Technical Support Organization
Roles and Responsibilities
IAEA Technical Meeting TM-45318
Vienna, 15-17 May, 2013
Scientific Secretary: A. N. Kilic
Purpose of IAEA Technical Meetings
to collect and exchange information on highly specialised
technical matters;
to review specific areas of nuclear science and technology,
to disseminate objective information,
to explore or build consensus on technical issues;
to review specific research and development work;
to provide authoritative advice and input on decision
making;
to enhance interaction among experts from all over the
world in the promotion of the Agency's statutory functions.
2
Basic Features of IAEA Technical Meetings
• TMs are not open to the public.
• Invitations to attend a TM are sent to select Member States;
requesting designation/participation and/or submission of
scientific contributions;
• The number of participants is restricted to those invited to
participate;
• The working language of a TM is usually English;
• Reports/Minutes from TMs are not published. The
publication of any information resulting from a TM is subject
to the Agency's publication policy.
3
BACKGROUND TSO Roles and Responsibilities
An effective technical support is essential to operate safely
and to maximize power generation: • ensure that the plant design meets the acceptance criteria for safety,
reliability and quality in accordance with relevant codes and standards, laws
and regulations
• Support plant operations with technical expertise to maintain and improve safe
and efficient performance;
• Identify and resolve any design and performance issue of SSCs and
procedures that support safe and reliable operation which would otherwise
entail cost and unproductive time burdens;
• Make facility (physical and administrative) changes with full knowledge of the
technical basis, intent and philosophy;
• Liaise with the regulatory body in charge of overseeing the facility design and
operation in a controlled and informed manner;
• Understand and update the records of facility information and able to trace it to
the conception of the design.
4
BACKGROUND IAEA Guidance on TSO Roles and Responsibilities
• IAEA TECDOC-1078 was published in 1999
• In response to recognition that the technical support (TS)
function at some NPPs is sometimes not clearly
understood or adequately addressed, and as the result,
some NPPs have experienced significant performance
problems.
• Targeted NPP management to establish mainly an
effective internal TSO
• Did not address the detailed external TSO interfaces
• Focused on the Operation stage
5
BACKGROUND 2000 - 2012
• New NPPs
• Constructions
• Life Extensions
• Power Uprates
• Heavy Equipment
Replacements
• Additional Operating
Experience
• Decommissions
• Fukushima Accident
6
7 5
2 0
3 2 4 5
2
6
3
6 4 4 3
6 4 5
9
6 4
10 11
14
21
24
32 33
20 18
22
19
6
11 13 13
11
20
13
10 12
4
7
0 1
Typical Utilization of TSO at NPP Lifetime
Pre-
project
7
External TSO Internal TSO
Design Construction
And
Commissioning
Operation Decommissioning
Fukushima Technical Impacts
• Regulatory limit, acceptance criteria changes?
• Decrease in the previously proven design safety margin
• Revalidation of original design basis / regulatory & NPP confidence
in margins
• Additional research for justification/confirmation of margin
• New design basis?
• Reclassification and requalification of SSCs?
• SBO equipment
• Requirements for PAM
• SFP cooling/inventory equipment, instrumentation
• Portable/stored equipment
• Requirements for SAM equipment
8
TSO and Interfaces
9
Owner/Operating Organization
TSO
Regulatory Body
TSO
R&D
Consultants
Contractors
Consultants
R&D
A/E
NSSS Vendor
Comp. Supplier
NS (DS429) NE (TECDOC-1078 -> NES)
TSO
TSO
TSO
TSO
TSO
Licensing Operations
Procurement
A TSO is Essential for a Safe and Efficient NPP
• Both for Newcomers and Established NPPs
• For the Entire NPP lifetime (Pre-Design ->
Decommissioning)
• One-time -> Daily Activities (e.g. PUR, Reload, Test)
• Both on-site or off-site activities (Deliverables,
Interfaces)
10
Technical Support WITH and FOR:
Safety + Quality + Reliability + Efficiency
BACKGROUND – IAEA Activities
• Started in May 2012
• 2 Consultancy Meetings
• 11 Consultants from 7 Member States
• 1 pre-TM Consultancy Meeting
• TM on May 15-17, 2013
• 30 specialists from 17 Member States and
2 International Organizations
• Nuclear Energy Series (NES) Report
11
IAEA - NES (Nuclear Energy Series) Documents
• Provide advice for those either planning or
implementing nuclear activities
• Target audience includes owners and operators of
utilities, implementing organizations, academia and
government officials in Member States, among others
• Based on Best Practices in the MS
• Building on expertise in MS as represented by their
nominees
12
TM-45318 OBJECTIVES
• Share international experience and exchange views on
best practices related to the TS for NPPs, with an
emphasis on new plants;
• Review and discuss IAEA activities including the NES
report in order to jointly contribute to the improvement of
the guidance and support and to enrich the report with
practical examples;
• Strengthen the international networking of specialists
in the TS organization and activities areas.
13
TM-45318 AGENDA
• Presentations from MSs, exchanging information,
as well as providing perspective and suggestions
to IAEA and other MSs
• Panel Session to discuss ideas in a forum format
• Discussion Session to exchange suggestions and
perspectives especially for the Newcomers
• Plenary Session to provide recommendations to
the IAEA guidance