Telecom Needs of Power Sector
Focus on
Transmission Utility
29-30th May 2012
14:23 1
Gujarat Energy Transmission Corporation Limited
2
Contents
Gujarat Power Network
Telecom Technologies
- Development, Utilization & Experience
Tomorrow’s Needs
GETCO Telecom Plan and Strategy
Expectations from the Telecom solution providers
14:23 2
Total installed capacity of Gujarat: 18394MW*
(* including Wind farm capacity 2884 MW, Solar capacity 664 MW, Biomass capacity 31 MW)
14:23 3
4
GETCO Network
Sr.
No.Voltage Class
Substations
(Nos.)
Transmission
Lines (cKM)
1 400 KV 11 3187
2 220 KV 79 14852
3 132 KV 49 4808
4 66 KV / 33 KV 1131 22177
Total 1270 45024
Transmission Elements Overview
14:23 4
5
Telecom Technologies –
Development, Utilization & Experience
• Genesis for need of Telecom Technologies
• How it evolved?
• Where & which technologies we utilized?
• What is our experience?
14:23 5
6
Power Station
Receiving
Substation
Transmission
Sub Station
Distribution
Substation
Distribution Grid
Transmission
GridSub
Transmission
Grid
14:23 Consumers
7
Transmission
Sub Station
Distribution
Substation
Transmission
GridSub
Transmission
Grid
14:23
Electricity
Distribution Grid
Power Station
Receiving
Substation
Consumers
8
Power Station
Receiving
Substation
Transmission
Sub Station
Distribution
Substation
Transmission
GridSub
Transmission
Grid
14:23
Information
Electricity
Distribution Grid
Consumers
Consumers
9
Transmission
GridSub
Transmission
Grid
14:23
Distribution Grid
Telephony
PSTN*
PLCC^
• Load Management
• Outages
• Talks on Operational eventsPower Station
Transmission
Sub Station
Distribution
Substation
* - Public Switched Telecom Network
^ - Power Line Carrier Communication
Distribution
Substation
Consumers
10
Transmission
GridSub
Transmission
Grid
14:23
Distribution GridPower Station
Transmission
Sub Station
Tele Printing
PLCC
• Outage Messages
• Generation data
• Important & urgent
directives
Load Dispatch Centre
Consumers
11
Distribution
Substation
Sub
Transmission
Grid
14:23
Distribution GridLoad Dispatch Centre
Power Station
Transmission
GridReceiving
Substation
Transmission
Sub Station
Tele Protection
PLCC
Carrier Inter trip
• Permissive trip
• Direct Trip
Consumers
Distribution Grid
12
Distribution
Substation
Transmission
GridSub
Transmission
Grid
14:23
Power Station
Receiving
Substation
• Power System data
Tele Metering
PLCC
Load Dispatch Centre
Transmission
Sub Station
Consumers
13
Receiving
Substation
Transmission
Sub Station
Distribution
Substation
Transmission
GridSub
Transmission
Grid
14:23
Distribution GridLoad Dispatch CentrePower Station
Power Station
Distribution
Substation
• Communication with
Isolated locations
Telephony
VHF
HF Radio
Satellite phone
Micro waves
Load Dispatch Centre
Distribution Substation
Wind Farm
Consumers
Distribution Grid
14
Power Station
Transmission
GridSub
Transmission
Grid
14:23
Receiving
Substation
Transmission
Sub Station
Distribution
Substation
• Automated Energy
meter data pooling
DAS*
PSTN Copper lines
DAS*
Nodal Centre
Load Dispatch Centre
Distribution Substation
* - Data Acquisition System
GSM
Consumers
15
Transmission
GridSub
Transmission
Grid
14:23
Power Station
Receiving
Substation
Transmission
Sub Station
Distribution
Substation
e-Urja
Corporate Data Centre
• Integration of
Organization
functional activities
ERP*
Leased Copper lines
Micro Waves
Distribution GridLoad Dispatch Centre
Distribution Substation
* - Enterprise Resource Planning
Development of Telecom Technology - Summary
14:23
PTN
PLCC
VHFHF
Radio
Satellite
Phone
Micro
Wave
Micro
Wave
Telephony
Tele Printing
Tele Protection
Tele Metering
DAS
ERP
PSTN /
Leased
Copper
line
Cellular
Mobiles
1st Generation 2nd Generation
PSTN
GSM
GETCO Experience
14:23
Public Switched Telecom Network
• The only source at that time • Dependent on service provider
• Costlier
PLCC
• Dedicated & safe
• Part of Utilities own transmission
network
• No dependence on
service provider
• Ruled for years
• Now digital PLCC,
but same core technology
• Frequency congestion
• Limited band width
– Restricted data transmission
GETCO Experience
14:23
HF Radio
• Useful for long distance
• Disaster Management
(Massive earthquake in Kutch)
• Requires license
VHF
• Helped in natural calamities
(Massive earthquake in Kutch)
• Open mode
• No network jam
• No dependence on
service provider
• Simultaneous contact to many
users
• Very useful in Distribution System
for load management
• Requires license
• Up to limited distance
GETCO Experience
14:23
Micro waves
• Relatively low cost
• Wide bandwidth
• Requires License
• Requires Line of sight
• Weather dependent
Satellite Phone
• Disaster Management
(Massive earthquake in Kutch and
flood in Surat)
• Useful for long distance
• Requires License
• Costlier
Leased copper lines
• Wide bandwidth
• More reliable• Dependent on service provider
Transmission
Sub Station
Distribution
Substation
Distribution Substation
Consumers
21
Distribution
Substation
Transmission
GridSub
Transmission
Grid
14:23
Distribution GridLoad Dispatch CentrePower Station
• Remote meter readings
• AMR* for ABT^ meters
Load Dispatch Centre
* - Automatic Meter Reading
^ - Availability Based Tariff
Receiving
Substation
Transmission
Sub Station
Consumers
Solar Power
Plant
Wind Farm
Consumers
Load Dispatch Centre
22
Distribution
Substation
Transmission
GridSub
Transmission
Grid
14:23
Distribution GridLoad Dispatch CentrePower Station
Distribution
Substation
• Remote Control of Sub Stn
• Sub Stn Automation and
SCADA*
Distribution Substation
* - Supervisory Control And
Data Acquisition
Transmission
Sub StationReceiving
Substation
Distribution
Substation
Distribution Substation
Consumers
23
Distribution
Substation
Transmission
GridSub
Transmission
Grid
14:23
Distribution GridLoad Dispatch Centre
• Monitoring Power System
health
• WAMS*
Load Dispatch Centre
* Wide Area Monitoring System
Receiving
Substation
Power Station
Transmission
Sub Station
Receiving
Substation
Transmission
Sub Station
Distribution
Substation
Distribution Substation
Consumers
24
Distribution
Substation
Transmission
GridSub
Transmission
Grid
14:23
Distribution GridLoad Dispatch CentrePower Station
Solar Power
Plant
• Monitoring Renewable
Energy
• Renewable Energy Integration
Load Dispatch Centre
Wind Farm
Distribution Grid
Power Station
Consumers
25
Transmission
GridSub
Transmission
Grid
14:23
Receiving
Substation
Transmission
Sub Station
Distribution
Substation
Intra
netCorporate Data Centre
• Internal mass
communication
• Monitoring
-Daily Reports
-maintenance data
-Project Progress
• Online exam, etc
Intra Net
Load Dispatch Centre
Distribution Substation
Distribution Grid
Power Station
Consumers
2614:23
Receiving
Substation
Transmission
Sub Station
Distribution
Substation
GIS*
Corporate Data Centre
• Long term benefits for
- maintenance,
- laying new lines and
- interface with other
agencies
GIS Mapping
Load Dispatch Centre
Distribution Substation
Transmission
GridSub
Transmission
Grid
* Geographical Information System
Tomorrow's Needs: Applications - Summary
14:23
Telephony
Tele Printing
Tele Protection
Tele Metering
DAS
ERP
• Automatic Meter Reading for ABT meters
• Intra net
• Sub Station Automation & Remote Control of Sub station (i.e.
SCADA)
• Wide Area Monitoring System (WAMS)
• Renewable energy integration
• Video Conferencing, Operational Surveillance
• Geographical Information System (GIS) Mapping
• Distribution Automation (DA)
• SCADA
• Advanced metering infrastructure (AMI)
• Demand Response (DR)
+
Smart Grid Applications in Transmission
Smart Grid Applications in Distribution
28
Tomorrow’s Needs - Features
14:23 28
Bulk data – Higher Band-width
High Speed – Low latency
High Reliability and Dependability
Immune to EMI
Data transmission over long distance
Secure
Redundancy
Cost effective
Tomorrow's Needs: Solution
14:23
Telephony
Tele Printing
Tele Protection
Tele Metering
DAS
ERP
• Automatic Meter Reading for ABT meters
• Intra net
• Sub Station Automation & Remote Control of Sub station
(i.e. SCADA)
• Wide Area Monitoring System (WAMS)
• Video Conferencing
• Geographical Information System (GIS) Mapping
• Enterprise Resource Planning (ERP)
• Distribution Automation (DA)
• SCADA
• Advanced metering infrastructure (AMI)
• Demand Response (DR)
+
3rd Generation
Fiber Optics - FO cables in Ground wire
OPGW
• No limitation in band-width –
huge transmission capacity
• Part of Transmission line -
Utilities own network
• Immune to interference
• No dependence on service provider
• Provides sufficient reserve capacity
to accommodate future expansion
30
GETCO Telecom Plan and Strategy
• Phasing out 1st & 2nd generation with 3rd generation technologies
• Installing OPGW on all new 400KV lines for Communication,
Protection, Control and SCADA (Digital Sub stations).
• Installing OPGW on strategic transmission network to provide
business opportunities.
• Developing communication network for WAMS
Ownership basis
Hiring basis.
• Going for GPRS connectivity for remote ABT meter reading.
• Opportunities from the transmission assets & business (consolidating
transmission assets into business units)
• Offering fiber and bandwidth on lease basis
14:23 30
31
Expectations from the telecom solution providers
• More manufacturers and suppliers should participate.
• It must be scalable.
• Modular design.
• IEC 61850 based Tele protection unit.
• Inter operability.
• Cost Effective
14:23 31
“Great discoveries and improvements invariably
involvethe cooperation of many
minds.”
Alexander Graham Bell (1847-1922)
3314:23
R. P. Satani
Deputy Engineer,
Engineering Cell, Corporate Office,
GETCO, Vadodara
Mobile: +91 99252 08735
e-mail: [email protected]