Los Angeles County One Gateway Plaza 213-922.2000 Tel metro. net Metropolitan Transportation Authority Los Angeles, CA 90012-2952
Metro
TO:
THROUGH:
FROM:
SUBJECT:
ISSUE
BOARD OF DIRECTORS
ARTHUR T. LEAHYJ,i~ CHIEF EXECUTIVE oi=~ 1CE'kJ MARTHA WELBORNE, FAIA
August 28, 2013
EXECUTIVE DIRECTOR, COUNTYWIDE PLANNING
MEASURE R UNFUNDED SCOPE ELEMENTS -REVISIONS
On August 9, 2013 a memo was transmitted with information about the estimated costs of the unfunded Measure R scope elements. Revisions are needed to better reflect project conditions on two projects, the 1-710 South and the Metro Gold Line Eastside Transit Corridor Phase 2. This report transmits the updated information.
DISCUSSION
Attached is the revised table titled MeasureR Unfunded Scope Elements by Subregion. The following revisions are shown in strikeout and underline text:
• For the 1-710 South Project, the "Total Cost" figures were revised to include "Existing Committed Funding" amount for 1-710 South Early Actions Projects. Those amounts had been omitted from the "Total Cost" figures in error.
• For the Metro Gold Line Eastside Transit Corridor Phase 2 project, the "Cost of Unfunded Scope" columns were revised to properly reflect the complete range of possible costs for the variations in the project alignments. The "Total Cost" figures for this project also required revisions to create multiple possible totals, one for each al ignment selection assumption.
As discussed in the August 9, 2013 memo, all costs are being reviewed to reflect the current bid environment and construction costs.
NEXT STEPS
Comments are due to Fanny Pan at [email protected] by September 12, 2013.
Attachment: MeasureR Unfunded Scope Elements by Subregion
-
1
2
3
4
5
6
7
Measure R Unfunded Scope Elements by Subregion ($) in millions
Measure R Project Unfunded Scope Elements
ARROYO VERDUGO SUBREGION
Arroyo Verdugo Subregion - Highway Projects
Highway Operational Improvements •Intersection and interchange improvements, signal synchronizations, ITS corridor improvements, soundwalls,
in Arroyo Verdugo Subregion auxiliary lanes, etc. 1-5/SR-134 interchange modifications.
1-5 Carpool Lanes from SR-134 to SR 170, NB & SB, incl Empire Ave •None Access lmprovementsC4>
Arroyo Verdugo Subregion - Highway Project Subtotal
Arroyo Verdugo Subregion -Transit Project Subtotal
ARROYO VERDUGO SUBREGION- TOTAL (1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
Low Est High Est
$583 $583
$603 $603
$1,186 $1,186
$0 $0
$1,186 $1,186
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$
(3) Project definition depends on final environmental process (4) Project is also shown in another
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
Existing Committed Funding in 2014$ (1)(2)
$183
$603
$786
$0
$786
ATTACHMENT A REVISED
Cost of Unfunded Scope'3> in 2014$
Low Est. High Est
$400 $400
$0 $0
$400 $400
$0 $0
$400 $400
Page 1
-
8
9
10
11
12
13
14
15
16
17
18
19
Measure R Unfunded Scope Elements by Subregion ($) in millions
Measure R Project Unfunded Scope Elements
CENTRAL LOS ANGELES SUBREGION
Central Los Angeles Subregion - Highway Projects
Four build alternatives are under consideration. Two have anticipated funding shortfalls:
SR-710 NorthC4>CS> •Light Rail Transit
•Freeway Tunnel, depending on contracting/delivery method
Central Los Angeles Subregion - Highway Project Subtotal
Central Los Angeles Subregion - Transit Projects
Crenshaw/LAX Transit Corridor •Extend LRT from Expo to Wilshire Boulevard
(LRT)c4>
•Improvements to first/last mile connections to stations,
Eastside Light Rail Access (Gold including bicycle and pedestrian infrastructure such as bicycle lanes, bicycle racks, curb extensions, crosswalks, enhanced
Line) pedestrian lighting, and tree canopies for key pedestrian corridors.
Metro Purple Line Extension, Section •None 1(6)
Regional Connector •Fifth and Flower Station
West Santa Ana Branch ROW •LRT Alternative based on SCAG Alternatives Analysis study.
Corridor4>
Central Los Angeles Subregion -Transit Project Subtotal
CENTRAL LOS ANGELES SUBREGION- TOTAL (1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
Low Est. High Est.
$798 $5,418
$798 $5,418
$2,935 $2,935
$43 $50
$2,234 $2,234
$1,527 $1,527
$3,034 $3,034
$9,772 $9,779
$10,570 $15,197
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$ (3) Project definition depends on final environmental process (4) Project is also shown in another subregion listing
Existing Committed Funding in 2014$ (1)(2)
$798
$798
$1,671
$29
$2,234
$1,327
$606
$5,867
$6,664
(5) Per Board direction on June 27, 2013 project is not to be accelerated. Potential candidate for TIFIA financing pending future Board direction. (6) Sections 2 and 3 are shown in Westside Cities Subregion
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
ATTACHMENT A REVISED
Cost of Unfunded Scope(3) in 2014$
Low Est. High Est.
$0 $4,620
$0 $4,620
$1,264 $1,264
$14 $21
$0 $0
$200 $200
$2,428 $2,428
$3,906 $3,913
$3,906 $8,533
Page 2
-
20
21
22
23
24
25
26
27
28
Measure R Unfunded Scope Elements by Subregion ($) in millions
Measure R Project Unfunded Scope Elements
GATEWAY CITIES SUBREGION
Gateway Cities Subregion - Highway Projects
BNSF Grade Separations in Gateway •Additional funding to complete one or more of the remaining Cities four grade separations
1-5 South Carmenita Road Interchange
1-5 South Carpool and Mixed Flow Lanes from Orange County Line to 1- •Segment 2 - Valley View Ramps 6051 including Valley View
1-605 Corridor "Hot Spot" Congestion relief projects on 1-6051 SR-91 I and 1-405. Interchanges
1-710 South/Early Action Projects:
•1-710 South Two alternatives are under consideration:
•Alternative 6C (Freight Corridor+Freeway Improvements}
•Alternative 60 (Freight Corridor}
•1-710 Early Action Projects •Gateway Cities Strategic Transportation Plan
Gateway Cities Subregion- Highway Project Subtotal
(1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
Low Est. High Est
$124 $295
$380 $380
$11501 $11501
$21843 $41443
ctJI 'l'l1 ct~ ("\(')JI I I
$4454 $8217
Included Included Above Above
$SM+8 $~4.~~2 $9,301 1141835
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$ (3} Project definition depends on final environmental process
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
Existing Committed Funding in 2014$ (1)(2)
$33
$380
$11451
$605
$414
$122
$3,005
ATTACHMENT A REVISED
Cost of Unfunded Scope in 2014$
LowEst High Est.
$91 $262
$0 $0
$50 $50
$21238 $31838
$31917 $71680
Included Included Above Above
$6,296 $11,830
Page 3
-
29
30
31
32
33
34
Measure R Unfunded Scope Elements by Subregion ($) in millions
Total Cost, Including Funded and Unfunded
Measure R Project Unfunded Scope Elements Scope in 2014$
Low Est. High Est. GATEWAY CITIES SUBREGION (CONT'D)
Gateway Cities Subregion - Transit Projects
Two alternatives are under consideration: ~, JIJIJI ~"l "71:"1 . ,_, ...,_ •If the selected alternative is Washington Blvd, unfunded scope is $4a+M $126M for low LRT estimate. $346M for high LRT
Metro Gold Line Eastside Transit estimate. $1545 $1766
Corridor Phase 2
-
35
36
37
38
39
40
Measure R Unfunded Scope Elements by Subregion ($) in millions
Measure R Project Unfunded Scope Elements
LAS VIRGENES/MALIBU SUBREGION
Las Virgenes/Malibu Subregion - Highway Projects
•Intersection and interchange improvements, signal Highway Operational Improvements synchronizations, ITS corridor improvements, soundwalls, in Las Virgenes/Malibu Subregion auxiliary lanes, etc. SR-1 01 widening, PCH congestion relief,
SR-27 improvements. Las Virgenes/Malibu Subregion - Highway Project Subtotal
Las Virgenes/Malibu Subregion - Transit Project Subtotal
LAS VIRGENES/MALIBU SUBREGION- TOTAL
(1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
LowEst High Est
$594 $594
$594 $594
$0 $0
$594 $594
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$
(3) Project definition depends on final environmental process
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
Existing Committed Funding in 2014$ (1)(2)
$194
$194
$0
$194
ATTACHMENT A REVISED
Cost of Unfunded Scope
-
41
42
43
44
45
46
47
48
49
Measure R Unfunded Scope Elements by Subregion ($) in millions
MeasureR Project Unfunded Scope Elements
NORTH LOS ANGELES COUNTY SUBREGION
North Los Angeles County Subregion - Highway Projects
•Design and construction of the multi-purpose corridor High Desert Corridor including highway, high-speed train, green energy, and bicycle
elements. Assumes P-3 delivery method.
1-5 North Capacity Enhancements •Extend truck lanes from Pico Canyon towards Kern County line. Extend HOT lanes from Parker towards Kern County Line
including Truck Lanes and connect with the LA County HOT network.
1-5/SR 14 Capacity •None
SR-138 Widening Additional •Additional $400 million will be necessary to complete the Segments improvements on SR-138.
North Los Angeles County Subregion - Highway Project Subtotal
North Los Angeles County Subregion -Transit Project Subtotal
NORTH LOS ANGELES COUNTY SUBREGION- TOTAL (1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
Low Est. High Est
$5,000 $5,000
$5,158 $5,158
$176 $176
$619 $619
$10,952 $10,952
$0 $0
$10,952 $10,952
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$
(3} Project definition depends on final environmental process
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
Existing Committed Funding in 2014$ (1)(2)
$33
$440
$176
$219
$867
$0
$867
ATTACHMENT A REVISED
Cost of Unfunded Scope in 2014$
LowEst High Est
$4,967 $4,967
$4,718 $4,718
$0 $0
$400 $400
$10,085 $10,085
$0 $0
$10,085 $10,085
Page 6
-
50
51
52
53
54
55
56
57
58
59
Measure R Unfunded Scope Elements by Subregion ($) in millions
Measure R Project Unfunded Scope Elements
SAN FERNANDO VALLEY SUBREGION
San Fernando Valley Subregion - Highway Projects
1-5 Carpool Lanes from SR-134 to SR 170, NB & SB, incl Empire Ave •None Access lmprovementsC4>
San Fernando Valley Subregion - Highway Project Subtotal
San Fernando Valley Subregion - Transit Projects
East San Fernando Valley Transit •Based on Alternatives Analysis, median bus lane and LRT Corridor alternatives require additional funding.
San Fernando Valley North-South •None
Metro Orange Line Canoga Extension
•Consider multimodal tunnel(s) carrying premium transit and
Sepulveda Pass Transit Corrido~4> tolled highway lanes. P3 being considered.
San Fernando Valley Subregion -Transit Project Subtotal
SAN FERNANDO VALLEY SUBREGION- TOTAL (1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
Low Est. High Est
$603 $603
$603 $603
$432 $3,377
$154 $154
TBD TBD
$586 $3,531
$1,189 $4,134
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$
{3) Project definition depends on final environmental process (4) Project is also shown in other subregion pages
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
Existing Committed Funding in 2014$ (1)(2)
$603
$603
$164
$154
$1,270
$1,588
$2,191
ATTACHMENT A REVISED
Cost of Unfunded Scope(3) in 2014$
Low Est. High Est.
$0 $0
$0 $0
$268 $3,214
$0 $0
TBD TBD
$268 $3,214
$268 $3,214
Page 7
-
60
61
62
63
64
65
66
67
68
Measure R Unfunded Scope Elements by Subregion ($) in millions
Measure R Project Unfunded Scope Elements
SAN GABRIEL VALLEY SUBREGION
San Gabriel Valley Subregion - Highway Projects
Alameda Corridor East •Three currently unfunded projects (Fairway DriveNalley Blvd., Turnbull Canyon, and Greenwood Ave. in Montebello)
Four build alternatives are under consideration. Two have anticipated funding shortfalls:
SR-710 North
-
69
Measure R Unfunded Scope Elements by Subregion ($) in millions
Measure R Project Unfunded Scope Elements
SAN GABRIEL VALLEY SUBREGION TOTAL
(1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
Low Est. High Est $&,545 $11,&91
15.621 110.256 or 15.111 or 110.256
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$ (3) Project definition depends on final environmental process (4) Project is also shown in another subregion listing
Existing Committed Funding in 2014$ (1)(2)
$4,47&
14.476 or 13.056
(6) Per Board direction on June 27, 2013 project is not to be accelerated. Potential candidate for TIFIA financing pending future Board direction. (8) Total depends on the alternative selected for the Metro Gold Line Eastside Transit Corridor Phase 2 Project (see Line 66 for further information).
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
ATTACHMENT A REVISED
Cost of Unfunded Scope in 2014$
Low Est. High Est. $2,0&9 $7,215
11.145 15.780 or 12.054 or 17.200
Page9
-
70
71
72
73
74
75
76
77
78
79
Measure R Unfunded Scope Elements by Subregion ($) in millions
MeasureR Project Unfunded Scope Elements
SOUTH BAY CITIES SUBREGION
South Bay Cities Subregion - Highway Projects
•Intersection and interchange improvements, signal South Bay Ramp and Interchange synchronizations, ITS corridor improvements, auxiliary lanes, Improvements gap closures, and congestion relief, etc. on 1-405, 1-110, 1-105,
SR-91, and PCH.
South Bay Cities Subregion - Highway Project Subtotal
South Bay Cities Subregion -Transit Projects
Airport Metro Connector •Aviation/Century to terminal
Crenshaw/LAX Transit Corridor •Aviation/Century Bus Plaza (LRT)(4>
•Redondo to Torrance South Bay Metro Green Line
•Torrance to 1-110 Extension •1-11 0 to San Pedro
South Bay Cities Subregion -Transit Project Subtotal
SOUTH BAY CITIES SUBREGION- TOTAL (1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
Low Est. High Est
$2,092 $2,092
$2,092 $2,092
$1,949 $1,949
$1,696 $1,696
$1,863 $1,863
$5,509 $5,509
$7,600 $7,600
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$
(3} Project definition depends on final environmental process (4} Project is also shown in another subregion listing
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
Existing Committed Funding in 2014$ (1)(2)
$992
$992
$228
$1,671
$318 +
+
$2,217
$3,209
ATTACHMENT A REVISED
Cost of Unfunded Scope in 2014$
LowEst High Est.
$1,100 $1,100
$1,100 $1,100
$1,721 $1,721
$25 $25
$301 $301
$412 + $412 $832 + $832
$3,291 $3,291
$4,391 $4,391
Page 10
-
80
81
82
83
84
85
86
87
Measure R Unfunded Scope Elements by Subregion ($) in millions
MeasureR Project Unfunded Scope Elements
WESTSIDE CITIES SUBREGION
Westside Cities Subregion - Highway Project Subtotal
Westside Cities Subregion - Transit Projects
Exposition LRT Phase II: Culver City •None
to Santa Monica
Metro Purple Line Extension, Section •WestwoodNA to City of Santa Monica 2 to Century City, Section 3 to Westwood(9)
•West Hollywood Extension
•Consider multimodal tunnel(s) carrying premium transit and
Sepulveda Pass Transit Corridor(4) tolled highway lanes. P3 being considered.
Westside Cities Subregion -Transit Project Subtotal
WESTSIDE CITIES SUBREGION- TOTAL (1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
LowEst High Est.
$0 $0
$1,481 $1,481
$4,600 $4,600 Included Included Above Above
TBD TBD
$6,081 $6,081
$6,081 $6,081
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$
(3) Project definition depends on final environmental process (4) Project is also shown in another subregion listing (9) Section 1 is shown in Central Los Angeles Subregion
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
Existing Committed Funding in 2014$ (1)(2)
$0
$1,481
$1,475
$1,270
$4,226
$4,226
ATTACHMENT A REVISED
Cost of Unfunded Scope'3> in 2014$
Low Est High Est.
$0 $0
$0 $0
$1,032 $1,032
+ $2,093 + $2,093
TBD TBD
$3,125 $3,125
$3,125 $3,125
Page 11
-
88
89
90
91
92
93
Measure R Unfunded Scope Elements by Subregion ($) in millions
MeasureR Project Unfunded Scope Elements
COUNTYWIDE SOUNDWALL PROJECTS
Countywide Soundwall Projects - Highway Projects
Countywide Soundwall Construction • Tier 1 Soundwall Packages 12 and above, Tiers 2 and 3 at Phase 2 various locations countywide.
Countywide Soundwall Projects - Highway Project Subtotal
Countywide Soundwall Projects -Transit Project Subtotal
COUNTYWIDE SOUNDWALL PROJECTS- TOTAL (1) Assumes federal grant program is intact
Total Cost, Including Funded and Unfunded
Scope in 2014$
Low Est. High Est
$2,078 $2,078
$2,078 $2,078
$0 $0
$2,078 $2,078
(2) Figures represent committed funding per June 2013 Finance Acceleration Plan (Blue Book), de-escalated to 2014$
(3) Project definition depends on final environmental process
8/29/2013 Measure R Unfunded Scope of Work and Acceleration Ballot Initiative
Existing Committed Funding in 2014$ (1)(2)
$78
$78
$0
$78
ATTACHMENT A REVISED
Cost of Unfunded Scope(3) in 2014$
Low Est. High Est.
$2,000 $2,000
$2,000 $2,000
$0 $0
$2,000 $2,000
Page 12