SubmergedRotary Jet Mixer
P43
Operators Manual
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
2/45
CONTENTS
1Equipment description
2Equipment operation
3Installation andmaintenance
4Technical inormation
5Specifc data
SbmereRoary Je MerP43
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
3/45
CONTENTS
1
1.1 Introduction ................................. ................................ ................................. ...........................1
1.2 Types o P43 ............................... ................................ ................................. ...........................1
1.3 Key Parameters ................................ ................................. ................................. ....................2
1.4 Nozzle Selection .............................. ................................. ................................. ....................2
1.5 Impeller Selection ................................. ................................ ................................. ...............2
1.6 Materials ................................. ................................. ................................. ............................... 2
Figures
1.1 Schematic o P43 ................................ ................................ ................................. ...............3
Equipment Description
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
4/45
1Equipment Description
1 Equipment Description 1
1. Equipment description
1.1 Introduction
The Veolia Environmental Services P43 is a device or directing a submerged jet o crude oil across
a pre-selected area o the bottom o a crude oil storage tank. This jet o crude oil dissolves and re-
suspends the accumulated sludge throughout the overhead oil.
The P43 is uid dynamically-powered, the nozzles being gearbox-driven by a xed-blade impeller
assembly which is rotated by the continuous ow o uid through the P43. This is shown in
Figure 1.1 on page 3 o this section.
The P43 was developed jointly by BUTTERWORTH SYSTEMS and EXXON RESEARCH AND
ENGINEERING COMPANYas a replacement to side-entering mixers. Full scale tests demonstrated
that complete de-sludging o a tank could be accomplished in less than 30 hours using the
P43. Periodic use o the P43 eliminates the need or side entering propeller mixers resulting in
substantial electrical savings.
1.2 Types o P43
There are two types o P43 available:
CENTRAL TYPE
The centre mounted P43 is designed to be placed on the tank oor in the centre o the tank. Both
nozzles normally would discharge simultaneously through the entire 360 rotation o the P43. One
nozzle o the P43 can be blanked o to accommodate pump ow rate limitations. Single-nozzle
operation requires that the installation be designed to withstand jet reaction.
This installation can only be considered in a clean, gas ree, tank since it is necessary to conduct
hot work.
SHELL TYPE
The shell mounted P43 is designed to be placed at the tank wall, using the existing tank shell
manway or mounting.
Only the nozzle acing away rom the tank shell discharges as the P43 continuously rotates in a
clockwise direction. An internal bae (see Figure 1.1) prevents the nozzle acing the tank shell rom
discharging. The ow change over between the nozzles is smooth and commences when the
nozzles are approximately tangential to the tank shell. Flow rom one nozzle is gradually reduced
as ow to the other is increased proportionally to begin the cleaning cycle again.
The shell mounted P43 can be installed in a tank that is in service provided the manway door
can be removed or installation. Unlike the centre mounted P43, the shell mounted P43 doesnot require any hot work or installation. The shell mounted P43 aords ease o access or
maintenance and the installation can be either portable or permanent.
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
5/45
2
The ollowing specications apply to the P43:
1.3 Key parameters
HEIGHT 548 mm (21.6 in)
NOZZLE TIP TO TIP 738 mm (29.1 in)WEIGHT 205 kg (450 lb)
* PRESSURE RATED 20 bar (295 psi)
* TEMPERATURE RATING -10 to 93C (14 to 200 F)
GEARBOX OIL EP 320 (1 Imp. Gal.)
(8 litres)
(*) Higher pressures and temperatures available on request.
1.4 Nozzle selection
These range rom 50mm (1.97") to 112.5mm (4.43"). Nozzle size selection is based on required jetrange, available pressure and ow rate or the P43 service.
1.5 Impeller selection
The speed o rotation can be varied by the ow rate through the P43 and also by a variety o
actory tted impellers. The speed range being 1.78 5.18 deg. min.
1.6 Materials (see Figure 1.1)
MAIN BODY Aluminium Bronze
NOZZLE BODY Ni Resist S.G. IronNOZZLE TIP Aluminium Bronze or Ni Resist
IMPELLER Aluminium Bronze or Ni Resist S.G. Iron
IMPELLER SHAFT Stainless Steel
GEARCASE Ni Resist S.G. Iron
GEARCASE COMPONENTS Phosphor Bronze
Aluminium Bronze
Stainless Steel
FASTENINGS Stainless Steel
O RINGS Viton
MECHANICAL SEAL Hasteloy C. Stainless Steel
1 Equipment Description
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
6/45
31 Equipment Description
Veolia P43. Made in UK. EPC, US and other patents granted and applied or.
1 Equipment Description
Figure 1.1 Schematic o P43
1.1
738 mm
FLUID FLOW(INLET)
8 ANSI FLANGE
IMPELLER SHAFTST/STEEL 440
MECHANICAL SEALBELLOWS HASTELOY CST/STEEL
NOZZLESALUM. BRONZE AB2OR Ni RESIST D2B
NOZZLE BODYNi RESIST D2WCAST IRON
BASE PLATE GASKET344mm DIA360mm DIAFLANGED PLUG
FLANGED PLUG
344mm DIA
360mm DIA
360mm
548mm
EARTH STRAP
MAIN BODYALUM. BRONZE AB2
BEARING PLATENi RESIST D2W
P43MADE IN UK
EPC, US AND OTHER PATENTSGRANTED AND APPLIED FOR
BAFFLE TO PREVENTDISCHARGE AGAINSTTANK SHELL(NOT INCLUDED INCENTRAL MOUNTEDP43)
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
7/45
CONTENTS
2
2.1 Operating Specications .............................. ................................ ................................. .....1
2.2 Recommended Operating Interval ................................ ................................. ................1
2.3 Use o Shell Mounted P43 to de-sludge Tank ............................... ......................... 6
2.4 Procedure or Processing Sludge Dispersed in Crude Oil ................................. .... 7
2.5 Routine Checks on Operation ............................... ................................. .......................... 7
2.6 Special Considerations ................................. ................................. ................................. .... 7
Figures
2.1 Flow Rate vs Cleaning Radius Shell Mounted P43 and
Central Mounted P43 with one nozzle discharging various nozzle
diameters oil S.G 0.9 ........................................................................................................2
2.2 Required Pressure Drop vs Cleaning Radius (Shell Mounted P43)
with various nozzle diameters oil S.G 0.9 ...............................................................3
2.3 Case Examples or P43 Specications ............................ ................................. ..........4
2.4 Required Pressure Drop vs Cleaning Radius P43 (Central Mounted).
Two nozzles various diameters oil S.G. 0.9 .........................................................5
NOTE: In connection with Performance Graphs
Required pressure drop is defned as the pressure drop across the P43, thereore,
allowance must be made or any losses in pipelines and or the static
head o liquid in the tank.
Equipment Operation
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
8/45
2Equipment Operation
1
2. Operation
2.1 Operating specications
During the normal operating sequence o the P43, there will be external circumstances which
will lead to a change in the normal ow rate and/or supply pressure. These changes will alter the
cleaning radius o the P43 and could aect the overall eectiveness o the P43 installation.
The graphs (Figures 2.1 to 2.4) enable the operator to calculate the impact o these changes
on cleaning radius, and which remaining parameters would need to be altered to restore the
installation to its normal operational eectiveness.
EXAMPLE:
In the case o a 260' (79m) diameter tank with three P43(s) at equidistant positions around the
circumerence o the tank, the ollowing applies:
For a 100mm nozzle rom Figure 2.3 and Figure 2.4:
CASE ARange Flow Pressure drop across P43
130' (39.5m) 3375 IGPM (921m3 /hr) 83 psi (5.8kg/cm2)
CASE B
Should the ow be reduced to 3000 GPM (819m3/hr) Then rom Figure 2.4:
Range
115 (35m)
CASE C
Should the pressure be reduced by 5psi then (rom Figure 2.3) the pressure drop across the P43 will
reduce to (83-5) = 78 psi (5.48kg / cm2).
Range
126 (38.4m)
2.2 Recommended operating interval
It is strongly recommended that the P43 is run at least once per month to prevent sludge build-up
and to ensure ree movement o internal components. The requency and duration o operation
will be a unction o sludge deposition rates, but in general should be about 8 sweeps per nozzle in
a month.
2 Equipment Operation
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
9/45
2
273 1000
2000
FLOW
RATE
1GPM
m3/hr
50
15
60
18
70
21
80
24
50.0mm
62.5mm
75.0mm
87.5mm
100.0mm
112.5mm
90
27
100
30
110
33
120
36
130
39
140
42
VARIOUS NOZZLE DIAMETERS
150 FEET
CLEANING RADIUS
METRES45
160
48
170
51
3000
4000
136 500
546
819
1092
Figure 2.1 Flow rate vs cleaning radius
Shell mounted P43 or centre mounted P43 with one nozzle discharging various nozzle diameters. Oil S.G.
0.9
2.1
2 Equipment Operation
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
10/45
3
1
2
3
4
5
6
7
8
9
10
12
12
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
REQUIREDPRESSUREDROP
50
15
60
18
70
21
80
24
50.0mm
62.5mm
75.0mm87.5mm 100.0mm
112.5mm
90
27
100
30
110
33
120
36
130
39
140
42
VARIOUS NOZZLE DIAMETERS
150 FEET
CLEANING RADIUS
METRES45
160
48
180
54
170
51
Figure 2.2 Required pressure drop vs cleaning radius
(Shell mounted P43) with various nozzle diameters. Oil S.G. 0.9
2.2
2 Equipment Operation
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
11/45
4
Figure 2.3 Case examples or P43 specications
2.3
273 1 000
2000
FLOWR
ATE
1GPM
m3/hr
50
15
60
18
70
21
80
24
50.0mm
62.5mm
75.0mm
87.5mm
100.0mm
112.5mm
90
27
100
30
110
33
120
36
130
39
140
42
VARIOUS NOZZLE DIAMETERS
150 FEETCLEANING RADIUS
METRES45
160
48
170
51
3000
4000
1 36 50 0
546
819
1092
1
2
3
4
5
6
7
8
9
10
12
12
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
REQUIREDPRESSUREDROP
50
15
60
18
70
21
80
24
50.0mm
62.5mm
75.0mm8 7. 5m m 10 0.0mm
112.5mm
90
27
100
30
110
33
120
36
130
39
140
42
VARIOUS NOZZLE DIAMETERS
150 FEET
CLEANING RADIUS
METRES45
160
48
180
54
170
51
Fre 2.1 Flow rae vsclea rasShell mounted P43 orcentre mounted P43 withone nozzle dischargingvarious nozzle diameters.Oil S.G. 0.9
Fre 2.2 Reqre pressrerop vs clea ras(shell mounted P43) withvarious nozzle diameters.Oil S.G. 0.9
CASE A
CASE A
CASE B
CASE C
2 Equipment Operation
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
12/45
5
1
2
3
4
5
6
7
8
9
10
11
12
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
REQUIREDPRESSUREDROP
Ib/in
kg/cm
50
15
60
18
70
21
80
24
50.0mm
62.5mm
75.0mm
112.5mm
100.0mm
87.5mm
90
27
100
30
110
33
120
36
130
39
140
42
VARIOUS NOZZLE DIAMETERS
150 FEET
CLEANING RADIUS
METRES45
160
48
170
51
Figure 2.4 Required pressure drop vs cleaning radius
P43 (central mounted) two nozzles various diameters. Oil o S.G. 0.9
2.4
2 Equipment Operation
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
13/45
62 Equipment Operation
MONITORING P43 EFFECTIVENESS
A tank monitoring procedure should be devised to
Determine the crude oil quality or selection o processing strategy
Measure the eectiveness o blending
Determine the rate and eectiveness o sludge re-suspension
2.3 Use o shell mounted P43 to de-sludge tank
(i) Take samples o sludge and measure:
B S & W (Bottom Sediment and Water)
(ii) Conduct sludge prole survey across the tank
Estimate sludge quantity
Empty tank and t P43 (see Section 3.3)
(iii) Fill storage tank with crude oil to a minimum height such that the roo is oating
It is advantageous to have a large volume o crude to disperse the sludge
A ratio o approximately 4:1 (crude to sludge) is usually sufcient
(iv) I a minimum level o crude has been used, raise roo legs to their operating position to
minimise jet disturbance during cleaning operation. Alternatively ll the tank to a level
where the roo legs are above the centre line o the jet
(v) Sample the crude oil ater lling the tank and measure B S & W levels
(vi) Gradually increase the pressure to each P43 until the designated rate is achieved
(vii) For the tank cleaning operation, we recommend a minimum o eight sweeps per P43. This
time can be reduced i the customer is prepared to stop the operation, allow a 1-hour settling
time and conduct sludge prole measurements. I the levels are satisactory then the operation
can be stopped
(viii) When the operation is stopped to assess sludge proles, it is recommended that samples are
taken at the top, middle and bottom to determine B S & W levels
This data will give you useul inormation on the operating characteristics o the P43 and will
assist in assessing the processing needs o this mixture
(ix) I sludge is still present in the tank and the B S & W level exceeds 15% in the bulk o the
crude oil, we recommend draining the tank and adding resh crude oil or a urther periodo P43 operation
NOTE: SEQUENTIAL OPERATION
I the renery is limited or ow rate it is possible to operate the P43 on a sequential basis.
However each P43 should be operated as outlined in section (vii). The total cleaning time would,
thereore, be extended.
Heating o the oil is also an advantage when de-sludging, with 60 C the maximum
recommended temperature.
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
14/45
72 Equipment Operation
2.4 Procedure or processing sludge dispersed in crude oil
The sludge dispersed in the crude oil mixture may need to be blended in line with the eedstock
rom a neighbouring tank. The decision on the exact percentage o the blend should be based on
the composition o the sludge / crude oil mixtures. I the P43 has been used to de-sludge the tank
with a minimum crude level, then a blend o 5 to 10% could be required.
The ollowing parameters should be monitored to assess any downstream impacts:
(i) B S & W and salt levels in the inlet and outlet o the desalter
In order to assess the ouling tendencies o the crude oil, monitor
(i) Pressure drops across crude pre-heat exchangers beore, during and ater sludge /
crude oil processing
(ii) Overall heat transer coefcients (U Values) across crude preheat exchangers,
beore, during and ater sludge / crude oil processing
2.5 Routine check on P43 operation
It is recommended that the ollowing checks are conducted periodically:
Check sludge level in the crude oil tank
Check pressure readings at tank shell and ensure these correlate with the design pressure
or the installation
Monitor line lter pressure drop to ensure that the line lter is not blocked
During P43 operation, check indicator (where tted) or correct P43 rotation
2.6 Special considerations
I the P43 is to be operated in an environment with oils which are solid at ambient temperatures,
special precautions should be taken. These include:
Keeping the temperature o the P43 and vicinity elevated
Checking that the strainer(s) is clear
Checking the indicator (where tted) to ensure the P43 is rotating
Checking the pressure and ow rate on starting against gures given or the installationsand/or previous results (see Figures 2.1 to 2.4)
Ensuring that the supply line to the P43 is drained / empty i the heat is to be
switched o
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
15/45
A. Installation...............................................................................................................................1
3.1 Equipment Supplied ................................. ................................. ................................. ..........1
3.2 External Pipework Details ................................. ................................. ................................1
3.2.1 Details or Centre Mounted P43 ............................. ................................ ......................1
3.2.2 Details or Shel Mounted P43 ............................... ................................. .....................2
3.3 Systems Installation / Commissioning........................................................ ..............10
3.3.1 Centre Mounted P43 ............................. ................................. ................................. ........10
3.3.2 Shell Mounted P43 (or manways 30 or greater) ................................. .............10
3.3.3 Shell Mounted P43 (or manways less than 30 ) ............................. ............... 11
3.3.4 P43 External Indicator ............................... ................................. ................................. ... 14
B. Maintenance.............................. ................................ ................................. ......................... 15
3.4 P43 Lubrication ............................ ................................. ................................. ................... 153.5 Recommended Operating Interval ............................... ................................. .............. 15
3.6 External Indicator ............................... ................................. ................................. .............. 15
3.7 Servicing Interval ................................ ................................. ................................. .............. 15
Figures
3.1 Typical Modes or Operating P43 ................................ ................................. ................3
3.2 Alternative Installation Positions ............................. ................................. .....................4
3.3 Pipework Details (Centre Mounted P43) ............................ ................................. .....5
3.4 Pipework Details (Shell Mounted P43) ................................ ................................. .... 63.5 Details o Anchor Mounting (Centre Mounted P43) ................................. .......... 7
3.6 Typical Support Brackets ............................. ................................. ................................. .....8
3.7 Suggested Alteration to Roo i Pontoon is likely to oul ............................ ......... 9
3.8 Typical Installation o Indicator ................................ ................................. ................... 12
3.9 Indicator (Shell Mounted) P43 E.5468 ............................. ................................. ... 13
CONTENTS
3Installation andMaintenance
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
16/45
1
A. Installation
3.1 Equipment supplied
Veolia provide only the P43, which is lled with oil and ready to be mounted onto the appropriate
supporting pipework. The P43 is tted with an 8 inch ANSI at ace mounting ange and is
complete with xing bolts, mating ange and an earthing strap.
The P43 is supplied as a sealed unit. Breakage o this seal will invalidate warranty.
Veolia do NOT provide any o the associated pipework, supports, valves, gauges etc. However we will
give technical advice on the installation and comment on any piping proposals.
Schematics or typical pipework required or installation o the P43 are illustrated on the
ollowing pages.
Prior to installation o the P43 in any tank, ull regard must be given to saety procedures to ensure
the protection o all personnel. All standard saety procedures as laid down by governmental bodies,
saety organizations and the operating company must be complied with.
3.2 External pipework details
3.2.1 Details or centre mounted P43
A schematic o the pipework is illustrated on Figure 3.3. The ollowing should also be considered
when designing the system:
Pipe diameter to be selected to ensure that the desired pressure at the P43 can be achieved
Line Supports. See Figure 3.6
P43 mounting anges are 8 inch ANSI B.16.5 and have been designed toAPI 650 standard
In-line strainer specication see Figure 3.3
Material stainless steel
Screen size diamond-shaped preventing a particle size
greater than 19mm (3/4") rom passing
It is recommended that the strainer is o a basket type design to acilitate cleaning.
3Installation andMaintenance
3 Installation and Maintenance
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
17/45
2
NOTE: It is possible that sufcient strainers may have been tted at the pumps, thus making
the tting o a urther strainer unnecessary.
All new pipework must be ushed through beore commissioning in order to clear any
debris that may have accumulated during installation. The use o temporary strainers
during commissioning is also recommended
Ensure centre line o jet does not directly impinge on internal piping, e.g. stream coils,
water draw-o, etc
Ensure also that all specied alterations to internal pipework have been completed
Line vents or commissioning should be included
Pressure gauges are tted to measure P43 inlet pressure and identiy i line lter
is blocking. These should be upstream and downstream o the line lter
Valve requirement. See Figure 3.4
P43 supports to withstand jet reaction quoted by Veolia
Fabrication o elbow assembly to acilitate P43 installation. See Figure 3.4
Minimum distance between vertical centre line o P43 and inside o tank well
should be *500mm or the P43 with standard nozzle attachments
Recommended clearance under the P43 125mm
Inlet ange designed to A.P.I 650 hence bolt holes straddle the centre line o the P43
Correct P43 orientation is indicated by a groove included on the main stationary component.
This groove marks the centre line o the P43 and should be directed at the centre o the tank
When steam coils are present, P43 must be positioned such that nozzle discharges below
steam heating coils
*This measurement should be increased to 800mm or P43(s) with S Bend Nozzle tube attachments
(see Section 4 Page 13).
3 Installation and Maintenance
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
18/45
33 Installation and Maintenance
Figure 3.1 Typical modes for operating P43
3.1
P43
P43
P43
P43
P43
P43
P43
P43
P43
P43
P43
P43
SHELLVALVE
SHELLVALVE
TO PUMP
FROM PUMPSEPARATE INLETOUTLET LINES
COMMON IN LET/OUTLET LINES
P43 FEED LINE FROMADJACENT TANK
FILTER
FILTER
HOT TAPFILL AND DRAW
SHELLVALVE
SHELLVALVE
RECIRCULATION
SHELL MOUNTED
CENTRE MOUNTED
KEY
HOT TAP
FILTER
3 Installation and Maintenance
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
19/45
43 Installation and Maintenance
Figure 3.2 Alternative installation positions
3.2
CLEAning RAdiuS = tAnK diAMEtER x 0.7
CLEAning RAdiuS = tAnK diAMEtER
TWO MACHINE INSTALLATION
1
1
2
2
3
THREE MACHINE INSTALLATION
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
20/45
53 Installation and Maintenance
3.3
Figure 3.3 Typical pipework details (centre mounted P43)
PLAN VIEWOF TANK I NSTALLATION
VENTS TO BE FITTED TOFACILITATE FILLING PIPE SUPPORTS SEE DETAIL OF HOT TAP FILTER AND
FOLLOWING ARRANGEMENT
PRESSURE GAUGE LOCATED UPSTREAMOF FILTER TO INDICATE WHEN THEFILTER BECOMES BLOCKED
SEE EXPANSION BEND DETAIL.NOTE THAT PIPE SHOULD BE RU N TOAVOID INTERNAL STRUCTURE SUCHAS ROOF LEGS, DRAIN PIPE, ETC
REINFORCING PLATE MAY BEENLARGED TO COVER AREAS OFCORROSION IN TANK BOTTOM
CENTRE OF M/C MUST BE WITHIN1 METER OF CENTRE OF TANK
INLINE FILTER TO BE STAINLESSSTEEL WITH A DIAMOND SHAPETO PREVENT PARTICLES GREATERTHAN 19mm FROM PASSING
2" 150 PSI VALVE
12" X 12" X 10" REDUCING TEE
GATE VALVE
REINFORCING PAD
EXISTING FEED LINE(20 NB TYPE)
2" 150 PSI CHECK VALVE
2" INSTANTANEOUSCOUPLING
DETAIL OF HOT-TAP-FILTER AN DFLUSHING ARRANGEMENT
12" X 10" REDUCER
IF 12 PIPE IS USEDINSIDE TANK THEREDUCER NOT REQUIRED
NON-RETURN VALVE
GATE VALVE
PRESSURE GAUGE
TANK
TANK BOTTOM
10" X 8" REDUCER(OR 12 X 8)
PLAN VIEW
SIDE ELEVATIONSIDE ELEVATION
EXPANSION BEND DETAILS
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
21/45
63 Installation and Maintenance
3.4
Figure 3.4 Typical pipework details (shell mounted P43)
PLAN VIEW OF TANK INSTALLATION (SCALE 1 : 200)THE NUMBER OF WALL MOUNTED MACHINES MAY VARY
FROM 1 TO 4. THIS EXAMPLE ILLUSTRATES 3 M/CS
P43 INSTALLATIONPOSITION P43 WITH mm WIDEGROOVE FACING CENTRE OF TANK
PLAN
SUPPORTS
VENTS TO BE FITTED TO
FACILITATE FILLING PI PE
SEE DETAIL OF HOT-TAP-FILTER ANDFLUSHING ARRANGEMENT(MAY REQUIRE 2ND FILTER)
AFTER TAPPING INTO MAIN SUPPLY LINEIF THE FEED TO RI NG MAIN CAN GOEITHER WAY, THEN A 2ND FILTER MAYBE NECESSARY
IN LINE FILTER TO BE STAINLESS STEEL WITHA DIAMOND SHAPE TO PR EVENT PARTICLESGREATER THAN 19mm FROM PASSING
16" X 16" X 10" OR 12" X12" X 10REDUCING TEEDEPENDING ON LINE SIZE
2" 150 PSI VALVE
2" 150 PSI CHECK VALVE
2" INSTANTANEOUSCOUPLING
DETAIL OF HOT-TAP-FILTER & FLUSHINGARRANGEMENT
ROOF
ROOF PONTOON
OUTLINE OFOBSTRUCTION
TANK SHELL
MIN CLEARANCE CAN BE REDUCED IFREFINERY CONFIRMS THAT THE M/CWILL NOT FOUL ON TANK BOTTOM
5/16" THK SEMI-CIRCULAR SHAPED SECTION WITH ONEEND BLANKED-OFF TO BE INSERTED INTO ROOF TOPREVENT FOULING WHEN ROOF IS I N LOWEST POSITION
NOTE: DURING A TANK CLEANING OPERATION IT ISIMPORTANT TO CHECK THAT THE ROOF WILL NOTFOUL ON THE P43. IT MAY BE NECESSARY TOOPERATE WITH THE ROOF LEGS FULLY EXTENDED
GATE VALVE
REINFORCING PAD
EXISTING FEED LINE(24" 30" N/BORE)
PRESSURE GAUGES LOCATED EITHERSIDE OF FILTER TO INDICATE WHEN THEFILTER BECOMES BLOCKED
16" DIA
SIDE ELEVATION
NON-RETURN VALVE
12" X 8" REDUCER GATE VALVE
PRESSURE GAUGE
SINCE ONE NOZZLE DISCHARGESAT A TIME GUSSETS TOWITHSTAND JET REACTION ASINDICATED IN QUOTATION
TANK FLOOR
GUSSET ARRANGEMENT
EXTERNAL INDICATOR(OPTIONAL EXTRA)
BO HOLE NEEDED INMANWAY COVER
See Fig 3.11 For typical
inStallation oF indicator
TANK WALL
12" DIA
12" DIA
SIDE ELEVATION
SIDE ELEVATION
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
22/45
7
Figure 3.5 Details of anchor mounting (centre mounted P43)
3.5
TO ENSURE THIS FLANGE ISMOUNTED HORIZONTALLY IT ISTO BE FITTED IN SITUATION ANDTESTED ON THE ELBOW TO ALLOWFOR SLOPE OF TANK BOTTOM
WELD PLATE TOTANK BOTTOM
GUSSET PLATES" THICK
30"
30" X 30" X " PLATE
36" X 36" X " PLATE
ROOF
CHECK THAT WITH ROOF INLOWEST POSITION, THEREIS SUFFICIENT CLEARANCEBETWEEN P43 AND ROOF SUMP
CHECK JET WILLNOT IMPINGE ONWATER DRAW-OFF PIPE ORHEATING COILS. IFNECESSARY, THISDIMENSION MAYBE INCREASED
P43
3 Installation and Maintenance
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
23/45
83 Installation and Maintenance
Figure 3.6 Typical support brackets
3.6
TYPICAL SUPPORT BRACKET INSIDE TANK
1" DIA. BAR
6" x 3" CHANNEL
6" x 3 " RSJ
CONCRETE BASE
5" x 2 " RSC " U BOLT SUFFICIENTCLEARANCETO ALLOW FOREXPANSION
TANKBOTTOM
2 STIFFENING PLATES
tYPiCAL SuPPORt BRACKEtS OutSidE tAnK
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
24/45
93 Installation and Maintenance
Figure 3.7 Suggested alteration to roof if pontoon is likely to foul pipework
with roof in lowest position (centre mounted P43)
3.7
OUTLINE OF OBSTRUCTION
5/16" THICK SEMI-CIRCULAR SHAPED SECTION WITH
ONE END B LANKED OFF TO BE INSERTED INTO ROOF TOPREVENT FOULING WHEN ROOF IS IN LOWEST POSITION
TANK SHELL
ROOF
ROOF POSITION
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
25/45
10
3.3 System installation commissioning
The ollowing procedure is recommended when installing and commissioning the Veolia P43.
3.3.1 Centre mounted P43
a) Check that the correct nozzle size has been installed (i.e. in accordance with design
specication). Ensure that the impeller in the inlet to the P43 is ree to rotate (by hand)
b) Ensure by observing the centre line position o the nozzle that there will be no direct jet
impingement on internal piping e.g. stream coils, water draw-o etc. Also that all specied
alterations to internal pipework have been completed
c) To prevent impeller ouling on start-up, ensure that the lines eeding the P43(s)
(downstream rom the line lter) have been ushed to remove scale deposits, welding rods etc .
prior to installing the P43(s). The use o a temporary strainer during commissioning is to
be recommended
d) Ensure that a pressure gauge 0-20 kg/cm (0-300 psi) has been installed in the line between
tank shell and valve to measure P43 inlet pressure
e) Fit gasket between the P43 and the saddle support and tighten bolts securely. Check the plane
o the nozzle rotation to ensure that it is ree rom obstruction, and the centre line o the jet
does not directly impinge on tank internals
) The P43 is electrically continuous. To ensure electrical continuity with the pipework an
earthing strap is supplied. This should be used to bond the inlet ange on the P43 to the pipe
assembly. When assembled the whole surace o the strap and the asteners should be coated
with an oil resistant paint
g) Ensure that the external indicator (where tted) is in place and the exible drive is
securely astened
h) Ater line commissioning, gradually increase the pressure to the P43 until the designed rateis achieved
i) Monitor the position o the P43 on the external indicator ater hal an hour operation and
record the position ater a urther hal an hour period to ensure that the P43 is rotating reely.
Check the rotation rate o the P43 and ensure that it is within 10% o the specied time or the
rotation at the design pressure
3.3.2 Shell mounted P43 (or manways 30 or greater)
a) Check that the correct nozzle size has been installed (i.e. in accordance with design
specication). Ensure that the impeller in the inlet to the P43 is ree to rotate (by hand)
b) Ensure by observing the centre line position o the nozzle that there will be no direct jet
impingement on the internal piping e.g. steam coils, water draw-o etc. Also that all specied
alterations to internal pipework have been completed
c) To prevent impeller ouling on start-up, ensure that the lines eeding the P43(s) (downstream
rom the line lter) have been ushed to remove scale, deposits, welding rods, etc. prior to
installing the P43(s)
d) Assemble P43 into inlet pipe abrication together with gate valve and non-return valve,
see Fig. 3.4
e) NOTE: that the centre line o the P43 is marked by a machined slot. This slot must point tothe centre o the tank
) Check that the earthing strap is xed across the anges and is making a good contact and has
been painted
3 Installation and Maintenance
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
26/45
11
g) The P43 can be easily manoeuvred by crane with the valve assembly acting as a balance
h) Ensure that the external indicator (where tted) is in place and the control cables are
securely astened
i) The assembly can be positioned and the manway ange bolts tightened
j) Ater line commissioning, gradually increase the pressure to the P43 until the designed rate
is achieved
k) Monitor the position o the P43 on the external indicator ater hal an hours operation and
record the position ater a urther hal-hour period to ensure that the P43 is rotating reely.
Check the rotation rate o the P43 and ensure that it is within 10% o the specied time
or one rotation at the design pressure
3.3.3 Shell mounted P43 (or manways less than 30 )
a) Check that the correct nozzle size has been installed (i.e. in accordance with design
specication). Ensure that the impeller in the inlet to the P43 is ree to rotate (by hand)
b) Ensure by observing the centre line position on the nozzle that there will be no direct jetimpingement on internal piping e.g. steam coils, water draw-o etc. Also that all specied
alterations to internal pipework have been completed
c) To prevent impeller ouling on start-up, ensure that the lines eeding the P43(s) (downstream
rom the line lter) have been ushed to remove scale deposits, welding rods, etc., prior to
installing the P43(s)
d) NOTE: That the centre line o the P43 is marked by a machined slot. This slot must point to
the centre o the tank
e) To install P43(s) through manway the P43 should be positioned on the inlet pipework in such
a manner that the machined slot on the P43(s) is pointing to the tank centre and the nozzle
positions are parallel to the tank shell
nOZZLES SHOuLd nOW BE REMOVEd
) Check that the earthing strap is xed across the anges and is making a good contact and has
been painted
g) From the main liting equipment an additional chain block is required, this second lit should
then be attached with a shackle or similar to the bottom holes in the manway cover to allow
the manway to be rotated through 90
h) The P43(s) can now be tted through the manway
Having positioned the P43(s) in the tank the secondary set o chain blocks can be lowered
allowing P43(s) to resume its normal position
i) Nozzle installation will have to take place through the manway door, with the valve assembly
resting outside the tank at base level
j) Once nozzles are xed ensure that the external indicator (where tted) is in place and the
control cables are securely astened
k) The assembly can be positioned and the manway ange bolts tightened
l) Ater line commissioning, gradually increase the pressure to the P43 until the designed rate
is achieved
m) Monitor the position o the P43 on the external indicator ater hal an hours operation and
record the position ater a urther hal-hour period to ensure that the P43 is rotating reely.
Check the rotation rate o the P43 and ensure that it is within 10% o the specied time or
one rotation at the design pressure
3 Installation and Maintenance
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
27/45
123 Installation and Maintenance
Figure 3.8 Typical installation of indicator
3.8
MANWAY HATCH COVER
P43 INDICATOR
8" N.B. PIPE
80mm
75mm
165mm
STUDDED FLANGE OUTSIDEDIA. 228.4mm
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
28/45
3 Installation and Maintenance 13
Figure 3.9 Indicator (shell mounted) P43 E.5468
5 17 33
15
30
18
40
36
1
32 351013
MANWAY COVER
3.9
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
29/45
143 Installation and Maintenance
3.3.4 P43 external indicator
Setting-up procedure or centre mounted unit
Reer to drawings Nos, E.5468, E.5615 and schedule E.5468
1. Select position or indicator on tank wall. This will usually be on a manway ange or other
convenient point. I a P43 wall mounted installation is being used, the indicator can be
mounted on the same ange as the inlet pipework
I the installation is centrally mounted, the position o the indicator may be determined by other
actors such as the route o the exible drive (item 38).
The exible drive should be routed such that it runs past any available xtures inside the tank such
as the P43 inlet pipework or the water draw-o line. This will enable the drive to be secured once
the indicator has been set-up. The drive should not be run close to heating coils where these may be
used ater installation.
Keep the number o changes in direction o the drive to a minimum. The indicator will operatesatisactorily with up to six 90 bends.
When routing the drive, ensure that no part o it can be trapped or caught by roo legs or roo water
draw-o pipework when the roo is raised or lowered.
2. Cut a hole 80mm dia. in the manway ange to coincide with the centre lines o the indicator
3. Weld the studded ange (item 13) to the manway ange centrally around 80mm dia. hole
4. Feed end o the exible drive through the 80mm hole and bolt indicator to studded ange with
items (32) and (35), including gasket (item 10)
5. Bolt manway ange to tank taking care not to damage the exible drive
6. Run drive along the desired route to the P43
7. Bolt P43 to inlet pipework ange. Choose two adjacent bolts on the P43 mounting ange
or the attachment o the mounting bracket (item 15). These will normally be in line with the
direction o the drive as it meets the P43. Leave these two bolts undone and the others slack
8. Slide mounting bracket over the bolts in the position shown on the drawing and secure.
Tighten all P43 ange bolts ully
9. Slide sprocket end o exible drive onto the mounting bracket until the sprocket touches the
pins on the bearing plate (item 1). Secure with items (5), (17) and (33), using Loctite 241 adhesiveor equivalent to coat the bolt threads
Note that Figure 3.9 shows a wall mounted installation. For a central mounted installation,
the whole assembly at the P43 will be upside down
10. Secure the whole length o the exible drive to the xtures along its route with stainless steel
wire. ENSURE THAT THE DRIVE NEAR THE P43 IS CLEAR OF THE ROTATING NOZZLES
11. When the P43 is run, there will be a delay o about 20 minutes beore the indicator moves.
When the P43 is moving, the indicating disc (item 16) will rotate at the same speed as the
P43. By timing the rotation o the disc through one revolution or any given angle, the speed o
the P43 can be assessed
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
30/45
153 Installation and Maintenance
B. Maintenance
3.4 P43 lubrication
The gearbox is lubricated by EP 320 oil. This should be renewed at the periodic services.
3.5 Recommended operating level
The requency and duration o operation will depend on the rate o sludge deposition.
But it is strongly recommended that the P43 be run or an approximate ONE ROTATION
OF THE NOZZLE at least ONCE A MONTH to ensure ree movement o internal components.
3.6 External indicator
An external indicator can be supplied as an optional extra.
INDICATOR indicates nozzle movement
(FOR SHELL MOUNTED P43) and nozzle position
INDICATOR
(FOR CENTRE MOUNTED P43) indicates nozzle movement only
The indicating mechanism is mechanically connected to the P43. (See Figure 3.9).
3.7 Servicing interval
Following 15 years o installation, it is recommended that the P43 is removed or routine service,together with the external indicator (where tted). It should then be returned to Veolia or our
approved service centre or complete overhaul. A substitute unit can be supplied at the time the
existing unit is removed to minimize tank outage time.
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
31/45
CONTENTS
4Technical Inormation
4.1 Service Enquiries ............................. ................................. ................................. .....................1
4.2 Centre Mounted P43 Assembly
(Parts Lists and Drawing) .........................................................................................2, 3, 4
4.3 Shell Mounted P43 Assembly
(Parts List and Drawing)............................................................................................5, 6, 7
4.4 Customer Variables .............................. ................................ ................................. ...............8
4.5 Impeller Shat Assembly ............................... ................................. .............................. 9
4.6 P43 Shell Mounted P43 External Indicator
(Parts List and Drawing)................................ ................................ ....................... 10, 11, 12
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
32/45
4Technical Inormation
1
4. Technical Inormation
4.1 Service enquiries
All service enquiries should be reerred to Veolia at:
Veolia Environmental ServicesDock Road South
Bromborough
Wirral
CH62 4SQ
Telephone: +44 (0) 151 6444300
Fax: +44 (0) 151 6444301
e-mail: [email protected]
or via your Local Representative.
4 Technical Inormation
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
33/45
ITEM TITLE QTY. PART No.
1 MAIN BODY ASSY. Central Mounted 543401
2 NOZZLE BODY ASSEMBLY 1 540902
3 BASE PLATE ASSEMBLY 1 540903
4 GEARBOX ASSEMBLY 1 540904
5
6 BEARING PLATE 1 540906
7 IMPELLER 1
8 IMPELLER NUT 1 540908
9 NOZZLE to suit
10
11 MOUNTING FLANGE GASKET 1 540911
12 BASE PLATE GASKET 1 540912
13 KEY 1 540913
14 FLANGED PLUG ( BSP) 2 519184
15 COPPER WASHER 2 540915
16 O RING 2 540916
17 PTFE FRICTION DISC 1 540917
18 O RING 1 540918
19 O RING to suit 540919
20 PTFE FRICTION DISC 1 540917A
16A O RING 1 540916A
2
P43 central mounted G.A. E.5434
4 Technical Inormation
4.2
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
34/45
ITEM TITLE QTY. PART No.
21 BOLT 540921
22 BOLT 12 S.3112
23 BOLT to suit 540923
24 SCREW 8 540924
25 SCREW 5 540925
26 WASHER SPRING 8 540926
27 WASHER SPRING 12 540927
28 WASHER SPRING 8 540928
29 WASHER SPRING to suit 540929
30 NUT 8 540930
31 MECHANICAL SEAL 1 540931
32 OIL 540932
33 LOCTITE to suit 540933
34 NOZZLE BLANK to suit 540934
35 COPPER WASHER 1 540940
36 FLANGED PLUG ( BSP) 1 540939
37
38
39
40
P43 central mounted G.A. E.5434
34 Technical Inormation
4.2
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
35/45
4
4.2
Figure 4.2 E 5434 P43 shore storage tank cleaning (central mounted type)
SECTION Y-Y(WITH NOZZLES REMOVED)
343mm FLANGE
360mm
548mm
360mm
27
22
X
Y
12
28 24 15 14 4 3 2
Y
X
16
18
25
16A20
17
306
26
13
31
17
1138
21
37
738mm
35
9
23
29 19SECTION X-X
ZZ
8
36
35
344mm
VEOLIA P43MADE IN UK
EPC, US AND OTHER PATENTSGRANTED AND APPLIED FOR
NOZZLE BLANKONE PER M/C MAY BEFITTED IN PLACE OF
NOZZLE ITEM 9 IF REQUIRED
4 Technical Information
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
36/45
ITEM TITLE QTY. PART No.
1 MAIN BODY ASSEMBLY (Shell mounted) 540901
2 NOZZLE BODY ASSEMBLY 1 540902
3 BASEPLATE ASSEMBLY 1 540903
4 GEARBOX ASSEMBLY 1 540904
5
6 BEARING PLATE 1 540906
7 IMPELLER 1
8 IMPELLER NUT 1 540908
9 NOZZLE 2
10
11 MOUNTING FLANGE GASKET 1 540911
12 BASEPLATE GASKET 1 540912
13 KEY 1 540913
14 FLANGED PLUG ( BSP) 2 519184
15 COPPER WASHER 2 540915
16 O RING 2 540916
17 PTFE FRICTION DISC 1 540917
18 O RING 1 540918
19 O RING 2 540919
20 PTFE FRICTION DISC
16A O RING 1 540916A
P43 shell mounted G.A. E.5409
54 Technical Inormation
4.3
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
37/45
6
ITEM TITLE QTY. PART No.
21 BOLT 540921
22 BOLT 12 S.3112
23 BOLT 4 540923
24 SCREW 8 540924
25 SCREW 5 540925
26 WASHER SPRING 8 540926
27 WASHER SPRING 12 540927
28 WASHER SPRING 8 540928
29 WASHER SPRING 4 540929
30 NUT 8 540930
31 MECHANICAL SEAL 1 540931
32 OIL 540932
33 LOCTITE to suit 540933
34
35 COPPER WASHER 1 540940
36 FLANGED PLUG (" BSP) 1 540939
37
38
39
40
P43 shell mounted G.A. E.5409
4 Technical Inormation
4.3
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
38/45
7
4.3
Figure 4.3 E 5409 P43 shore storage tank cleaning (wall mounted type)
SECTION Y-Y(WITH NOZZLES REMOVED)
343mm FLANGE
360mm
548mm
360mm
27
22
X
Y
12
28 24 15 14 4 3 2
Y
X
16
18
25
16A20
17
306
26
13
31
17
1138
21
37
738mm
35
923
29 19SECTION X-X
ZZ
8
36
35
344mm
VEOLIA P43MADE IN UK
EPC, US AND OTHER PATENTSGRANTED AND APPLIED FOR
4 Technical Information
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
39/45
ITEM TITLE QTY. PART No.
1 NOZZLE 2" as req. 543701
2 NOZZLE 2.5 as req. 543702
3 NOZZLE 3.0 as req. 543703
4 NOZZLE 3.5 as req. 543704
5 NOZZLE 4.0 as req. 543705
6 NOZZLE 4.5 as req. 543700
7
8
9
10
11
12 IMPELLER 30 1 543712
13
14
15 IMPELLER 45 1 543715
16 IMPELLER 50 1 543716
17
18 IMPELLER 65 1 543718
19
20
P43 customer variables E.5437
84 Technical Inormation
4.4
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
40/45
9
ITEM TITLE QTY. PART No.
1 IMPELLER SHAFT 1 541901
2 BALL BEARING 1 541902
3 CIRCLIP 1 541903
P43 impeller shaft assembly E.5419
4 Technical Inormation
4.5
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
41/45
ITEM TITLE QTY. PART No.
1 BEA RING PLATE ASSEMBLY 1 549200
2 INDICATOR BODY 1 549600
3
4
5 BOLT HEX. HEAD 2 546805
6 GEARBOX MOUNTING SUB- ASSEMBLY 1 562000
7 SEAL HOUSING 1 546807
8 DRIVE SHAFT 1 546808
9 DRIVE PIECE ASSEMBLY 1 549900
10 GASKET 1 546810
11 BACKING WASHER (SEAL) 1 546811
12 SPACING SLEEVE 1 546812
13 STUDDED FLANGE 1 561600
14 SLEEVE 1 546814
15 MOUNTING BRACKET 1 546815
16 INDICATOR DISC SUB-ASSEMBLY 1 562100
17 NUT HEX 2 546817
18 PLATEWHEEL DISC SUB-ASSEMBLY 1 546818
19 GEARBOX 1 546819
20 BUSH 1 546820
P43 shell mounted external indicator E.5468
104 Technical Inormation
4.6
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
42/45
11
ITEM TITLE QTY. PART No.
21 THRUST WASHER 2 546821
22 OIL SEAL 1 546822
23 O RING 1 546823
24 O RING 1 546824
25 SPRING 1 546825
26 SOCKET CAP-HEADED SCREWS 4 546826
27 SOCKET CAP-HEADED SCREWS 2 546827
28 BOLTS HEX. HEAD 8 546828
29 SOCKET CSK HD. SCREWS 6 546829
30 SOCKET SET SCREW 1 546830
31 NUT HEX 1 2500/54
32 NUT HEX 16 546832
33 WASHER 6 4007/73
34 WASHER 1 4007/59
35 WASHER 16 546835
36 SOCKET CAP-HD. SCREWS 3 546836
37 MOUNTING ADAPTOR 1 546837
38 FLEXIBLE SHAFT ASSEMBLY 1 549100
39 SIGHT GLASS 1 546839
40 PLATE WHEEL 1 546840
P43 shell mounted external indicator E.5468
4 Technical Inormation
4.6
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
43/45
Figure 4.6 E 5468 external indicator P43
12
4.6
8
3326
38
23
12
25
9
2 22 11 3134
19 27 37 14
20 7 21 6 24 29 39
ITEM 16 TO BE MOUNTED CENTRALLYON ITEM 37 WITH ARALDITE
ITEM 37 TO BE FITTED TO OUTPUTSHAFT OF ITEM 19 WITH LOCTITE 270
4 Technical Inormation
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
44/45
Fig 4.7 S bend nozzle adaptor
13
4.7
DOWEL TO BE A PRESS-FITWITH SIDE PLATES
3
2
12
1
7
45A
11
10
4 Technical Inormation
-
7/29/2019 technical_manual_p43 VEOLIA TOP .pdf
45/45
THIS SECTION IS FOR YOU TO KEEP YOUR
OWN RELEVANT TECHNICAL DATA
5Specifc Data