    SubmergedRotary Jet Mixer

    P43

    Operators Manual

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    2/45

    CONTENTS

    1Equipment description

    2Equipment operation

    3Installation andmaintenance

    4Technical inormation

    5Specifc data

    SbmereRoary Je MerP43

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    3/45

    CONTENTS

    1

    1.1 Introduction ................................. ................................ ................................. ...........................1

    1.2 Types o P43 ............................... ................................ ................................. ...........................1

    1.3 Key Parameters ................................ ................................. ................................. ....................2

    1.4 Nozzle Selection .............................. ................................. ................................. ....................2

    1.5 Impeller Selection ................................. ................................ ................................. ...............2

    1.6 Materials ................................. ................................. ................................. ............................... 2

    Figures

    1.1 Schematic o P43 ................................ ................................ ................................. ...............3

    Equipment Description

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    4/45

    1Equipment Description

    1 Equipment Description 1

    1. Equipment description

    1.1 Introduction

    The Veolia Environmental Services P43 is a device or directing a submerged jet o crude oil across

    a pre-selected area o the bottom o a crude oil storage tank. This jet o crude oil dissolves and re-

    suspends the accumulated sludge throughout the overhead oil.

    The P43 is uid dynamically-powered, the nozzles being gearbox-driven by a xed-blade impeller

    assembly which is rotated by the continuous ow o uid through the P43. This is shown in

    Figure 1.1 on page 3 o this section.

    The P43 was developed jointly by BUTTERWORTH SYSTEMS and EXXON RESEARCH AND

    ENGINEERING COMPANYas a replacement to side-entering mixers. Full scale tests demonstrated

    that complete de-sludging o a tank could be accomplished in less than 30 hours using the

    P43. Periodic use o the P43 eliminates the need or side entering propeller mixers resulting in

    substantial electrical savings.

    1.2 Types o P43

    There are two types o P43 available:

    CENTRAL TYPE

    The centre mounted P43 is designed to be placed on the tank oor in the centre o the tank. Both

    nozzles normally would discharge simultaneously through the entire 360 rotation o the P43. One

    nozzle o the P43 can be blanked o to accommodate pump ow rate limitations. Single-nozzle

    operation requires that the installation be designed to withstand jet reaction.

    This installation can only be considered in a clean, gas ree, tank since it is necessary to conduct

    hot work.

    SHELL TYPE

    The shell mounted P43 is designed to be placed at the tank wall, using the existing tank shell

    manway or mounting.

    Only the nozzle acing away rom the tank shell discharges as the P43 continuously rotates in a

    clockwise direction. An internal bae (see Figure 1.1) prevents the nozzle acing the tank shell rom

    discharging. The ow change over between the nozzles is smooth and commences when the

    nozzles are approximately tangential to the tank shell. Flow rom one nozzle is gradually reduced

    as ow to the other is increased proportionally to begin the cleaning cycle again.

    The shell mounted P43 can be installed in a tank that is in service provided the manway door

    can be removed or installation. Unlike the centre mounted P43, the shell mounted P43 doesnot require any hot work or installation. The shell mounted P43 aords ease o access or

    maintenance and the installation can be either portable or permanent.

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    5/45

    2

    The ollowing specications apply to the P43:

    1.3 Key parameters

    HEIGHT 548 mm (21.6 in)

    NOZZLE TIP TO TIP 738 mm (29.1 in)WEIGHT 205 kg (450 lb)

    * PRESSURE RATED 20 bar (295 psi)

    * TEMPERATURE RATING -10 to 93C (14 to 200 F)

    GEARBOX OIL EP 320 (1 Imp. Gal.)

    (8 litres)

    (*) Higher pressures and temperatures available on request.

    1.4 Nozzle selection

    These range rom 50mm (1.97") to 112.5mm (4.43"). Nozzle size selection is based on required jetrange, available pressure and ow rate or the P43 service.

    1.5 Impeller selection

    The speed o rotation can be varied by the ow rate through the P43 and also by a variety o

    actory tted impellers. The speed range being 1.78 5.18 deg. min.

    1.6 Materials (see Figure 1.1)

    MAIN BODY Aluminium Bronze

    NOZZLE BODY Ni Resist S.G. IronNOZZLE TIP Aluminium Bronze or Ni Resist

    IMPELLER Aluminium Bronze or Ni Resist S.G. Iron

    IMPELLER SHAFT Stainless Steel

    GEARCASE Ni Resist S.G. Iron

    GEARCASE COMPONENTS Phosphor Bronze

    Aluminium Bronze

    Stainless Steel

    FASTENINGS Stainless Steel

    O RINGS Viton

    MECHANICAL SEAL Hasteloy C. Stainless Steel

    1 Equipment Description

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    6/45

    31 Equipment Description

    Veolia P43. Made in UK. EPC, US and other patents granted and applied or.

    1 Equipment Description

    Figure 1.1 Schematic o P43

    1.1

    738 mm

    FLUID FLOW(INLET)

    8 ANSI FLANGE

    IMPELLER SHAFTST/STEEL 440

    MECHANICAL SEALBELLOWS HASTELOY CST/STEEL

    NOZZLESALUM. BRONZE AB2OR Ni RESIST D2B

    NOZZLE BODYNi RESIST D2WCAST IRON

    BASE PLATE GASKET344mm DIA360mm DIAFLANGED PLUG

    FLANGED PLUG

    344mm DIA

    360mm DIA

    360mm

    548mm

    EARTH STRAP

    MAIN BODYALUM. BRONZE AB2

    BEARING PLATENi RESIST D2W

    P43MADE IN UK

    EPC, US AND OTHER PATENTSGRANTED AND APPLIED FOR

    BAFFLE TO PREVENTDISCHARGE AGAINSTTANK SHELL(NOT INCLUDED INCENTRAL MOUNTEDP43)

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    7/45

    CONTENTS

    2

    2.1 Operating Specications .............................. ................................ ................................. .....1

    2.2 Recommended Operating Interval ................................ ................................. ................1

    2.3 Use o Shell Mounted P43 to de-sludge Tank ............................... ......................... 6

    2.4 Procedure or Processing Sludge Dispersed in Crude Oil ................................. .... 7

    2.5 Routine Checks on Operation ............................... ................................. .......................... 7

    2.6 Special Considerations ................................. ................................. ................................. .... 7

    Figures

    2.1 Flow Rate vs Cleaning Radius Shell Mounted P43 and

    Central Mounted P43 with one nozzle discharging various nozzle

    diameters oil S.G 0.9 ........................................................................................................2

    2.2 Required Pressure Drop vs Cleaning Radius (Shell Mounted P43)

    with various nozzle diameters oil S.G 0.9 ...............................................................3

    2.3 Case Examples or P43 Specications ............................ ................................. ..........4

    2.4 Required Pressure Drop vs Cleaning Radius P43 (Central Mounted).

    Two nozzles various diameters oil S.G. 0.9 .........................................................5

    NOTE: In connection with Performance Graphs

    Required pressure drop is defned as the pressure drop across the P43, thereore,

    allowance must be made or any losses in pipelines and or the static

    head o liquid in the tank.

    Equipment Operation

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    8/45

    2Equipment Operation

    1

    2. Operation

    2.1 Operating specications

    During the normal operating sequence o the P43, there will be external circumstances which

    will lead to a change in the normal ow rate and/or supply pressure. These changes will alter the

    cleaning radius o the P43 and could aect the overall eectiveness o the P43 installation.

    The graphs (Figures 2.1 to 2.4) enable the operator to calculate the impact o these changes

    on cleaning radius, and which remaining parameters would need to be altered to restore the

    installation to its normal operational eectiveness.

    EXAMPLE:

    In the case o a 260' (79m) diameter tank with three P43(s) at equidistant positions around the

    circumerence o the tank, the ollowing applies:

    For a 100mm nozzle rom Figure 2.3 and Figure 2.4:

    CASE ARange Flow Pressure drop across P43

    130' (39.5m) 3375 IGPM (921m3 /hr) 83 psi (5.8kg/cm2)

    CASE B

    Should the ow be reduced to 3000 GPM (819m3/hr) Then rom Figure 2.4:

    Range

    115 (35m)

    CASE C

    Should the pressure be reduced by 5psi then (rom Figure 2.3) the pressure drop across the P43 will

    reduce to (83-5) = 78 psi (5.48kg / cm2).

    Range

    126 (38.4m)

    2.2 Recommended operating interval

    It is strongly recommended that the P43 is run at least once per month to prevent sludge build-up

    and to ensure ree movement o internal components. The requency and duration o operation

    will be a unction o sludge deposition rates, but in general should be about 8 sweeps per nozzle in

    a month.

    2 Equipment Operation

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    9/45

    2

    273 1000

    2000

    FLOW

    RATE

    1GPM

    m3/hr

    50

    15

    60

    18

    70

    21

    80

    24

    50.0mm

    62.5mm

    75.0mm

    87.5mm

    100.0mm

    112.5mm

    90

    27

    100

    30

    110

    33

    120

    36

    130

    39

    140

    42

    VARIOUS NOZZLE DIAMETERS

    150 FEET

    CLEANING RADIUS

    METRES45

    160

    48

    170

    51

    3000

    4000

    136 500

    546

    819

    1092

    Figure 2.1 Flow rate vs cleaning radius

    Shell mounted P43 or centre mounted P43 with one nozzle discharging various nozzle diameters. Oil S.G.

    0.9

    2.1

    2 Equipment Operation

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    10/45

    3

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    12

    12

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    110

    120

    130

    140

    150

    160

    170

    REQUIREDPRESSUREDROP

    50

    15

    60

    18

    70

    21

    80

    24

    50.0mm

    62.5mm

    75.0mm87.5mm 100.0mm

    112.5mm

    90

    27

    100

    30

    110

    33

    120

    36

    130

    39

    140

    42

    VARIOUS NOZZLE DIAMETERS

    150 FEET

    CLEANING RADIUS

    METRES45

    160

    48

    180

    54

    170

    51

    Figure 2.2 Required pressure drop vs cleaning radius

    (Shell mounted P43) with various nozzle diameters. Oil S.G. 0.9

    2.2

    2 Equipment Operation

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    11/45

    4

    Figure 2.3 Case examples or P43 specications

    2.3

    273 1 000

    2000

    FLOWR

    ATE

    1GPM

    m3/hr

    50

    15

    60

    18

    70

    21

    80

    24

    50.0mm

    62.5mm

    75.0mm

    87.5mm

    100.0mm

    112.5mm

    90

    27

    100

    30

    110

    33

    120

    36

    130

    39

    140

    42

    VARIOUS NOZZLE DIAMETERS

    150 FEETCLEANING RADIUS

    METRES45

    160

    48

    170

    51

    3000

    4000

    1 36 50 0

    546

    819

    1092

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    12

    12

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    110

    120

    130

    140

    150

    160

    170

    REQUIREDPRESSUREDROP

    50

    15

    60

    18

    70

    21

    80

    24

    50.0mm

    62.5mm

    75.0mm8 7. 5m m 10 0.0mm

    112.5mm

    90

    27

    100

    30

    110

    33

    120

    36

    130

    39

    140

    42

    VARIOUS NOZZLE DIAMETERS

    150 FEET

    CLEANING RADIUS

    METRES45

    160

    48

    180

    54

    170

    51

    Fre 2.1 Flow rae vsclea rasShell mounted P43 orcentre mounted P43 withone nozzle dischargingvarious nozzle diameters.Oil S.G. 0.9

    Fre 2.2 Reqre pressrerop vs clea ras(shell mounted P43) withvarious nozzle diameters.Oil S.G. 0.9

    CASE A

    CASE A

    CASE B

    CASE C

    2 Equipment Operation

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    12/45

    5

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    110

    120

    130

    140

    150

    160

    170

    REQUIREDPRESSUREDROP

    Ib/in

    kg/cm

    50

    15

    60

    18

    70

    21

    80

    24

    50.0mm

    62.5mm

    75.0mm

    112.5mm

    100.0mm

    87.5mm

    90

    27

    100

    30

    110

    33

    120

    36

    130

    39

    140

    42

    VARIOUS NOZZLE DIAMETERS

    150 FEET

    CLEANING RADIUS

    METRES45

    160

    48

    170

    51

    Figure 2.4 Required pressure drop vs cleaning radius

    P43 (central mounted) two nozzles various diameters. Oil o S.G. 0.9

    2.4

    2 Equipment Operation

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    13/45

    62 Equipment Operation

    MONITORING P43 EFFECTIVENESS

    A tank monitoring procedure should be devised to

    Determine the crude oil quality or selection o processing strategy

    Measure the eectiveness o blending

    Determine the rate and eectiveness o sludge re-suspension

    2.3 Use o shell mounted P43 to de-sludge tank

    (i) Take samples o sludge and measure:

    B S & W (Bottom Sediment and Water)

    (ii) Conduct sludge prole survey across the tank

    Estimate sludge quantity

    Empty tank and t P43 (see Section 3.3)

    (iii) Fill storage tank with crude oil to a minimum height such that the roo is oating

    It is advantageous to have a large volume o crude to disperse the sludge

    A ratio o approximately 4:1 (crude to sludge) is usually sufcient

    (iv) I a minimum level o crude has been used, raise roo legs to their operating position to

    minimise jet disturbance during cleaning operation. Alternatively ll the tank to a level

    where the roo legs are above the centre line o the jet

    (v) Sample the crude oil ater lling the tank and measure B S & W levels

    (vi) Gradually increase the pressure to each P43 until the designated rate is achieved

    (vii) For the tank cleaning operation, we recommend a minimum o eight sweeps per P43. This

    time can be reduced i the customer is prepared to stop the operation, allow a 1-hour settling

    time and conduct sludge prole measurements. I the levels are satisactory then the operation

    can be stopped

    (viii) When the operation is stopped to assess sludge proles, it is recommended that samples are

    taken at the top, middle and bottom to determine B S & W levels

    This data will give you useul inormation on the operating characteristics o the P43 and will

    assist in assessing the processing needs o this mixture

    (ix) I sludge is still present in the tank and the B S & W level exceeds 15% in the bulk o the

    crude oil, we recommend draining the tank and adding resh crude oil or a urther periodo P43 operation

    NOTE: SEQUENTIAL OPERATION

    I the renery is limited or ow rate it is possible to operate the P43 on a sequential basis.

    However each P43 should be operated as outlined in section (vii). The total cleaning time would,

    thereore, be extended.

    Heating o the oil is also an advantage when de-sludging, with 60 C the maximum

    recommended temperature.

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    14/45

    72 Equipment Operation

    2.4 Procedure or processing sludge dispersed in crude oil

    The sludge dispersed in the crude oil mixture may need to be blended in line with the eedstock

    rom a neighbouring tank. The decision on the exact percentage o the blend should be based on

    the composition o the sludge / crude oil mixtures. I the P43 has been used to de-sludge the tank

    with a minimum crude level, then a blend o 5 to 10% could be required.

    The ollowing parameters should be monitored to assess any downstream impacts:

    (i) B S & W and salt levels in the inlet and outlet o the desalter

    In order to assess the ouling tendencies o the crude oil, monitor

    (i) Pressure drops across crude pre-heat exchangers beore, during and ater sludge /

    crude oil processing

    (ii) Overall heat transer coefcients (U Values) across crude preheat exchangers,

    beore, during and ater sludge / crude oil processing

    2.5 Routine check on P43 operation

    It is recommended that the ollowing checks are conducted periodically:

    Check sludge level in the crude oil tank

    Check pressure readings at tank shell and ensure these correlate with the design pressure

    or the installation

    Monitor line lter pressure drop to ensure that the line lter is not blocked

    During P43 operation, check indicator (where tted) or correct P43 rotation

    2.6 Special considerations

    I the P43 is to be operated in an environment with oils which are solid at ambient temperatures,

    special precautions should be taken. These include:

    Keeping the temperature o the P43 and vicinity elevated

    Checking that the strainer(s) is clear

    Checking the indicator (where tted) to ensure the P43 is rotating

    Checking the pressure and ow rate on starting against gures given or the installationsand/or previous results (see Figures 2.1 to 2.4)

    Ensuring that the supply line to the P43 is drained / empty i the heat is to be

    switched o

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    15/45

    A. Installation...............................................................................................................................1

    3.1 Equipment Supplied ................................. ................................. ................................. ..........1

    3.2 External Pipework Details ................................. ................................. ................................1

    3.2.1 Details or Centre Mounted P43 ............................. ................................ ......................1

    3.2.2 Details or Shel Mounted P43 ............................... ................................. .....................2

    3.3 Systems Installation / Commissioning........................................................ ..............10

    3.3.1 Centre Mounted P43 ............................. ................................. ................................. ........10

    3.3.2 Shell Mounted P43 (or manways 30 or greater) ................................. .............10

    3.3.3 Shell Mounted P43 (or manways less than 30 ) ............................. ............... 11

    3.3.4 P43 External Indicator ............................... ................................. ................................. ... 14

    B. Maintenance.............................. ................................ ................................. ......................... 15

    3.4 P43 Lubrication ............................ ................................. ................................. ................... 153.5 Recommended Operating Interval ............................... ................................. .............. 15

    3.6 External Indicator ............................... ................................. ................................. .............. 15

    3.7 Servicing Interval ................................ ................................. ................................. .............. 15

    Figures

    3.1 Typical Modes or Operating P43 ................................ ................................. ................3

    3.2 Alternative Installation Positions ............................. ................................. .....................4

    3.3 Pipework Details (Centre Mounted P43) ............................ ................................. .....5

    3.4 Pipework Details (Shell Mounted P43) ................................ ................................. .... 63.5 Details o Anchor Mounting (Centre Mounted P43) ................................. .......... 7

    3.6 Typical Support Brackets ............................. ................................. ................................. .....8

    3.7 Suggested Alteration to Roo i Pontoon is likely to oul ............................ ......... 9

    3.8 Typical Installation o Indicator ................................ ................................. ................... 12

    3.9 Indicator (Shell Mounted) P43 E.5468 ............................. ................................. ... 13

    CONTENTS

    3Installation andMaintenance

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    16/45

    1

    A. Installation

    3.1 Equipment supplied

    Veolia provide only the P43, which is lled with oil and ready to be mounted onto the appropriate

    supporting pipework. The P43 is tted with an 8 inch ANSI at ace mounting ange and is

    complete with xing bolts, mating ange and an earthing strap.

    The P43 is supplied as a sealed unit. Breakage o this seal will invalidate warranty.

    Veolia do NOT provide any o the associated pipework, supports, valves, gauges etc. However we will

    give technical advice on the installation and comment on any piping proposals.

    Schematics or typical pipework required or installation o the P43 are illustrated on the

    ollowing pages.

    Prior to installation o the P43 in any tank, ull regard must be given to saety procedures to ensure

    the protection o all personnel. All standard saety procedures as laid down by governmental bodies,

    saety organizations and the operating company must be complied with.

    3.2 External pipework details

    3.2.1 Details or centre mounted P43

    A schematic o the pipework is illustrated on Figure 3.3. The ollowing should also be considered

    when designing the system:

    Pipe diameter to be selected to ensure that the desired pressure at the P43 can be achieved

    Line Supports. See Figure 3.6

    P43 mounting anges are 8 inch ANSI B.16.5 and have been designed toAPI 650 standard

    In-line strainer specication see Figure 3.3

    Material stainless steel

    Screen size diamond-shaped preventing a particle size

    greater than 19mm (3/4") rom passing

    It is recommended that the strainer is o a basket type design to acilitate cleaning.

    3Installation andMaintenance

    3 Installation and Maintenance

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    17/45

    2

    NOTE: It is possible that sufcient strainers may have been tted at the pumps, thus making

    the tting o a urther strainer unnecessary.

    All new pipework must be ushed through beore commissioning in order to clear any

    debris that may have accumulated during installation. The use o temporary strainers

    during commissioning is also recommended

    Ensure centre line o jet does not directly impinge on internal piping, e.g. stream coils,

    water draw-o, etc

    Ensure also that all specied alterations to internal pipework have been completed

    Line vents or commissioning should be included

    Pressure gauges are tted to measure P43 inlet pressure and identiy i line lter

    is blocking. These should be upstream and downstream o the line lter

    Valve requirement. See Figure 3.4

    P43 supports to withstand jet reaction quoted by Veolia

    Fabrication o elbow assembly to acilitate P43 installation. See Figure 3.4

    Minimum distance between vertical centre line o P43 and inside o tank well

    should be *500mm or the P43 with standard nozzle attachments

    Recommended clearance under the P43 125mm

    Inlet ange designed to A.P.I 650 hence bolt holes straddle the centre line o the P43

    Correct P43 orientation is indicated by a groove included on the main stationary component.

    This groove marks the centre line o the P43 and should be directed at the centre o the tank

    When steam coils are present, P43 must be positioned such that nozzle discharges below

    steam heating coils

    *This measurement should be increased to 800mm or P43(s) with S Bend Nozzle tube attachments

    (see Section 4 Page 13).

    3 Installation and Maintenance

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    18/45

    33 Installation and Maintenance

    Figure 3.1 Typical modes for operating P43

    3.1

    P43

    P43

    P43

    P43

    P43

    P43

    P43

    P43

    P43

    P43

    P43

    P43

    SHELLVALVE

    SHELLVALVE

    TO PUMP

    FROM PUMPSEPARATE INLETOUTLET LINES

    COMMON IN LET/OUTLET LINES

    P43 FEED LINE FROMADJACENT TANK

    FILTER

    FILTER

    HOT TAPFILL AND DRAW

    SHELLVALVE

    SHELLVALVE

    RECIRCULATION

    SHELL MOUNTED

    CENTRE MOUNTED

    KEY

    HOT TAP

    FILTER

    3 Installation and Maintenance

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    19/45

    43 Installation and Maintenance

    Figure 3.2 Alternative installation positions

    3.2

    CLEAning RAdiuS = tAnK diAMEtER x 0.7

    CLEAning RAdiuS = tAnK diAMEtER

    TWO MACHINE INSTALLATION

    1

    1

    2

    2

    3

    THREE MACHINE INSTALLATION

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    20/45

    53 Installation and Maintenance

    3.3

    Figure 3.3 Typical pipework details (centre mounted P43)

    PLAN VIEWOF TANK I NSTALLATION

    VENTS TO BE FITTED TOFACILITATE FILLING PIPE SUPPORTS SEE DETAIL OF HOT TAP FILTER AND

    FOLLOWING ARRANGEMENT

    PRESSURE GAUGE LOCATED UPSTREAMOF FILTER TO INDICATE WHEN THEFILTER BECOMES BLOCKED

    SEE EXPANSION BEND DETAIL.NOTE THAT PIPE SHOULD BE RU N TOAVOID INTERNAL STRUCTURE SUCHAS ROOF LEGS, DRAIN PIPE, ETC

    REINFORCING PLATE MAY BEENLARGED TO COVER AREAS OFCORROSION IN TANK BOTTOM

    CENTRE OF M/C MUST BE WITHIN1 METER OF CENTRE OF TANK

    INLINE FILTER TO BE STAINLESSSTEEL WITH A DIAMOND SHAPETO PREVENT PARTICLES GREATERTHAN 19mm FROM PASSING

    2" 150 PSI VALVE

    12" X 12" X 10" REDUCING TEE

    GATE VALVE

    REINFORCING PAD

    EXISTING FEED LINE(20 NB TYPE)

    2" 150 PSI CHECK VALVE

    2" INSTANTANEOUSCOUPLING

    DETAIL OF HOT-TAP-FILTER AN DFLUSHING ARRANGEMENT

    12" X 10" REDUCER

    IF 12 PIPE IS USEDINSIDE TANK THEREDUCER NOT REQUIRED

    NON-RETURN VALVE

    GATE VALVE

    PRESSURE GAUGE

    TANK

    TANK BOTTOM

    10" X 8" REDUCER(OR 12 X 8)

    PLAN VIEW

    SIDE ELEVATIONSIDE ELEVATION

    EXPANSION BEND DETAILS

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    21/45

    63 Installation and Maintenance

    3.4

    Figure 3.4 Typical pipework details (shell mounted P43)

    PLAN VIEW OF TANK INSTALLATION (SCALE 1 : 200)THE NUMBER OF WALL MOUNTED MACHINES MAY VARY

    FROM 1 TO 4. THIS EXAMPLE ILLUSTRATES 3 M/CS

    P43 INSTALLATIONPOSITION P43 WITH mm WIDEGROOVE FACING CENTRE OF TANK

    PLAN

    SUPPORTS

    VENTS TO BE FITTED TO

    FACILITATE FILLING PI PE

    SEE DETAIL OF HOT-TAP-FILTER ANDFLUSHING ARRANGEMENT(MAY REQUIRE 2ND FILTER)

    AFTER TAPPING INTO MAIN SUPPLY LINEIF THE FEED TO RI NG MAIN CAN GOEITHER WAY, THEN A 2ND FILTER MAYBE NECESSARY

    IN LINE FILTER TO BE STAINLESS STEEL WITHA DIAMOND SHAPE TO PR EVENT PARTICLESGREATER THAN 19mm FROM PASSING

    16" X 16" X 10" OR 12" X12" X 10REDUCING TEEDEPENDING ON LINE SIZE

    2" 150 PSI VALVE

    2" 150 PSI CHECK VALVE

    2" INSTANTANEOUSCOUPLING

    DETAIL OF HOT-TAP-FILTER & FLUSHINGARRANGEMENT

    ROOF

    ROOF PONTOON

    OUTLINE OFOBSTRUCTION

    TANK SHELL

    MIN CLEARANCE CAN BE REDUCED IFREFINERY CONFIRMS THAT THE M/CWILL NOT FOUL ON TANK BOTTOM

    5/16" THK SEMI-CIRCULAR SHAPED SECTION WITH ONEEND BLANKED-OFF TO BE INSERTED INTO ROOF TOPREVENT FOULING WHEN ROOF IS I N LOWEST POSITION

    NOTE: DURING A TANK CLEANING OPERATION IT ISIMPORTANT TO CHECK THAT THE ROOF WILL NOTFOUL ON THE P43. IT MAY BE NECESSARY TOOPERATE WITH THE ROOF LEGS FULLY EXTENDED

    GATE VALVE

    REINFORCING PAD

    EXISTING FEED LINE(24" 30" N/BORE)

    PRESSURE GAUGES LOCATED EITHERSIDE OF FILTER TO INDICATE WHEN THEFILTER BECOMES BLOCKED

    16" DIA

    SIDE ELEVATION

    NON-RETURN VALVE

    12" X 8" REDUCER GATE VALVE

    PRESSURE GAUGE

    SINCE ONE NOZZLE DISCHARGESAT A TIME GUSSETS TOWITHSTAND JET REACTION ASINDICATED IN QUOTATION

    TANK FLOOR

    GUSSET ARRANGEMENT

    EXTERNAL INDICATOR(OPTIONAL EXTRA)

    BO HOLE NEEDED INMANWAY COVER

    See Fig 3.11 For typical

    inStallation oF indicator

    TANK WALL

    12" DIA

    12" DIA

    SIDE ELEVATION

    SIDE ELEVATION

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    22/45

    7

    Figure 3.5 Details of anchor mounting (centre mounted P43)

    3.5

    TO ENSURE THIS FLANGE ISMOUNTED HORIZONTALLY IT ISTO BE FITTED IN SITUATION ANDTESTED ON THE ELBOW TO ALLOWFOR SLOPE OF TANK BOTTOM

    WELD PLATE TOTANK BOTTOM

    GUSSET PLATES" THICK

    30"

    30" X 30" X " PLATE

    36" X 36" X " PLATE

    ROOF

    CHECK THAT WITH ROOF INLOWEST POSITION, THEREIS SUFFICIENT CLEARANCEBETWEEN P43 AND ROOF SUMP

    CHECK JET WILLNOT IMPINGE ONWATER DRAW-OFF PIPE ORHEATING COILS. IFNECESSARY, THISDIMENSION MAYBE INCREASED

    P43

    3 Installation and Maintenance

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    23/45

    83 Installation and Maintenance

    Figure 3.6 Typical support brackets

    3.6

    TYPICAL SUPPORT BRACKET INSIDE TANK

    1" DIA. BAR

    6" x 3" CHANNEL

    6" x 3 " RSJ

    CONCRETE BASE

    5" x 2 " RSC " U BOLT SUFFICIENTCLEARANCETO ALLOW FOREXPANSION

    TANKBOTTOM

    2 STIFFENING PLATES

    tYPiCAL SuPPORt BRACKEtS OutSidE tAnK

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    24/45

    93 Installation and Maintenance

    Figure 3.7 Suggested alteration to roof if pontoon is likely to foul pipework

    with roof in lowest position (centre mounted P43)

    3.7

    OUTLINE OF OBSTRUCTION

    5/16" THICK SEMI-CIRCULAR SHAPED SECTION WITH

    ONE END B LANKED OFF TO BE INSERTED INTO ROOF TOPREVENT FOULING WHEN ROOF IS IN LOWEST POSITION

    TANK SHELL

    ROOF

    ROOF POSITION

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    25/45

    10

    3.3 System installation commissioning

    The ollowing procedure is recommended when installing and commissioning the Veolia P43.

    3.3.1 Centre mounted P43

    a) Check that the correct nozzle size has been installed (i.e. in accordance with design

    specication). Ensure that the impeller in the inlet to the P43 is ree to rotate (by hand)

    b) Ensure by observing the centre line position o the nozzle that there will be no direct jet

    impingement on internal piping e.g. stream coils, water draw-o etc. Also that all specied

    alterations to internal pipework have been completed

    c) To prevent impeller ouling on start-up, ensure that the lines eeding the P43(s)

    (downstream rom the line lter) have been ushed to remove scale deposits, welding rods etc .

    prior to installing the P43(s). The use o a temporary strainer during commissioning is to

    be recommended

    d) Ensure that a pressure gauge 0-20 kg/cm (0-300 psi) has been installed in the line between

    tank shell and valve to measure P43 inlet pressure

    e) Fit gasket between the P43 and the saddle support and tighten bolts securely. Check the plane

    o the nozzle rotation to ensure that it is ree rom obstruction, and the centre line o the jet

    does not directly impinge on tank internals

    ) The P43 is electrically continuous. To ensure electrical continuity with the pipework an

    earthing strap is supplied. This should be used to bond the inlet ange on the P43 to the pipe

    assembly. When assembled the whole surace o the strap and the asteners should be coated

    with an oil resistant paint

    g) Ensure that the external indicator (where tted) is in place and the exible drive is

    securely astened

    h) Ater line commissioning, gradually increase the pressure to the P43 until the designed rateis achieved

    i) Monitor the position o the P43 on the external indicator ater hal an hour operation and

    record the position ater a urther hal an hour period to ensure that the P43 is rotating reely.

    Check the rotation rate o the P43 and ensure that it is within 10% o the specied time or the

    rotation at the design pressure

    3.3.2 Shell mounted P43 (or manways 30 or greater)

    a) Check that the correct nozzle size has been installed (i.e. in accordance with design

    specication). Ensure that the impeller in the inlet to the P43 is ree to rotate (by hand)

    b) Ensure by observing the centre line position o the nozzle that there will be no direct jet

    impingement on the internal piping e.g. steam coils, water draw-o etc. Also that all specied

    alterations to internal pipework have been completed

    c) To prevent impeller ouling on start-up, ensure that the lines eeding the P43(s) (downstream

    rom the line lter) have been ushed to remove scale, deposits, welding rods, etc. prior to

    installing the P43(s)

    d) Assemble P43 into inlet pipe abrication together with gate valve and non-return valve,

    see Fig. 3.4

    e) NOTE: that the centre line o the P43 is marked by a machined slot. This slot must point tothe centre o the tank

    ) Check that the earthing strap is xed across the anges and is making a good contact and has

    been painted

    3 Installation and Maintenance

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    26/45

    11

    g) The P43 can be easily manoeuvred by crane with the valve assembly acting as a balance

    h) Ensure that the external indicator (where tted) is in place and the control cables are

    securely astened

    i) The assembly can be positioned and the manway ange bolts tightened

    j) Ater line commissioning, gradually increase the pressure to the P43 until the designed rate

    is achieved

    k) Monitor the position o the P43 on the external indicator ater hal an hours operation and

    record the position ater a urther hal-hour period to ensure that the P43 is rotating reely.

    Check the rotation rate o the P43 and ensure that it is within 10% o the specied time

    or one rotation at the design pressure

    3.3.3 Shell mounted P43 (or manways less than 30 )

    a) Check that the correct nozzle size has been installed (i.e. in accordance with design

    specication). Ensure that the impeller in the inlet to the P43 is ree to rotate (by hand)

    b) Ensure by observing the centre line position on the nozzle that there will be no direct jetimpingement on internal piping e.g. steam coils, water draw-o etc. Also that all specied

    alterations to internal pipework have been completed

    c) To prevent impeller ouling on start-up, ensure that the lines eeding the P43(s) (downstream

    rom the line lter) have been ushed to remove scale deposits, welding rods, etc., prior to

    installing the P43(s)

    d) NOTE: That the centre line o the P43 is marked by a machined slot. This slot must point to

    the centre o the tank

    e) To install P43(s) through manway the P43 should be positioned on the inlet pipework in such

    a manner that the machined slot on the P43(s) is pointing to the tank centre and the nozzle

    positions are parallel to the tank shell

    nOZZLES SHOuLd nOW BE REMOVEd

    ) Check that the earthing strap is xed across the anges and is making a good contact and has

    been painted

    g) From the main liting equipment an additional chain block is required, this second lit should

    then be attached with a shackle or similar to the bottom holes in the manway cover to allow

    the manway to be rotated through 90

    h) The P43(s) can now be tted through the manway

    Having positioned the P43(s) in the tank the secondary set o chain blocks can be lowered

    allowing P43(s) to resume its normal position

    i) Nozzle installation will have to take place through the manway door, with the valve assembly

    resting outside the tank at base level

    j) Once nozzles are xed ensure that the external indicator (where tted) is in place and the

    control cables are securely astened

    k) The assembly can be positioned and the manway ange bolts tightened

    l) Ater line commissioning, gradually increase the pressure to the P43 until the designed rate

    is achieved

    m) Monitor the position o the P43 on the external indicator ater hal an hours operation and

    record the position ater a urther hal-hour period to ensure that the P43 is rotating reely.

    Check the rotation rate o the P43 and ensure that it is within 10% o the specied time or

    one rotation at the design pressure

    3 Installation and Maintenance

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    27/45

    123 Installation and Maintenance

    Figure 3.8 Typical installation of indicator

    3.8

    MANWAY HATCH COVER

    P43 INDICATOR

    8" N.B. PIPE

    80mm

    75mm

    165mm

    STUDDED FLANGE OUTSIDEDIA. 228.4mm

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    28/45

    3 Installation and Maintenance 13

    Figure 3.9 Indicator (shell mounted) P43 E.5468

    5 17 33

    15

    30

    18

    40

    36

    1

    32 351013

    MANWAY COVER

    3.9

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    29/45

    143 Installation and Maintenance

    3.3.4 P43 external indicator

    Setting-up procedure or centre mounted unit

    Reer to drawings Nos, E.5468, E.5615 and schedule E.5468

    1. Select position or indicator on tank wall. This will usually be on a manway ange or other

    convenient point. I a P43 wall mounted installation is being used, the indicator can be

    mounted on the same ange as the inlet pipework

    I the installation is centrally mounted, the position o the indicator may be determined by other

    actors such as the route o the exible drive (item 38).

    The exible drive should be routed such that it runs past any available xtures inside the tank such

    as the P43 inlet pipework or the water draw-o line. This will enable the drive to be secured once

    the indicator has been set-up. The drive should not be run close to heating coils where these may be

    used ater installation.

    Keep the number o changes in direction o the drive to a minimum. The indicator will operatesatisactorily with up to six 90 bends.

    When routing the drive, ensure that no part o it can be trapped or caught by roo legs or roo water

    draw-o pipework when the roo is raised or lowered.

    2. Cut a hole 80mm dia. in the manway ange to coincide with the centre lines o the indicator

    3. Weld the studded ange (item 13) to the manway ange centrally around 80mm dia. hole

    4. Feed end o the exible drive through the 80mm hole and bolt indicator to studded ange with

    items (32) and (35), including gasket (item 10)

    5. Bolt manway ange to tank taking care not to damage the exible drive

    6. Run drive along the desired route to the P43

    7. Bolt P43 to inlet pipework ange. Choose two adjacent bolts on the P43 mounting ange

    or the attachment o the mounting bracket (item 15). These will normally be in line with the

    direction o the drive as it meets the P43. Leave these two bolts undone and the others slack

    8. Slide mounting bracket over the bolts in the position shown on the drawing and secure.

    Tighten all P43 ange bolts ully

    9. Slide sprocket end o exible drive onto the mounting bracket until the sprocket touches the

    pins on the bearing plate (item 1). Secure with items (5), (17) and (33), using Loctite 241 adhesiveor equivalent to coat the bolt threads

    Note that Figure 3.9 shows a wall mounted installation. For a central mounted installation,

    the whole assembly at the P43 will be upside down

    10. Secure the whole length o the exible drive to the xtures along its route with stainless steel

    wire. ENSURE THAT THE DRIVE NEAR THE P43 IS CLEAR OF THE ROTATING NOZZLES

    11. When the P43 is run, there will be a delay o about 20 minutes beore the indicator moves.

    When the P43 is moving, the indicating disc (item 16) will rotate at the same speed as the

    P43. By timing the rotation o the disc through one revolution or any given angle, the speed o

    the P43 can be assessed

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    30/45

    153 Installation and Maintenance

    B. Maintenance

    3.4 P43 lubrication

    The gearbox is lubricated by EP 320 oil. This should be renewed at the periodic services.

    3.5 Recommended operating level

    The requency and duration o operation will depend on the rate o sludge deposition.

    But it is strongly recommended that the P43 be run or an approximate ONE ROTATION

    OF THE NOZZLE at least ONCE A MONTH to ensure ree movement o internal components.

    3.6 External indicator

    An external indicator can be supplied as an optional extra.

    INDICATOR indicates nozzle movement

    (FOR SHELL MOUNTED P43) and nozzle position

    INDICATOR

    (FOR CENTRE MOUNTED P43) indicates nozzle movement only

    The indicating mechanism is mechanically connected to the P43. (See Figure 3.9).

    3.7 Servicing interval

    Following 15 years o installation, it is recommended that the P43 is removed or routine service,together with the external indicator (where tted). It should then be returned to Veolia or our

    approved service centre or complete overhaul. A substitute unit can be supplied at the time the

    existing unit is removed to minimize tank outage time.

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    31/45

    CONTENTS

    4Technical Inormation

    4.1 Service Enquiries ............................. ................................. ................................. .....................1

    4.2 Centre Mounted P43 Assembly

    (Parts Lists and Drawing) .........................................................................................2, 3, 4

    4.3 Shell Mounted P43 Assembly

    (Parts List and Drawing)............................................................................................5, 6, 7

    4.4 Customer Variables .............................. ................................ ................................. ...............8

    4.5 Impeller Shat Assembly ............................... ................................. .............................. 9

    4.6 P43 Shell Mounted P43 External Indicator

    (Parts List and Drawing)................................ ................................ ....................... 10, 11, 12

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    32/45

    4Technical Inormation

    1

    4. Technical Inormation

    4.1 Service enquiries

    All service enquiries should be reerred to Veolia at:

    Veolia Environmental ServicesDock Road South

    Bromborough

    Wirral

    CH62 4SQ

    Telephone: +44 (0) 151 6444300

    Fax: +44 (0) 151 6444301

    e-mail: [email protected]

    or via your Local Representative.

    4 Technical Inormation

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    33/45

    ITEM TITLE QTY. PART No.

    1 MAIN BODY ASSY. Central Mounted 543401

    2 NOZZLE BODY ASSEMBLY 1 540902

    3 BASE PLATE ASSEMBLY 1 540903

    4 GEARBOX ASSEMBLY 1 540904

    5

    6 BEARING PLATE 1 540906

    7 IMPELLER 1

    8 IMPELLER NUT 1 540908

    9 NOZZLE to suit

    10

    11 MOUNTING FLANGE GASKET 1 540911

    12 BASE PLATE GASKET 1 540912

    13 KEY 1 540913

    14 FLANGED PLUG ( BSP) 2 519184

    15 COPPER WASHER 2 540915

    16 O RING 2 540916

    17 PTFE FRICTION DISC 1 540917

    18 O RING 1 540918

    19 O RING to suit 540919

    20 PTFE FRICTION DISC 1 540917A

    16A O RING 1 540916A

    2

    P43 central mounted G.A. E.5434

    4 Technical Inormation

    4.2

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    34/45

    ITEM TITLE QTY. PART No.

    21 BOLT 540921

    22 BOLT 12 S.3112

    23 BOLT to suit 540923

    24 SCREW 8 540924

    25 SCREW 5 540925

    26 WASHER SPRING 8 540926

    27 WASHER SPRING 12 540927

    28 WASHER SPRING 8 540928

    29 WASHER SPRING to suit 540929

    30 NUT 8 540930

    31 MECHANICAL SEAL 1 540931

    32 OIL 540932

    33 LOCTITE to suit 540933

    34 NOZZLE BLANK to suit 540934

    35 COPPER WASHER 1 540940

    36 FLANGED PLUG ( BSP) 1 540939

    37

    38

    39

    40

    P43 central mounted G.A. E.5434

    34 Technical Inormation

    4.2

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    35/45

    4

    4.2

    Figure 4.2 E 5434 P43 shore storage tank cleaning (central mounted type)

    SECTION Y-Y(WITH NOZZLES REMOVED)

    343mm FLANGE

    360mm

    548mm

    360mm

    27

    22

    X

    Y

    12

    28 24 15 14 4 3 2

    Y

    X

    16

    18

    25

    16A20

    17

    306

    26

    13

    31

    17

    1138

    21

    37

    738mm

    35

    9

    23

    29 19SECTION X-X

    ZZ

    8

    36

    35

    344mm

    VEOLIA P43MADE IN UK

    EPC, US AND OTHER PATENTSGRANTED AND APPLIED FOR

    NOZZLE BLANKONE PER M/C MAY BEFITTED IN PLACE OF

    NOZZLE ITEM 9 IF REQUIRED

    4 Technical Information

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    36/45

    ITEM TITLE QTY. PART No.

    1 MAIN BODY ASSEMBLY (Shell mounted) 540901

    2 NOZZLE BODY ASSEMBLY 1 540902

    3 BASEPLATE ASSEMBLY 1 540903

    4 GEARBOX ASSEMBLY 1 540904

    5

    6 BEARING PLATE 1 540906

    7 IMPELLER 1

    8 IMPELLER NUT 1 540908

    9 NOZZLE 2

    10

    11 MOUNTING FLANGE GASKET 1 540911

    12 BASEPLATE GASKET 1 540912

    13 KEY 1 540913

    14 FLANGED PLUG ( BSP) 2 519184

    15 COPPER WASHER 2 540915

    16 O RING 2 540916

    17 PTFE FRICTION DISC 1 540917

    18 O RING 1 540918

    19 O RING 2 540919

    20 PTFE FRICTION DISC

    16A O RING 1 540916A

    P43 shell mounted G.A. E.5409

    54 Technical Inormation

    4.3

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    37/45

    6

    ITEM TITLE QTY. PART No.

    21 BOLT 540921

    22 BOLT 12 S.3112

    23 BOLT 4 540923

    24 SCREW 8 540924

    25 SCREW 5 540925

    26 WASHER SPRING 8 540926

    27 WASHER SPRING 12 540927

    28 WASHER SPRING 8 540928

    29 WASHER SPRING 4 540929

    30 NUT 8 540930

    31 MECHANICAL SEAL 1 540931

    32 OIL 540932

    33 LOCTITE to suit 540933

    34

    35 COPPER WASHER 1 540940

    36 FLANGED PLUG (" BSP) 1 540939

    37

    38

    39

    40

    P43 shell mounted G.A. E.5409

    4 Technical Inormation

    4.3

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    38/45

    7

    4.3

    Figure 4.3 E 5409 P43 shore storage tank cleaning (wall mounted type)

    SECTION Y-Y(WITH NOZZLES REMOVED)

    343mm FLANGE

    360mm

    548mm

    360mm

    27

    22

    X

    Y

    12

    28 24 15 14 4 3 2

    Y

    X

    16

    18

    25

    16A20

    17

    306

    26

    13

    31

    17

    1138

    21

    37

    738mm

    35

    923

    29 19SECTION X-X

    ZZ

    8

    36

    35

    344mm

    VEOLIA P43MADE IN UK

    EPC, US AND OTHER PATENTSGRANTED AND APPLIED FOR

    4 Technical Information

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    39/45

    ITEM TITLE QTY. PART No.

    1 NOZZLE 2" as req. 543701

    2 NOZZLE 2.5 as req. 543702

    3 NOZZLE 3.0 as req. 543703

    4 NOZZLE 3.5 as req. 543704

    5 NOZZLE 4.0 as req. 543705

    6 NOZZLE 4.5 as req. 543700

    7

    8

    9

    10

    11

    12 IMPELLER 30 1 543712

    13

    14

    15 IMPELLER 45 1 543715

    16 IMPELLER 50 1 543716

    17

    18 IMPELLER 65 1 543718

    19

    20

    P43 customer variables E.5437

    84 Technical Inormation

    4.4

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    40/45

    9

    ITEM TITLE QTY. PART No.

    1 IMPELLER SHAFT 1 541901

    2 BALL BEARING 1 541902

    3 CIRCLIP 1 541903

    P43 impeller shaft assembly E.5419

    4 Technical Inormation

    4.5

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    41/45

    ITEM TITLE QTY. PART No.

    1 BEA RING PLATE ASSEMBLY 1 549200

    2 INDICATOR BODY 1 549600

    3

    4

    5 BOLT HEX. HEAD 2 546805

    6 GEARBOX MOUNTING SUB- ASSEMBLY 1 562000

    7 SEAL HOUSING 1 546807

    8 DRIVE SHAFT 1 546808

    9 DRIVE PIECE ASSEMBLY 1 549900

    10 GASKET 1 546810

    11 BACKING WASHER (SEAL) 1 546811

    12 SPACING SLEEVE 1 546812

    13 STUDDED FLANGE 1 561600

    14 SLEEVE 1 546814

    15 MOUNTING BRACKET 1 546815

    16 INDICATOR DISC SUB-ASSEMBLY 1 562100

    17 NUT HEX 2 546817

    18 PLATEWHEEL DISC SUB-ASSEMBLY 1 546818

    19 GEARBOX 1 546819

    20 BUSH 1 546820

    P43 shell mounted external indicator E.5468

    104 Technical Inormation

    4.6

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    42/45

    11

    ITEM TITLE QTY. PART No.

    21 THRUST WASHER 2 546821

    22 OIL SEAL 1 546822

    23 O RING 1 546823

    24 O RING 1 546824

    25 SPRING 1 546825

    26 SOCKET CAP-HEADED SCREWS 4 546826

    27 SOCKET CAP-HEADED SCREWS 2 546827

    28 BOLTS HEX. HEAD 8 546828

    29 SOCKET CSK HD. SCREWS 6 546829

    30 SOCKET SET SCREW 1 546830

    31 NUT HEX 1 2500/54

    32 NUT HEX 16 546832

    33 WASHER 6 4007/73

    34 WASHER 1 4007/59

    35 WASHER 16 546835

    36 SOCKET CAP-HD. SCREWS 3 546836

    37 MOUNTING ADAPTOR 1 546837

    38 FLEXIBLE SHAFT ASSEMBLY 1 549100

    39 SIGHT GLASS 1 546839

    40 PLATE WHEEL 1 546840

    P43 shell mounted external indicator E.5468

    4 Technical Inormation

    4.6

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    43/45

    Figure 4.6 E 5468 external indicator P43

    12

    4.6

    8

    3326

    38

    23

    12

    25

    9

    2 22 11 3134

    19 27 37 14

    20 7 21 6 24 29 39

    ITEM 16 TO BE MOUNTED CENTRALLYON ITEM 37 WITH ARALDITE

    ITEM 37 TO BE FITTED TO OUTPUTSHAFT OF ITEM 19 WITH LOCTITE 270

    4 Technical Inormation

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    44/45

    Fig 4.7 S bend nozzle adaptor

    13

    4.7

    DOWEL TO BE A PRESS-FITWITH SIDE PLATES

    3

    2

    12

    1

    7

    45A

    11

    10

    4 Technical Inormation

  • 7/29/2019 technical_manual_p43 VEOLIA TOP .pdf

    45/45

    THIS SECTION IS FOR YOU TO KEEP YOUR

    OWN RELEVANT TECHNICAL DATA

    5Specifc Data