FORMAT No.: ENGG(MM).PRA.DM.025.F01.Rev. 03Page 1
ESSAR STEEL INDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
ESSAR PROJECTS (INDIA) LIMITEDENGINEERING & PROJECT MANAGEMENT
HAZIRA
TS. No.: 2746-H000-F11340-0015-1518-0003 MONTH & YEAR: March 2014
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 2 of 20
Conf
ident
ial
DETAILS OF REVISION:
DATE DETAILS OF REVISION REVISION NO.
16/05/2014 FOR CONCURRENCE A
17/05/2014 FOR APPROVAL P0
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 3 of 20
Conf
ident
ial
CONTENTS
CHAPTERNo. DESCRIPTION PAGE No.1 GENERAL INFORMATION 42 SCOPE OF WORK 53 TECHNICAL SPECIFICATION 64 INSPECTION & TESTING 85 HSE REQUIREMENT 96 DELIVERY 107 PAINTING 118 WORKMANSHIP & PERFORMANCE GUARANTEE 139 SPECIAL INSTRUCTIONS TO SELLER 14
10 DOCUMENTS TO BE SUPPLIED 15
ANNEXURESI SITE CONDITIONS 16
IIFORMAT FOR DEVIATION FROM SELLERDOCUMENT 17
IIIQUESTIONNAIRE TO BE FILLED IN AND SUBMITTEDWITH OFFER 18
IV OVERALL SUPPLY & IMPLEMENTATION SCHEDULE 19V QUALITY ASSURANCE PLAN 20VI BILL OF QUANTITY
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 4 of 20
Conf
ident
ial
1. GENERAL INFORMATION
ESSAR Steel (INDIA) Ltd. (EST(I)L) is a fully integrated flat carbon steel
manufacturer — from iron ore to ready-to-market products with a current capacity of
10 million tons per annum (MTPA) at Hazira. The complex has 6 HBI/DRI modules, 2
COREX modules and one blast furnace for making Iron, in six modules module 1 – 5
are HBI/HDRI product, and in module 6 is Cold DRI plant. From this Cold DRI plant
the cold DRI discharged from furnace and transferred to Steel Making Plant through
conveyor system.
M/s EST(I)L contracted to “M/s. ESSAR PROJECT (INDIA) LIMITED - ENGINEERING
& PROJECT MANAGEMENT HAZIRA” to provide engineering service for the
enhancement of VPSA –Mod VI located at Hazira, Surat.
This document covers the minimum technical requirements for valves as mention
below.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 5 of 20
Conf
ident
ial
2. SCOPE OF WORK
The scope of work of supplier shall include Manufacture/fabrication, Inspection,
testing and supply of pipes as per attached Bill of Quantity and applicable codes
indicated with this specification.
The scope of supply / work shall comprise of following:
Manufacture, Testing, Inspection, Painting/Protective coating, Marking and Supply ofpipes as per attached BOQ.
Seaworthy packing if applicable
Loading of pipes at works, shipment / transportation and unloading of the same atproject site.
Documentation as per requirement.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 6 of 20
Conf
ident
ial
3. TECHNICAL SPECIFICATION
Supplied pipes shall meet the requirement of clauses indicated in the technical
requirement and shall be as per the attached bill of material.
3.1. TECHNICAL REQUIREMENT
Dimensions, tolerances, chemical composition, physical properties, heat treatmentand other testing and marking shall conform to the codes and standards specified inthis specification.
Test reports shall be furnished for all mandatory tests as per the applicable materialspecifications.
Material test certificates (physical property, chemical composition and heat treatmentreport) shall also be furnished for the pipes & pipe fittings.
Pipe shall be supplied in single length of 5 to 6 m.
ERW pipes shall not have any circumferential seam joint in a random length.
Weld repair shall be done on pipe welds upon prior approval from the Buyer/Consultant. Specified heat treatment for carbon steel shall be carried out afterwelding / weld repairs. Number of weld repairs at same spot shall be restricted tomaximum two by approved repair procedure.
3.2. MARKING & DISPATCH
All pipes shall be marked in accordance with the applicable codes, standards andspecifications in addition to the Purchase Order No.
Pipes shall be marked singularly.
Tags shall incorporate the following data: Manufacturer’s identification IS Number LOT identification Nominal pipe size Sch. No. / wall thickness
Pipes shall be dry, clean and free from oil, moisture, dirt and loose foreign materialsof any kind.
Pipes shall be protected from rust, corrosion and mechanical damages during
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 7 of 20
Conf
ident
ial
transportation, shipment and storage.
Rust preventive used on machined surfaces to be welded shall be easily removablewith a petroleum solvent or shall not be harmful to welding.
Both ends of the pipe shall be protected with the wood / metal.
End protectors to be used shall be securely and tightly attached with belt or wire.
3.3. APPLICABLE CODES AND STANDARDS
Plate work shall conform to IS 2062 (FE 410 WA)
Pipes shall conform to IS 1239 Part – I & IS 3589 (Fe 330 ERW, Bevel end)
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 8 of 20
Conf
ident
ial
4. INSPECTION AND TESTING
Seller shall furnish a QAP which he proposes to follow at the factory and the tests heproposes to conduct at site within 30 days of email order.
Buyer reserves the right to verify the quality program and entire productcharacteristics during manufacturing to assure the intended and specified quality ofthe product.
Inspection & testing of material shall be witnessed by buyer or an authorized agent ofbuyer at the works of supplier during manufacturing and on final product to ensureconformity with requirement.
The successful bidder shall send the intimation to Buyer for inspection along-with hisinternal inspection certificates at-least three weeks prior to the start of inspection.
The successful Seller shall include and provide for in his offer all facilities, which willenable witnessing inspection by Buyer or his authorized representatives.
Samples of materials shall be furnished by the successful Seller to Buyer freeof cost, if required.
Any material declared defective by Buyer during manufacture/ testing shall bereplaced. However no cost extra commercial implication is acceptable.
All supplied pipes shall be hydrostatically tested at works before dispatch.
Visual and non - destructive examinations of weld preparation and weldedjoints shall conform to the requirements of the stipulated codes for thepurpose.
Non Destructive examination procedures shall be submitted for client approval.
It is mandatory that all welds shall be 100% NDT.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 9 of 20
Conf
ident
ial
5. HSE REQUIREMENT
Tenderer shall comply with the entire applicable statutory requirement as minimumnational standards (plant local government’s standard).
In additional to the above Tenderer shall comply with the Client’s internal Standards /Procedures.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 10 of 20
Conf
ident
ial
6. DELIVERY
The delivery of all the valves covered under this specification shall be at plant site on doordelivery freight pre paid basis within 03 months from the date of placement of order.
All material shall be packed properly for prevention of damage during transit anddeterioration during storage.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 11 of 20
Conf
ident
ial
7. PAINTING
The following specification shall be applicable for all equipment covered under thisdocument unless separate painting specification is elaborated in the respectiveattachments.
Preparation and painting of piping. The term “painting” referred herein covers rustpreventive and decorative coating along with surface protection.
Surfaces made of aluminum, brass; bronze, stainless steel, cast iron and othercorrosion resistant alloys are not required to be painted unless specified except foraesthetic purposes or for identification bands.
All machined mating surfaces (e.g. flanges) shall be properly cleaned, greased andprotected before dispatch. General compatibility between primer and finishing paintsshall be certified by the paint manufacturer supplying the paints.
Areas which become inaccessible after assembly shall be painted before assembly(after painting clearance has been given by the inspecting authority) after requisitesurface cleaning as specified.
The machine finished surfaces shall be coated with white lead and covered beforeshipment or before being put out into the open air.
The Color code to be followed for the final coat shall be intimated to thesuccessful tenderer.
The complete paint system for any item includes the following activities
Proper surface preparation Application of primer coats Application of intermediate coats Application of finished coats
All Sheet metal work shall undergo a process of
Degreasing Pickling in Acid. Cold Rinsing and phosphating. Final coat of painting.
Surfaces which cannot be painted but require protection shall be given a coat of rustinhibitive grease according to standards. The general guideline followed for paintingis follows:
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 12 of 20
Conf
ident
ial
GENERAL SPECIFICATION FOR SURFACE TREATMENT AND PAINTING
Area or surface Surfacepreparation
Initial Painting Final Painting
Painting Scheme DFT/COAT
Fabricated items(surfacesexposed to gasstream)
SA 2.52 coats of Epoxy polyamideresin based Red-oxide Zincphosphate primer
40 microns NIL NIL
Fabricated items(surfacesexposed toatmosphere)
SA 2.5 2 coats of aluminum paint(normal temp0 25 microns
1 coat ofaluminumpaint (Normaltemp)
25microns
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 13 of 20
Conf
ident
ial
8. WORKMANSHIP AND PERFORMANCE GUARANTEE
The material used shall be new and best of its kind available and shall conform torelevant latest international standards.
The warrantee shall cover faulty design / material / workmanship. All replacementunder the warrantee shall be done by the supplier free of cost.
The Seller should study the specification and satisfy himself regarding the workabilityof the proposed system and shall take full responsibility for the manufacture, qualityof the material, workmanship, etc. of the entire system
Witness of inspection by Buyer or their authorized representative does not absolve orrelieve the supplier from any of his obligations under this contract.
The supplier is solely responsible and accountable for any defects and subsequentdelays in supply due to manufacture/inspection.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 14 of 20
Conf
ident
ial
9. SPECIAL INSTRUCTIONS TO SELLER
The supply items shall meet the requirements stipulated in the technicalspecifications and standard method of manufacture.
The Buyer reserves the right to place order for only one or more items in part or fullquantity on a particular supplier. The Seller shall confirm his agreement to acceptpart order.
Depending on the performance of manufacture, Buyer reserves the right to cancelthe order or increase or decrease the quantity ordered at the same price/rate withoutany financial implications on the Buyer’s part or any compensation to the supplier.
Any deviations proposed by the Seller shall be listed in technical bid. NOADDITIONAL WRITE-UP WILL BE ACCEPTED.
The Seller shall furnish drawings / documents / catalogues as applicable along withthe tender to enable evaluation of his offer. These documents shall be furnished asper clause no. 10
Manufacturing will be taken up only on the basis of material data duly approved andsigned.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 15 of 20
Conf
ident
ial
10. DOCUMENTS TO BE FURNISHED
The following sets of document shall be submitted
6 sets of Test and Inspection certificates/ reports (Test Certificate / Report) shallcover material test, destructive test for weld quality.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 16 of 20
Conf
ident
ial
Annexure-ISITE CONDITION
Geographical Conditionsi) Site Location : Hazira, Surat, Gujarat, India
ii) Seismic zone
Zone as per IS: 1893(Part-I):2002- Zone – III
Zone factor 0.16
Importance factor 1.50
Meteorological Conditionsi) Ambient air temperature
Maximum dry bulb : 45.6° C
Minimum dry bulb : 4.4° C
Max. daily average Dry bulb : 33.6° C
Design ambient : 50° C
ii) Relative humidity
Maximum (during : 100%
monsoon)
Minimum : 33%
Average Relative Humidity : 71%
iii) Rainfall
Annual average : 1203 mm
Period : June to September
iv) Climatic condition
Tropical sea coast climate with petrochemical complexes within the radius of about 5 km.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 17 of 20
Conf
ident
ial
Annexure-IIFORMAT FOR DEVIATIONS FROM TECHNICAL SPECIFICATION
Sr. No. Clause No. Seller’s Deviations Reason for Deviation
The Seller hereby certifies that the above mentioned are the only deviations from thetechnical specification.
Signature :
Name :
Designation :
Company seal
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 18 of 20
Conf
ident
ial
Annexure-IIITO BE SUBMITTED BY THE SELLER ALONG WITH OFFER
Seller's name and address.
Quotation number and date.
Unit weight of the valves.
Weight and dimension of the heaviest single package.
Special storage requirement, if any.
Available manufacturing facility.
Available spare capacity if required.
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 19 of 20
Conf
ident
ial
Annexure-IVOVERALL SUPPLY & IMPLEMENTATION SCHEDULE
Sl.No. WORK DESCRIPTIONWEEKS FROM
Start Finish
1.0 Design & Engineering
2.0 Equipment Manufacture
b Mechanical
e Bought out items
i) Ordering on sub sellers
ii)Manufacturing schedule & progress status
iii) Delivery
3.0 Equipment delivery at site
ESSAR STEELINDIA LIMITED
CAPACITY ENHANCEMENT OF VPSAMOD – 6 (DOUBLING)
TECHNICAL SPECIFICATIONFOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003ESSAR PROJECTS (INDIA) LIMITED
ENGINEERING & PROJECT MANAGEMENT
TS. No.: 2746-H000-F11340-0015-1518-0003 Page 20 of 20
Conf
ident
ial
Annexure-VQUALITY ASSURANCE PLAN (QAP)
Seller shall furnish Quality Assurance Plan (QAP) after completion of detailed
engineering and finalization of billing schedule and prior to start of manufacturing.
QAP shall be prepared and furnished by Seller for all components.
Inspection and test requirements shall be decided with due consideration of factors
like safety, duty cycle, operating conditions, equipment life, environment conditions,
place of installation and statutory regulations, as applicable for a particular
equipment.
QAP shall clearly indicate the followings through use of codes in the appropriate
columns:
Range of inspection & tests to be carried out by Seller and cross checkedduring manufacturing of equipment from raw materials to finishing stage.
Suggestive check/ hold points for Buyer inspection and witnessing of testsduring manufacturing and final product inspection.
Details of test certificates, internal inspection reports and calibration certificatesto be furnished by Seller to Buyer.
Inspection documents to be furnished by Seller to Buyer for reference duringinspection along with acceptable norms as per codes/ regulations.