32
C C C H H H E E E N N N N N N A A A I I I P P P O O O R R R T T T T T T R R R U U U S S S T T T MARINE DEPARTMENT BUDGETARY OFFER FOR RETRO-FIT OF OIL RECOVERY VESSEL ‘ANNAM’ INCLUDING RENEWAL OF DECK, HULL, BULWARK AND WHEELHOUSE STEEL PLATES AND ALL OTHER WORKS. Y2/219/2014/M SUBMISSION ON OR BEFORE 8-12-2013 @ 2.30PM

Transcript of TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase...

Page 1: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

CCCHHHEEENNNNNNAAAIII PPPOOORRRTTT TTTRRRUUUSSSTTT

MARINE DEPARTMENT

BUDGETARY OFFER FOR RETRO-FIT OF OIL RECOVERY VESSEL ‘ANNAM’ INCLUDING RENEWAL OF DECK, HULL, BULWARK AND WHEELHOUSE STEEL PLATES AND ALL OTHER WORKS.

Y2/219/2014/M

SUBMISSION ON OR BEFORE 8-12-2013 @ 2.30PM

Page 2: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

BUDGETARY OFFER FOR RETRO-FIT OF OIL RECOVERY VESSEL ‘ANNAM’ INCLUDING RENEWAL OF DECK, HULL, BULWARK AND WHEELHOUSE STEEL PLATES AND ALL OTHER WORKS.

SCHEDULE ‘A’ TECHNICAL SPECIFICATION

1. PURPOSE:

Oil Recovery Vessel “Annam” is a special purpose vessel and is used for recovery

of spilled oil from sea and has wing tanks to store about 50 kilo litres of oil. It has one

propulsion engine and one generator engine by which power supply is given for operation

of skimmer and spill spray system. The craft can carry men and materials such as booms

required for combating oil spills. The craft is regularly used for garbage collection and

cleaning of oil traces in the water front and for pollution prevention and combating

operations.

ORV “ANNAM” built in the year 1994 is at present lifted up at the boat basin to

facilitate carrying out complete retrofit of the vessel so that the life of this special purpose

vessel can be extended and it is proposed to carryout the repairs to the hull and

machinery. The retro fit of the vessel shall be carried out at the boat basin jetty.

The vessel was taken on boat basin and thereafter cleaning and chipping was

carried out. After chipping it was noticed that in many places especially engine room

bilge area and rudder compartment the hull plates are holed and thinned down. Ultrasonic

thickness gauging has been carried out by the Trust and hull, deck and bulwark steel

plates are required to be renewed as per the recommendation of Third Party Inspection

Surveyor who shall be engaged by the contractor prior to commencement of the work.

The scope of work includes complete refurnishing of wheel house and removal of pipe

lines, valves, accessories etc., by gas cutting and welding. The contractor shall put back

all the machineries, equipments and fittings etc. after overhaul / repairs or renew as per

the scope of the work and recommendation of IRS / Chennai Port on completion of

welding of the steel plates. The work also includes installation of new machineries and

Page 3: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

equipments, pipelines etc. including pollution control equipments. The work shall be

carried out to the satisfaction of DC or his authorized Trust officials. Necessary care

shall be taken while gas cutting and welding and all the precautionary requirements and

procedures shall be followed.

2. LEADING PARAMETERS OF THE VESSEL ORV ‘ANNAM’:

Length : O.A. : 18.0 Mtr

Breadth : MLD : 4.4 Mtr

Depth : MLD : 2.25 Mtr

Draft : 1.4 Mtr.

3. BRIEF DERCTIPTION OF WORK :

Grade of steel to be used IS 2062 Grade B steel and Grade certificate shall be

produced to the Trust along with the IRS approval .

The contractor shall carryout the work as per the recommendation of the surveyor

and in case any frame, web plates, bulk head plates or any other strengthening member

are found damaged or thinned down the same shall be cropped up and renewed. The

entire work and workmanship shall be approved and certified by the surveyor of the IRS

classification society as third party. The materials used and persons engaged for the work

shall be approved and certified by such surveyor. The frames and structures shall be as

per the original drawings and all directions shall be approved by TPI Surveyor. In case of

any damage to the equipments, fittings, etc., it shall be replaced or repaired at the

contractors cost and to the entire satisfaction of the DC or his authorized Trust officials.

The required M.S. Plates, angles, Steel pipes etc. shall be arranged by the

contractor as per the requirement. The old and cropped plates, angles etc. shall be handed

over at Trust Returned Store Yard after obtaining necessary forms from Dock Master.

The firm shall have to work at worksite at their own cost. The firm shall have to

maintain high quality of welding by engaging qualified welders as followed in good ship

building practice. The welding and work carried out shall be approved by third party

inspector.

Page 4: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

4. SCOPE OF WORK:

Budgetary offers are  invited from Ship yards and Marine workshops for Retro‐fit of Oil 

Recovery  Vessel  'ANNAM'.    This    Pollution  Control  Craft    owned  by  Chennai  Port  Trust‐ORV 

'ANNAM', which is 20 years old and requires extensive plate renewal. The Retro fit work shall be 

carried out as per the  IRS Class requirements for refit of ships operating within harbour areas. 

The vessel was originally built under IRS Class but presently not under Class. As part of retro‐fit  

all the redundant systems, old and unused and damaged machineries and equipments shall be 

dismantled and new pollution equipments will be mounted. The tanks for collecting oily wastes 

shall be repaired and the void spaces and unused  compartments are to be converted into tanks 

to  increase  the  waste  oil  holding  capacity  without  affecting  the  stability  of  the  craft.  The 

conversions  and  addition  and  removing/shifting of  loads  require  the    approval of Class..  It  is 

therefore necessary  to engage Naval Architect  to plan  the Retro‐fit. The new equipment shall 

also be  designed as part of  the modification of the vessel. IRS approval has to be obtained for 

the Retro‐fit plan and on completion of retro‐fit of the Vessel, an Inclination has test has to br 

conducted  by Class for issuing  Revised Trim and Stability book shall be issued.. 

 The following are the works involved in the Retro‐fit  of ORV ‘ANNAM’ 

PLATE RENEWAL 

1.)Complete deck plate renewal  to be carriedout and side and bottom plates renewals will be 

according to IRS recommendation. 

2).UTG  of  hull to be taken if required by Class. 

3) The Wheel house  side and  ceiling  steel plates are  to be  completely    renewed and  interior 

paneling, glass and flooring as well as exterior to change..The  Mast and other structures on the 

wheel house are also to be renewed.   The wheel house to be designed for good aesthetic  look 

and all round visibility. The possibility of raising the floor height for a clear view of the activities 

at the forward without affecting the stability to be considered while designing the wheel house.               

.                                                                                                                                                                                                                 

The Navigation  and electric panels,  switch board,  lighting, wipers,  remote  (for  speed  setting)  

and other equipments/controls  to renew/repair.install as required. 

4)  The  inspection  and  testing  (if  recommended  by  Class)  of  frames  and  all  transverse  and 

longitudinal members and strengthening/renewal as required. Also to provide extras frames as  

per recommendation. 

5)  The  dismantling  of  all  the  redundant  systems  and  old  and  unused  machineries  and 

equipments, pipelines and valves and welding  of suitable inserts or fitting blanks. 

Page 5: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

6)    The  strengthening  of  tank  bulkheads  and  renewal  of manholes/doors,  combings,  fittings, 

vent  and sounding pipes.The man hole doors  to be of uniform/standard dimensions wherever 

possible.. 

7)    The  tanks  for  collecting  oily wastes  shall  be  repaired  and  the  void  spaces  and  un  used  

compartments  to be  converted  into  tanks  to  increase  the waste oil holding  capacity without 

affecting the stability of the craft with necessary approvals 

8)  )To renew all the railings on the deck and wheel house top and deck and E/Room bulwark to 

renew as required.  

9) To fix anodes as per the Ckass requirement 

10) E/Room top cover to repair and sky light doors and exhaust blower  to provide. 

      The  total quantity of  steel renewal for hull and deck plates is approximately 25,000 kgs. To 

reduce  the  cost  the  cut   and   dismantled hull plates  found  in  reusable  condition are  to used  

suitably such as man hole doors, combings, bulwark, fittings etc.,  

  The scaffoldings necessary for carrying out the shall be arranged by the contractor. 

VESSEL SYSTEM 

11) All unused machineries and pipelines  to remove and new pipelines, valves and  fittings    to 

renew wherever found thinned down/damaged.   

12) To fit suitable G.S.Pump, fuel transfer pump, bilge pump,   air compressor, fuel service tank 

(these will be supplied by Trust  in as  is where  is condition and may require o/haul, repairs and 

new spares) with new or exsisting  pipe lines, valves and valve chests in Engine Room. Sea chests 

and gratings to repair and wherever required new pipes, valves and chests to provide. 

13) All electrical panels/boards and switches and cables and  blowers to repair/renew. 

14) All electrical fittings in E/Room , deck  and navigation lights, focus lights and cables 

 are to be fitted new.Also to provide sockets in E/Room , Deck  and W/House. 

15) To provide new  fire hydrant  system  in E/Room and deck  ( 8  to 10 nos.,)  from G.S/ pump 

discharge with hoses and nozzles and fixing suitable stands for hoses.  

16) To overhaul/repair 1no., alternator, 1no., gear box and steering gear systems and  fit back 

and commission. 

17) To dismantle Kort nozzle, overhaul and fit back with new spares‐bushes ,seals, O‐rings  etc., 

Page 6: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

18)  To  install  and  commission  main  engine:  Couple  with  o/hauled  gear  box,  aligning  after 

checking the trueness  of the shaft and stern tube and fit with  new spares‐bushes,seals, O‐rings, 

couplings, bollts,nuts etc., 

19) To install and commission generator  engine couple with Alternator(o/hauled by contractor) 

after  checking  the alignment   etc., and  fit with   new  spares‐bushes,  seals, O‐rings,  couplings, 

bollts, nuts etc., 

20) Propeller shaft and propeller to dismantle and shaft trueness to check. Propeller profile to 

check and necessary repairs to carry out .To assemble back with new bushes. 

21) To provide heavy duty plug points and service air at different locations in E/Room and deck. 

22) Also provide necessary fire extinguishers. 

POLLUTION CONTROL RELATED EQUIPMENTS 

23) To procure and install following pollution control equipments on deck :  

a) Screw pump for transferring oils of different viscosity including waste oils. 

b) Submersible pump and sufficient hoses, strainer, couplings etc.,  

24) 1no., work boat supplied by Trust to be repaired and suitable arrangement made for fixing 

out board motor. 2nos., out board motors supplied by Trust to be o'hauled and tried out. 

25)    Sweeping  Arm:  To    design  and    fit  sweeping    arms  (JIB)  of minimum  12 mtrs  length 

fabricated with  materials capable of withstanding corrosion. The one end of jib to be fitted on 

deck on both  the sides suitably  located between  forward and mid shipand  the other end  to a 

float to which the  booms is also connected.(see photos attached). 

26) Garbage collector: To  fit garbage/trash   collecting tray  (suitable shape and size)  fabricated 

with steel capable of withstanding corrosion due  to permanent  immersion  in sea water.    (see 

photos  attached).The  tray  is  to  be  fitted  at  the  forward  and  operated  by  electrical/electro 

hydraulic davit. When the tray is lowered the garbage  collects into it and when lifted collected 

garbage  fall  into  bins  kept  on  the  platform  erected  at  suitable  level  between  the  forepeaks. 

Arrangement to lock the tray in vertical position while it is not in use. 

  A platform made of anti corrosive steel to made at appropriate level between the fore 

peaks for dumping the garbage when the tray is lifted up. The PVC bins into which the garbage is 

filled  can  be  lifted up by means of mechanically operated davit by means  of opening  at  the 

ford’(the gratings fitted on the opening at the ford’). 

  The deck at  the  ford’  to be extended as  shown  in  the photograph  for  the workers  to 

handle  the garbage collection operations. 

    

Page 7: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

27) To fabricate and install 1no., mechanically and 1 no., /motor/electro‐hydraulic davits one on 

port and another on the stbd. sides. Chain blocks of 2 and 5 tons capacity to provide.  

28)  To  provide  talk  back  communication  system  at  the  ford’  to  communicate with  amaaster 

while collecting garvage. Also to provide 2nos., Walkie Talkies with spare batteries and charger. 

29) To make and lay wooden gratings on deck all around  the tank manhole doors. 

30) To repair/overhaul spill spray equipments  including engine and pump and  install spill spray 

arms and driving gear with motor, gear box, connecting hoses,tank etc 

31) To overhaul and  fit 1no., hand operated winch  (Trust supply) at suitable  location on deck.                                     

32) The surfaces of new and old plates fitted to be suitably prepared on both sides as per the 

Class requirements prior to applying primer and finished coats. 

33) To paint  deck, wheel house, tanks, deck and  engine room, machineries and all equipments, 

pipe lines and engine room. 

34) To paint hull as per Class painting scheme. 

35) Engraving and fixing  of name boards at the forward,aft and on the top of wheel house. 

 36) All thescrap ferrous and non‐ferrous certified by Trust officials as unusable and condemned 

to be shifted periodically and on completion of entire work to Trust's RSA Yard.  

37)   To  carryout  inclination  test and  issue Approved Trim and Stability booklet  (Revised after 

Retro fit) and other mandatory certificates for refit and equipments and to take Sea Trials. 

38) All the charges towards IRS, Naval Architect, tests and trials, certification etc., to bo borne by 

the contractor. 

39) All taxes,  Insurance, transportation shall be to thecontractor’s account and service tax will 

be reimbursed on production of documentary evidence.  

5. COMMENCEMENT OF WORK:

The firm shall after acceptance of the order submit a detailed program showing

procedures and methods and the order in which the work is proposed to be carried out

within 10 days from the date of award of Contract. The work shall be commenced within

20 days from the date of issue of work order. The Contractor shall also intimate the

details of TPI Surveyor engaged by them.

Page 8: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

6. COMPLETION OF WORK:

The firm shall complete the entire work within 90 Trust working days from the

date of receipt and acceptance of the order or from the date the craft is made available.

The contractor shall be given extension for 15 days for extra steel renewal given

subsequently based on TPI Surveyor’s recommendation. After completion of the entire

work all the old steel plates, pipes and other scrap shall be returned back to RSD, stores

department of Chennai Port at firms cost.

7. PAYMENT TERMS:

The payment shall be made for the actual area covered for the renewal of deck,

hull, bulwark and steel fender etc. Payment shall be made only after completion of all the

works and trials and tests and submitting proper bills in the Trust format by the firm and

accepted by the Deputy Conservator or his representative. All efforts will be made to

arrange payment within 30 days.

8. GUARANTEE:

The entire work carried out by the firm shall be guaranteed for the materials and

workman ship for 12 months from the date of acceptance of the work by the Trust and in

case any of the works are given to a sub contractor by the contractor to whom the work

has been awarded it shall be the responsibility of the contractor for proper exececution

and timely completion of the work and for guarantee for the materials, equipments,

spares and workman ship .

The firm is responsible for the cleanliness of the area on deck and inside the

Engine room, rudder compartment of the vessel ORV “Annam”” and surrounding areas

on the jetty, The firm shall remove and clean all the old wasted items and they shall dump

all the waste materials in the area specified by the Trust Engineer.

Page 9: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

9. RATE TO BE QUOTED:

The tenderers shall inspect the vessel ORV ‘Annam’, which is lifted up at boat

basin jetty before quoting. The firm while submitting the tender shall indicate

specification of steel plates as mentioned in the cost schedule. The work shall be carried

out at the boat basin. The offer shall be submitted in the Trust format indicating rate per

ton and the total cost for each item mentioned in detail in the Annexures I - IV .

The contract involves steel renewal of 25 tons of steel plates, angles, pipes

etc., of different sizes for hull, deck, wheel house and bulwark and deck outfittings.

The actual quantity of steel shall be based on TPI Surveyor recommendation.

The details of steel renewal works and painting are given as ANNEXURE-I and

rates per each work shall be quoted separately.

All other works are given in ANNEXURE-II & III and the tenderer shall

quote separately for each work.

The rate shall include all taxes, third party surveyor charges, contingencies,

insurance, transport etc., and shall be quoted separately as ANNEXURE- IV.

Even though the breakup details of work involved are mentioned in the

ANNEXURES –I to IV and the tenderers are required to quote for each item separately,,

Chennai Port Trust shall award the work to the overall lowest offerer i.e.) total cost

inclusive of taxes.

The tenderer is also required to QUOTE SEPARATELY IN COST

SCHEDULE –A1 the cost of labour, consumable materials for welding and cutting

including surface preparation for OLD AND DISMANTLED PLATES OR NEW

STEEL PLATES, if supplied by Trust.

Page 10: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

10. SECURITY DEPOSIT:

The successful tenderer prior to commencement of the work shall pay a security

deposit of 5% of the contract value and on awarding the additional steel renewal work

over and above the minimum of 25 tons of steel renewal work shall pay additional

security deposit @ 5% of the value of the additional work awarded within 7 days from

the date of acceptance of the work order of the additional work.

11. GENERAL PROVISION

The vessel is on the jetty at the boat basin to facilitate carrying out the work. The

firm has to bring all equipments and accessories for carrying each specified work as per

schedule like gas for cutting & renewal. A good quality welding electrodes approved by

Class having radiographic quality above shall be used. The contractor shall on

completion of the welding test all the welded sections as per the TP Surveyor

requirements and procedures. Representatives of Chennai Port Trust shall be present

whenever testing is done by TP Surveyor and any re-work / rectification shall be carried

out. On satisfactory completion of the testing and prior to handing over surface

preparation on the inner and outer sides of entire steel plates of the craft shall be done and

a coat of zinc primer shall be applied on both sides. The contractor shall fit back all the

machineries, equipments, pipelines, wheelhouse fittings and cables and confirm in

writing that all are in order and in working condition.

12. EXPERIENCE & WORKMANSHIP:

The firm shall have the ship building/ship repairing experience with complete

facilities to do the repairs mentioned above. The firm shall have technical know how

sufficient experience and facilities for hull and deck plate renewal. The firm shall have

adequate and competent personal supervisory staff and equipment to carryout the work.

The plating work shall be carried out as per the ship building practices and accordance

with the existing rules and regulations. The firm is responsible for the safety of their

employees as per the industrial Act. The Deputy conservator or the Deputy Marine

Page 11: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

Engineer’s authorized by him has full powers to adopt any materials and to confirm the

quality of the work carried out by the firm. The firm shall claim for the work carried out

for the actual area measured.

The firm shall carryout any rectification/redoing of the work not done properly

specified by the representative of DC without any extra cost. If the rectification ordered

to be done is not rectified during the time specified by the DC or his representative. Trust

shall have the right to change such work to any other agency and recover the cost from

the contractor. The entire work carried out by the firm shall satisfy and accepted by the

DC or his representative.

13. STORAGE OF EQUIPMENTS / MATERIALS:

The storage of all equipments / materials under safe custody and safeguarding of

the equipments / materials used for the work shall be entirely the Contractor’s

responsibility and the Trust shall not be responsible for any damage or loss of any of the

equipments / materials.

 

 

 

 

 

 

 

 

 

 

 

 

Page 12: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

 

COST SCHEDULE –A1 BUDGETARY OFFER FOR RETRO-FIT OF OIL RECOVERY VESSEL ‘ANNAM’ INCLUDING RENEWAL OF DECK, HULL, BULWARK AND WHEELHOUSE STEEL PLATES AND ALL OTHER WORKS.

Sl.

No

Description of work Quantity (approx)

Unit rate Rs. per Kg

Cost Rs.

a. Renewal of Steel plates of deck, hull, bulwark, wheelhouse and deck out fittings inclusive of supply of class approved plates, materials, labour for cropping and welding @ Rs. ______ per ton of steel (As detailed in Annexure-I)

25 Tons

b. Repair / Overhaul , Installation & Commissioning of Vessel’s Machineries & System (As detailed in Annexure-II)

Lumpsum

c Design / Repair / Overhaul , Installation & Commissioning of Oil Spill Response related Equipments, Machineries & System (As detailed in Annexure-III)

Lumpsum

d Miscellaneous (As detailed in Annexure-IV) Lumpsum

TOTAL

(Rupees…………………………………………………………………………………… only) The above offer is for carrying out the complete work using ……… grade of steel of sizes ……..mm x ………mm and as per the specifications and terms and conditions of Chennai Port Trust for the above tender.

Sl.No. Description Rate per Ton of Steel

I Cost of Plate renewal with supply of plates (new or old) by Trust for the works mentioned in Annexure-I inclusive of labour, consumable materials, surface preperation etc.

SIGNATURE OF CONTRACTOR

WITH DATE AND SEAL

Page 13: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

 

             

SL.NO  LOCATION ORV ANNAM ‐ BUDGETARY OFFER 2014    

DESCRIPTION OF WORK  QUANTITY

(APPROX) GOW 

UNIT 

RATE 

PER KG 

(Rs) 

COST 

Rupees 

     

Annexure‐I (Plate renewal, Deck out 

fittings,Pipelines, Fenders & other allied 

works) 

           

1  Main deck 

To Crop & Renew the compkete Main Deck plates by 

using thr following materials 

MS Plate app.18,000x4400x8mmthk‐01No and. 

MS Angle 75x75x8mmthk‐90mtrs.             

2  Main deck 

Outfittings 

To Crop & Renew Main Deck  Outfitting by using 

following materials             

     

Materials to be Used for 01set Booby hatch Door 

with coaming of app. Dimension       12  SETS          

      MS Plate  660x660x6mmthk‐01No.             

      MS Plate 660x100x8mmthk‐04Nos.             

      MS Flat 25x6mmthk‐05mtrs.             

     

MS Hinges, butterfly eye bolts with nuts, 

Rubberbeading will be extra.             

                   

3    

Materials to be Used for 01set Booby hatch Door 

with coaming          06 

SETS          

      MS Plate  700x700x6mmthk‐01No.             

      MS Plate 700x300x8mmthk‐04Nos.             

      MS Flat 25x6mmthk‐06mtrs.             

      MS Hinges, butterfly eye bolts with nuts,             

Page 14: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

Rubberbeading will be extra. 

                   

4     UTG, if mandatory  as per Class.   Lump sum          

                    

5     To Crop & Renew BOLLARDS by using following material             

     

Materials to be Used for 01set Bollard  of 

approximate dimensions  05 SETS          

      6” MS Sch.80 Seamless pipe x 500mm long‐02Nos.             

      MS Plate  550x300x10mmthk‐01No.             

      MS Plate  550x100x10mmthk‐02Nos.             

      MS Plate  300x100x10mmthk‐02Nos.             

      MS Plate  200x200x10mmthk‐02Nos.             

     

MS Round bar dia20mmx100mm long‐02Nos. 

 

             

   To Crop & Renew  forward gratings  

  

Kgs. 

  

  

   Materials to be Used for FWD Gratings      

  

  

  

  

     

   MS Round bar dia20mmx450mm long‐50Nos.             

  

  

  

  

                 

To Crop & Renew Main Deck Railings by using 

following materials          

   Materials to be Used          

   1” GI C Class Pipe – 55mtrs.          

   1 1/2” GI C Class Pipe – 25mtrs.          

      MS Plate 150x150x8mmthk‐75nos.             

Page 15: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

                    

8    

To Crop & Renew Railings on Wheel House top  by 

using following materials             

      Materials to be Used             

      1” GI C Class Pipe – 15mtrs.             

      MS Round Bar dia 20mm ‐ 15mtrs.             

                    

                    

9    

To Crop & Renew E/Room Bulwark coaming by 

using following materials             

      Materials to be Used             

      MS Plate 4500x600x8mmthk‐02Nos.             

      MS Plate 2500x100x8mmthk‐02nos.             

      MS Angle 50x50x6mmthk x 600mm long‐20Nos.             

     

MS Plate  4500x100x8mmthk‐02Nos. (Drill hole ‐ 

75Nos. To be made)             

     

MS Fabricated I‐Beam 200x100x8mmthkx2500mm 

long ‐ 01No.             

     

MS Plate  2500x100x8mmthk‐02Nos. (Drill hole ‐ 75Nos. 

To be made)             

     

MS Plate  4500x2500x8mmthk‐01No.& Necessary Rubber 

joint & bolt with nut extra.               

                    

10    

To Crop & Renew E/Room Diesel tank by using 

following materials             

      Materials to be Used             

      MS Plate 2000x500x6mmthk‐02Nos.             

      MS Plate 2000x300x6mmthk‐02Nos.             

Page 16: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

      MS Plate 500x300x6mmthk‐02Nos.             

     

Necessary copper & MS pipe lines, fittings &connections 

will be Extra.             

                    

11    

To Crop & Renew Deck Bulwark coaming by using 

following materials             

      Materials to be Used             

      MS Plate 18000x1000x8mmthk‐01No.             

      MS Plate  1000x100x8mmthk‐12Nos.             

      MS Plate  1000x75x8mmthk‐12Nos.             

      1 1/2” GI C Class Pipe – 20mtrs.             

                    

12    

To Renew D‐Fenders all around the craft with SS Bolts 

with Nuts.             

      Materials to be Used             

      D‐Fendors with necessary SS Bolts & nuts. ‐ 24Nos.             

     

To Facilicate above work,  Staging to be erected for the 

below size .             

     

Staging size : 4mtr ht x 2mtrwidth x 45mtrrs long (for 4 

sides)             

                    

13     To Renew Tyre Fenders with  Link chain & SS D Shackle               

      Materials to be Used             

      Fender Round Tyre ‐ 40Nos.             

      MS Round Bar dia 16mm ‐ 15mtrs.             

      SS 'D' Shackle Dia 16mm ‐ 80Nos             

      GI Link alloy chain dia 16mm ‐ 60mtrs.             

Page 17: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

                    

14  Wheel House  To  Crop rusted plates, design & Renew Wheel house              

      The app dimensions of the materials to be Used             

      MS Plate 2200x2200x6mmthk‐04Nos.             

      MS Plate 3000x3000x6mmthk‐01No.             

      MS Plate 3000x250x6mmthk‐04Nos.             

      MS Plate 400x100x8mmthk‐20Nos.             

      MS Angle 50x50x6mmthk x 3000mm long‐08Nos.             

      MS Cheq. Plate 1500x300x6mmthk‐01No.             

      MS Round Bar dia 16mm ‐ 02mtrs.             

                    

15    

To  Crop & Renew Scupper line ( connecting  Wheel 

house top to maindeck  area)             

      Materials to be Used             

      2  1/2” GI C Class Pipe – 06mtrs.             

      2  1/2 GI short bend      –04Nos.             

      2   1/2”     MS Flange – 04Nos.             

     

MS bolts with nuts & NeopreneRubber joints will be 

extra.             

                    

16    

To  Crop & Renew Vertical ladder ( connecting  Wheel 

house top to maindeck  area)             

      Materials to be Used             

      MS Flat 75x10mm thkx3000mmlong‐02Nos.             

      MS Round Bar dia 20mm ‐ 04mtrs.             

      MS Plate 100x80x10mmthk‐02Nos.             

Page 18: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

      MS Flat 75x10mm thkx150mmlong‐02Nos.             

                    

17     To  Crop & Renew Lightmast on Wheelhouse deck             

      Materials to be Used             

      3” MS Sch.40 Seamless pipe ‐03mtrs.             

      MS Plate 300x300x8mmthk‐04Nos.             

      1 1/2” GI C Class Pipe – 2mtrs.             

      MS Plate 150x150x10mmthk‐02Nos.             

                    

18 

Main deck 

AFT 

To  Crop & Renew Steering dear hyraulic pump sheet 

metal casing             

      Materials to be Used             

      MS Plate 1000x1000x6mmthk‐05Nos.             

      MS Angle 50x50x6mmthk x4000mm long‐01No.             

      MS Round Bar dia 20mm ‐ 01mtr.             

                    

19  Tanks  To  Crop & Renew wasted steel areas             

      Materials to be Used             

      MS Plate ‐ 3000kgs.approx. (for  total 12Nos. Tanks)              

      MS Flat 75x10mm thkx3000mmlong‐10Nos.             

     

MS Round Bar dia 20mm ‐ 40mtrs. (for  total 12Nos. 

Tanks)              

                    

20  Tanks,Deck & 

To Remove all redundant M/Cs, Equipments,valves, 

pipelines etc.,in the tanks and E/Room (12Nos. tank) & 

provide MS Dummy blanks/inserts  wherver required 

(Size of pipe : 3",4" & 5" lines ‐ 30mtrs. Approx.             

Page 19: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

     

To cut/dismantle/Remove  un used and redundant ferrous 

and non ferrous  identified and marked by Trust; officials  

from E/Room andother compartments/tanks and the 

same to be  shifted  and handed over at RSA Yard / 

workshop by contractor's men and transport.              

                    

21  Side shell 

To  Crop & Renew wasted & thinned down  side shell 

areas(port and stbd. Sides)             

      Materials to be Used             

     

MS Plate  18000x2500x8mmthk‐02Nos.(Port & Stbd 

side)             

      MS Plate  4000x1000x8mmthk‐01No.(AFT)             

      MS Plate  4000x1000x8mmthk‐01No.(FWD)             

     

To Facilicate above work, Scaffolding/Staging to be 

erected for the below size .             

     

Staging size : 4mtr ht x 2mtrwidth x 45mtrrs long (for 4 

sides)             

                    

 22  FWD 

To  Crop & Renew wasted & thinned down    Fender half 

round pipe             

      Materials to be Used             

     

6” MS Sch.80 Seamless pipe ‐04mtrs.(To make into 

two halves)             

      MS Plate 150x150x8mmthk‐16Nos.             

                    

 23 

Steeringr 

compartment MS Plate 2000x2000x8mmthk‐02Nos. 

           

                    

  

FWD 

Curvature 

MS Plate 4000x2500x8mmthk‐02Nos. (Same to be  

bent to required shape)              

Page 20: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

                    

24  Bottom Plate 

To  Crop & Renew wasted & thinned down  Bottom 

plating areas             

      Materials to be Used             

     

MS Plate  18000x4000x8mmthk‐01No.(Port & Stbd 

side)             

     

The maximum percentage of scantlings @ ___% for 

the above works                 

Kgs.          

      Andes as  per Class requirements to fit.             

     

Complete Painting all steel structure (Internal and 

external)  to be done as per Class painting scheme 

including surface preparation by grit /copper slag 

blasting as per IRS recommendation.             

     

To Carryout complete Carpentry 

work,Panelling,Flooring , Navigational inclu. Cabin 

glass,Main door to be renewed, Wiper with motor 

arrangement to be installed.               

     

Engraving of vessl's and name in the forward and aft 

and name plates on wheel house.              

                                TOTAL                                            

             

             

             

             

             

             

             

             

             

Page 21: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

             

    ANNEXURE‐II           

   

(Repair / overhaul/inbtallayion /commissioning of vessel 

machineries and systems)         

25    

Main and Generator Engines to Install & Commosioning 

to be done              

     

1  no.,  Main Engine o/hauled and supplied by Trust shall 

be installed and coupled with gear box (o/haul in 

contractor's scope) and 1  no., Generator Engine o/hauled 

and supplied by Trust shall be installed and coupled with 

Alternator (o/haul in contractor's scope) .All the materials 

including couplings,bearings & other gear box spares shall 

be procured and assembled by the contractor.             

26    

 To Remove  of Propellor shaft, renew bushes, fit back in 

place ,align with M/E and &  Trial test to be done. To 

check trueness and carry all the necessary repairs. All the 

materials including ,bearings  spares etc., shall be 

procured and assembled by the contractor             

     

All electrical motors, blowers, panels, main switch boards 

and switches and cables to repair/renew. Engine charging 

cicuits, alternators,starting motors to repair/new to 

provide and batteries to supply.             

27    

 All electrical fittings in E/Room , Nain deck  and 

navigation lights, focus lights /search lights/flood lights 

and cables switchesand fittings are to be renewed and 

wherever required new fittings to provide.  Also to 

provide sockets in E/Room , Deck  and W/House             

     

Electrical work in Wheel House, Steering compartment 

and oter spaces/compartments                                                  

Lighting and switches/sockets and panel boards and all 

the necessary fittings to provide.             

Page 22: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

28 

  

To overhaul and Install  the following Machineries 

supplied by the Trust . To Overhaul the following E/ Room 

Machineries : 1no.‐ Main Engine gear box , 1no.‐ 

Alternator, 1no.‐  General Service Pump, 1no.‐Air 

Compressor, 1no.‐Exhaust blower,1no.‐  Bilge pump . The 

contractir shall provide  suitable or repair/modify existing 

base,foundation,suction and discharge chests ,sea 

suction, pipe lines ,o/board  & by pass whre ever 

required.1) GS/Fire Pump to be installed for deck and 

E/Room  hydrant system.(6 hydrants) 2)Bilge p/p for 

pumping out E/Room and Steering compartmentts. 3) Air 

Compressor with reciver and service  air lines to E/Room 

and deck.   

             

29    

To provide fire fighting system with discharge from GS 

Pump with new pipelines and hyrants (8to10) in E/Room 

and deck.             

30    

To Crop& Renew Pipelines in E/R wherever required  

Suitably for all the new and existing systems. Also to fit 

new valves and fittings wherever necessary.             

31    

To paint all macineries and pipelines as per painting 

code.             

32    

To provide service air and heavy duty plug points in 

E/Room and deck.             

   

                                                                                                            

TOTAL         

             

    ANNEXURE‐III           

             

   

( Design/ overhaul/Install/Commission of OSR  related 

equipments  and systems)         

33    

To Install  Pollution related equipments:  To procure and 

install Fuel oil transfer pump capable of handling oils of 

different viscosities, submersible pump with necessary 

hoses, strainer and electrical cable etc.,             

34    To Install  Devit  elec. Motor driven on Maindeck Port& 

           

Page 23: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

Stbd side. 

1 No. Mechanical devit. 

1 No. Electric / Electrohydrolic Devit 

35    

To  provide wooden gratings on deck to the height of 

tank comings.             

     

    To  design and  fit sweeping  arms (JIB) 25)  Sweeping 

Arm:  To    design  and    fit  sweeping    arms  (JIB)  of 

minimum 12 mtrs  length  fabricated with   materials 

capable of withstanding corrosion. The one end of jib 

to  be  fitted  on  deck  on  both  the  sides  suitably 

located between forward and mid shipand the other 

end  to  a  float  to  which  the    booms  is  also 

connected.(see photos attached).             

36    

1no., work boat owned by Trust to be repaired and 

suitable arrangement made for fixing out board motor. 

2nos., out board motors supplied by Trust to be o'hauled 

and tried out             

37    

To fit garbage collecting arrangement: 

Garbage  collector:  To  fit  garbage/trash    collecting 

tray  (suitable  shape  and  size)  fabricated with  steel 

capable of withstanding corrosion due to permanent 

immersion  in sea water.    (see photos attached).The 

tray  is  to be  fitted at  the  forward and operated by 

electrical/electro  hydraulic  davit. When  the  tray  is 

lowered the garbage  collects into it and when lifted 

collected garbage fall  into bins kept on the platform 

erected  at  suitable  level  between  the  forepeaks. 

Arrangement  to  lock  the  tray  in  vertical  position 

while it is not in use. 

  A  platform made  of  anti  corrosive  steel  to 

made  at  appropriate  level  between  the  fore  peaks 

for dumping  the garbage when  the  tray  is  lifted up. 

The PVC bins  into which the garbage  is filled can be 

lifted up by means of mechanically operated davit by 

means of opening at the ford’(the gratings fitted on 

the opening at the ford’).             

Page 24: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

  The  deck  at  the  ford’  to  be  extended  as 

shown  in the photograph  for the workers to handle  

the garbage collection operations. 

38    

To install Spill Spray unit and Spill Spray arms: To 

overhaul the complete spill unit (engine and pump with 

new spares as required and install the same with new 

base. To Provide Electrical Drive for Spill Spary arms 

mechanism  on Maindeck Port &  Stbd side with 2 sets of 

Electrical motors with new connections from E/Room 

mains and  start/stop pyeh buttons , suitable gear 

drive,hoses, stays etc. Materials to be Used for Spill Spray 

unit  base stand               

             

    

                                                                                                            

TOTAL         

             

      ANNEXURE‐IV             

39    

Charges for TPI By IRS Class Suuveyor & Naval Arct. To be 

Engaged for the supervision and tests and trials including 

Inclination test and Revise Trim and Stability booklet.             

40     Transport , Insurance, Power supply etc.              

41     Taxes & Duties (to specify)             

42     Contingencies             

43     Service Tax @ _____%             

      TOTAL             

 

 

 

 

 

Page 25: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

BUDGETARY OFFER FOR RETROFIT OF ORV “ANNAM” 

.SAMPLE PHOTOS FOR ILLUSTRATION OF SWEEPING ARM AND GARBAGE COLLECTOR 

Note:   The following photos / figures are given only for the purpose of illustration / guidance 

and shall not be taken as the requirement of Chennai Port under Scope of Work.  

 

PHOTO 1 

 

 

   

 

 

 

 

 

 

 

PHOTO 2 

 

 

Page 26: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

 

PHOTO 3 

PHOTO 4 

 

 

 

 

Page 27: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

WHILE COLLECTING GARBAGE – TRAY IMMERSED IN WATER

PHOTO 5

 

 

 

WHILE COLLECTING GARBAGE – TRAY BEING LIFTED UP FROM WATER

PHOTO 6

 

 

Page 28: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

WHILE DUMPING THE COLLECTED GARBAGE

PHOTO 7

 

 

 

PHOTO 8SWEEPING ARM JIB FIXING ARRANGEMENT ON DECK

 

 

Page 29: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

PHOTO 9SWEEPING ARM JIB FIXED TO THE CRAFT

 

 

 

 

JIB AND BOOM CONNECTED TO FLOAT

PHOTO 10

 

Page 30: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

The dimensions for designing SWEEPING ARM JIB are approximate and for guidance only

 

Page 31: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 32: TENDER FOR RETRO-FIT OF Oil Recovery Vessel · PDF file · 2014-11-29to increase the waste oil holding capacity without ... To fit suitable G.S.Pump, fuel transfer pump, bilge pump,