Template Traceability Matrix
-
Upload
vibhaskelk -
Category
Documents
-
view
213 -
download
0
Transcript of Template Traceability Matrix
-
8/18/2019 Template Traceability Matrix
1/8
Project Name
Traceability Matrix
TEMPLATE
-
8/18/2019 Template Traceability Matrix
2/8
Change Control Page
The following information is being used to control and track modifications made to thisdocument.
1) Revision ate!Author!"ection#s)!Page $umber#s)!"ummar% of &hange#s)!
-
8/18/2019 Template Traceability Matrix
3/8
Title Page
ocument $ame! Project NameRe'uirements Traceabilit% Matri(
&reation ate! Month Year
ocument $umber! **
Pro+ect $umber! Task!
&reated b%!
A,,rover! -------------------------- Name and Organization
&oncurrence! ------------------------- Name and Organization
-
8/18/2019 Template Traceability Matrix
4/8
Table of Contents
Preface..............................................................................................................................................ii
1. verview...............................................................................................................................1*11.1 "co,e..........................................................................................................................1*11./ Res,onsibilities............................................................................................................1*1
/. Re'uirements Traceabilit% Matri(........................................................................................./*1
/.1 escri,tion of Matri( 0ields......................................................................................./*1/./ Re'uirements Traceabilit% Matri(.............................................................................../*1
-
8/18/2019 Template Traceability Matrix
5/8
Preface
Document Version Control: t is the reader2s res,onsibilit% to ensure the% have the latest version
of this document. 3uestions should be directed to the owner of this document4 or the ,ro+ectmanager.
This document was generated b% the Project Name ,ro+ect team. System/Project Name will bedevelo,ed for the Organizational Name.
Lifecycle Stage! Project Name is in the Re'uirements stage of the software lifec%cle.
Approval: A completed stage exit will constitute approval o this document!
Document !ner! The ,rimar% contact for 'uestions regarding this document is!
Author =s Name" Author =s #unction" e!g!" Project Planner Project Name TeamPhone! $%%%& %%%'%%%% Primar% email! %%%%
cc mail! %%%%
Privacy "nformation
This document ma% contain information of a sensitive nature. This information should not begiven to ,ersons other than those who are involved in the Project Name ,ro+ect or who will become involved during the lifec%cle.
-
8/18/2019 Template Traceability Matrix
6/8
#$ vervie!
#$# Scope
The re'uirements traceabilit% matri( is a table used to trace ,ro+ect life c%cle activities and work ,roducts to the ,ro+ect re'uirements. The matri( establishes a thread that traces re'uirementsfrom identification through im,lementation. ocument the sco,e of the re'uirements traceabilit%matri( in this section.
#$% &esponsibilities
The re'uirements traceabilit% matri( will be maintained b% the ,ro+ect manager or designee5however4 in,ut to the table ma% be re'uired from other team members. ocument theres,onsibilities in this section.
-
8/18/2019 Template Traceability Matrix
7/8
%$ &e'uirements Traceability Matrix
%$# Description of Matrix (iel)s
evelo, a matri( to trace the re'uirements back to the ,ro+ect ob+ectives identified in the Pro+ectPlan and forward through the remainder of the ,ro+ect life c%cle stages. Place a co,% of thematri( in the Pro+ect 0ile. E(,and the matri( in each stage to show traceabilit% of work ,roductsto the re'uirements and vice versa. The re'uirements traceabilit% matri( should contain thefollowing fields!
$ A uni'ue identification number containing the general categor% of the re'uirement #e.g.4
"6"AM) and a number assigned in ascending order #e.g.4 1.75 1.15 1./).
$ The re'uirement statement.
$ Re'uirement source #&onference5 &onfiguration &ontrol 8oard5 Task Assignment4 etc.).
$ "oftware Re'uirements ",ecification90unctional Re'uirements ocument ,aragra,h numbercontaining the re'uirement.
$ esign ",ecification ,aragra,h number containing the re'uirement.
$ Program Module containing the re'uirement.
$ Test ",ecification containing the re'uirement test.
$ Test &ase number#s) where re'uirement is to be tested #o,tional).
$ :erification of successful testing of re'uirements.
$
-
8/18/2019 Template Traceability Matrix
8/8
Pro*ect +ame&e'uirements Traceability Matrix
;ni'ue $umber
Re'uirement "ource of Re'uirement
"oftware Re's. ",ec90unctional Re'. oc.
esign",ec.
ProgramModule
Test",ec.
Test&ase#s)
"uccessfulTest
:erification
Modificationof
Re'uirement
Remarks
b*ective #:
Project Name Req. Traceability Matrix 2-2 11/98