KINGDOM OF THAILAND
ROYAL IRRIGATION DEPARTMENT MINISTRY OF AGLICULTURE AND COOPERATIVES
TENDER AND CONTRACTING DOCUMENTS FOR
THE FLOOD PREVENTION PROJECT OF EAST SIDE OF THE PASAK RIVER IN AYUTTHAYA
VOLUME II
TENDER DRAWINGS
OCTOBER 2012
CTI ENGINEERING INTERNATIONAL CO., LTD. TOKYO, JAPAN
-
TITLE DWG NO. TITLE DWG NO.
GENERAL PLAN BAR ARRANGEMENT (PART - U-SHAPED FLOODWALL LEFT 1/4) KM-FG-049
GENERAL MAP GP-001 BAR ARRANGEMENT (PART - U-SHAPED FLOODWALL LEFT 2/4) KM-FG-050
GENERAL NOTE GP-002 BAR ARRANGEMENT (PART - U-SHAPED FLOODWALL LEFT 3/4) KM-FG-051
KRA MANG FLOODGATE BAR ARRANGEMENT (PART - U-SHAPED FLOODWALL LEFT 4/4) KM-FG-052
OVERALL LAYOUT (1/2) KM-FG-001 BAR ARRANGEMENT (PART - U-SHAPED FLOODWALL RIGHT 1/4) KM-FG-053
OVERALL LAYOUT (2/2) KM-FG-002 BAR ARRANGEMENT (PART - U-SHAPED FLOODWALL RIGHT 2/4) KM-FG-054
PLAN KM-FG-003 BAR ARRANGEMENT (PART - U-SHAPED FLOODWALL RIGHT 3/4) KM-FG-055
FRONT VIEW AT PASAK RIVER SIDE (1/3) KM-FG-004 BAR ARRANGEMENT (PART - U-SHAPED FLOODWALL RIGHT 4/4) KM-FG-056
FRONT VIEW AT PASAK RIVER SIDE (2/3) KM-FG-005 BAR ARRANGEMENT (PART - DRAINAGE GATE 1/3) KM-FG-057
FRONT VIEW AT PASAK RIVER SIDE (3/3) KM-FG-006 BAR ARRANGEMENT (PART - DRAINAGE GATE 2/3) KM-FG-058
FRONT VIEW AT KRA MANG CANAL SIDE (1/2) KM-FG-007 BAR ARRANGEMENT (PART - DRAINAGE GATE 3/3) KM-FG-059
FRONT VIEW AT KRA MANG CANAL SIDE (2/2) KM-FG-008 BAR ARRANGEMENT (PART - WING WALL LEFT) KM-FG-060
LONGITUDINAL SECTION (1/2) KM-FG-009 BAR ARRANGEMENT (PART - WING WALL RIGHT) KM-FG-061
LONGITUDINAL SECTION (2/2) KM-FG-010 BAR ARRANGEMENT (PART - UPSTREAM APRON 1/3) KM-FG-062
MAIN STRUCTURE PLAN AND SECTIONS (1/5) KM-FG-011 BAR ARRANGEMENT (PART - UPSTREAM APRON 2/3) KM-FG-063
MAIN STRUCTURE PLAN AND SECTIONS (2/5) KM-FG-012 BAR ARRANGEMENT (PART - UPSTREAM APRON 3/3) KM-FG-064
MAIN STRUCTURE PLAN AND SECTIONS (3/5) KM-FG-013 BAR ARRANGEMENT (PART - DOWNSTREAM APRON 1/4) KM-FG-065
MAIN STRUCTURE PLAN AND SECTIONS (4/5) KM-FG-014 BAR ARRANGEMENT (PART - DOWNSTREAM APRON 2/4) KM-FG-066
MAIN STRUCTURE PLAN AND SECTIONS (5/5) KM-FG-015 BAR ARRANGEMENT (PART - DOWNSTREAM APRON 3/4) KM-FG-067
DRAINAGE GATE (1/2) KM-FG-016 BAR ARRANGEMENT (PART - DOWNSTREAM APRON 4/4) KM-FG-068
DRAINAGE GATE (2/2) KM-FG-017 TEMPORARY WORKS OF KRA MANG FLOODGATE
CONFIGURATION OF FOUNDATION PILES AND IMPERVIOUS STEEL SHEET PILES KM-FG-018 LAYOUT PLAN KM-TW-001
BOREHOLE LOGS KM-FG-018A DETAIL OF TEMPORARY DAM 2 KM-TW-002
STAIRCASE (1/4) KM-FG-019 PLAN OF TEMPORARY EXCAVATION WORKS KM-TW-003
STAIRCASE (2/4) KM-FG-020 DETAIL OF TEMPORARY WORKS (1/2) KM-TW-004
STAIRCASE (3/4) KM-FG-021 DETAIL OF TEMPORARY WORKS (2/2) KM-TW-005
STAIRCASE (4/4) KM-FG-022 HAN TRA FLOODGATE AND CANAL
FLOODWALL (1/4) KM-FG-023 OVERALL LAYOUT HT-FG&BP-001
FLOODWALL (2/4) KM-FG-024 LAYOUT (1/3) HT-FG&BP-002
FLOODWALL (3/4) KM-FG-025 LAYOUT (2/3) HT-FG&BP-003
FLOODWALL (4/4) KM-FG-026 LAYOUT (3/3) HT-FG&BP-004
SLOPE PROTECTION OF APPROACH WAY KM-FG-027 HAN TRA FLOODGATE
FLOOR PROTECTION CONCRETE (1/2) KM-FG-027A PLAN HT-FG-001
FLOOR PROTECTION CONCRETE (2/2) KM-FG-027B FRONT VIEW AT PASAK RIVER SIDE (1/2) HT-FG-002
CONFIGURATION OF HANDRAILS AND FENCES KM-FG-027C FRONT VIEW AT PASAK RIVER SIDE (2/2) HT-FG-003
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 1/18) KM-FG-028 FRONT VIEW AT HAN TRA CANAL SIDE (1/2) HT-FG-004
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 2/18) KM-FG-029 FRONT VIEW AT HAN TRA CANAL SIDE (2/2) HT-FG-005
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 3/18) KM-FG-030 LONGITUDINAL SECTION (1/2) HT-FG-006
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 4/18) KM-FG-031 LONGITUDINAL SECTION (2/2) HT-FG-007
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 5/18) KM-FG-032 MAIN STRUCTURE PLAN AND SECTIONS (1/5) HT-FG-008
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 6/18) KM-FG-033 MAIN STRUCTURE PLAN AND SECTIONS (2/5) HT-FG-009
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 7/18) KM-FG-034 MAIN STRUCTURE PLAN AND SECTIONS (3/5) HT-FG-010
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 8/18) KM-FG-035 MAIN STRUCTURE PLAN AND SECTIONS (4/5) HT-FG-011
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 9/18) KM-FG-036 MAIN STRUCTURE PLAN AND SECTIONS (5/5) HT-FG-012
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 10/18) KM-FG-037 CONFIGURATION OF FOUNDATION PILES AND IMPERVIOUS STEEL SHEET PILES HT-FG-013
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 11/18) KM-FG-038 BOREHOLE LOGS HT-FG-013A
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 12/18) KM-FG-039 STAIRCASE (1/4) HT-FG-014
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 13/18) KM-FG-040 STAIRCASE (2/4) HT-FG-015
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 14/18) KM-FG-041 STAIRCASE (3/4) HT-FG-016
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 15/18) KM-FG-042 STAIRCASE (4/4) HT-FG-017
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 16/18) KM-FG-043 FLOODWALL (1/4) HT-FG-018
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 17/18) KM-FG-044 FLOODWALL (2/4) HT-FG-019
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 18/18) KM-FG-045 FLOODWALL (3/4) HT-FG-020
BAR ARRANGEMENT (SERVICE BRIDGES) KM-FG-046 FLOODWALL (4/4) HT-FG-021
BAR ARRANGEMENT (CURTAIN WALL & SLAB) KM-FG-047 FLOOR PROTECTION CONCRETE (1/2) HT-FG-021A
BAR ARRANGEMENT (STAIRCASE) KM-FG-048 FLOOR PROTECTION CONCRETE (2/2) HT-FG-021B
THE FLOOD PREVENTION PROJECT OF EAST SIDE OF THE PASAK RIVER IN AYUTTHAYALIST OF DRAWINGS
-
TITLE DWG NO. TITLE DWG NO.
CONFIGURATION OF HANDRAILS AND FENCES HT-FG-021C SLUICE PIPE (3/3) HT-BP-019
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 1/24) HT-FG-022 CONCRETE PAVEMENT (1/2) HT-BP-020
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 2/24) HT-FG-023 CONCRETE PAVEMENT (2/2) HT-BP-021
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 3/24) HT-FG-024 COMMON WORK FOR FLOODGATES
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 4/24) HT-FG-025 SHED (1/4) FG-A-001
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 5/24) HT-FG-026 SHED (2/4) FG-A-002
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 6/24) HT-FG-027 SHED (3/4) FG-A-003
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 7/24) HT-FG-028 SHED (4/4) FG-A-004
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 8/24) HT-FG-029 HANDRAIL FG-A-005
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 9/24) HT-FG-030
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 10/24) HT-FG-031
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 11/24) HT-FG-032
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 12/24) HT-FG-033
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 13/24) HT-FG-034
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 14/24) HT-FG-035
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 15/24) HT-FG-036
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 16/24) HT-FG-037
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 17/24) HT-FG-038
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 18/24) HT-FG-039
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 19/24) HT-FG-040
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 20/24) HT-FG-041
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 21/24) HT-FG-042
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 22/24) HT-FG-043
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 23/24) HT-FG-044
BAR ARRANGEMENT (MAIN BODY OF FLOODGATE 24/24) HT-FG-045
BAR ARRANGEMENT (SERVICE BRIDGES) HT-FG-046
BAR ARRANGEMENT (CURTAIN WALL & SLAB) HT-FG-047
BAR ARRANGEMENT (STAIRCASE) HT-FG-048
BAR ARRANGEMENT (PART - WING WALL 1/3) HT-FG-049
BAR ARRANGEMENT (PART - WING WALL 2/3) HT-FG-050
BAR ARRANGEMENT (PART - WING WALL 3/3) HT-FG-051
BAR ARRANGEMENT (PART - APRON 1/3) HT-FG-052
BAR ARRANGEMENT (PART - APRON 2/3) HT-FG-053
BAR ARRANGEMENT (PART - APRON 3/3) HT-FG-054
TEMPORARY WORKS OF HAN TRA FLOODGATE
LAYOUT PLAN HT-TW-001
PLAN OF TEMPORARY EXCAVATION WORKS HT-TW-002
DETAIL OF TEMPORARY WORKS (1/2) HT-TW-003
DETAIL OF TEMPORARY WORKS (2/2) HT-TW-004
BANK PROTECTION OF HAN TRA CANAL
TYPICAL CROSS SECTION HT-BP-001
TRANSVERSE SECTIONS (1/8) NO.0 TO NO.0+20.00 HT-BP-002
TRANSVERSE SECTIONS (2/8) NO.0+40.00 TO NO.0+60.00 HT-BP-003
TRANSVERSE SECTIONS (3/8) NO.0+80.00 TO NO.1 HT-BP-004
TRANSVERSE SECTIONS (4/8) NO.1+20.00 TO NO.1+40.00 HT-BP-005
TRANSVERSE SECTIONS (5/8) NO.1+60.00 TO NO.1+80.00 HT-BP-006
TRANSVERSE SECTIONS (6/8) NO.2 TO NO.2+20.00 HT-BP-007
TRANSVERSE SECTIONS (7/8) NO.2+40.00 TO NO.2+60.00 HT-BP-008
TRANSVERSE SECTIONS (8/8) NO.2+80.00 TO NO.3 HT-BP-009
DETAILS (1/2) HT-BP-010
DETAILS (2/2) HT-BP-011
U-SHAPED DITCH HT-BP-012
STAIRS AT REVETMENT (1/4) HT-BP-013
STAIRS AT REVETMENT (2/4) HT-BP-014
STAIRS AT REVETMENT (3/4) HT-BP-015
STAIRS AT REVETMENT (4/4) HT-BP-016
SLUICE PIPE (1/3) HT-BP-017
SLUICE PIPE (2/3) HT-BP-018
-
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
CTI ENGINEERING INTERNATIONAL CO., LTD.
GP-001
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
GENERAL PLAN
GENERAL MAP
0 0.5 1.0 1.5 2.0SCALE
KILOMETERS
RAIL W
AY
PASAK RIVER
CHAO PRAYA RIVER
EXISTINGCHANNEL
KHA MAOCHANNEL
HAN TRAFLOODGATE SITE
KRA MANGFLOODGATE SITE
EXISTINGKHA MAO FLOODGATE
ROUTE 32
ROUTE 309
AYUTTHAYAHISTORICAL AREA
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
CONSULTING FIRMS :
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CTI ENGINEERING INTERNATIONAL CO., LTD.
DATE
NO.
The Flood Prevention Project of
Akio SHICHIJUGARI
East Side of the Pasak River in Ayutthaya
T. MISHINA
in the Kingdom of Thailand
GENERAL PLAN
GP-002
Masaki ISHII
GENERAL NOTE
Masaki ISHII P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
X
X X X X
X
X
X X
XX
X
X
X X
// //
9697
99
100
101
102
103105
104
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
103
104
106
107
108 109
110 111
112
144
145
146158
159
160
161162
163
157
156155154
153
152
151
150
149
147
148
213
Public Gutter
Public Road
Public Gutter
26m30m
22.5m
27m
14m27m
21.14m
14m
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-001
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
OVERALL LAYOUT (1/2)
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
X
X X X X
X
X
104108 109
144
145
146158
159
160
161162
155154
153
152
151
26m30m
22.5m
27m
14m
27m
21.14m
14m
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-002
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
OVERALL LAYOUT (2/2)
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
SLOPESLO
PE
SLOPE SLO
PE
SLO
PE
SLO
PE
Slope 10%
UP
Pasak River side
PLAN OF KRA MANG FLOOD GATE
Kra Mang Canal side
27000
100026000 1000
28000
100026000 1000
28000
1500
060
00
5000
6000
1000
1300
010
00
1500
060
00
5000
6000
1000
1300
010
00
7000 6000 50006000
2250
0
5600
800 4000900
9000
3600
3400
7500
1450
0
30000
21@1000=21000
6@1000
=6000
10@
1000
=100
00
4000
6230
9@1000=9000
8@1000=8000
715012150
26200 4600
8003000
800
4000
5000260005000
8000
14@
1000
=140
0065
0
120
14@
1000
=140
0065
012
0
800
800
800
800
800800
150
PC corrugated sheet piles SW500AL=15m
PC corrugated sheet piles SW500AL=15m
PC corrugated sheet piles SW500AL=15m
PC corrugated sheet piles SW500AL=15m
PC corrugated sheet piles SW500AL=15m
PC corrugated sheet piles SW500AL=15m
PC corrugated sheet piles SW500AL=15m
PC corrugated sheet piles SW500AL=15m
1000
1000
800
8@10
00=8
000
350
150
18@
1000
=180
008@
1000
=800
0
800 2000 800
PC corrugated sheet piles SW500AL=15m
4620
1627
0
1000 1000
2880
800
800
1502@1000=2000
150120
8@1000=8000150
2@1000=2000
15012010960
1000150
650
1000150
650 65
09@1000=9000
150
20@
1000
=200
0065
0
150 16@1000=16000
2000
2000
150
24@1000=24000
150
270
150
150
650
6@10
00=6
000
150
3@1000=3000
150650
20 20
2020
2020
2020
7@1000=7000
270150
2200
7@1000=7000
130
2020
7@1000=3000
2020
350
150 150
20 20
1400
014
000
2000
6000
3@1000=3000270
162°
153°
135°
135°
135°
150
Resin-coated stepsW350 x L150 @30cm
Resin-coated stepsW350 x L150 @30cm
Resin-coated stepsW350 x L150 @30cm
Resin-coated stepsW350 x L150 @30cm 60
0
600
600
600
Radar level gauge in2m mounting frame
Radar level gauge in2m mounting frame
2700
2700
DN
4500
4100
0 2 4 6 8 10 15 20SCALE
METERS
55
44
6
3
22
11
6
77
3
+3.00mMSL
+2.00mMSL
+1.50mMSL
+1.00mMSL
+0.50mMSL
±0mMSL
-0.50mMSL
+3.00mMSL
+2.00mMSL
+1.50mMSL
+1.00mMSL
+0.50mMSL
±0mMSL
-0.50mMSL
-0.50mMSL
-0.50mMSL
+3.00mMSL
+3.00mMSL
+3.00mMSL
+2.00mMSL
+1.00mMSL
±0mMSL
+2.00mMSL
+1.00mMSL
±0mMSL
-0.50mMSL
-0.50mMSL
-0.50mMSL
-0.50mMSL
1000
2000
1000 2000
Zinc-coated gabion mattressL2.0m x W1.0m x H0.5m /pieceMesh wire diameter Ø2.7mm or moreNon-woven geotextile of 2mm or more in thickness to be placed back and below all bottom gabions
Zinc-coated gabion mattressL2.0m x W1.0m x H0.5m /pieceMesh wire diameter Ø2.7mm or moreNon-woven geotextile of 2mm or more in thickness to be placed back and below all bottom gabions
26000
5980
190
120010
00 120
01000 12
0019
0
500 25@1000=25000 500
500 500
26000500
25@1000=25000500
Baffle piers
Baffle piers
26000
25@1000=25000
1000
1500
2600059
80
190
120010
00 120
01000 12
0019
0
500 25@1000=25000 500
500 500
26000500
25@1000=25000500
190 200
100010001000
190200
1000
2001000
1000
150020
00
BAFFLE PIERS
See PLAN 1
See PLAN 2
PLAN 1
PLAN 2
SECTION A-A4
B B
SECTION C-CSECTION D-D
CC
DD
A A
SECTION B-B
5980
DETAIL OF BAFFLE PIER
200
4@20
0=80
0
1000
100
100
1004@215=860240
400
1200
59 10041
1000
4@200=800 100100
4@20
0=80
0
1000
100
100
400
DB12
DB12
DB12
0SCALE
METERS
0.5 1 1.5 2
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
PLAN
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-003
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
26000
4603
2000 6000 2000 6000 2000 6000 2000
Right Bank of Canal Left Bank of Canal
8000
HWL + 6.00m MSL
LWL + 0.50m MSL
+13.00m MSL
HWL + 6.00m MSL
LWL + 0.50m MSL
MSL
1450 550 6000 550 900 550 6000 550 900 550 6000 550 1450
100
5000
100
5000
+15.60m MSL
+16.65m MSL
CL
Staircase
650
+7.50m MSL
5000 6000 700060002000
22000 2000
1000
5000
5000
1000
500
Wing wall
500
1500
500
20
2010
00MSL
150
8000
-0.50m MSL
4000 800800
1500
500
2000
500
7500
1000
500
7500
3000800 800
-0.50mMSL
95@400=38000 14@400=640012@400=4800
+4.60m MSL
L=15mPC corrugated sheet piles SW 500A
32500
4600
250
650
900
7000
2300
1200 1100
6875
Impervious steel sheet piles SP-III, L=3mSP-III, L=6.5m SP-III, L=6.5m
L=15mPC corrugated sheet piles SW 500A
6000
6000
600
150
200
-0.50m MSL
500
500
600
500
600
500
800
800
800
800
+7.50m
+7.50m
Radar level gauge in2m mounting frame
105
105
0 2 4 6 8 10 15SCALE
METERS
1600900
1500900
2600 1500
200
200
SECTION 1-1
Zinc-coated gabion mattressL2.0m x W1.0m x H0.5m /pieceMesh wire diameter Ø2.7mm or more
26000
1000
Non-woven geotextile of 2mm or more in thickness to be placed back and below all bottom gabions
FRONT VIEW AT PASAK RIVER SIDE (1/3)
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-004
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
FRONT VIEW AT PASAK RIVER SIDE (1/3)
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
26000
4603
2000 6000 2000 6000 2000 6000 2000
Right Bank of Canal Left Bank of Canal
1000
0
HWL + 6.00m MSL
LWL + 0.50m MSL
+13.00m MSL
HWL + 6.00m MSL
LWL + 0.50m MSL
1450 550 6000 550 900 550 6000 550 900 550 6000 550 1450
+15.60m MSL
+16.65m MSL
CL
Staircase
650
+7.50m MSL
6500
6500Wing wall
20
500
1000
0
-0.50m MSL
4000 800800
7500
2250500 500
-0.50mMSL
+4.60m MSL
L=15mPC corrugated sheet piles SW 500A
32500
4600
250
650
900
7000
2300
1100 1100
6875
L=15mPC corrugated sheet piles SW 500A
1000
Wing wall
4800
-0.50m MSL
500
1200
600
850
2800
350
4400
3850
5150
9000
2200
2000
800
1500
700
1875
350
500
150
150
500
150
5000 6000 70006000
2000
22000 2000
500
20MSL
+7.50mMSL
+7.50m
100
105
105
0 2 4 6 8 10 15SCALE
METERS
2000 200020001150
900
500
200
600900
2600 1500RC piles Ø150 L=3munder 1m x 2m bed area of each bottom gabion mattress
SECTION 2-2
26000
1500
5000
1500
5000
Zinc-coated gabion mattressL2.0m x W1.0m x H0.5m /pieceMesh wire diameter Ø2.7mm or moreNon-woven geotextile of 2mm or more in thickness to be placed back and below all bottom gabions
FRONT VIEW AT PASAK RIVER SIDE (2/3)
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-005
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
FRONT VIEW AT PASAK RIVER SIDE (2/3)
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
26000
4603
2000 6000 2000 6000 2000 6000 2000
Right Bank of Canal Left Bank of Canal
HWL + 6.00m MSL
LWL + 0.50m MSL
+13.00m MSL
HWL + 6.00m MSL
LWL + 0.50m MSL
1450 550 6000 550 900 550 6000 550 900 550 6000 550 1450
+15.60m MSL
+16.65m MSL
CL
Staircase
5000 6000 700060002000
22000 2000
800
20 20
150
500
-0.50m MSL -0.50m MSL
500
+4.60m MSLSand fill t=1m
650
32500
7000
4600
650
250
900
2300
1100 1100
6875
L=15mPC corrugated sheet piles SW 500A
L=15mPC corrugated sheet piles SW 500A
RC piles Ø150 L=3munder 1m x 2m bed area of each bottom gabion mattress
800
MSL+7.50m
MSL+7.50m
MSL+7.50m
100
105
105
0 2 4 6 8 10 15SCALE
METERS
+3.00m MSL10005
00
1000 500
±0.00m MSL
-0.50m MSL
+3.00m MSL
±0.00m MSL
SECTION 3-3
1000
FRONT VIEW AT PASAK RIVER SIDE (3/3)
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-006
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
FRONT VIEW AT PASAK RIVER SIDE (3/3)
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
4600
900
2000 6000 2000 6000 2000 6000 2000
1500
Right Bank of CanalLeft Bank of Canal
HWL + 3.50m MSL
LWL + 0.50m MSL
+13.00m MSL
HWL + 3.50m MSL
LWL + 0.50m MSL-0.50m MSL
1450 550 6000 550 900 550 6000 550 900 550 6000 550 1450
100
5000
100
5000
+15.60m MSL
+16.65m MSL
CL
Staircase
500
13150 81502000 220002000
+4.50m MSL
Impervious steel sheet piles SP-IIIL=3m
1500
500
650
L=15m
800 800
150
8000
69@400=27600
1:2.0
Sodding
Earth fill
4000
PC corrugated sheet piles SW 500A
27000
L=15mPC corrugated sheet piles SW 500A
+4.50m MSL +4.50m MSL
2300
1100 1200
650
250
32500
7000
6875
Impervious steel sheet piles SP-III, L=3m
3000
8000
4603
800
800
MSL+7.50m
MSL+7.50m
150
MSL+7.50m
Radar level gauge in2m mounting frame
26000
105
105
0 2 4 6 8 10 15SCALE
METERS
SECTION 4-4
4000
1500
4000
1500
Zinc-coated gabion mattressL2.0m x W1.0m x H0.5m /pieceMesh wire diameter Ø2.7mm or moreNon-woven geotextile of 2mm or more in thickness to be placed back and below all bottom gabions
Natural ground
FRONT VIEW AT KRA MANG CANAL SIDE (1/2)
Natural ground
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-007
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
26000
4600
900
2000 6000 2000 6000 2000 6000 2000
Right Bank of CanalLeft Bank of Canal
HWL + 3.50m MSL
LWL + 0.50m MSL
+13.00m MSL
HWL + 3.50m MSL
LWL + 0.50m MSL-0.50m MSL
1450 550 6000 550 900 550 6000 550 900 550 6000 550 1450
+15.60m MSL
+16.65m MSL
CL
Staircase
13150 81502000 220002000
+4.50m MSL
800
1:2.0
Gabion mattress
Earth fill
4000
27000
L=15mPC corrugated sheet piles SW 500A
+4.50m MSL +4.50m MSL46
03
7000
2300
1100 1200
650
250
32500
6875
300080
0
800
RC piles Ø150 L=3munder 1m x 2m bed area of each bottom gabion mattress
L=15mPC corrugated sheet piles SW 500A
MSL+7.50m
MSL+7.50m
MSL+7.50m
105
105
0 2 4 6 8 10 15mSCALE
METERS
+3.00m MSL 1000500
1000
±0.00m MSL
500
+3.00m MSL
±0.00m MSL
SECTION 5-5
1000
Natural groundNatural ground
FRONT VIEW AT KRA MANG CANAL SIDE (2/2)
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-008
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
4500
15000
Pasak River side Kra Mang Canal side
4600
900
2600
2000
10005001000 500
500
500
8000
3000
1500
500
1000500
3000
500
2500
500
1500
10001000
Impervious steel sheet piles SP-III
-0.50m MSL
+13.00m MSL
2000
2000
1000
4600
100
PC spun piles Ø600
7502100210021002100210075010
50
6000 3000 6000
+4.50m MSL
6000 13990
20
600
6000
5000
-0.50m MSL
800
20
5000
500
1000
1000 4000
8000
1500
2000
500
1500
500600 600
PC corrugated sheet piles SW 500AL=15m
1200
20
3400
2700 35035045
5012
0075
0
8300
800
2200
Curtain wall
Stainless steel fixed wheel gateClear span 2.0m x Height 1.5m
36004620
20 20
U type wall
Coping concrete
7500
1000
500
Impervious steel sheet piles SP-III
150
150
+7.50m MSLMSL
+7.50m
14500
7500
L=6.5m
PC spun piles Ø600 L=8.5m
1500 15001500
3000 1500150015001500
15001500 2000 1500
PC corrugated sheet piles SW 500AL=15m
RC piles Ø150 L=3munder 1m x 2m bed area of each bottom gabion mattress
RC piles Ø150 L=3munder 1m x 2m bed area of each bottom gabion mattress
750
1000
900
750
650
250
5501050
650
250
1490 990
-0.50m MSL
480SP-III, L=3m35@400=14000
320
2500
1500
450
800
150
800
HWL + 3.50m MSL
LWL + 0.50m MSL
HWL + 6.00m MSL
LWL + 0.50m MSL
L=3m
L=5m
450
450
Pressure
25@
300=
7500
350
Resin-coated steps350W x 150L @30cm
25@
300=
7500
350
Resin-coated steps350W x 150L @30cm
600
MSL+7.50mMSL
+7.00mMSL
+7.00m
105
105
3900
+15.60m MSL
+16.65m MSL
0 2 4 6 8 10 15SCALE
METERS
SECTION 6-6
+3.00mMSL
+3.00m MSL
1400014000
1000
1000
1000
500
1000
500
500
500
500
500
Zinc-coated gabion mattressL2.0m x W1.0m x H0.5m /pieceMesh wire diameter Ø2.7mm or more
Zinc-coated gabion mattressL2.0m x W1.0m x H0.5m /pieceMesh wire diameter Ø2.7mm or more
1000
LONGITUDINAL SECTION (1/2)
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-009
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
LONGITUDINAL SECTION (1/2)
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
-
4500
15000
Pasak River sideKra Mang Canal side
4600
900
2600
2000
1000 500 1000500 500
500
8000
30001500
500
1000500
3000
500
2500
500
15001000
1000
Impervious steel sheet piles
HWL + 3.50m MSL
LWL + 0.50m MSL-0.50m MSL
+13.00m MSL
2000
7502000
1000
750
4600
100
PC spun piles Ø600 L=5m750 2100 2100 2100 2100 2100 750
1050
600030006000
+4.50m MSL
600013990
20
6000
5000
-0.50m MSL
5001
000
1000
10004000
8000
1500
2000
500
1500
500
600
600
PC corrugated sheet pilesSW 500A L=15m
20
Impervious steel sheet piles SP-III
Coping concrete
20
22500
7500
1000
500
L=6.5m20
800
150
150
MSL+7.50m
5000
5000
55@400=22000
16270
150030001500 1500 1500 1500 15001500
PC spun piles Ø600 L=8.5m15002000 1500
150
6350
RC piles Ø150 L=3munder 1m x 2m bed area of each bottom gabion mattress
RC piles Ø150 L=3munder 1m x 2m bed area of each bottom gabion mattress
650
250
990 1490
1050
550
1000
250
-0.50m MSL
Impervious steel sheet piles SP-III, L=3m320Welded fitting SP-IIIL=3m
2500
480
1500
650
900
PC corrugated sheet piles SW 500AL=15m
450
800
800800
HWL + 6.00m MSL
LWL + 0.50m MSL
SP-III L=3m
800
450
450
Pressure
25@
300=
7500
350
600
Resin-coated steps350W x 150L @30cm
Resin-coated steps350W x 150L @30cm
25@
300=
7500
350
600
MSL+7.50m MSL
+7.00m
105
105 +15.60m MSL
+16.65m MSL3900
LONGITUDINAL SECTION (2/2)
0 2 4 6 8 10 15SCALE
METERS
SECTION 7-7
+3.00m MSL+3.00m MSL
1000
500
500
500
500
500
14000
Zinc-coated gabion mattressL2.0m x W1.0m x H0.5m /pieceMesh wire diameter Ø2.7mm or more
1000
1000
1000
500
10000
22000
Zinc-coated gabion mattressL2.0m x W1.0m x H0.5m /pieceMesh wire diameter Ø2.7mm or more
1000
4990
APPROVEDLOCATIONREV.
DESCRIPTIONCHECKED
PRESENT APPROVED
APPROVEDDATE
OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP
APPROVED
DESIGNED
CHECKED
DRAWN
DATE
PROPOSED
APPROVED
VERIFIED
ROYAL IRRIGATION DEPARTMENT
CHIEF
DIRECTOR
D.G.
ROYAL IRRIGATION DEPARTMENT
CONSULTING FIRMS :
DATE
NO.
The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya
in the Kingdom of Thailand
KRA MANG FLOODGATE(CIVIL WORKS)
CTI ENGINEERING INTERNATIONAL CO., LTD.
KM-FG-010
Masaki ISHII
Masaki ISHII
Akio SHICHIJUGARI
T. MISHINA
LONGITUDINAL SECTION (2/2)
P. SIRION
S. INTARAPRACHA
L. KOWATTANA
CoverList of drawingsGeneral planKra Mang floodgate