components (labour material etc., ) shall

be worked out by the following formulae:

i) L=Rx(I-Io) x P

Io 100

ii) M=Rx(W-Wo) x Q

Wo 100

iii) U=Rx(F-Fo) x Z

Fo 100

iv) X=Rx(E-Eo) x S

Eo 100

v) N=Rx(D-Do) x T

Do 100

Page 25: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 25 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

25

vi) Ms=O x (Bs-Bso)

vii) Mc=A x(Wc-Wco)/Wco

Where

L Amount of price variation in labour

M Amount of price variation in Materials

U Amount of price variation in fuel

X Amount of price variation in Explosives

N Amount of price variation in Detonators

Ms Amount of price variation in Steel

Mc Amount of price variation in Cement

Mcc Amount of price variation in Concreting

Mf Amount of price variation in Ferrous

Mnf Amount of price variation in Non-ferrous

Mz Amount of price variation in Zinc

MIN Amount of price variation in Insulator

O Weight of steel in tones supplied by the contractor as per the „on-account‟ bill for the

month under consideration.

R Gross value of work done by contractor as per on account bill(s) excluding cost of

materials supplied by Railway at fixed price minus the price values of cement and

steel. This will also exclude specific payment, if any, to be made to the consultants

engaged by contractors (such payment will be indicated in the contractors offer)

Ref:Rly Bd Lr.No.2007/CE-I/CT/18/Pt.19, dt.07.05.2013.

A Value of Cement supplied by Contractor as per on account bill in the quarter under

consideration.

Io Consumer Price Index Number for Industrial Workers- All India- Published in RBI

Bulletin for the base period

I Consumer Price Index Number for Industrial Workers- All India-Published in RBI

Bulletin for the average price index of the 3 months of the quarter under consideration

Wo Index Number of Wholesale Prices- By Groups and sub-Groups-All commodities- as

published in the RBI Bulletin for the base period

W Index Number of Wholesale Prices- By Groups and Sub-groups-All commodities- as

published in the RBI Bulletin for the average Price index of the 3 months of the

quarter under consideration.

Fo Index Number of Wholesale Prices- By Groups and sub-Groups for Fuel, Power,

Light and Lubricants as published in the RBI Bulletin for the base period.

F Index Number of Wholesale Prices- By groups and sub-groups for Fuel, Power, Light

and Lubricants as published in the RBI Bulletin for the average price index of the 3

months of the quarter under consideration.

Eo Cost of explosives as fixed by DGS&D in the relevant rate contract of the firm from

whom purchases of explosives are made by the contractor for the base period.

Page 26: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 26 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

26

E Cost of explosives as fixed by DGS&D in the relevant rate contract of the firm from

whom purchases of explosives are made by the contractor for the average price index

of the 3 months of the quarter under consideration.

Do Cost of detonators as fixed by DGS&D in the relevant rate contract of the firm from

whom purchases of detonators are made by the contractor for the base period.

D Cost of detonators as fixed by DGS&D in the relevant rate contract of the firm from

whom purchases of detonators are made by the contractor for the average price index

of the 3 months of the quarter under consideration

Bs SAILs (Steel Authority of India Limited) ex-works price plus Excise Duty thereof ( In

rupees per tone) for the relevant category of steel supplied by the contractor as

prevailing on the first day of the month in which the steel was purchased by the

contractor (or) as prevailing on the first day of the month in which steel was brought

to the site by the contractor whichever is lower

Bso SAILs ex-works price plus Excise Duty thereof ( in Rs. Per tone) for the relevant

category of steel supplied by the contractor as prevailing on the first day of the month

in which the tender was opened

Wco Index no. of Wholesale Price of sub-group (of cement) as published in RBI Bulletin

for the base period.

Wc Index no. of Wholesale Price of sub-group (of cement) as published in RBI Bulletin

for the average price index of the 3 months of the quarter under consideration.

C RBI wholesale price index for cement for the month which is six months prior to date

of casting of foundations

Co RBI wholesale price index for cement for the month which is one month prior to date

of opening of tender

Z IEEMA price for zinc for the month which is two months prior to date of inspection of

material.

Zo IEEMA price for Zinc for the month which is one month prior to date of opening of

tender.

Cu IEEMA price for copper wire bar for the month which is two months prior to date of

inspection of material

Cuo IEEMA price for copper wire bar for the month which is one month prior to date of

opening of tender

Sf IEEMA price index for Iron & Steel for the month which is two months prior to date

of inspection of material

Sfo IEEMA price index for Iron & Steel for the month which is one month prior to date of

opening of tender

In RBI wholesale price index for Structural clay products for the month which is two

months prior to date of inspection of material.

Ino RBI wholesale price index for Structural clay products for the month which is one

month prior to date of opening of tender

P % of Labour component

Q % of Material component

Z % of Fuel component

S % of Explosive component

Page 27: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 27 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

27

T % of Detonators component

G % of concreting component

H % of Ferrous component

J % of Non-ferrous component

W % of Zinc component

46A,8. The demands for escalation of cost shall be allowed on the basis of provisional

indices made available by Reserve Bank of India. Any adjustment needed to be

done based on the finally published indices shall be made as and when they became

available.

46A.9. Relevant categories of steel for the purpose of operating Price Variation formula, as

mentioned in this clause, based on Sails Ex-Works Price Plus Excise Duty thereof,

shall be as under:

Sl.

No.

Category of Steel supplied in Railway

work

Category of Steel produced by SAIL Whose Ex-

works Price Plus Excise Duty would be adopted

to determine Price Variation.

1. Reinforcement bars and other rounds TMT 8mm IS 1786 Fe 415/Fe 500

2. All types and sizes of angles Angle 65x65x6mm IS 2062 E250A SK

3. All types and sizes of plates PM plates above 10-20mm IS 2062 E250A SK

4. All Types and sizes of channels and joists Channels 200x75mm IS 2062 E250A SK

5. Any other section of steel not covered in

the above categories and excluding HTS

Average of price for the 3 categories covered

under SL 1, 2, & 3 above.

46A.10 Price variation During Extended Period of contract.

The price adjustment as worked out above, ie., either increase or decrease shall be

applicable up to the stipulated date of completion of work including the extended

period of completion where such extension has been granted under Clause 17-! Of

the General Conditions of Contract. However, where extension of time has been

granted due to contractors failure under Clause-17B of the General conditions of

Contract, price adjustments shall be done as follows:

a) In case the indices increase above the indices applicable to the last month of

original completion period or the extended period under clause 17-A, the price

adjustment for the period of extension granted under Clause 17-B shall be

limited to the amount payable as per the Indices applicable to the last month of

the original completion period or the extended period under clause 17-A of the

General conditions of contract; as the case may be.

b) In case the indices fall below the indices applicable to the last month of

original/extended period of completion under clause 17-A, as the case may be;

then the lower indices shall be adopted for the price adjustment for the period

of extension under clause 17-B of the General Conditions of Contract.

Page 28: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 28 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

28

12. DEDUCTION OF INCOME TAX AT SOURCE

In terms of new Section 194-C inserted by the Finance Act 1972 , in the income tax Act 1961

the Railway shall at the time of arranging payments to the contractor and/or sub contractor(in

the case of sub contractor only when the Railway is responsible for payment of consideration

to him under the contract) for carrying out any work (including supply of labour for carrying

out any work) under the contract be entitled to deduct income tax at source on Income

comprised in the sum of such payments.

The deduction towards income tax to be made at source from the payments due to non-

residents shall continue to be governed by Section 195 of the Income Tax Act 1961.

No Income Tax will be deducted by the Railway on payments made for supply of materials

where such value of supply portion is distinct and ascertainable such as supply of Timber, tiles,

bricks, ballast including track/ballast etc. The deductions towards Income Tax to be made at

source from the payment due to non/residents shall continue to be governed by Section 195 of

the Income Tax Act 1961.

13. LIABILITY OF CONTRACTOR(S) - ANY DAMAGE SUSTAINED BY RAILWAYS

DURING ACCIDENTS ETC., CAUSED DUE TO CONTRACTOR(S) FAILURES, FAULT

OR NEGLIGENCE. Railway will post an Engineer-in-charge who may be SSE/SE/JE or Supervisor of any grade at

site for Technical Supervision of the work. This Engineer-in-charge will be responsible for

safety of the traffic. The work shall be executed by the contractor in a workman like manner to

the satisfaction of the Engineer-in-charge. The Contractor and his labour shall be guided by the

instructions of the Engineer-in-Charge. In the event of any accident occurring at the work site

and it is established during the departmental enquiry by the Railway or by Statutory enquiry of

CRS, that the accident occurred wholly or partly due to any act tantamounting to negligence on

the part of the contractor or his labour in not adhering to the instructions of the engineer-in-

charge, the contractor shall render himself liable for damages and also legal prosecution if loss

of life is involved.

14. Implementation of – the Building and other construction Workers (RECS) Act, 1996

and the Building and other Construction Workers Welfare Cess Act, 1996 in Railway

Contracts. “The Tenderer for carrying out any construction work in Andhra Pradesh (name of State) must

get themselves registered from the Registering Officer under Section-7 of the Building and

other Construction Workers Act, 1996 and rules made thereto by the Andhra Pradesh (name of

State)Government and submit certificate of registration issued from the Registering Officer of

the Andhra Pradesh(name of the State) Government (Labour Department). For enactment of

this act, the Tenderer shall be required to pay cess @ 1% of cost of construction work to be

deducted from each bill, Cost of material shall be outside the purview of cess, when supplied

under a separate schedule item.”

Page 29: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 29 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

29

ANNEXURE- “III”

WORKS CONTRACT CLAUSE-13

1. In case cement, Steel, AC sheet with or without accessories, GI sheets with or without

accessories, glasses or any other materials/items are issued to the contractor(s) either free of

cost or on cost to be recovered for use on the work as stipulated in the agreement the supply

thereof shall be made in stages depending on the progress of the work, limited to the quantity

/quantities computed by the Railway, according to the prescribed specification and approved

drawings as per agreement.

The materials supplied should conform to Railway‟s Specification in all respects should be

in accordance with approved sample.

All such materials supplied to the contractor(s) for the work either free of charge or on

payment as the case may be will be issued to contractor(s) at the Railway depot/godown/goods

shed and will have to be transported by the contractor to the site of work at his cost. All such

materials shall be used by the Contractor for the work in such quantities as are indicated in the

schedule or in the relevant specifications or drawings or as approved by the Engineer, whose

decision thereon shall be final. Wastage or damages of such materials in any manner shall be

totally avoided. The contractor(s) shall be liable to the accountal for all such materials issued

by Railway either free of cost or on payment excluding the permissible wastage which incase

of steel materials should not in any case exceed 1% of the total quantity required for the work

as per the approved drawings. No wastage under other items is permissible. Short lengths of

rods should also be utilized to the extent possible by overlapping joints.

The Cement, Steel, A.C.Sheets with or without accessories, G.I sheets with or without

accessories glasses or any other materials issued in excess of the requirement(s) as above, shall

be returned in perfectly good condition by the contractor(s) to the Railway at the Railway

depot/Godown/Goods shed at________immediately after completion or termination of the

contract. If the contractor fails to return the said materials then the cost of such materials issued

in excess of the requirement as computed by Railway according to the specification and

approved drawings will be recovered from the contractor(s) at twice the prevailing procurement

cost at the time of last issue viz., 2 x (purchases price +5% freight only). This will be without

prejudice to the right of Railway to take action against the contractors under the condition of

the contract for not doing/completing the work according to the prescribed specification and

approved drawings. If it is discovered that the quantity of cement, steel or any other material

used is less than the quantity computed by the Railway, according to specifications and

approved drawings the cost of materials not returned will be recovered at the same rates as

applicable to excess issue of materials, indicated in the preceding para.

Page 30: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 30 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

30

2. It shall be the responsibility of the contractor to keep in safe custody any Railway material

plant or equipment issued for the work. The contractor shall at his own expense provide

suitable temporary shed/sheds for this purpose on the Railway land made available by the

Railway free of rent and shall remove the shed/sheds when no longer required in terms of

clause 30 of General conditions of contract.

3. If due to any reason the Railway is not in a position to make available the Railway land the

Railway Engineer-in-charge of the work may permit the contractor to erect at his own cost

shed/sheds or secure private accommodation outside the Railway premises. In such a case the

contractor may be permitted to take the Railway material required for the works outside the

railway premises and to store in the Shed so erected or private accommodation so secured. It

shall be the responsibility of the contractor to keep the railway material in safe custody and the

same should be kept entire separate from the contractors material and the Railway shall have

liberty to inspect the same from time to time.

4. The code Nos. description and rates given in the schedule are based on the printed USSR -

2010, of S.C.Railway. Any discrepancy noticed during the execution of the work, in the

working rates quantity of cement etc. should be rectified by reference to the printed schedule,

which shall be treated as authoritative and binding on the contract. The relevant notes

applicable to the respective sub chapters will apply to the items of the Tender schedule and

should be considered as having been incorporated in the contract agreement and binding on the

Contractor.

5. For any other items not specially shown in the schedule of rates appended to the tender

document, the Divisional/Executive Engineer will offer rates as shown for the_________ zone

in the South central railway printed USSR - 2010, of S.C.Railway subject to the same

percentage adjustment accepted in the contract being applicable to the additional items.

6. Railway shall not supply from its own quota to the contractors controlled or imported

commodities. Assistance will, however given by recommending to appropriate authorities.

Contractor applications for issue of import licenses and release of controlled commodities if the

Engineer is satisfied that this material is actually required by contractor for carrying out the

work and is not available in the country.

7. VARIATION OF COSTS

Price variation clause is not applicable for advertised tender value upto Rs.50 lakhs. Time

is the essence of contract

8. (a) PERIOD OF COMPLETION: The Railway expects that a resourceful and experienced

contractor should be able to complete the work in all respects within the period as

specified in the Tender Notice and in the Schedule where items of work are

furnished from the date of letter of acceptance of the Tender

(b) Extension of time of completion will be governed by clause 17 of General Conditions

of Contract. However, while granting the extension of time under clause 17(B) of

GCC, a token penalty as deemed fit based on the circumstances of the case can be

imposed on the contractor without prejudice to other rights of Railway

Administration as provided under GCC.

9. MAINTENANCE PERIOD: The work shall be maintained after completion for a period as

specified in the Schedule where items of work are furnished by the contractor and he shall

make good any defects, imperfections, shrinkages or faults which may appear at his own cost.

10. It is HEREBY AGREED that it shall be the duty of the contractor to keep himself informed of

all corrections, and amendments of the said General conditions of contract made up to the date

of the execution of these presents and no objection shall be taken by the contractor on the

ground that he was not aware of such amendments and corrections of the said General

Conditions of Contract or to any of them.

Page 31: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 31 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

31

11. VARIATION IN CONTRACT QUANTITIES:-

The procedure as detailed below shall be adopted for dealing with variations in quantities

during execution of works contracts:

a) The Railway reserves the right to alter the designs and drawings. If due to change of drawing or

design or any other reasons, there be variations, either increase or decrease in quantities,

payment will be made only for the actual quantities executed at the accepted rates. If

there be sufficient cause the Railway may grant extension of the date of completion

suitably. Such circumstances shall in no way affect or vitiate the contract or alter the

character thereof, or entitle the contractor to damages or compensation thereof except as

provided for in this contract.

b) The quantities of each item of work furnished in the Schedule are approximate and are

intended for the guidance of Tenderer/Contractor. In actual execution of work there may

be some increase in the quantities specified. Such variation upto 25% shall in no degree

affect the validity of the contract and it shall be performed by the contractor as provided

therein and be subjected to the same conditions, stipulations and obligations originally

and expressly included and provided for in specifications and drawings and the amount

to be paid there for shall be calculated in accordance with accepted schedule rates.

(1) Prior Finance concurrence is necessary for varying the individual quantities

beyond 25% or where the gross agreement value exceeds 25% of the agreement

value.

(2) Individual NS items in contracts shall be operated with variations of plus or minus

25% and payment would be made as per the agreement rate. For this, no Finance

concurrence would be required.

(3) In case an increase in quantity of an individual item by more than 25% of the

agreement quantity is considered unavoidable, the same shall be got executed by

floating a fresh tender. If floating a fresh tender for operating that item is

considered not practicable, quantity of that item may be operated in excess of

125% of the agreement quantity (100% i.e., the original quantity +25% ie.,

quantity over and above the original quantity) subject to the following conditions.

a) Operation of an item by more than 125% of the agreement quantity needs

the approval of an officer of the rank not less than S.A. Grade:

i) Quantities operated in excess of 125% but upto 140% of the

agreement quantity of the concerned item, shall be paid at 98% of the

rate awarded for that item in that particular tender;

ii) Quantities operated in excess of 140% but upto 150% of the

agreement quantity of the concerned item shall be paid at 96% of the

rate awarded for that item in that particular tender;

iii) Variation in quantities of individual items beyond 150% will be

prohibited and would be permitted only in exceptional unavoidable

circumstances with the concurrence of associate finance and shall be

paid at 96% of the rate awarded for that item in that particular tender

b) The variation in quantities as per the above formula will apply only to the

Individual items of the contract and not on the overall contract value.

c) Execution of quantities beyond 150% of the overall agreement value should

not be permitted and, if found necessary should be only through fresh

tenders or by negotiating with existing contractor, with prior personal

concurrence of FA&CAO/ FA&CAO(C) and approval of General Manager.

Page 32: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 32 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

32

4. The limit for varying quantities for minor value items shall be 100% (as against

25% prescribed for other items). A minor value item for this purpose is defined as

an item whose original agreement value is less than 1% of the total original

agreement value.

5. No such quantity variation limit shall apply for foundation items.

6. As far as SSR/SOR items are concerned, the limit of 25% would apply to the

value of SSR/SOR schedule as a whole and not on individual SSR/SOR items.

However, in case of NS items, the limit of 25% would apply on the individual

items irrespective of the manner of quoting the rate (single percentage rate or

individual item rate).

7. For the tenders accepted at the Zonal Railways level, variations in the quantities

will be approved by the authority in whose powers revised value of the agreement

lies.

8. For tenders accepted by General Manager, variations upto 125% of the original

agreement value may be accepted by General Manager.

9. For tenders accepted by Board Members and Railway Ministers variations upto

110% of the original agreement value may be accepted by General Manager

10. The aspect of vitiation of tender with respect to variation in quantities should be

checked and avoided. In case of vitiation of the tender (both for increase as well as

decrease of value of contract agreement) sanction of the competent authority as per

single tender should be obtained.

11. In cases where decrease is involved during execution of contract:

a. The contract signing authority can decrease the items upto 25% of

individual item without finance concurrence.

b. For decrease beyond 25% for individual items or 25% of contract

agreement value, the approval of an officer not less than rank of S.A.

Grade may be taken, after obtaining „No claim certificate‟ from the

contractor and with finance concurrence giving detailed reasons for each

such decrease in the quantities.

c. It should be certified that the quantities proposed to be reduced will not be

required in the same work at a later stage

d. In the event of any reduction in the quantity to be executed for any reasons

whatsoever, the contractor shall not be entitled to any compensation but

shall be paid only for the actual amount of work done.

e. The contractor is bound to notify the Engineer at least seven days before the

necessity arises for the execution of any item in excess of 25% of the over

all value of the agreement.

12. In case the contractor fails to attend the meeting after being notified to do so or in

the event of no settlement being arrived at, the Railway shall be entitled to execute

the extra works by other means and the contractor shall have no claim for loss or

damage that result from such procedure

Page 33: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 33 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

33

12. Employment of Civil Engineering Graduates/Diploma-holders:

The contractor shall employ the following technical staff during the execution of this work.

i) One graduate engineer when the cost of the work to be executed is Rs.2 Crores and

above.

ii) One qualified diploma holder (over-seer) when the cost of the work to be executed is

more than Rs.25 lakhs but less than Rs.2 Crores. Technical staff should be available at

site whenever required by the Engineer-in-charge to take instructions. In case the

contractor fails to employ the technical staff as aforesaid, he shall be liable to pay a

reasonable amount not exceeding a sum of Rs.40,000/- (forty thousand only) for each

month of default in case of graduate engineer and Rs.25,000/- (twenty five thousand

only) for each month of default in case of diploma holder (over-seer)

(Modification of Cl.26 and introduction of new Cl.26A to IR‟s GCC Ref: Rly. Bd.

Lr.No.2012/CE-I/CT/0/20, dt.10.05.2013.)

The decision of the Engineer-in-charge as to the period for which the required technical staff

was not employed by the contractor and as to the reasonableness of the amount to be deducted

on this account shall be final and binding on the contractor.

iii) Individuals having Diploma in Railway Engineering awarded by IPWE (India) shall also

be considered as qualified Diploma holder Engineers and contractors for track contract

works can employ such individuals at their worksite on Indian Railways.

(Ref: Rly. Bd. Lr.No.2012/CE-I/CT/0/20, dt.12.07.2013.)

Note: The above clause is not applicable for contracts for Welding of Rail joints.

13. Railway Contractors / Extension of Provident Fund Act to the Employees working under

Railway Contractors:-

The Contractor shall comply with the provisions of EPF & MP Act, 1952 and obtain code

number from the concerned authorities whenever workmen employed by him are 20 or more.

He shall also indemnify Railways from and against any claim, penalties, recoveries under the

above Act and Rules. Contractors to get the code number under the EPF so as to enable the PF

Commissioners to extend the social security benefits to the workmen engaged by the Railway

contractors. The first month‟s bill will be released only after code number is taken from the PF

Office and a copy of coverage intimation produced. Subsequently for each month, bills will be

released only on submission of challans & 12 A monthly return copy in proof of remittance of

PF dues for previous month.”

14. Conservancy charges as applicable and as modified from time to time will be recovered

from Contractor’s running bills.

Page 34: Tender No. 09/Bridges/2014 .for T.… · (iii) Schedule-A2=(+)54% (Plus fifty four percent only) on USSR-2010 (iv) Schedule-B=(+)87.3% (Plus eighty seven point three percent only)

Tender No. 05/Bridges/2014

DEN/Bridges/BZA Signature of Tenderer(s) Page 34 of 34

BZA Divn., SCR, T.No.09/Bridges/2014 invited vide Open Tender No.DRM/Works/BZA/08/2014 dt.31.10.2014,

date of opening on 30.07.2014 for the work of “Strengthening of exg corroded and perforated gussets, top lateral bracing

angles and cross frames of Br. No.594 Dn bet. KRV-ANB, Replt of corroded/slack rivets and top lateral bracings, Providing

protective guards to cross girders for bridge Nos.248A, 544 Dn and 703 Up, Bridge No.248-A-Strengthening of Top floor system, cross frame etc.”

34

SPECIAL CONDITIONS

MODIFICATION TO CLAUSE 63 & 64 OF

GENERAL CONDITIONS OF CONTRACT

1. The Provision of Clause 63 and 64 of the General Conditions of Contract will be

applicable only for settlement of claims /disputes, for values less than or equal to

20% of the original value (excluding the cost of materials supplied free by

Railway) of the contract or 20% of the actual value of the work done (excluding the

value of the work rejected) under the contract whichever is less. When

claims/disputes are of value more than 20% of the value of the original contract or

20% of the value of the actual work done under the contract, whichever is less, the

contractor will not be entitled to seek such disputes/claims for reference to

arbitration and the provisions of Clause No; 63 &64 of the General Conditions of

Contract will not be applicable for referring the disputes to be settled through

arbitration

2. The Contractor shall furnish his monthly statement of claims as per Clause 43(1) of

General Conditions of Contract. But the Contractor should seek reference to

arbitration to settle the disputes only once, subject to the conditions as per Para 1

3. The Special conditions shall prevail over the existing Clause 63 & 64 of General

Conditions of contract