TECNOLOG APIN - globalenergyca.com EORSG Brochure oct2014.… · Tecnolog through its Technology,...
Transcript of TECNOLOG APIN - globalenergyca.com EORSG Brochure oct2014.… · Tecnolog through its Technology,...
TECNOLOG s.a. APIN Boilers Ofic. Ave Bolivia #1122/ Ave Las Calderas 330, Pta. Hermosa, Lima,
Lima 01, PERU [email protected] www.tecnologperu.com Phone: +511-717-3725 - Plant +511-715-8866
TURN-KEY SYSTEMS
CUSTOM DESIGN
ENGINEERING
FABRICATION
TECNOLOG
s.a.
“From ultra-pure water treatment
equipment to enhanced heavy-crude
production facilities, this catalogue
illustrates our capabilities
and range of expertise.” Tecnolog through its Technology, since 1967, is the
leader in the design and fabrication of the Once Through
Oilfield Type Steam Generators and has supplied quite a few of
steam generators installed worldwide.
Tecnolog/APIN™ Steam Generators have been
in operation since the inception of steam flood technology.
Tecnolog/APIN™ steam generators supplied
APIN™ is the only steam generator designer/
manufacturer that is staffed by some of the original
engineers whom now hold key positions at Tecnolog. Our
staff of high caliber engineers, designers, fabrication
specialists, and service technicians has combined experience
of over 100 years in APIN™ steam generator design. APIN™
has Packaged Steam Generator capabilities to 400,000 pph
as well as Field Erected APIN Boilers to +1MM pph.
APIN™ /Tecnolog Reverse Osmosis System
Vessel skid and piping system fabrication jobs— in progress
• STEAM GENERATION
• WATER TECHNOLOGIES
• FABRICATION
APIN™ Gas Fired Heater Package
“Experienced in providing specific
engineered packages, our designs or yours, to accommodate your operational
and production requirements.”
KEY CONTACTS
FABRICATION
Jesus Sanabria, Sales & Estimating
Phone: + 511-715-8866 Email: [email protected]
STEAM GENERATION
EDGAR GERBER, President
Phone: + 511-715-8866
Email: [email protected]
Ian Gerber EOR Manager Phone: +511-715-8866 Email: [email protected]
WATER TECHNOLOGIES
EDGAR GERBER, President Phone:
+ 511-715-8866 Email: [email protected]
FABRICATION FACILITY & CAPABILITIES WELDING CAPABILITIES:
Process Semi- Code
Procedures Number Manual Auto Compliance Backing
SMAW (2) P#1 X ASME IX NO
SMAW (2) P#8 X ASME IX NO
FCAW (2) P#1 X ASME IX NO
GMAW (2) P#1 X ASME IX NO
GMAW (2) P#8 X ASME IX NO
SAW (2) P#1 AUTO ASME IX YES
SAW (1) P#8 AUTO ASME IX YES
GTAW (2) P#1 X ASME IX NO
GTAW (2) P#8 X ASME IX NO
GTAW (1) P#42 X ASME IX NO
GTAW (1) P#44 X ASME IX NO GTAW (1) P#45 X ASME IX NO
CUTTING, GOUGING AND BEVELING METHODS EMPLOYED: Air/Arc Carbon Gouge 0xy/Acetylene Cutting and Beveling
4 Torch Eye Machines Track Burners 24” Chop Saw w/rails and cooling
Plasma Arc Cutting and Beveling ½” x 10’ Shear
Do-All Saw w/rails and cooling 90 Ton Iron Worker 3/8” x 10’ Break
MANIPULATOR / POSITIONING EQUIPMENT: 3 - Manipulator/Sub-Arc 1 - 500# Positioner
1 - 10,000# Positioner 3 - 10 Ton Turning Rolls with Idler
2 - 30 Ton Turning Rolls with Idler
PIPING MATERIALS: Carbon Steel Chrome
Hastelloy Monel
Nickel Clad Stainless
SPECIALIZED CAPABILITIES:
10 - 200# Positioner 1 - 5000# Positioner
2 - 5 Ton Turning Rolls with Idler 1 - 20 Ton Turning Rolls with Idler
Rolling Equipment : 2” x 12’ plate roll, Machining Lathes : 60” Dia x 12 ft
Milling & Drilling unlimited with CNC Equipment Tube Bender : 1 1/2” to 3” O.D. - 3” to 18”” radius
ELECTRICAL: Climate Controlled Building 30’ x 40’ Electrical/Control (systems, enclosures, logic controllers, etc.)
System Design Programmable Logic Controllers
BLASTING and PAINTING: Enclosed
Blasting Building 40’ x 80’ Climate
Controlled Paint Building 40’ x 80’
NDT - NON-DESTRUCTIVE TESTING: Sub-contractor testing on-site
TECNOLOG
s.a.
4—APIN™ 50 MM BTU/HR Once Through Steam Generators ready for shipment, each with its own APIN water treatment system.
25 MM BTU/HR 250 MM BTU/HR Trailer Mounted Once Through Steam Generator Steam Generator During Assembly
STEAM GENERATION APIN/Tecnolog
DESIGNED
and
FABRICATED
OTSG 50MMBTU/HR,
2600 psig discharge
pressure, dual oil/
Gas fired, skid
mounted.
CHINA NATIONAL PETROLEUM LIAO HE FIELD
APIN™ Once through, single pass, direct fired unit
consisting of a combination chamber radiant
section, convection section and burner system
complete with all necessary valves and safety
Equipment required for safe and
Efficient operation.
PETROBRAS—ALTO DO RODRIGUES FIELD, BRAZIL
Waste Heat Recovery APIN™ Steam Generator — 50 MM BTU/HR, 1500 Psig Discharge Pressure
Design, fabrication, transport, installation and training all by qualified Tecnolog personnel.
STEAM is APIN
TECNOLOG APIN™ 250 MM BTU/HR Nominal One of Four During Assembly on site.
APIN™ Once Through Steam Generator
Six Pass, 1450 Psig Discharge Pressure
Gas Fired, Skid Mounted
Engineered, Designed, and Fabricated
for Assembly On-Site
APIN UPS & EORSG STEAM INSTALLATIONS
APIN UPS System for APIN EORSG support
APIN™ EORSG located at East Texas oilfield
WATER TECHNOLOGIES APIN™ RO System with Chemical
Cleaning Skid and Control Panel.
APIN™ Multi-Media Filtration System
Sets of Tecnolog Dual Bank Water Softener and Chemical
Feed Systems for APIN™ Oil Field Steam Generators.