Annual Budget 2015/16
DRAFTTechnical Services
www.armadale.wa.gov.au
Available in alternative formats on request
Technical Services Directorate Budget 2015-2016 - Draft
Contents
1. Directorate Overview 2
2. Key Actions for 2015-2016 3
3. Directorate Workforce 10
4. Proposed Directorate Estimates 13
5. Proposed Capital Expense Details 20
6. Proposed Fees and Charges 30
Technical Services Directorate Budget 2015-2016 - Draft
2
Directorate Overview
The Technical Services Directorate reports to the Technical Services Committee. The Directorate provides various
essential services to the Community, develops and maintains all Council’s assets and is responsible for the following
areas: –
Directorate Management Services
The executive, administration and financial activities of the Executive Director of Technical Services’ Office, includes
strategic functions and specialist projects relating to the Technical Services Directorate.
Asset Management
The monitoring and recording of Council’s infrastructure, including long term analysis for the ongoing operations,
maintenance and renewal of Council’s assets.
Civil Works
The administration, construction and maintenance of civil works associated with roads, pathways, drainage and bridges
and other associated road works, including the management and maintenance of the works depot, vehicles, plant and
equipment, and storage of materials.
Engineering Design
Guided by asset management plans, engineering analysis with associated design plans are provided for the renewal,
upgrade and new capital civil projects.
Environmental Services
The administration and management of implementation of environmental projects in association with other parks
environmental activities.
Parks and Reserves
The administration, construction and maintenance of recreational and natural reserves associated with parks and
gardens, streetscapes, road verges, roundabouts and other associated parks environmental activities.
Project Management
The administration and coordination of engineering projects associated with civil works.
Property
The administration, construction and maintenance of Council's buildings and associated community facilities, sporting
clubs and pavilions, public halls and centres, emergency services facilities and other associated works.
Subdivisions
The planning and administration of engineering and environmental requirements associated with new subdivisions.
Support Services
The maintenance and provision of works depot, machinery, equipment and inventory of material for works.
Waste Services
The administration and operation of refuse collection and disposal services, including recyclable and green waste
collection services and associated waste disposal sites.
Technical Services Directorate Budget 2015-2016 - Draft
3
Key Actions for 2015-2016
The following is commentary on the Key Actions to be undertaken by the Technical Services Directorate in delivering
the City’s Strategic Community Plan.
The links between the Strategic Community Plan, the Corporate Business Plan and Informing Strategies, such as the
Workforce Plan, Asset Management Plan and Long Term Financial Plan are shown as follows:-
The City’s Strategic Community Plan under the future direction headings of Community Wellbeing, Enhanced Natural
and Built Environments and Economic Growth, identifies a series of Outcomes and Strategies relevant to the
operations and responsibilities of the Technical Services Directorate.
Looking Forward
Strategic Community Plan
Corporate Business Plan
Annual Budget & Operational Plans
Informing Strategies
eg. Strategic Financial
Plan, Workforce Plan, Asset
Management Plan, etc.
Future Directions
Outcomes
Strategies
Actions
Community Outcomes
Technical Services Directorate Budget 2015-2016 - Draft
4
Key Actions for 2015-2016
The City’s Corporate Business Plan identifies a series of Actions to be taken for each strategy and hereunder are those
Actions relevant to the Technical Services Directorate to be undertaken during the 2015-16 year.
These Actions together with the functions and activities ordinarily undertaken by the Directorate on a daily basis (referred to
in the Corporate Business Plan as enabling services) collectively contribute to the Outcomes of the Strategic Community
Plan.
All of the following Actions are funded from either the estimates already included in the adopted Corporate Business Plan or
additional funds identified during the recent Councillor Workshops for consideration and inclusion.
Outcomes and Strategies
Future Direction: Community Wellbeing
Outcome – 1.6 A community that feels safe.
Strategy – 1.6.3 Promote and support planning and activities that encourage a safe and responsible community.
Actions
Implement new CCTV strategies and promote success.
Continue to support RoadWise principles.
Technical Services Directorate Budget 2015-2016 - Draft
5
Key Actions for 2015-2016
Future Direction: Enhanced Natural and Built Environments
Outcome – 2.3 Diverse and attractive development that is integrated with the distinctive character of the City. Strategy – 2.3.1 Provide supportive planning and development guidance and liaison on major land developments.
Actions
Enforce Public Works Engineering Australia and City of Armadale subdivisional guidelines.
Outcome – 2.4 Attractive and user-friendly streetscapes and open space.
Strategy – 2.4.1 Implement townscape, streetscape and parkland improvements to enhance the distinctive character of the City.
Actions
Assess public domain in key centres - Urban Forest Strategy
Undertake landscaping works along Ranford Road between Tonkin Highway and Warton Road.
Strategy – 2.4.2 Maintain and improve where required the quality, amenity and accessibility of open spaces.
Actions
Implement current maintenance and management plans. Implement POS Strategy.
Advocate for additional funding and raise current level of service in POS.
Implement environmental strategies.
Outcome – 2.5 Safe and efficient movement of goods, services and people. Strategy - 2.5.1 Provide a safe and efficient movement network, including local and arterial roads and associated infrastructure.
Actions
Develop the network for the next 5 years together with MRWA, DoT and Developers.
Provide guidelines for the future in line with DoT (for 2031).
Technical Services Directorate Budget 2015-2016 - Draft
6
Key Actions for 2015-2016
Future Direction: Enhanced Natural and Built Environments
Strategy - 2.5.2 Implement pathway strategies, in accordance with community needs.
Actions
Implement the existing 5 yr programme for paths and cycleways.
Strategy – 2.5.4 Provide appropriate on-road and off-street car parking.
Actions
Monitor requirements and implement parking as funding allows.
Outcome – 2.6 Council buildings and facilities that meet community needs. Strategy - 2.6.1 Maintain Council buildings, facilities and public amenities to the determined levels of service.
Actions
Maintain current Maintenance & Management practices.
Develop a maintenance and usage agreement with DoE regarding shared use sites.
Major upgrade and refurbishment of the Greendale Centre.
Strategy - 2.6.2 Implement improvements to buildings amenities and facilities as required to enhance the service to the community.
Actions
Implement Master Plans for the City’s major community hubs.
Seek external funding for the construction of community facilities.
Outcome - 2.7 Assets and infrastructure managed over the long term to meet current and future needs. Strategy - 2.7.1 Develop and implement long-term Service and Asset Management Plans for all Council assets, having regard for current and future asset needs and the City’s long-term financial plan.
Actions
Development of maintenance operations, renewal and upgrade strategies.
Strategy - 2.7.2 Address the infrastructure requirements of the various community plans.
Actions
Development of maintenance operations, renewal and upgrade strategies.
Technical Services Directorate Budget 2015-2016 - Draft
7
Key Actions for 2015-2016
Future Direction: Enhanced Natural and Built Environments
Outcome – 2.8 A natural environment and bushland that is sustained, enhanced and strengthened. Strategy - 2.8.1 Develop an appropriate policy and long term works programs to protect and enhance our bushland and natural environs under the City’s control.
Actions
Implement Action 9 of the Local Biodiversity Strategy by developing a Local Planning Policy for Local Natural Areas.
Strategy - 2.8.2 Provide natural area maintenance and management programs.
Actions
Implement Action B6a, B6b and B6c of the State of the Environment Report to develop and implement weed control, capital works and dieback programs on a three-yearly basis.
Strategy - 2.8.3 Advocate and support management plans and initiatives to improve waterways and natural areas within the City.
Actions
Implement Action B18 and W5 of the State of the Environment Report in relation to the Streamcare Program and the review of water strategy documents (UWMPs) to implement water sensitive urban design.
Implement Action W5 (see above), W6 and W7 in relation to the development of water sensitive urban design features and participation in the Sediment and Erosion and Urban Waterways Renewal Projects.
Outcome - 2.9 Recognition of climate change. Strategy - 2.9.1 Plan for climate change impacts at the local level in partnership with the community, government and the private sector.
Actions
Implement actions C12 and C13a of the State of the Environment Report to assist in implementation of the Switch your Thinking Business Plan and the development of a Corporate Greenhouse Gas Action Plan.
Implement action C12 of the State of the Environment Report to assist in implementation of the Switch your Thinking Business Plan.
Technical Services Directorate Budget 2015-2016 - Draft
8
Key Actions for 2015-2016
Future Direction: Enhanced Natural and Built Environments
Strategy - 2.9.2 Identify and pursue appropriate initiatives to reduce greenhouse gases and energy consumption.
Actions
Implement action C13a of the State of the Environment Report to develop a Corporate Greenhouse Gas Action Plan.
Outcome - 2.10 Best practice integrated waste management. Strategy - 2.10.1 Maintain determined service standards related to municipal waste and recycling collection services.
Actions
Strive for recycled recovery.
Work with Regional Rivers Council on the investigation of Alternate Waste Treatments.
Strategy - 2.10.2 Implement continuous improvement of recycling, reuse and minimisation of waste.
Actions
Introduce small load separation facility for land fill site.
Support the Rivers Regional Council with their recycling education programmes.
Strategy - 2.10.3 Maintain the existing improvement programmes for waste disposal and recycling facilities.
Actions
Participate in Waste Authority sanctioned improvement programs for waste recycling, treatment and collection.
Outcome - 2.11 Safe and effective disposal of domestic wastewater and stormwater . Strategy - 2.11.1 Manage and maintain stormwater infrastructure.
Actions
Investigate continuous analysis and assessment of existing stormwater structures.
Refine development guidelines in line with development expectations.
Technical Services Directorate Budget 2015-2016 - Draft
9
Key Actions for 2015-2016
Future Direction: Enhanced Natural and Built Environments
Strategy - 2.11.2 Ensure provision of sound drainage infrastructure for new development.
Actions
Encourage the retention of stormwater run-offs and treatment prior to disposal.
Strategy - 2.11.3 Promote and assess initiatives for water conservation and re-use.
Actions
To conserve the supply of treated water.
Technical Services Directorate Budget 2015-2016 - Draft
10
Directorate Workforce
The Technical Services Directorate is primarily a service provider to the Community. Consequently, as development of the
City increases along with community expectations there is a need to increase Directorate resources to meet necessary
demands.
The following Table shows the Directorate’s workforce over the last year –
Management Area Actual
2014/15
Proposed
2015/16
Administration 10.0 10.0
Asset Management 6.0 6.0
Civil Works 34.1 34.1
Engineering Design 9.0 9.0
Environmental Services 3.4 3.4
Parks and Reserves 39.4 40.4
Project Management 1.0 1.0
Property Services 20.0 20.0
Subdivisions 6.0 7.0
Waste Services 21.0 22.0
Sub-Total 149.9 152.9
The Directorate’s workforce for 2015-16 is proposed to increase by (3.0) FTE’s.
Additional resource requirements are in response to growth based activities and level of service increases in the operational
areas (parks, property and waste). In order to meet these higher demands, areas within the Directorate require additional
resources to meet the objectives of the Strategic Community Plan and the Corporate Business Plan.
The following positions have been approved in the Chief Executive Officer’s Workforce Plan Report 2015-16 as resolved at
the Council Meeting held on 28 April 2015 (resolution C131/4/15 refers).
Department Position
Subdivisions Manager Subdivisions
Parks Technical Officer - Parks Operations
Waste Truck Driver
Of the additional 3 positions proposed in 2015-16, only one position requires funding from the Workforce Plan, the remaining
two positions can be accommodated from funds allocated to operational areas of the Directorate.
Technical Services Directorate Budget 2015-2016 - Draft
11
Proposed Directorate Estimates Explained
The 2015-16 estimates for each Management Area together with the current 2014/15 year budget and actuals are presented
in the following pages.
Matters to note about the following financial estimates include:
• The first schedule shows the Total Summary Position, i.e. the total municipal funds required to fund the
enabling services and Key Actions within the Technical Services Directorate is estimated at $31,336,310.
• The subsequent schedules show the breakdown of the $31,336,310 over the various Management Areas:
� Asset Management
� Civil Works
� Engineering Design
� Environmental Services
� Project Management
� Parks
� Property
� Subdivisions
� Depot
� Crossovers
� Technical Services Administration
� Waste Services
The revenue and expense descriptors used in the schedules are explained as follows:
Operating Revenues
Grants / Contributions Revenue received from external sources primarily for road infrastructure projects.
Capital Funding Revenue received in relation to capital funding received, primarily for road infrastructure
projects.
Fees and Charges Income received in relation to fees and charges raised for operational activities of the
Directorate.
Operating Costs
Employment Costs associated with staff employment, including salaries, superannuation, workers
compensation, training, etc.
Office Costs associated with operational activities, including telephones, printing, stationery, etc.
Professional Services Costs associated with professional activities, including consultancy, legal matters, etc.
Vehicles Costs associated with vehicle operational activities, including fuel, maintenance, etc.
Facilities Costs associated with the operational and maintenance activities of the Directorate, associated
with the Property Services Department.
Projects / Works Costs associated with the operational and maintenance activities of the Directorate, mainly
associated with the Parks and Civil Works Departments
Other Expense Operational costs such as crossover subsidies, CCTV operations, request for street lighting,
graffiti operations, expendable material, etc.
Accounting Overheads of on-cost allocation and depreciation costs internally allocated to operational
Departments.
Technical Services Directorate Budget 2015-2016 - Draft
12
Proposed Directorate Estimates Explained
Capital Costs
Land / Building Costs associated with the creation of new, upgrade and renewal of Council’s
buildings.
Plant / Machinery Costs associated with the replacement of Council’s vehicles and plant as part of the
vehicle replacement programme.
Furniture / Equipment Costs associated with the purchase of new, upgrade and renewal of furniture and
equipment.
Roads Costs associated with the construction of new, upgrade and renewal of road
infrastructure.
Drainage Costs associated with the construction of new, upgrade and renewal of drainage.
Pathways Costs associated with the construction of new, upgrade and renewal of paths and
cycleways.
Parks Costs associated with the construction of new, upgrade and renewal of parks and
reserves and associated parks equipment.
Non-Operating Revenue
Sale Proceeds Revenue received from the trade-in of Council vehicles and plant as part of the
vehicle replacement programme.
Other matters to note about the financial schedules are:-
- The “YTD Actual” figures are the year to date actual revenues and expenses for the period 1st July to 30
th April
2015.
- The “2014/15 Revised Budget” figures represent the budget figures as adopted by Council in the 2014-15 Annual
Budget, plus or minus budget amendments made during the year.
- The “2015/16 Proposed Budget” figures represent the estimates as shown in the currently adopted Corporate
Business Plan for the 2015-16 year plus or minus the variations workshopped with Councillors over the last (2)
months.
Technical Services Directorate Budget 2015-2016 - Draft
13
Proposed Directorate Estimates
Technical Services Directorate 2014/15 2015/16
Summary Total
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds 8,328,640 32,182,129 40,510,769 26,389,065 31,336,310
Revenue -2,271,510 -26,791,218 -29,062,728 -16,139,979 -23,476,254
Grants / Contributions 0 -2,353,060 -2,353,060 -1,253,071 -3,013,786
Capital Funding -2,271,510 -11,964,958 -14,236,468 -3,173,952 -6,495,968
Fees and Charges 0 -12,473,200 -12,473,200 -11,712,957 -13,966,500
Expense 622,010 31,687,605 32,309,615 26,727,311 35,527,187
Employment 12,100 8,199,554 8,211,654 7,409,610 8,720,811
Office 0 294,180 294,180 260,905 313,732
Professional Services 87,900 404,500 492,400 107,146 401,381
Vehicles 0 475,800 475,800 346,568 495,900
Facilities 0 4,729,563 4,729,563 3,983,422 0
Projects / Works 441,210 23,295,408 23,736,618 18,134,210 30,331,532
Other Expense 80,800 3,357,240 3,438,040 2,467,030 3,810,646
Deprecation 0 1,398,400 1,398,400 1,500,978 1,661,100
Accounting 0 -9,068,640 -7,670,240 -5,981,580 -10,207,916
Capital Expense 10,282,140 26.973,542 37,255,682 16,747,277 19,205,078
Land / Buildings 1,169,800 2,933,400 4,103,200 1,782,317 4,459,900
Plant / Machinery 1,612,800 3,948,414 5,561,214 4,099,194 2,775,249
Furniture / Equipment 40,900 175,000 215,900 32,714 5,000
Roads 4,290,030 13,520,126 17,810,156 6,103,991 8,669,700
Drainage 144,760 967,300 1,112,060 193,125 813,000
Pathways 0 1,376,516 1,376,516 1,017,062 539,500
Parks 3,023,850 4,052,786 7,076,636 3,518,875 1,942,729
Non-Operating Revenue -304,000 -1,086,200 -1,390,200 -945,544 -644,241
Reserve Transfer 0 0 0 0 -74,332
Sale Proceeds -304,000 -1,086,200 -1,390,200 -945,544 -569,909
Non-Operating Expense 0 0 0 0 724,550
To Reserve Transfer 0 0 0 0 724,550
Technical Services Directorate Budget 2015-2016 - Draft
14
Proposed Directorate Estimates
2014/15 2015/16
Asset Management
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
77,900 1,154,720 1,232,620 767,300 862,720
Expense 77,900 1,154,720 1,232,620 767,300 862,720
Employment 12,100 604,320 616,420 546,400 604,974
Office 0 2,600 2,600 976 2,600
Professional Services 15,000 50,000 65,000 699 50,000
Vehicles 0 20,000 20,000 17,465 20,000
Other Expense 50,800 477,800 528,600 201,761 185,146
2014/15 2015/16
Civil Works
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
2,479,280 6,889,411 9,368,691 6,098,925 6,232,384
Revenue -1,955,510 -12,931,158 -14,886,668 -4,182,805 -7,836,968
Grants / Contributions 0 -1,341,000 -1,341,000 -1,020,244 -1,238,000
Capital Funding
-1,955,510 -11,482,958 -13,438,468 -3,053,376 -6,495,968
Fees and Charges 0 -107,200 -107,200 -109,186 -103,000
Expense 0 3,956,627 3,956,627 2,967,552 4,047,152
Employment 0 1,099,650 1,099,650 1,009,260 1,166,477
Office 0 61,600 61,600 59,947 83,500
Professional Services 0 8,900 8,900 3,394 2,500
Vehicles 0 90,900 90,900 46,196 50,000
Projects / Works 0 3,956,627 3,956,627 2,707,016 4,047,152
Other Expense 0 111,240 111,240 71,733 137,300
Accounting 0 -1,372,290 -1,372,290 -929,995 -1,439,777
Capital Expense 4,434,790 15,863,942 20,298,732 7,314,177 10,022,200
Roads ** 4,290,030 13,520,126 17,810,156 6,103,991 8,669,700
Drainage ** 144,760 967,300 1,112,060 193,125 813,000
Pathways ** 0 1,376,516 1,376,516 1,017,062 539,500
** Note: For Civil Works Capital Expense Details, please refer to page 20
Technical Services Directorate Budget 2015-2016 - Draft
15
Proposed Directorate Estimates
2014/15 2015/16
Engineering Design
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
7,300 863,770 871,070 720,738 863,960
Expense 7,300 863,770 871,070 720,738 863,960
Employment 0 937,200 937,200 833,244 1,002,528
Office 0 13,570 13,570 1,723 11,432
Professional Services 7,300 135,000 142,300 63,654 130,000
Vehicles 0 60,000 60,000 40,491 50,000
Other Expense 0 18,000 18,000 3,587 10,000
Accounting 0 -300,000 -300,000 -221,960 -340,000
2014/15 2015/16
Environment Services
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
441,210 605,732 1,046,942 672,962 1,103,910
Revenue 0 -406,560 -406,560 -183,322 -183,286
Grants / Contributions 0 -406,560 -406,560 -183,322 -183,286
Expense 441,210 1,012,292 1,453,502 856,284 1,287,196
Employment 0 475,930 475,930 393,904 549,048
Office 0 9,300 9,300 2,430 8,500
Vehicles 0 24,000 24,000 15,769 24,000
Projects / Works 441,210 503,062 944,272 444,182 705,648
Project Management 2014/15 2015/16
Project Management - Infrastructure C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
19,600 78,710 98,310 68,414 121,110
Expense 19,600 78,710 98,310 68,414 121,110
Employment 0 108,710 108,710 87,909 107,103
Professional Services 19,600 60,000 79,600 14,396 104,007
Vehicles 0 15,000 15,000 6,899 15,000
Accounting 0 -105,000 -105,000 -40,790 -105,000
Technical Services Directorate Budget 2015-2016 - Draft
16
Proposed Directorate Estimates
2014/15 2015/16
Parks
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
2,707,850 12,006,505 14,714,355 9,756,208 10,058,217
Revenue -316,000 -170,000 -486,000 -22,002 -274,000
Grants / Contributions 0 0 0 0 -250,000
Capital Funding -316,000 -146,000 -462,000 -1,134 0
Fees and Charges 0 -24,000 -24,000 -20,868 -24,000
Expense 0 8,123,719 8,123,719 6,259,335 8,389,488
Employment 0 1,290,500 1,290,500 1,241,200 1,311,747
Office 0 73,200 73,200 79,512 73,200
Professional Services 0 50,000 50,000 10,684 50,000
Vehicles 0 90,900 90,900 47,714 90,900
Projects / Works 0 8,123,719 8,123,719 6,386,553 8,389,488
Other Expense 0 17,600 17,600 23,279 64,400
Accounting 0 -1,522,200 -1,522,200 -1,529,606 -1,590,247
Capital Expense 3,023,850 4,052,786 7,076,636 3,518,875 1,942,729
Parks ## 3,023,850 4,052,786 7,076,636 3,518,875 1,942,729
## Note: For Parks Capital Expense Details, please refer to page 23
2014/15 2015/16
Property
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
970,400 6,782,199 7,752,599 5,692,416 7,014,229
Revenue 0 -500,000 -500,000 -1,939 -1,550,000
Grants / Contributions 0 -334,000 -334,000 -1,939 -1,550,000
Capital Funding 0 -166,000 -166,000 0 0
Expense 0 4,710,799 4,710,799 4,013,062 4,819,329
Employment 0 726,196 726,196 631,612 704,726
Office 0 26,200 26,200 19,309 26,200
Vehicles 0 36,600 36,600 20,007 36,600
Facilities 0 4,729,563 4,729,563 3,958,245 4,819,329
Other Expense 0 21,200 21,200 26,759 68,000
Accounting 0 -828,960 -828,960 -642,869 -835,526
Capital Expense 970,400 2,571,400 3,541,800 1,681,293 3,744,900
Land / Buildings ^^ 970,400 2,571,400 3,541,800 1,681,293 3,744,900
^^ Note: For Property Capital Expense Details, please refer to page 25
Technical Services Directorate Budget 2015-2016 - Draft
17
Proposed Directorate Estimates
2014/15 2015/16
Subdivisions
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
0 376,750 376,750 160,286 440,650
Revenue 0 -397,000 -397,000 -436,901 -392,000
Fees and Charges 0 -397,000 -397,000 -436,901 -392,000
Expense 0 773,750 773,750 597,186 832,650
Employment 0 670,750 670,750 548,389 750,144
Office 0 9,000 9,000 6,736 9,000
Professional Services 0 20,000 20,000 0 12,506
Vehicles 0 60,000 60,000 42,061 50,000
Other Expense 0 14,000 14,000 0 11,000
Support 2014/15 2015/16
Depot
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
385,800 2,198,214 2,584,014 2,303,768 1,831,000
Revenue 0 0 0 -79,442 0
Capital Funding 0 0 0 -79,442 0
Expense 0 0 0 166,799 0
Employment 0 248,400 248,400 242,833 441,000
Office 0 16,910 16,910 15,748 18,000
Vehicles 0 20,000 20,000 27,729 106,000
Facilities 0 0 0 25,177 0
Projects / Works 0 0 0 0 30,000
Other Expense 0 2,254,000 2,254,000 1,801,632 2,616,500
Depreciation 0 1,398,400 1,398,400 1,500,978 1,661,100
Accounting
0 -3,937,710 -3,937,710 -3,447,304 -4,872,600
Capital Expense 689,800 3,284,414 3,974,214 3,161,955 2,475,249
Land / Buildings 0 0 0 0 135,000
Plant / Machinery δ 689,800 3,284,414 3,974,214 3,161,955 2,340,249
Non-Operating Revenue -304,000 -1,086,200 -1,390,200 -945,544 -644,241
From Reserve Transfer 0 0 0 0 -74,332
Sale Proceeds -304,000 -1,086,200 -1,390,200 -945,544 -569,909
δNote: For Plant/Machinery Capital Expense and Depot Capital Expense Details, please refer to pages 28 & 29
Technical Services Directorate Budget 2015-2016 - Draft
18
Proposed Directorate Estimates
Support 2014/15 2015/16
Crossovers
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
0 0 0 0 243,700
Revenue -230,000
Fees and Charges -230,000
Expense 0 0 0 0 473,700
Employment 0 0 0 0 153,700
Other Expense 0 0 0 0 320,000
Proposed Directorate Estimates
Technical Services 2014/15 2015/16
Technical Services Management C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
76,000 3,039,380 3,115,380 2,481,395 3,272,881
Revenue 0 -462,500 -462,500 -226,556 -48,000
Grants / Contributions 0 -57,500 -57,500 -1,000 -42,500
Capital Funding 0 -170,000 -170,000 -40,000 0
Fees and Charges 0 -235,000 -235,000 -185,556 -5,500
Expense 76,000 3,326,880 3,402,880 2,675,237 3,315,881
Employment 0 1,199,880 1,199,880 1,014,614 1,094,697
Office 0 54,000 54,000 43,184 53,500
Professional Services 46,000 45,000 91,000 14,076 16,768
Vehicles 0 30,000 30,000 37,673 25,000
Projects / Works 0 1,605,000 1,605,000 1,239,428 1,825,915
Other Expense 30,000 393,000 423,000 326,263 300,000
Capital Expense 0 175,000 175,000 32,714 5,000
Furniture / Equipment 0 175,000 175,000 32,714 5,000
Technical Services Directorate Budget 2015-2016 - Draft
19
2014/15 2015/16
Waste
C/Fwds Revised Total YTD Proposed
Budget Budget Budget Actual Budget
Required Municipal Funds
1,163,300 -1,813,262 -649,962 -2,333,347 -708,450
Revenue 0 -11,924,000 -11,924,000 -11,007,013 -12,962,000
Grants / Contributions 0 -214,000 -214,000 -46,566 0
Fees and Charges 0 -11,710,000 -11,710,000 -10,960,447 -12,962,000
Expense 0 9,084,738 9,084,738 7,635,403 10,514,000
Employment 0 838,018 838,018 860,247 834,666
Office 0 27,800 27,800 31,340 27,800
Professional Services 0 35,600 35,600 236 35,600
Vehicles 0 28,400 28,400 44,566 28,400
Projects / Works 0 9,107,000 9,107,000 7,357,031 10,514,000
Other Expense 0 50,400 50,400 12,018 98,300
Accounting 0 -1,002,480 -1,002,480 -670,034 -1,024,766
Capital Expense 1,163,300 1,026,000 2,189,300 1,038,263 1,015,000
Land / Buildings ∞ 199,400 362,000 561,400 101,024 580,000
Plant / Machinery ∞ 923,000 664,000 1,587,000 937,239 435,000
Furniture / Equipment 40,900 0 40,900 0 0
Non-Operating Expense 724,550
Transfer to Plant Reserve 724,550
∞Note: For Waste Capital Expense Details, please refer to page 29
Technical Services Directorate Budget 2015-2016 - Draft
20
Proposed Capital Expense Details
Total
$
Civil Works 10,022,200
Civil Works - Roads 8,669,700
Roads - Upgrade 2,900,000
Armadale CBD Upgrade Roads Municipal 400,000
Eighth Road MRA DCS 2,500,000
Roads - Renew 1,491,136
Third Road / Southwest Hwy Reconstruct Intersection 93,000
Abingdon Place From Hollybush Way to end 73,000
Adams Court From Ravenscroft Way to end 39,000
Armitage Road From River Road to end 32,000
Coventry Road Cul-de-sac east for 300m 32,000
Cullen Court From Westfield Road to end 80,000
Dean Street From Fancote Street to end 46,000
Hillman Court From Ravenscroft Road to end 41,000
Kidbroke Place From Third Avenue to end 83,000
Merlin Close From Westfield Road to end 45,000
Natasha Way From Lantana Way to end 118,000
Parkfield Road From Third Avenue to Tollington Park Road 144,136
Ravenscroft Way From Regina Road to Adams Court 265,000
Regina Road From Ravenscroft Way to Ravenscroft Way 210,000
Slee Avenue From Cammilo Road to Third Avenue 94,000
Talwin Court From Regina Road to end 36,000
Various Roads Crack Seal 60,000
Traffic Calming Installations - Upgrade 1,732,650
Federal Government Black Spot 1,495,570
Church Ave – Commerce / Hobbs Pre-deflections 93,700
Forrest Road / Neilson Avenue Roundabout 366,560
Railway Avenue / Westfield Road Pre-deflections 183,080
Seventh Road Street Lighting & Shared Path 147,500
Strawberry Drive Lane Separation 109,200
Waterwheel Road Signs & Lines 45,460
Westfield Road Lane Separation 386,200
Williams Road / Braemore Street Lane Separation & Street Lighting 81,800
Ypres Road / O’Sullivan Drive Intersection Improvements 82,070
State Government Black Spot 237,080
Abbey Road Lane Separation 24,000
Fifth Road Lane Separation 52,000
Jarrah Road / Wygonda Road Street Lighting 29,000
Third Avenue / Parkfield Road Street Lighting & Intersection Upgrade 72,080
Wright Road Lane Separation 60,000
LATM Programmes - New 360,000
Harrisdale Road Blister Midblock Islands, Line Marking 60,000
Lucich Street Blister Midblock Islands, Line Marking 120,000
Patterson Road Blister Midblock Islands, Line Marking 60,000
Strawberry Drive Blister Midblock Islands, Line Marking 60,000
Wungong Road Blister Midblock Islands 60,000
Technical Services Directorate Budget 2015-2016 - Draft
21
Proposed Capital Expense Details
Total
$
Streetscapes - Upgrade 440,000
Camillo Westfield Road Precinct 2 440,000
Roundabouts & Intersections - Renew 255,000
Davis Road / Albany Hwy Road Reconstruction 60,000
Eleventh Road / Rowley Road Roundabout 50,000
Challis Road / Williams Road Roundabout 45,000
Railway Avenue / Champion Dr Roundabout 50,000
Railway Avenue / Merrifield Road Roundabout 50,000
Community Safety 30,000
To Be Determined Community safety requests - Various 30,000
Culs-de-sac - Upgrade 120,000
Slab Gully Road Stage 1 & 2 – Upgrade Cul-de-Sac 60,000
Allen Road Upgrade Culs-de-sac 60,000
Bridges & Culverts - Renew 721,400
Croyden Road Replacement (Box Culvert) 472,400
Forrest Road Repair Stringers 150,000
Gilwell Avenue Piers, Footpath, Joist & Road Surfacing 99,000
Bus Shelters - New 27,000
Cammillo Road Kelmscott Senior High School 6,750
Harber Drive After Ninth Road 6,750
Harber Drive After Avecot Street 6,750
Tijuana Road After Mornington Street 6,750
Bus Shelters - Renew 30,000
Albany Highway Before Mountain View 15,000
Albany Highway Before Carawatha Avenue 15,000
Car Parks 235,000
Car Parks-New 100,000
School Parking – Various Locations New Car Park 100,000
Car Parks-Renew 135,000
Creyk Park Car Parks (2) Resurfacing Car Park 100,000
Grassmere Child Health Resurfacing Car Park 35,000
Street Lighting - New 160,000
Holden Road / Raeburn Road Street Lighting 90,000
Seville Drive / Challis Road Street Lighting 70,000
Kerbing-Renew 40,000
Various Locations Reconstruct Kerbing 40,000
Signage (Road)-Renew 20,314
Various Locations Replacement Signage 20,314
Private Works 107,200
Private Works Various Locations 107,200
Technical Services Directorate Budget 2015-2016 - Draft
22
Proposed Capital Expense Details
Total
$
Civil Works - Pathways 539,500
Paths - New 400,000
Brookton Highway From Hill Street – Stage 1 115,500
Davis Road North Side of Davis Road (full length) 21,000
Delamere Way Baxendale Court to Harlow Court 29,400
Derry Avenue Henrietta Street to Brian Street 22,000
Emu Road Chadwick Parade to Wedgetail Court 21,000
Garland Road Windsor Avenue – Stage 1 61,400
Gunnamatta Place Railway Avenue to Tollington Park Road 17,000
Heritage Drive ARA Walktrail to Existing Parking Bay 32,000
Martin Street Merrilee Terrace to Ashley Drive 21,000
South Western Highway Burndale Road to Opposite Hobbs Drive 11,000
Ullyott Street Streich Avenue to Spencer Road 11,600
Urch Road Barnes Road to Peet Road 30,500
Weld Street Armadale Road to Dunsday Drive 6,600
Paths Renewal 80,000
Ruby Court To Bedfordale Hill Road 30,000
Waterwheel Road Churchman’s Brook to Trewarn Place 50,000
Cyclepaths - New 59,500
Bicycle Network Plan Develop Bike Plan for City 59,500
Civil Works - Drainage 813,000
Drainage - New 688,000
Banyard Avenue Cammillo Road to Railway Avenue 223,000
Observation Circle Stage 2 and Land Resumption 455,000
Ranford Park Open Drain 10,000
Drainage - Renew 75,000
Various Locations Pipe Condition Assessment 75,000
Drainage-Upgrade 50,000
Forrestdale Business Park (East) Swale 50,000
Technical Services Directorate Budget 2015-2016 - Draft
23
Proposed Capital Expense Details
Total
$
Parks 1,942,729
Parks - New 1,250,029
Fixtures and Structures - New 59,529
Corrondale Park – Ralphs & Braemore Bollards 7,500
Quenda Reserve Memorial Plaques 4,000
Heronwood Reserve Memorial Plaques 4,000
Various Locations Municipal Signage 36,529
San Jacinta Park Pathways 7,500
Flora - New 850,000
Urban Forest Strategy Implementation – Phase 2 400,000
Ranford Road–Wright Rd to Tonkin Hwy Landscaping 400,000
Various Locations Entry Statements 50,000
Furniture - New 35,000
New Estates Miscellaneous Items 25,000
San Jacinta Reserve Disabled Access Shelter 10,000
Lighting - New 20,000
Pamplona Park 4 x Solar Lights 20,000
Play - New 35,500
Borello Park Shade Structures 15,000
Memorial Park Shade Structures 20,500
Sporting Facilities - New 60,000
Burtonia Park Half-Court & Basketball Ring & Drainage 30,000
Northerly Reserve Half-Court & Basketball Ring & Drainage 30,000
Water Facilities - New 190,000
Bronzewing Reserve Bores 35,000
Kuhl Park Bores 35,000
Bob Blackburn-Rushton Park Soil Moisture Monitoring System 15,000
Wright Jandakot Water Area Bore Telemetry Systems 25,000
Kuhl Park Bore Electrical Cabinets 30,000
Kuhl Park Bore Storage Tanks and Infrastructure 35,000
Various Locations Hardware Applications / Computer Software 15,000
Parks - Renew 622,700
Fixtures and Structures - Renew 55,000
Troon Park Bollards 5,000
Morgan Park Pathways 15,000
Arbour Reserve Pathways 35,000
Flora - Renew 100,000
Churchman’s Brook Park Gardens 30,000
Armadale Streetscapes Rehabilitate Gardens 30,000
Estate Streetscapes Improvements 40,000
Technical Services Directorate Budget 2015-2016 - Draft
24
Proposed Capital Expense Details
Total
$ Furniture - Renew
9,500
Grovelands Reserve Bench Seats 2,500
Patterson Park Bench Seats 7,000
Lighting Renewal 100,000
Springdale Oval Floodlighting (1 Additional Tower & Luminaires 50,000
Gwynne Park & John Dunn Investigation & Design Oval Lighting 50,000
Play Facilities - Renew 40,000
Youth Activity Area Softfall Rubber 40,000
Playground – Renew 52,200
Memorial Park Softfall & Playground 52,200
Sport Facilities - Renew 102,500
Gwynne Park AFL Goals 12,500
Alfred Skeet Oval Soccer Goals 15,000
Frye Park Winter Covers & Pallets (2 wickets) 30,000
Gwynne Park Main Winter Covers & Pallets (3 wickets) 45,000
Water Facilities - Renew 163,500
Matthew Stott Reserve Irrigation Control Cabinets 25,000
Gwynne Park Irrigation Control Cabinets 25,000
Morgan Park Irrigation Control Cabinets 25,000
Grovelands Drive Reserve Bore Pump 10,000
Sanctuary Lake Bore Pump 7,500
Wallaby Reserve Bore Pump 5,000
William Lockhard Reserve Bore Head Works 7,500
Horrie Hill Reserve Bore Head Works 3,500
Matthew Stott Reserve Bore Head Works 3,500
Morgan Park Bore Head Works 3,500
John Dunn Bore Storage Tank 35,000
Bob Blackburn Drink Fountain 5,000
Gwynne Park Drink Fountain 5,000
Borello Park Drink Fountain 3,000
Parks - Upgrade 70,000
Fixtures and Structures - Upgrade 25,000
Alfred Skeet Oval Boundary Fence 15,000
Errol Green Upgrade Stairs, Pathways & Fencing 10,000
Play Facilities - Upgrade 15,000
Piara Waters Oval Rubber Softfall Works & Terracing 15,000
Water Facilities 30,000
Churchman’s Brook Park Village Green & Gardens Irrigation 30,000
Technical Services Directorate Budget 2015-2016 - Draft
25
Proposed Capital Expense Details
Total
$
Property 3,744,900
Property - New 485,800
Education & Historic - New 45,000
Seville Grove Library Security Fencing 45,000
Halls & Pavilions - New 172,800
Armadale Hall Bin Storage Compound 6,500
Bob Blackburn Bin Storage Compound 6,500
Champion Centre Entry Portico for Weather Protection 66,800
Champion Centre External Client Seating Area 50,000
Churchman’s Brook Hall Bin Storage Compound 6,500
Cross Park Football Club Replace Sea Container with Storage Shed 20,000
Forrestdale Hall Bin Storage Compound 6,500
Scout & Guides Hall Bin Storage Compound 10,000
Health & Community Facilities - New 75,000
Harold King Centre Security Grills 25,000
Westfield Centre Garrison Fencing – Rear of Property 30,000
Westfield Centre Security Grills to Rear of Building 20,000
Operational Facilities - New 8,500
Administration Building Air-conditioning Photocopying Room 8,500
Public Toilets - New 148,000
Lions Park New Public Toilet 128,000
Lions Park Demolish Old Toilet 20,000
Sporting Facilities - New 36,500
Badminton Centre Fit Emergency Fire Exit Doors 6,500
Palomino Pony Club New Storage Shed 30,000
Property – Upgrade 1,062,000
Education & Historic – Upgrade 65,000
Armadale Library Reconfigure Meeting Room Door 15,000
Seville Grove Library Improve Natural Lighting – Solar Tubes 25,000
Seville Grove Library Hard Wall to Interior Rear Wall 15,000
Seville Grove Library Storage 10,000
Halls & Pavilions – Upgrade 317,500
Bob Blackburn Render Exterior & Paint 20,000
Bob Blackburn Kitchen Upgrade 22,000
Champion Centre Manager’s Front Office 15,000
Champion Centre Rear Storeroom Upgrade 20,000
Champion Centre Re-key Facility 3,500
Champion Centre Install Ladder Access & Roof Anchor to Roof 10,000
Champion Centre Front Foyer Reception 25,000
Gwynne Park Pavilions Full Render & Repaint of Exterior Surfaces 75,000
Gwynne Park Pavilions Upgrade All Existing Outer Security Grills 20,000
Forrestdale Sportsmans Club Patio Replacement 35,000
John Dunn Halls Ceiling Upgrade 20,000
John Dunn Halls Kitchen Upgrade 30,000
Karragullen Hall Increase Water Tank Capacity 17,000
Piara Waters Sporting Pavilion Bin Storage Area 5,000
Technical Services Directorate Budget 2015-2016 - Draft
26
Proposed Capital Expense Details
Total
$
Health & Community Facilities – Upgrade 2,050,000
Greendale Centre Upgrade & Refurbishment 2.050,000
Operational Facilities - Upgrade 25,000
Depot Pound Stockyard & Cattery Access 25,000
Public Toilets - Upgrade 6,500
Rushton Park Outdoor Centre Air-Conditioning to Club Room 6,500
Sporting Facilities - Upgrade 148,000
Arena Creche Softfall 40,000
Aquatic Centre Public Seating 37,000
Aquatic Centre Render Front Change Room & Paint 25,000
Aquatic Centre Remove Old Sand Filter & Return to Storage 30,000
Aquatic Centre Emergency Exit Pathway Inclusive of DIAP 16,000
Property - Renewal 647,100
Education & History - Renewal 39,500
Forrestdale Sportsman’s Club Facility Improvement - Exterior Painting 8,500
History House Replace HVAC System 6,000
History House Full External Repaint 7,500
Kindiamana Kindergarten Replace HVAC System 3,500
Old CALM Building Facility Improvement - Exterior Painting 9,000
Settler’s Common Study Centre Facility Improvement – Exterior Painting 5,000
Halls & Pavilions - Renewal 131,500
Armadale Hall Replace Curtains to Stage 10,500
Bob Blackburn Replace Gutters & Downpipes 6,000
Champion Centre Re-tile Toilets 15,000
Champion Centre Entry Signage 4,000
Champion Centre Tables & Chairs 10,000
Champion Centre Front Entry Door 5,000
Champion Centre Air-Conditioning / Heating Main Hall 16,000
Cross Park Precinct Electrical Renewal 50,000
Forrestdale Sportsman’s Club Downpipe & Gutters 5,000
Gwynne Park Pavilion Downpipe 4,000
Gwynne Park Pavilion Lighting & Signage – External 6,000
Health & Community Facilities - Renewal 31,500
Evelyn Gribble Community Centre Air-Conditioning / Heating – Main Hall 12,000
Harold King Centre Exterior / Interior Hall Repaint 15,000
Harold King Centre Replace HVAC 4,500
Sporting Facilities - Renewal 82,500
Aquatic Centre Replace Lino – Kitchen Area 10,000
Aquatic Centre Access - Paving & Painting of Concourse 20,000
Aquatic Centre Soffits 40,000
Arena External Signage 7,500
Badminton Centre Flooring 5,000
Technical Services Directorate Budget 2015-2016 - Draft
27
Proposed Directorate Estimates
Total
$
Other - Renewal 362,100
Municipal Buildings Minor Works 114,100
Municipal Buildings – Stat Regs Asbestos Removal from Various Facilities 45,000
Municipal Buildings – Stat Regs Disability Inclusions Plans Facilities 40,000
Municipal Buildings – Asset Man. Painting 25,000
Municipal Buildings – Asset Man. Flooring Replacement 38,000
Municipal Buildings – Asset Man. Security Upgrade 30,000
Municipal Buildings – Asset Man. Facility Signage – Replacement 20,000
Municipal Buildings – Asset Man. Facility Car Park – Re-marking 10,000
Municipal Buildings – Asset Man. Table & Chair Replacements 25,000
Municipal Buildings – Asset Man Flooring Replacement 10,000
Municipal Buildings – Asset Man Painting Programme 5,000
Technical Services Directorate Budget 2015-2016 - Draft
28
Proposed Capital Expense Details
$
Plant / Machinery – Replacement 2,340,249
Animal Control Utility (P1717) 36,500
Animal Control Utility (P1714) 36,500
Animal Control Utility (P1715) 36,500
Animal Control Utility (P1760) 36,500
Animal Control Utility (P1761) 36,500
SES 4X4 Van (P611) 35,000
Asset Management Wagon (P1773) 32,100
CEO Administration Sedan (P1775) 59,100
CEO Administration Sedan (P1787) 59,100
CEO Administration Sedan (P1772) 32,100
Civil Works Trailer (P123) 8,800
Civil Works Trailer (P124) 4,200
Civil Works Truck (P135) 74,000
Civil Works Truck (P138) 75,000
Civil Works Roller (P157) 14,300
Civil Works Ute (P1769) 26,900
Community Sedan (P1798) 32,100
Community Wagon (P1802) 32,100
Depot Fuel Control System (P579) 104,878
Development Services Ute (P1735) 26,900
EDCmS Wagon (P1771) 48,800
EMCpS Sedan (P1782) 32,100
EDDS Sedan (P1795) 48,800
EDTS Wagon (P1776) 48,800
EMTS Sedan (P1800) 37,500
Engineering Design Sedan (P1777) 32,100
Fire Prevention Trailer (P555) 9,000
Health Sedan (P1779) 32,100
Health Sedan (P1745) 26,900
Parks Utility (P1755) 32,100
Parks Utility (P948) 26,900
Parks Trailer (P319) 20,000
Parks Trailer (P320) 22,200
Parks Slasher (P348) 13,100
Parks Truck (P358) 103,000
Parks Mower (P374) 28,200
Parks Mower (P376) 28,200
Parks Mower (P377) 28,200
Parks Mower (P378) 28,200
Parks Trailer (P379) 28,200
Parks Trailer (P380) 4,500
Parks Trailer (P381) 6,000
Parks Trailer (P303) 1,600
Planning Wagon (PK1719) 26,900
Project Management Sedan (P1736) 26,900
Property Sedan (P1752) 26,900
Property Utility (P1725) 26,900
Property Trailer (P510) 16,400
Subdivisions Sedan (P1721) 26,900
Technical Services Directorate Budget 2015-2016 - Draft
29
$
Plant / Machinery – Replacement
Subdivisions Utility (P1757) 26,900
Waste Utility (P1751) 33,200
Waste Loader (P554) 262,500
Waste Truck (P557) 373,000
Waste Weighbridge Computer System (P580) 8,171
Depot 135,000
Remove and replace old shed 40,000
Remove pit and replace with hoist 55,000
Upgrade electric fence 40,000
Waste 1,015,000
Land / Buildings – New 580,000
CCTV Upgrade 110,000
Data Connection 50,000
Gatehouse Relocation 100,000
Shade Sails 20,000
Asphalt 60,000
Education Facilities 180,000
Weighbridge 60,000
Plant / Machinery 435,000
Plant / Machinery - New Waste Truck 400,000
Ute 4 X 4 35,000
Technical Services Directorate Budget 2015-2016 - Draft
30
Proposed Fees and Charges The Proposed Fees and Charges as relevant to the operations and responsibilities of the Directorate for the 2015/16
financial year are explained as follows.
It is to be noted that some fees and charges cannot be varied by Council on account of being set in accordance with
legislation – these are denoted in the Schedule with an asterisk (*).
For the majority of other fees and charges, an inflationary increase factor is proposed. This factor has been applied having
regard for –
• The requirement of Section 6.17 of the Local Government Act 1995 * &
• The primary cost drivers are labour costs at (+) 3% and the forecast Local Government Cost Index of (+) 2.2%
The proposed fees aim to maintain affordable access to Council facilities and services. Fees and charges will need to
increase each year in order to offset the increased cost of simply doing business. Further reviews of management practices
and service levels provided may have an impact on fees and charges in the future.
* Section 6.17 of the Local Government Act 1995 – Setting the level of fees and charges states:
1. In determining the amount of fee or charge for a service or for goods, a local government is required to take into
consideration the following factors –
a) The cost to the local government of providing the service or goods;
b) The importance of the service or good s to the community; and
c) The price at which the service or good could be provided by an alternative provider.
Technical Services Directorate Budget 2015-2016 - Draft
31
Proposed Fees and Charges
1 July 2015 to 30 June 2016
Schedule of Fees and Charges 2014/15 2015/16 Fees
Including Fees
Excluding
Fees Including
GST GST GST GST
Particulars $ $ $ $
Community Amenities
Domestic Recycling and Waste Charges
Replacement bin due to loss or damage 98.00 91.82 9.18 101.00
Residential (weekly rubbish, fortnightly recycling) 308.00 344.00 0.00 344.00
Commercial annual rubbish and recycling 287.00 323.00 0.00 323.00
Additional Recycling Service 70.00 75.00 0.00 75.00
Additional Refuse Service 241.00 244.00 0.00 244.00
Alternate Day Collection (including travel cost / service) 233.00 243.00 0.00 243.00
Special services general waste 217.00 210.00 21.00 231.00
Special services recycling 108.00 102.73 10.27 113.00
Special Event Bins – Commercial Services
Delivery of Bins 103.00 96.36 9.64 106.00
Emptying of Bins per Lift 5.00 4.55 0.45 5.00
Cleaning of Bins 51.00 48.18 4.82 53.00
Waste Tipping Charges for Cars and Trailers
Not exceeding 1.3m3 - with valid pass 0.00 0.00 0.00 0.00
Not exceeding 1.3m3 - without valid pass - green waste 26.00 27.27 2.73 30.00
Not exceeding 1.3m3 - without valid pass - rubbish 39.00 39.09 3.91 43.00
Not exceeding 1.3m3 - unsorted - rubbish 110.00 104.55 10.45 115.00
Not exceeding 2.6m3 - green waste 35.00 35.45 3.55 39.00
Not exceeding 2.6m3 - rubbish 59.00 57.27 5.73 63.00
Not exceeding 2.6m3 - unsorted rubbish 130.00 127.27 12.73 140.00
Additional tip pass (Armadale residents) - green waste 21.00 21.82 2.18 24.00
Additional tip pass (Armadale residents) - rubbish 32.00 32.73 3.27 36.00
Tip Pass Charge - other Local Authorities - greenwaste 0.00 25.45 2.55 28.00
Tip Pass Charge - other Local Authorities - rubbish 0.00 36.36 3.64 40.00
Waste Tipping Charges for General Waste
Logs, reinforced concrete - per tonne 81.00 85.45 8.55 94.00
Logs, reinforced concrete - minimum 59.00 57.27 5.73 63.00
Domestic, putrescibles, trade waste - per tonne 151.00 151.82 15.18 167.00
Domestic, putrescibles, trade waste - minimum 59.00 57.27 5.73 63.00
Clean bricks, unreinforced concrete, sand, soil - tonne 36.00 44.55 4.45 49.00
Clean bricks, unreinforced concrete, sand, soil – min. 59.00 57.27 5.73 63.00
Tree lopping’s, vegetation, garden waste - per tonne 54.00 60.00 6.00 66.00
Tree lopping’s, vegetation, garden waste - minimum 35.00 35.45 3.55 39.00
Unsorted loads – per tonne 227.00 218.18 21.82 240.00
Unsorted Loads – Minimum 106.00 127.27 12.73 140.00
Large consignments and special burial on application on application
Garden bags contractors (sorted) / Unit 78.00 75.45 7.55 83.00
Waste oil quantities greater than 20 litres - per litre 0.20 0.23 0.02 0.25
Mattresses-commercial quantities each 21.00 22.73 2.27 25.00
Loader Assisted Unloading – Per tonne 0.00 10.91 1.09 12.00
Loader Assisted Unloading - Minimum 0.00 21.82 2.18 24.00
Technical Services Directorate Budget 2015-2016 - Draft
32
Proposed Fees and Charges
July 2015 to June 2016
Schedule of Fees and Charges 2014/15 2015/16 Fees
Including Fees
Excluding
Fees Including
GST GST GST GST
Particulars $ $ $ $
Community Amenities
Waste Tipping Charges for Vehicle Bodies
From residential premises 0.00 0.00 0.00 0.00
From commercial and industrial premises 45.00 45.45 4.55 50.00
Waste Tipping Charges for Asbestos
Asbestos - per tonne 101.00 103.64 10.36 114.00
Commercial loads - additional 39.00 40.00 4.00 44.00
Asbestos - minimum 28.00 30.91 3.09 34.00
Small packs (less than 5kg) Free Free
Waste Tipping Charges for Unprocessed Tyres (Residents)
Designated tip pass - 4 car tyres or 2 small truck tyres 0.00 0.00 0.00 0.00
Car tyres per tyre 5.00 3.64 0.36 4.00
Small truck tyres per tyre 7.00 6.36 0.64 7.00
Truck tyres per tyre 18.00 14.55 1.45 16.00
Tyres on rims 100% surcharge 100% surcharge
Waste Tipping Charges for TV and Computer Screens 1 tip pass per screen 0.00 0.00 0.00 0.00
Screen - each Free Free
Large consignments of e-waste on application on application
Waste Tipping Charges for Animal Carcasses
Small animals (dogs etc.) - per animal 28.00 26.36 2.64 29.00
Large animals (cattle etc.) - per animal 107.00 100.91 10.09 111.00
Offal and animal products - per tonne 188.00 178.18 17.82 196.00
Offal and animal products - minimum 106.00 100.00 10.00 110.00
Waste Tipping Charges for Weighbridge Breakdown
Non-compacted waste per wheel of truck or trailer 171.00 160.91 16.09 177.00
Compacted waste per wheel of truck or trailer 182.00 171.82 17.18 189.00
Burial surcharges add 50% per rate per wheel 0.00 0.00 0.00 0.00
Mixed waste surcharge add 50% per wheel 0.00 0.00 0.00 0.00
Compost Bins
225 litre compost bin (delivery inclusive) 47.00 47.27 4.73 52.00
400 litre compost bin (delivery inclusive) 59.00 58.18 5.82 64.00
Charges for Mulch and Firewood
Mulch - Self-loaded trailer to 3m3 0.00 0.00 0.00 0.00
Mulch - Machine loaded trailer - Pensioners - Tues AM 0.00 0.00 0.00 0.00
Mulch - Machine loaded per tonne - Minimum 23.00 26.36 2.64 29.00
Mulch - Large consignments on application on application
Split fire wood - Self loaded per tonne - Minimum 77.00 75.45 7.55 83.00
Split fire wood - Machine loaded per tonne - Minimum 87.00 86.36 8.64 95.00
Block fire wood - Self loaded per tonne - Minimum 36.00 38.18 3.82 42.00
Technical Services Directorate Budget 2015-2016 - Draft
33
Proposed Fees and Charges
July 2015 to June 2016
Schedule of Fees and Charges 2014/15 2015/16 Fees
Including Fees
Excluding
Fees Including
GST GST GST GST
Particulars $ $ $ $
Transport
Security Deposits Footpath and kerb administration fee 132.00 130.00 0.00 130.00
Drainage / Stormwater Connections Administration fee 132.00 130.00 0.00 130.00
Private Works Charges Actual costs incurred plus 12.5% on-costs, and GST Minimum 27.50 30.00 3.00 33.00
Special Road Closures First road closure 187.00 190.00 0.00 190.00
Per additional road closure 132.00 130.00 0.00 130.00
Bonds may apply
Administration Fees on Works / Public Utilities Reinstatements
Actual costs incurred plus 12.5% on-costs, plus GST Minimum 27.50 30.00 3.00 33.00
Subdivision administration fee 0.00 130.00 0.00 130.00
Engineering Supervision 1.5% of contract with consulting engineer and clerk of
works 3.0% of contract without consulting engineer and clerk of
works Plumbers permit administration fee 132.00 130.00 0.00 130.00
Technical Services Directorate Budget 2015-2016 - Draft
34
Proposed Fees and Charges
July 2015 to June 2016
Schedule of Fees and Charges 2014/15 2015/16
Fees
Including Fees Excluding
Fees
Including
GST GST GST GST
Particulars $ $ $ $
Development Engineering Assessment Fees
a) Pre lodgement assessment services and associated inspections.
Charged actual cost plus administration fees
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
b) Supervision of each stage of subdivisional road and drainage civil works, including associated site inspections.
Charged actual cost plus administration fees
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
c) Assessment of each stage of subdivisional civil works plan submissions for roads, drainage and artificial waterways.
Charged actual cost plus administration fees
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
d) Assessment of technical reports, studies and management plans, such as relevant traffic studies, construction, environmental management plans, erosion and sediment control plans etc.
Charged actual cost plus administration fees
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
e) Assessment of additional plans and drawings for areas of development not addressed in (d) above, such as detailed earthwork plans, landscape plans etc.
Charged actual cost plus administration fees
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
Technical Services Directorate Budget 2015-2016 - Draft
35
Proposed Fees and Charges
July 2015 to June 2016
Schedule of Fees and Charges 2014/15 2015/16
Fees
Including Fees Excluding
Fees
Including
GST GST GST GST
Particulars $ $ $ $
Development Engineering Assessment Fees
Schedule of Fees & Charges for the Year Ended 30 June 2016
f) Additional site inspections required over and above the standard inspections, such as re-inspection of works due to failed areas/items, unfinished stage of works or special site visit requests.
Charged at the actual cost for the provision this service
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
g) Assessment of a Local Water Management Strategy (LWMS), Urban Water Management Plan (UWMP) flood, stormwater or any other water management plan or drainage study associated with the development area.
Charged at the actual cost for the provision this service
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
h) Assessment of additional water management documentation and plans, such as on-site stormwater management studies, including supporting engineering drainage plans detailing detention and retention systems etc., if such information was not addressed in (g).
Charged at the actual cost for the provision this service
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
i) Assessment of works and/or plan submissions requiring review and comment by independent third party experts/consultants, and these experts/consultants are engaged by the City, such as detailed hydraulics analysis, traffic management plans, proposed road closures, signing of roads etc.
Charged actual cost plus administration fees
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
j) Any other assessment services not directly
relating to subdivisional civil works submission.
Technical Services Directorate Budget 2015-2016 - Draft
36
Proposed Fees and Charges
July 2015 to June 2016
Schedule of Fees and Charges 2014/15 2015/16
Fees
Including Fees Excluding
Fees
Including
GST GST GST GST
Particulars $ $ $ $
Development Engineering Assessment Fees
Schedule of Fees & Charges for the Year Ended 30 June 2016
k) Decorative Public Open Space (POS) lighting
or street lighting operation and maintenance where the City pays a tariff to Western Power for decorative POS lighting or street lighting which includes the energy cost, maintenance cost, and cost of the Bulk Globe Replacement Programme. Alternatively, where a tariff is imposed by the energy provider to charge for energy consumption only, with ownership and total responsibility for ongoing maintenance of the POS lighting or street lighting infrastructure ultimately transferred to the City.
l) Administration fee for the creation and
processing of bonds for incomplete subdivisional civil works.
Charged actual cost plus administration fees
- Varies
Charged actual cost plus
administration fee of $65.00
minimum, $130.000 maximum
$1,000 plus GST
Annual Budget 2015/16
DRAFTTechnical Services
www.armadale.wa.gov.au
Available in alternative formats on request