Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE 23.11.2012.
TE/MPE/EE
description
Transcript of TE/MPE/EE
![Page 1: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/1.jpg)
TE/MPE/EE
J. M
oura
o T/
MPE
/EE
1 N
ovem
ber 2
012
LHC Machine
Local protection Redundant Power supply (DQLPUR) - Review
![Page 2: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/2.jpg)
TE/MPE/EE
Local protection Redundant Power supply (DQLPUR)J.
Mou
rao
T/M
PE/E
E 1
Nov
embe
r 201
2
LHC Machine
- DQLPUR (new 6 voltages DC power supply)
- MPE/EP power requests- Design (theory)- Design (schematics )- Design (implementation)- Today’s situation- What’s Next ?
![Page 3: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/3.jpg)
TE/MPE/EE
Local protection Redundant Power supply (DQLPUR)MPE/EP power requests
J. M
oura
o T/
MPE
/EE
1 N
ovem
ber 2
012
LHC Machine
Equipment+5.6 V isolated
+15 V isolated
-15 V isolated
+5.6 V common
+15 V common
-15 V common
DQQDL_A 100 50 50 0 0 0DQQDL_B 100 50 50 0 0 0DQAMC 0 0 0 250 100 100DQHSU 0 0 0 250 40 20DQCSU 0 0 0 250 20 10SPARE_1 0 0 0 250 50 50
Total 200 100 100 1000 210 180Requested Current 500 mA 250 mA 250 mA 2000 mA 500 mA 500 mAPower 2.8 W 3.75W 3.75W 11.2W 7.5W 7.5W
MPE/EP section asked for:- Six DC voltages ( & the following currents)
Total power requested = 36.5 W
- Voltage decay: All the 6 voltages should remain at least for 100ms after a power cut.
- The insulation between the 3 isolated Voltages and the earth should be > 1.9 kV.
- Full Redundancy on all these voltages (in total they need 12 DC Voltages)
![Page 4: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/4.jpg)
TE/MPE/EE
Local protection Redundant Power supply (DQLPUR)Design (theory)
J. M
oura
o T/
MPE
/EE
1 N
ovem
ber 2
012
LHC Machine
- For these linear power supplies, we are using the LT 1084 regulator (same as the one use in the nQPS powerpacks)
- Rated output current of 5[A]
- It as a Short circuit protection (by limiting the output current to a maximum)
Left board schematic
![Page 5: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/5.jpg)
TE/MPE/EE
Local protection Redundant Power supply (DQLPUR)Design (schematics)
J. M
oura
o T/
MPE
/EE
1 N
ovem
ber 2
012
LHC Machine
Left PCB (common/earth potential, EDMS: EDA-02607) :
- 3 voltages (+5,+15,-15 VDC)- 1 power-cycle circuit (P.S. + Relay)
Right PCB(isolate/ magnet potential, EDMS: EDA-02607) :
- 3 isolated DC (+5,+15,-15 VDC)
Left board schematic
![Page 6: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/6.jpg)
TE/MPE/EE
Local protection Redundant Power supply (DQLPUR)Design (implementation)
J. M
oura
o T/
MPE
/EE
1 N
ovem
ber 2
012
LHC Machine
Items fixed on the Heat sink :- 6 regulators- 100VA transformer- 1 rectifier Bridge
Isolated (magnet potential)Common (earth potential)
![Page 7: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/7.jpg)
TE/MPE/EE
Local protection Redundant Power supply (DQLPUR)Today’s situation
J. M
oura
o T/
MPE
/EE
1 N
ovem
ber 2
012
LHC Machine
- A First DQLPUR prototype (without the remote power cycle function) was built and tested (see Steve presentation).
- The second DQLPUR prototype was assembled by MathieuThese unit is under test (Heat run, power cycle function, ripple meas.).
![Page 8: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/8.jpg)
TE/MPE/EE
Local protection Redundant Power supply (DQLPUR)What’s Next ?
J. M
oura
o T/
MPE
/EE
1 N
ovem
ber 2
012
LHC Machine
- Complete de test of the second prototype- We already found an insulation problem on these second prototype ->
new PCBs iteration needed
- Mathieu is preparing a second “version 2 prototype” -> to be supplied next week to EPC for testing.
- The final documentation should be ready in January 2013 for the production of 2’700 DQLPUR in the Industry.
- We are know contacting manufacturers to get prices offers (&delivery times ) for the “most expensive” items in the DQLPUR (mechanical box, Heat sink, main transformer)
- The market Survey process is in progress (see Knud presentation)
![Page 9: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/9.jpg)
TE/MPE/EE
Local protection Redundant Power supply (DQLPUR)J.
Mou
rao
T/M
PE/E
E 1
Nov
embe
r 201
2
LHC Machine
Questions ?
![Page 10: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/10.jpg)
TE/MPE/EE
Interface Module (DQLIM) progress statusAnnex 1: DQLPUR insertion in the DQLIM
J. M
oura
o T/
MPE
/EE
1 N
ovem
ber 2
012
LHC Machine
QRL side
Way side
DQLPUR (UPS1)
DQLPUR (UPS2)
DQLIM
![Page 11: TE/MPE/EE](https://reader036.fdocuments.in/reader036/viewer/2022081514/56816329550346895dd3a390/html5/thumbnails/11.jpg)
TE/MPE/EE
Interface Module (DQLIM) progress statusAnnex 2: DQLIM motherboard schematic
J. M
oura
o T/
MPE
/EE
1 N
ovem
ber 2
012
LHC Machine
Courtesy of J.M Wickham