33
Telecom Needs of Power Sector Focus on Transmission Utility 29-30 th May 2012 14:23 1 Gujarat Energy Transmission Corporation Limited

Transcript of Telecom Needs of Power Sector - National Power Training ... · PDF fileTelecom Needs of Power...

Telecom Needs of Power Sector

Focus on

Transmission Utility

29-30th May 2012

14:23 1

Gujarat Energy Transmission Corporation Limited

2

Contents

Gujarat Power Network

Telecom Technologies

- Development, Utilization & Experience

Tomorrow’s Needs

GETCO Telecom Plan and Strategy

Expectations from the Telecom solution providers

14:23 2

Total installed capacity of Gujarat: 18394MW*

(* including Wind farm capacity 2884 MW, Solar capacity 664 MW, Biomass capacity 31 MW)

14:23 3

4

GETCO Network

Sr.

No.Voltage Class

Substations

(Nos.)

Transmission

Lines (cKM)

1 400 KV 11 3187

2 220 KV 79 14852

3 132 KV 49 4808

4 66 KV / 33 KV 1131 22177

Total 1270 45024

Transmission Elements Overview

14:23 4

5

Telecom Technologies –

Development, Utilization & Experience

• Genesis for need of Telecom Technologies

• How it evolved?

• Where & which technologies we utilized?

• What is our experience?

14:23 5

6

Power Station

Receiving

Substation

Transmission

Sub Station

Distribution

Substation

Distribution Grid

Transmission

GridSub

Transmission

Grid

14:23 Consumers

7

Transmission

Sub Station

Distribution

Substation

Transmission

GridSub

Transmission

Grid

14:23

Electricity

Distribution Grid

Power Station

Receiving

Substation

Consumers

8

Power Station

Receiving

Substation

Transmission

Sub Station

Distribution

Substation

Transmission

GridSub

Transmission

Grid

14:23

Information

Electricity

Distribution Grid

Consumers

Consumers

9

Transmission

GridSub

Transmission

Grid

14:23

Distribution Grid

Telephony

PSTN*

PLCC^

• Load Management

• Outages

• Talks on Operational eventsPower Station

Transmission

Sub Station

Distribution

Substation

* - Public Switched Telecom Network

^ - Power Line Carrier Communication

Distribution

Substation

Consumers

10

Transmission

GridSub

Transmission

Grid

14:23

Distribution GridPower Station

Transmission

Sub Station

Tele Printing

PLCC

• Outage Messages

• Generation data

• Important & urgent

directives

Load Dispatch Centre

Consumers

11

Distribution

Substation

Sub

Transmission

Grid

14:23

Distribution GridLoad Dispatch Centre

Power Station

Transmission

GridReceiving

Substation

Transmission

Sub Station

Tele Protection

PLCC

Carrier Inter trip

• Permissive trip

• Direct Trip

Consumers

Distribution Grid

12

Distribution

Substation

Transmission

GridSub

Transmission

Grid

14:23

Power Station

Receiving

Substation

• Power System data

Tele Metering

PLCC

Load Dispatch Centre

Transmission

Sub Station

Consumers

13

Receiving

Substation

Transmission

Sub Station

Distribution

Substation

Transmission

GridSub

Transmission

Grid

14:23

Distribution GridLoad Dispatch CentrePower Station

Power Station

Distribution

Substation

• Communication with

Isolated locations

Telephony

VHF

HF Radio

Satellite phone

Micro waves

Load Dispatch Centre

Distribution Substation

Wind Farm

Consumers

Distribution Grid

14

Power Station

Transmission

GridSub

Transmission

Grid

14:23

Receiving

Substation

Transmission

Sub Station

Distribution

Substation

• Automated Energy

meter data pooling

DAS*

PSTN Copper lines

DAS*

Nodal Centre

Load Dispatch Centre

Distribution Substation

* - Data Acquisition System

GSM

Consumers

15

Transmission

GridSub

Transmission

Grid

14:23

Power Station

Receiving

Substation

Transmission

Sub Station

Distribution

Substation

e-Urja

Corporate Data Centre

• Integration of

Organization

functional activities

ERP*

Leased Copper lines

Micro Waves

Distribution GridLoad Dispatch Centre

Distribution Substation

* - Enterprise Resource Planning

Development of Telecom Technology - Summary

14:23

PTN

PLCC

VHFHF

Radio

Satellite

Phone

Micro

Wave

Micro

Wave

Telephony

Tele Printing

Tele Protection

Tele Metering

DAS

ERP

PSTN /

Leased

Copper

line

Cellular

Mobiles

1st Generation 2nd Generation

PSTN

GSM

GETCO Experience

14:23

Public Switched Telecom Network

• The only source at that time • Dependent on service provider

• Costlier

PLCC

• Dedicated & safe

• Part of Utilities own transmission

network

• No dependence on

service provider

• Ruled for years

• Now digital PLCC,

but same core technology

• Frequency congestion

• Limited band width

– Restricted data transmission

GETCO Experience

14:23

HF Radio

• Useful for long distance

• Disaster Management

(Massive earthquake in Kutch)

• Requires license

VHF

• Helped in natural calamities

(Massive earthquake in Kutch)

• Open mode

• No network jam

• No dependence on

service provider

• Simultaneous contact to many

users

• Very useful in Distribution System

for load management

• Requires license

• Up to limited distance

GETCO Experience

14:23

Micro waves

• Relatively low cost

• Wide bandwidth

• Requires License

• Requires Line of sight

• Weather dependent

Satellite Phone

• Disaster Management

(Massive earthquake in Kutch and

flood in Surat)

• Useful for long distance

• Requires License

• Costlier

Leased copper lines

• Wide bandwidth

• More reliable• Dependent on service provider

Tomorrow's Needs: Applications

14:23

Transmission

Sub Station

Distribution

Substation

Distribution Substation

Consumers

21

Distribution

Substation

Transmission

GridSub

Transmission

Grid

14:23

Distribution GridLoad Dispatch CentrePower Station

• Remote meter readings

• AMR* for ABT^ meters

Load Dispatch Centre

* - Automatic Meter Reading

^ - Availability Based Tariff

Receiving

Substation

Transmission

Sub Station

Consumers

Solar Power

Plant

Wind Farm

Consumers

Load Dispatch Centre

22

Distribution

Substation

Transmission

GridSub

Transmission

Grid

14:23

Distribution GridLoad Dispatch CentrePower Station

Distribution

Substation

• Remote Control of Sub Stn

• Sub Stn Automation and

SCADA*

Distribution Substation

* - Supervisory Control And

Data Acquisition

Transmission

Sub StationReceiving

Substation

Distribution

Substation

Distribution Substation

Consumers

23

Distribution

Substation

Transmission

GridSub

Transmission

Grid

14:23

Distribution GridLoad Dispatch Centre

• Monitoring Power System

health

• WAMS*

Load Dispatch Centre

* Wide Area Monitoring System

Receiving

Substation

Power Station

Transmission

Sub Station

Receiving

Substation

Transmission

Sub Station

Distribution

Substation

Distribution Substation

Consumers

24

Distribution

Substation

Transmission

GridSub

Transmission

Grid

14:23

Distribution GridLoad Dispatch CentrePower Station

Solar Power

Plant

• Monitoring Renewable

Energy

• Renewable Energy Integration

Load Dispatch Centre

Wind Farm

Distribution Grid

Power Station

Consumers

25

Transmission

GridSub

Transmission

Grid

14:23

Receiving

Substation

Transmission

Sub Station

Distribution

Substation

Intra

netCorporate Data Centre

• Internal mass

communication

• Monitoring

-Daily Reports

-maintenance data

-Project Progress

• Online exam, etc

Intra Net

Load Dispatch Centre

Distribution Substation

Distribution Grid

Power Station

Consumers

2614:23

Receiving

Substation

Transmission

Sub Station

Distribution

Substation

GIS*

Corporate Data Centre

• Long term benefits for

- maintenance,

- laying new lines and

- interface with other

agencies

GIS Mapping

Load Dispatch Centre

Distribution Substation

Transmission

GridSub

Transmission

Grid

* Geographical Information System

Tomorrow's Needs: Applications - Summary

14:23

Telephony

Tele Printing

Tele Protection

Tele Metering

DAS

ERP

• Automatic Meter Reading for ABT meters

• Intra net

• Sub Station Automation & Remote Control of Sub station (i.e.

SCADA)

• Wide Area Monitoring System (WAMS)

• Renewable energy integration

• Video Conferencing, Operational Surveillance

• Geographical Information System (GIS) Mapping

• Distribution Automation (DA)

• SCADA

• Advanced metering infrastructure (AMI)

• Demand Response (DR)

+

Smart Grid Applications in Transmission

Smart Grid Applications in Distribution

28

Tomorrow’s Needs - Features

14:23 28

Bulk data – Higher Band-width

High Speed – Low latency

High Reliability and Dependability

Immune to EMI

Data transmission over long distance

Secure

Redundancy

Cost effective

Tomorrow's Needs: Solution

14:23

Telephony

Tele Printing

Tele Protection

Tele Metering

DAS

ERP

• Automatic Meter Reading for ABT meters

• Intra net

• Sub Station Automation & Remote Control of Sub station

(i.e. SCADA)

• Wide Area Monitoring System (WAMS)

• Video Conferencing

• Geographical Information System (GIS) Mapping

• Enterprise Resource Planning (ERP)

• Distribution Automation (DA)

• SCADA

• Advanced metering infrastructure (AMI)

• Demand Response (DR)

+

3rd Generation

Fiber Optics - FO cables in Ground wire

OPGW

• No limitation in band-width –

huge transmission capacity

• Part of Transmission line -

Utilities own network

• Immune to interference

• No dependence on service provider

• Provides sufficient reserve capacity

to accommodate future expansion

30

GETCO Telecom Plan and Strategy

• Phasing out 1st & 2nd generation with 3rd generation technologies

• Installing OPGW on all new 400KV lines for Communication,

Protection, Control and SCADA (Digital Sub stations).

• Installing OPGW on strategic transmission network to provide

business opportunities.

• Developing communication network for WAMS

Ownership basis

Hiring basis.

• Going for GPRS connectivity for remote ABT meter reading.

• Opportunities from the transmission assets & business (consolidating

transmission assets into business units)

• Offering fiber and bandwidth on lease basis

14:23 30

31

Expectations from the telecom solution providers

• More manufacturers and suppliers should participate.

• It must be scalable.

• Modular design.

• IEC 61850 based Tele protection unit.

• Inter operability.

• Cost Effective

14:23 31

“Great discoveries and improvements invariably

involvethe cooperation of many

minds.”

Alexander Graham Bell (1847-1922)

3314:23

R. P. Satani

Deputy Engineer,

Engineering Cell, Corporate Office,

GETCO, Vadodara

Mobile: +91 99252 08735

e-mail: [email protected]