Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to...
Transcript of Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to...
![Page 2: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/2.jpg)
2
This is Tekla We provide model-based software for
customers in construction, infrastructure and energy industries
worldwide.
![Page 3: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/3.jpg)
Introduction to Tekla
Tekla is part of structures division of Trimble
3
1966
![Page 4: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/4.jpg)
Tekla Company Worldwide
4
Finland
Russia
UK
France
UAE
KSA
Qatar
India
China
Malaysia
South Africa Australia
Philippines
Turkey
Chile
Brazil
USA
Mexico
Canada
Colombia
Singapore Indonesia
Thailand
Spain
Tekla has over 20 offices worldwide and a global network of resellers.
Tekla Office
Reseller
HQ
South Korea
Japan
![Page 5: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/5.jpg)
Tekla Offices
5
102
Building No.3
Dubai Internet City
P.O. Box 500103 Dubai
United Arab Emirates
www.Tekla.com
Dubai Qatar KSA
Tekla Qatar
B-Ring Road
Roudha Al Khail , Street No 220
Building No 66756.
+974 5024 1874
Office 316
Riyadh Gallery Business Center
Olia Road
Riyadh
Saudi Arabia
+966 50 447 2607
![Page 6: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/6.jpg)
Tekla Provides Solutions For:
6
Concrete Contractors General Contractors Rebar Fabricators
Offshore EPC Steel Fabricators
Precast Fabricators Structural Engineers Students
![Page 7: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/7.jpg)
7
Projects in Tekla Structures Software
Infrastructures Projects
![Page 8: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/8.jpg)
Projects in Tekla
8
Midfield Terminal Building
King Abdulaziz Airport
Salalah Airport
Muscat Airport
![Page 9: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/9.jpg)
Projects in Tekla
9 Peace Bridge
Peace Bridge
![Page 10: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/10.jpg)
Projects in Tekla
10
Chenab Bridge
Varikko depot bridge
Finland
![Page 11: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/11.jpg)
Projects in Tekla
11
Crusell Bridge Crusell Bridge
![Page 12: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/12.jpg)
12
Projects in Tekla Structures Software
Vertical Structures
![Page 13: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/13.jpg)
August 24, 2015
Capital Gate
Al Dar
ADIC
Khalifa
Louvre Museum Gate Towers
![Page 14: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/14.jpg)
August 24, 2015
Sheikh Zayed Mosque Dome
Yas Marina F1 Circuit
Kingdom Tower Riyadh
QPICO Tower Qatar
Ski Dubai
![Page 15: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/15.jpg)
August 24, 2015
Cleveland Clinic Zayed University
St. Regis Hotel
![Page 16: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/16.jpg)
August 24, 2015
Shangri La Hotel
KAPSARC
Presidential Palace
Sorbonne University
![Page 17: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/17.jpg)
17 King Abdullah Sports City
Masdar HQ
National Museum Qatar
![Page 18: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/18.jpg)
18
King Abdulaziz Center for World Culture
King Abdullah Financial District
Madinah Airport
![Page 19: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/19.jpg)
What is BIM?
19
Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility. BIM is a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life-cycle (defined from earliest conception to demolition).
![Page 21: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/21.jpg)
Reduction in costs by implementing BIM
21
Collaborative BIM vs. 2D or lonely BIM.
There is a dramatic business improvement moving
from 2D projects to collaborative BIM.
http://www.teklabimsight.com/what-is-bim/path-to-bim
The contractor J. C. Cannistraro, LLC analyzed
cost data from 408 projects performed over 6
years. Their total value was $558,858,574. The
percentage of change orders in relation to all costs
drops significantly when BIM use increases.
![Page 22: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/22.jpg)
Modeling for construction, not for drawings
22
We have seen cases where the costs have
been reduced by 50 % by using BIM.
Having constructability issues sorted out before starting construction will inevitably lead to less errors. Charles Eastman professor Georgia Tech college of Architecture
http://www.tekla.com/company/building-construction/constructability
![Page 23: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/23.jpg)
23 Bigger, better, cheaper, faster now
Modeling for construction, not for drawings
We develop Building Information Modeling (BIM) software that allows the construction industry work more efficiently. Our BIM software solutions are used around the world to create, combine, manage and distribute accurate, constructible multi-material models of all structures, from residential buildings and offshore platforms to complex landmark structures.
![Page 24: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/24.jpg)
24
BIM Tools Really Help
![Page 25: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/25.jpg)
BIM Technologies
25
![Page 26: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/26.jpg)
Accurate, Constructible Infra Models
26
BIM software for accurate, constructible modeling of any structure
Key benefits Collaborate and integrate
thanks to open BIM approach.
Model all materials. Handle even the largest,
most complex structures. Create accurate,
constructible models. Let information flow from
design and detailing to construction site.
Tekla Structures
![Page 27: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/27.jpg)
27
Tekla Structures
Accurate, Constructible Infra Models
Used For: • 3D modeling • 4D simulation • Materials takeoff & Estimation • Design integration • Design coordination &
communication • Drawing production • CNC linking • Site layout and positing
![Page 28: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/28.jpg)
28
Tekla Structures
Accurate, Constructible Infra Models
Used For: • 3D modeling • 4D simulation • Materials takeoff & Estimation • Design integration • Design coordination & communication • Drawing production • CNC linking • Site layout and positing
15.Sep.09 Week 0
Bank Council
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
In Progress
Concrete Slab
Concrete Columns
Concrete Walls
Steel
Mshrabiya
Month
![Page 29: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/29.jpg)
29
Tekla Structures
Accurate, Constructible Infra Models
Used For: • 3D modeling • 4D simulation • Materials takeoff & Estimation • Design integration • Design coordination & communication • Drawing production • CNC linking • Site layout and positing
![Page 30: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/30.jpg)
30
Tekla Structures
Accurate, Constructible Infra Models
Used For: • 3D modeling • 4D simulation • Materials takeoff & Estimation • Design integration • Design coordination & communication • Drawing production • CNC linking • Site layout and positing
![Page 31: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/31.jpg)
31
Tekla Structures
Accurate, Constructible Infra Models
Used For: • 3D modeling • 4D simulation • Materials takeoff & Estimation • Design integration • Design coordination & communication • Drawing production • CNC linking • Site layout and positing
![Page 32: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/32.jpg)
32
Tekla Structures
Accurate, Constructible Infra Models
Used For: • 3D modeling • 4D simulation • Materials takeoff & Estimation • Design integration • Design coordination & communication • Drawing production • CNC linking • Site layout and positing
![Page 33: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/33.jpg)
33
Tekla Structures
Accurate, Constructible Infra Models
Used For: • 3D modeling • 4D simulation • Materials takeoff & Estimation • Design integration • Design coordination & communication • Drawing production • CNC linking • Site layout and positing
![Page 34: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/34.jpg)
Used For: • 3D modeling • 4D simulation • Materials takeoff & Estimation • Design integration • Design coordination & communication • Drawing production • CNC linking • Site layout and positing
34
Tekla Structures
Accurate, Constructible Infra Models
![Page 35: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/35.jpg)
35
Tekla Structures
Accurate, Constructible Infra Models
Used For: • 3D modeling • 4D simulation • Materials takeoff & Estimation • Design integration • Design coordination & communication • Drawing production • CNC linking • Site layout and positing
![Page 36: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/36.jpg)
BIM Technologies
36
![Page 37: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/37.jpg)
Fast-Track Value-Engineering
37
Analyze and design buildings efficiently
Key benefits Achieve faster design times Establish the best solution
quickly Manage changes easily Maximize profitability and
efficiency
Tekla Structural Designer
![Page 38: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/38.jpg)
BIM Technologies
38
![Page 39: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/39.jpg)
High Quality Communication
39
Key benefits Combine and share models Check for conflicts Communicate using notes
The professional tool for construction project collaboration.
TeklaBIMsight
Seattle's massive tunnel makes travel safer – with Tekla BIMsight
“In BIM collaboration, we utilized the models in
weekly all-discipline coordination meetings. With all of the discipline models loaded into Tekla BIMsight, we were able to see conflicts and possible
design changes.”
![Page 40: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/40.jpg)
BIM Technologies
40
![Page 41: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/41.jpg)
Mobile Your Project for better Stakeholders Transparency
41
Key benefits Easily view and navigate
your 3D models Share your models within
the project Collaborate with the
project team
BIM collaboration in your pocket.
Tekla Field 3D
![Page 42: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/42.jpg)
BIM Technologies
42
![Page 43: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/43.jpg)
Improve Documentation Processes
43
Key benefits Increase productivity Transparent calculations Minimize errors
Powerful software to automate your repetitive Civil/Structural calculations
Tekla Tedds
![Page 44: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/44.jpg)
Real Examples (Bridges & Railway Models)
44
Gare de Mons
![Page 45: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/45.jpg)
Real Examples (Bridges & Railway Models)
45
![Page 46: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/46.jpg)
E.Pihl & Son Bridge BIM project
46
This video shows how Danish contractor, E.Pihl & Son, used BIM in a Cast-in-Place concrete bridge project in Denmark and Sweden. See how they use the model on construction site management and how they have integrated model-based, accurate data even to the Celsa rebar factory production line.
![Page 47: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/47.jpg)
E.Pihl & Son Bridge BIM project
47
Fully parametric model Easy manage the model changes Central model for all the project participants Procurement & fabrication of reinforcement Collusion checking to solve the model issues
Transferring the model reinforcement information to the ERP system (CELSA)
Automatic reinforcement fabrication production by using Tekla CELSA BIM technology
Number of rebar, size, cutting length, weight & all the measurements.
Accurate cut & bend from Tekla BIM 3D model information
Rebar marked with tags and shipped to the site If using traditional methods, errors would need to be
correct at site, which will cost time and money Minimize the cutting and bending on site and reduce
the waste of material
![Page 48: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/48.jpg)
E.Pihl & Son Bridge BIM project
48
Reduce a lot of time from the 3D visualization ease of understanding
The 3D models made it easy for communication between office and site people
20 - 25 errors using the traditional method of working from the procurement side
Which will cost of doing a lot of cutting and bending on site
New way of working, narrow down to 0 – 2 errors by doing clash checking before work starts on site
Same work in 7 -9 days instead of 23 workdays for the reinforcement work
Production time has reduced to 2/3
BIM is expanding to all the project parties in the company
![Page 49: Tekla Infrastructure & BIM & fabrication of reinforcement ... Rebar marked with tags and shipped to the site ... understanding The 3D models ...](https://reader031.fdocuments.in/reader031/viewer/2022022010/5b02d1e47f8b9ab9598e667b/html5/thumbnails/49.jpg)
49