Acnden~~fir Educational Developn~eitr ARMENIA ENERGY TRAINING PROGRAM Contract No. LAG-1-00-98-00011-00, Task Order Two Technical Report Electric Transmission and Distribution Loss Reduction Strategies - September 7, 1999 Submitted to U.S. Agency for Illternational Development Submitted by the Academy for Educational Development with Hagler Bailly Services

Transcript of Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf ·...

Page 1: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Acnden~~f i r Educational Developn~eitr

ARMENIA ENERGY TRAINING PROGRAM

Contract No. LAG-1-00-98-0001 1-00, Task Order Two

Technical Report

Electric Transmission and Distribution Loss Reduction Strategies

- September 7, 1999

Submitted to U.S. Agency for Illternational Development

Submitted by the Academy for Educational Development with Hagler Bailly Services

Page 2: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

ARMENIA ENERGY SECTOR TRAINING PROGRAM Technical Report

Course #lo: Electric Transmission and Distribution Loss Reduction Strategies

US AID Strategic Objective 1.5 A more economically sustainable and environmentally sound energy sector

Intermediate Result 2 Increased economic efficiency in the energy sector

Participant profile Armenia's energy companies, government ministries and regulatory entities with competence over the energy sector

A. Course Purpose

Although Armenia's energy sector has undergone substantial changes within the last four years there remain many issues related to the development of an economically sustainable energy sector. This course builds on activities undertaken previously as part of USAID's technical assistance efforts in the energy sector.

The Armenian electric system has very high rates of technical and commercial transmission and distribution losses. This course discussed both technical and organizational measures to reduce such losses. Course topics included: possible causes of losses; loss estimation methods; meter testing procedures; and procedures for improving internal financial controls to reduce commercial losses.

The course objectives were:

To provide practical training on technical and organizational measures and techniques to reduce both technical and commercial losses in Armenia's electric transmission and distribution networks

To increase participant awareness of the USAID Armenia Power Sector Metering Improvement Program and demonstrate necessary organizational and business measures that need to be taken to reduce losses in line with Government of Armenia targets and sound utility practice.

-

The course was held from June 2 1-34, 1999. Mr Douglas Whyte was the principal trainer. Dean White and Armen Arzumanyan also taught sections of the seminar. Table 1 shows the course participants.

Technical Report Course# 10 September 7, 1999 1

Page 3: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Table 1: List of Participants

C. Material Covered

The seminar was divided into three main areas. The first part of the course focused on reducing technical losses, including measuring and estimating energy and demand losses on both an annual and an hourly basis, and allocating their electric system components, using the Southern California Edison (SCE) system as an example. This segment also provided a methodology for valuation of both energy and demand losses by voltage level, including methods for forecasting the value of future losses. Following a review of economic analyses, these values were then used in sample loss reduction projects, and assignments were given to the class to analyze and recommend three loss reduction projects using at least two different economic analysis techniques.

The second part of the course covered: commercial loss mitigation, including meter characteristics, accuracy, calibration and testing; billing systems and processes; electric rates and bills, using examples from Southern California Edison; revenue collection and non-payment issues; and energy theft and revenue protection including investigation, past due bill calculation, payment arrangements and criminal prosecution.

The final course component included a demonstration of the hardware provided through the USAID metering, billing and collection system project; a discussion of commercial losses in Armenia; an overview and findings from the USAIDIHagler Bailly comlllercialization projects, and site visits to the Komitas metering installation and the Yerevan Distribution Company's meter shop.

Technical Report Course# 10 September 7, 1999 2

Page 4: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

D. Participant Evaluations

The participants expressed concern over the quality of the translation of technical materials and written materials. Because of the course's highly technical nature, some terms did not translate precisely. AEDIHagler Bailly has taken steps to address this matter for future courses, and to correct the translations on the materials to be left with the co-trainers.

Although all the participants found the content of the course usefill, 44.4% were unsure that they would be able to apply what they had learned in their work.

The trainers were given good ratings in method, content, technical and training ability by all of the participants.

Most of the participants (71%) have made arrangements to remain in contact with the course instn~ctors.

E. Anticipated Outcomes

The seminar helped to increase awareness of USAID's Power Sector Metering Improvement Program, and of USAID's recently-completed pilot commercialization activities. The course improved participants' understanding of how to better organize metering, billing and collection processes to help identify where losses are occurring on the electric system and to improve power sector financial performance. It is anticipated that some of the approaches presented will be implemented in Armenia's distribution utilities, which should result in improved losses and reduced expenses in the Armenian power system.

F. Recommended Follow-up

Seminar participants seemed reluctant to accept the idea that low losses in world-class utilities are the result of economic system design, as well as hard work on metering, rate-making, billing, collection and energy theft processes. Overall losses in Armenia are around 35%, roughly evenly split between technical and commercial losses. Course participants believe that a reduction in energy theft is likely to result in reduced electricity consumption, rather than increased revenue., due to the fact that electricity bills represent a substantial share of typical family and business income. -

Class participants were skilled in technical areas, but could benefit from additional training in power system economics, since they had difficulty grasping the basic economics that motivate reducing both technical and non-technical losses. This type of course would address engineering economic concepts (e.g., net present value, future value, choice of discount rates) and project evaluation concepts (e.g., valuing energy savings from reduction in technical losses.)

Secondly, additional training devoted exclusively to revenue protection, including energy theft mitigation, finding and correcting metering, billing, and collection errors, and revenue recovery

Technical Report Course# 10 September 7, 1999 3

Page 5: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

would be of value. This training should be targeted to distribution company representatives.

Third, there is considerable need for more work on metering, especially related to the importance of meter calibration and replacement programs within each utility as well as maintenance of accurate records regarding meters in place, dates of testing, age, and type. This type of training may be better handled as a study tour, to demonstrate the organization and operation of a utility's metering function. This type of study tour is being considered as part of the Armenia Power Sector Metering Improvement Program.

Technical Report Course# 10 September 7, 1999 4

Page 6: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

APPENDIX A

Seminar Outline

Electric Transmission and Distribution Loss Reduction Strategies

Technical Report Course# 10 September 7, 1999 5

Page 7: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Monday - June 21,1999

10:OO AM Introductions Course objectives Course overview Desired course outcomes

10:45 AM Causes of technical losses Measurement of technical losses Estimation methods with incomplete metering International trends in estimatinglmeasuring technical losses in the electric power

industry Comparison of losses in power companies around the world

12:30 PM Lunch

1:30 PM Cost of losses a) energy b) demand

Calculating benefitlcost of loss reduction projects

4:00 PM Adjourn

Tuesday - June 22,1999

10:OO AM Loss reduction programs under capital rationing Losses and system design criteria

1220 PM Lunch

1 :30 PM Techniques for loss reduction on existing transmission network Distribution automation techniques for loss reduction and improved service

quality Effect of load shaping/Demand Side Management /Distributed Generation on

-losses

4:00 PM Adjourn

Wednesday - June 23,1999

10:OO AM Relationship of loss reduction to least-cost plan Example: Losses in an economic study of renewable energy source

Technical Report Course# 10 September 7, 1999 6

Page 8: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Loss accounting for direct energy sales from generator to consumer Example: Assignment of losses to facilities with multiple ownership

12:30 PM Lunch

1 3 0 PM Economic dispatch with transmission loss factors Presentation of class case study exercise

Class will be divided into 3 groups. Each group will develop recommendations for capital expenditures for sample projects for (technical) loss reduction

4:00 PM Adjourn

Thursday - June 24,1999

10:OO AM Causes of commercial losses Estimation of commercial losses

Metering accuracy, meter testing methods Meter reading systems and techniques

12:30 PM Lunch

1:30 PM Internal accounting and financial systems Billing and billing systems Customer information Revenue collections and non-payment

4:00 PM Adjourn

Friday - June 25,1999

10:OO AM Energy theft mitigation Review results of Hagler Bailley's pilot commercialization projects

1:30 PM Case study presentations by class Review and Discussion of course material Discussion of implementation of course ideas Course evaluation

4:00 PM Adjourn

Technical Report Course# 10 September 7, 1999 7

Page 9: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

APPENDIX B

Course Materials

Electric Transmission and Distribution Loss Reduction Strategies

Technical Report Course# 10 September 7, 1999 8

Page 10: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 11: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 12: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Course Objectives

Provide training on technical and organizational measures and techniques to reduce losses in the electric transmission and distribution networks.

Increase understanding of the importance of both T&D loss reduction and T&D network maintenance on reliable and profitable electric service

Provide training on measures to reduce commercial losses in an electric power enterprise.

Page 13: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 14: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

E

* R Ip

q plM

2 3i g

= u

33

%

*-$

"

PfZ

-

ra

sP

- ~6

8~

U

rn

:ssm $

%a

x3

: q:

Sd

s I

Page 15: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Today's Power System Western System Coordinating Council

Territorv in 14 western U. S. states, and parts of ~ a n a d i a n d Mexico

66 Members

150,000 MW resources

40% of energy supplied by public power and governmental entities

112,300 MW peak demand Edison

30 control areas 1 $8 Billion Revenue

\ 4.2 Million Customers

California

3 investor-owned utilities; 22 public power and governmental entities

12,642 Employees ( I 997)

11 major interconnections

19,935 MW peak demand

65,000 MW resources ( I 998)

30% of energy supplied by public power and governmental entities

t 53,000 MW peak demand (1992)

3 control areas, Independent System

)U Operator (ISO), Power Exchange (PX)

Page 16: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 17: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 18: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 19: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 20: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

i i

4 I ?

f "ir

j icU

ico p- 1s ?a !L #L

;O

;a, /N

b

*

Page 21: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

3~

s

a

bs

o

Page 22: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Economies of Scale Growing Sales

Changing Conditions

Unit Cost

Build Plants Increase Market Share Prices Drop

Costs Rise Sales Drop Fixed Costs Sell-off Plant Prices Rise

Time ---+

Page 23: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 24: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Essential Goals of Electric Power Systems

Safety (Human and Equipment) Provide High Quality Electric Service - Reliable, Dependable Service - Resource, Fuel Diversity - Expandable Power System

Provide electric Service at lowest possible cost to customer - Beat the Competition - Stay in Business

Page 25: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Balancing Competing Goals

FINANCIAL COST TO Elements of an Enterprise Strategy: RISK CUSTOMER RELIABILITY EFFICIENCY

A. Reduce Financial Risk to the Enterprise 0 B. Reduce Cost of Service to Customers

C. lmprove Reliability of Service

D. lmprove Electric System Efficiency

Page 26: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Old Things

Institutional Perspective

Folks Repeat Old Successes eagerly

NEW THINGS CAUSE ANXIETY. THERE WILL ALWAYS BE "OVERWHELMING" OBSTACLES, UNLESS THERE IS MORE ANXIETY IN DOING THE OLD THINGS.

Normal Tendency: Close Out Options by Raising Constraints

THE QUESTION: CAN YOU CONTINUE TO USE THE STRATEGIES THAT HAVE WORKED IN THE PAST?

SHOULD YOU?

Page 27: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Achieve Goals of the Enterprise

Improve System Efficiency - Reduce Technical Losses - lmprove Revenue Collection

Improve System Reliability - Reduce Power Outages - lmprove Power Quality

Reduce Cost To Customers - lmproved System Efficiency - Reduce Operation & Maintenance Cost

Achieve Financial Stability - lmproved Collections - Reduced Debt Burden

Page 28: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Losses - Southern California Edison System - 1997

Total Energy Requirement 86,849 Total Electric Sales*: 77,234

"Total" Losses 9,615 ( I I . I %) Energy Theft 772 Technical Losses 8,843 (1 0.2%)

Revenue from Electric Sales $7,729 Million Average Revenue per kwh 10.0 4

*includes uncollectible accounts

Page 29: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Value of Edison Losses - 1997

$ Millions

MkWh Cost Retail Value

Technical Losses 8,843 232.0 884.3 Energy Theft 772 20.2 77.2 Uncollecti ble Accounts 21 0 5.5 20.6 TOTALS: Losses and Uncollecti bles 9,825 257.7 982.1

Page 30: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 31: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

How Are These Losses Determined?

1. Generation Input to the System am) Metered at Power Plants b.) Purchases from Other Utilities

2. Power Output to Customer am) Customer Revenue Meters b.) Sales to Other Utilities

Page 32: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Source of Errors in Measurement

1 Metering Inaccuracies - At Power Plants - Revenue Meters

2. Interchange Inaccuracies - Allowance for Losses in Utility-to-Utility

Transactions - Allowance for Losses in Power Transmitted

across Neigh boring Power Systems

3. Timing Differences - Between Power Transmitted and Meter Reading

4. Meter Reading Errors

Page 33: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Utility

Losses - World Utilities

Hydro Quebec Tokyo Electric Power Southern Company American Electric Power Southern Calif. Edison Duke Power Houston Lighting Kyushu Electric Carolina Power & Light South power

Country

Canada Japan USA USA USA USA USA Japan USA New Zealand

Year Energy Provided ( I 000 GWH)

186 170 155 114 87 81 64 49 43 2.4

Losses %

Page 34: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Losses History -- Tokyo Electric Power

Page 35: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Sources of Losses

A. Technical Losses Losses Which Vary with Electric Demand (IZR) Losses Which are Constant (Magnetizing Currents) Losses Which Vary with Weather (Corona) Power Plant Auxiliaries

Commercial Losses Uncollectible Accounts Energy Theft Measurement Errors Unmetered Accounts

Page 36: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 37: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Technical Losses on a "Typical" Electric Utility

Transmission Transmission Distribution Substations Lines Substations

Secondary Lines

Meters

3€ Distribution Distribution

Transformers Lines

Page 38: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

I FlGu8E 3 Power Flow Diagram WHIER ROYY DIAGRAM SHOMEIG COMPONENTS OF EACH SERVICE LEVEL

&Elm LwSm SYSTZM DEL A+FRy Showing + G m t i o n I I n t w o n ~ o Com~onents of

.......... STEP UP BANKS,

SYSTEM LI€S.,......... .......

BULK WWER STEP UP BhNKS,..

EULK WWER SYSTEM LIREXm.++,,.m I [A BANKS..,,.,.+.. ......................

SUBTRAh/SMi$SJON SUBTRWB. STEP UP BANKS

0 BANK 9U8TRANS. CUSTOUERS BANKS...,,.. .,.......... LOW S1M 1 l M N € . . D du LW6.fDE1, f \ti I I LRESAE vwsmmma .............. 1 ........... ,+,, ....,........ Y

w. CC. Omlivrr y -

.............. I tin P R I Y ~ ~ R Y CIRCUITS

QRiHARY CIRCUITS ! ~ m m t h

....... Ilf PRIMARY ClACUlTS........

, DISTRI0UTIQN UNE TRANSFORMERS DlaTRieUr~o~ LLK TRANSF..,....,.

1 SECONDARY SIDE

....... ...... * ~D*LLwrr ---. .

................ SECONDARY CIRCUITS ........,.,.+....... .................

Each service Level

Page 39: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

SCE System Energy Flow -

S C E SYSTEM 1978 ENERGY FLOW IGWH) fiG!.A?f 1

r.-

BULK PWER SSTm

glr LIW$ .......,.,,....., ...n.-11fj

RlwGg..,, .....................................

Page 40: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

SCE System Energy Loss Multipliers

me (1) SPt-ved ?run S P m : s s i m System kt f e t e d

m Lw a& M M a r m a zk t;prlmary voltages.

Or. hli 12-18 17-22 Hid P=;r E-12 and 18-22 5 1 7 ow psa~r e-9 E-3

Page 41: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

SCE System Peak MW Flow t +1+, . .

r n , R f P SCE SYSTEM 1978 PEAK MW F W (SEPTEMBER 25, 3PM.l

EHV SYSTEM 8UU POWER S)"STEM SUElTRANSMfSSION SETEM DISTRIBUIOM SYSTEM

I

0 unk .... .... .... ,. ...... -.... .... mwm w c u m i mb----------$M]

PRIULRY C L ~ I J ~ T ~ L uPCl---------.3b2 + 1 I I I$mm l,M lRWHRW%-.-119

C c $ T q l r n WmQfi clmjz> ----.A--.---.-. ...

4;] 47 STmI L [ W -.-. ,. a,... 0 .... a...,, .... -.. run L" ....,.... 865 - -

i1.44% (xi6 %/* - TOTAL SCE SYSTEM LOSSES ; 1220 MW OR O?.IO% I*

thDTL I !f4 PERCENT dF W SYSTEM EBSQN Y T I S D OWO CF IZmW [)QllOlllf 1- REb. I PS8 9-20-rP IM." '

Page 42: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

SCE System Demand Loss Multipliers

4 m sfzaZkE pwt l~ 1.12(5 1.145 1 .I& T a i B 1 .I37 1.136 1-12P ,LLpung C a l l Parer CSdm3t U&tIw

51) S w d h s&tmmmlrssim Sygkzt mt metemd m lac al& taf 4nnaF- at prm&y ualtapa.

911 M k 12-18 17-22 mtd Peak 612 and 1&22 &17 m h k 224 E-8

Page 43: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Loss Estimation Methods with Incomplete Metering

Make Estimates Using: - Known Data to the Extent Possible - Filling in the Blanks with Best Judgements

How to make "Best Judgements": - Use Equipment Ratings where available - Use typical Equipment Ratings - Use computer simulations

Page 44: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 45: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

SCE Distribution Line Transformer Losses

Transformer Size

(KVA)

5 I 0 15 25

37.5 50 75

100 167

Number of Transformers Management Total SCE

Svstem System

Losses (kW) Per Transformer

No Load Load

Losses (%) Per Transformer

No Load Load

Page 46: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

N

U-, J

Page 47: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Determine and Allocate System Technical Losses Using Incomplete Metering

1. Determine Annual Energy Loss DeterminelEstimate Energy Inputs and Outputs

Metered and Estimated Data - Adjust for Billing Lag

2. Make Reasonable Estimates for Generator Step-up Banks Components where Field MeasurementIMetering is not available

3. Transmission Network Use Power Flow Simulation and Load FactorlLoss Factor Approximations

4. Power Transformers Calculate Losses for a "Typical" Transformer, then Multiply by Number of Transformers

5. Distribution Circuits, Distribution Transformers, etc. Calculate Losses for a "Typical" Component by Voltage Class, the Multiply by Number of Components.

Page 48: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 49: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Cost of Energy for Use in Loss Analysis

Marginal Costs - Based on Incremental Output of Marginal Generation - Includes Price of Fuel, Generator Incremental Efficiency,

Variable Operation and Maintenance

Expressed Hourly or Grouped in Time Periods of Similar Value

Includes Forecast of Future Values - Determined from Computer Simulations

Values can be Used for Marginal Cost Ratemaking

Page 50: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Energy Cost Depends on Marginal Generation

% of Hours in Year

Peaking Generation: 0 - 5% Capacity Factor Intermediate: 5 - 65% Capacity Factor Base Load: 65% Capacity Factor

Page 51: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Time Period Groupings (Southern California Edison)

Summer: On-Peak: 12:OO P.M. - 6:00 P.M. weekdays except holidays Mid-Peak: 8:OOA.M. - 12:OO P.M., 6:00 P.M. - 11:OO P.M.

weekdays except holidays Off-Peak All Other Hours

Winter: Mid-Peak: 8:00 A.M. - 9:00 P.M. weekdays except holidays Off-Peak All Hours Not Included in the Mid-Peak and Super-

Off-Peak Time Periods Super-off-

Peak: 12:00 A.M. - 6:00 A.M. everyday

Page 52: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Incremental Energy Rates (Southern California Edison)

,Reu?nue Protection Results i I I i 'Billings ; ' i I 3

i ' 1996' ' '2.5 ' I I i ' 1997, , 4.7 . . i : - 5 ' 1 4.7 ;

I I

i ! 1

'Collections 1 - 1906: i 1997:

I

i .-

I--- - - : 1. -

Page 53: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Incremental Energy Rates (Southern California Edison)

Page 54: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Future Energy Rates by Time Period (Southern California Edison)

.".. . , " . - , ,

Page 55: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Actual and Projected Oil Prices

$ ~ B L ACTUAL AND PROJECTED OIL PRICES

(1 968- 1985) ; 501 b $

- ACTUAL

20- r r r ~ ~ l l a t PROJECTED t975 PrqJected Oil Prices I , I " . . L I I . ~ ~ ~ ~ l l I ~ ~ ~ ~ ~ ~ ' ~ ' ~ ' l

15-

10-

1968 Projected Oil Prices

Page 56: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Cost of Demand (or Capacity)

Marginal Costs of Capacity - Based on Plans for New Generation Capacity or

Refurbishments - Includes Installed Cost of New Capacity, Owners hip Costs

(Financing, Depreciation, Taxes, Etc.), "Fixed" Operation and Maintenance, Inflation

Takes Into Account: - Probability That Losses Will Affect Timing Decisions On New Generation Capacity - Reserve Margin

Expressed Annually or by Grouping in Time Periods with Similar Hourly Values. Calculated for Future Years Values Can Be Used for Marginal Cost Ratem

Page 57: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Utility Loads and Resources Step-Chart

Resources Under Construction and Planned

I I

Peak Load

CD I- I-

S a 0 W '

YEARS

4 ,-----I Existing Resources I---- I

I----- I

I \ I I -+--A /-

I /--

-/-+ /-

4- ----+ Forecast

L Recorded Peak Load

Page 58: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 59: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 60: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 61: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 62: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Capacity Valuation Factors *

On-peak Mid-peak Off-peak Super-off Total

Summer Winter Total

* The Capacity Valuation factors are used to convert annual capacity values ($/kwh-yr) to monthly values by time period. The factors were derived from the February 15,1995 "Avoided Cost Posting".

Page 63: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 64: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Levelized Capacity Value $IkW-yr

Page 65: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Carrying Charges

RETURN OF CAPITAL (I.E., DEPRECIATION

+ RETURN ON CAPITAL (I.E., INTEREST AND PROFIT)

+ TAXES ON RETURN ON CAPITAL

+ OPERATING EXPENSES

Page 66: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

XX

X

00

rC

)h

O

W

0 0 0

Page 67: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

1994 Edison ($1 ?000?000)

Revenues

Expenses

Fuel & Purchased Power

Operations & Maintenance

Depreciation

Property Tax

Interest

Pre-Tax lncome

lncome Tax

Net lncome

I 145**

TOTAL TAXES = 203* + 507*** = 710

Page 68: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 69: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 70: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Edison Operating Ratios 1988-97 !%I Fuel &

Purchased Power

41.8 41 .O 43.5 44.4 40.6 44.4 45.2 44.4 43.2 41.3

Operation &

Maintenance

20.4 19.9 20.2 21 .I 22.0 20.0 20.5 19.6 20.2 21 .o

Investment Related

37.8 39.1 36.3 34.5 37.4 35.6 34.3 36.0 36.6

Page 71: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Carrying Charges, or Fixed Charges, are those based on Capital Investment in Project,

Not its Operating Costs:

THAT IS: TAXES RETURN DEPRECIATION

Page 72: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Typical "Carrying Charge Components" for a 30 Year Facility

RETURN 10.0%

DEPRECIATION 0.6%

INCOME TAXES 2.9%

PROPERTY TAXES I .2%

ADMINISTRATIVE & GENERAL I .O%

INSURANCE 0.1%

TOTAL 15.8%

DEPRECIATION + AVERAGE RETURN = SINKING FUN DEPRECIATION + COST OF CAPITAL

Page 73: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 74: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Example: Distribution Line Reconductor Project

Pump Load: Continuous

To Omega 4kV Circuit Substation

1 Operation

795 ACSR

F

The Existing Circuit is in Good Repair, but Would it be Cost- Effective to Reconductor with Heavier Wire, Either 336 or 795 ACSR?

I KM Extension Existing Conductor: 210 ACSR

Page 75: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Technical and Economic Factors

Pump = 1000 Horsepower, 0.9 PF, I I 5 Amps per Phase

Estimated Cost to Reconductor with 336 ACSR Material $2500 Labor $1 000 Salvage $<300>

Total Cost $3200

Year of Installation: 1999

Estimated Life of Project: 30 years

Cost of Money - - 10%

Page 76: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

6)

Q)

6) r

s .I

CD

CV b

h r

ti)

I I

z x 2 n

b

0

0

0 0

+ b

CV 0 0 u

s Y 00 CV C

Y)

hi C

D

CD

0

0

CV s .I

00 b

r

c6 ti)

I1

s .z a n V) 00

0

0 0

+ V)

CV d. 0 0 u

f & 00 CV C

Y)

hi

CD

CD

r

r

r

ti)

II 00

C')

V)

0

=I= n

Q

) Y

-

0

I

00 cY) rr)

0 u

CD CV b

r

ti)

. I

Q) 6)

6, r

Page 77: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 78: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Example: Annual Cost

Estimated Project Useful Life = 30 years Carrying Charge = 15.8%

Annual Cost = $3200 (0.158) = $505 Annual Loss Savings = $1 11 6

BenefitlCost Ratio = 2.2 to I

Page 79: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Example: 6 6 C l a ~ ~ i ~ a l Method"

To Perform Engineering Economic Studies Net Present Value (NPV) Future Revenue Requirements.

Solution:

Find the NPV of Each Plan, Using Cost of Money as the Discount Factor

Page 80: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

r

r

=

rC) 0

V)

€e

+ %

r

r - \ V) 0 V) ti) + r r

- rn 0 V) ti)

Page 81: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 82: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Decision Analysis and Decision Trees

- List Decision We Can Make, and Our Choices

- List Chance Events Beyond Our Control with Possible Outcomes and Their Probabilities

- List Out All Possible Combinations of Decision and Chance Events, and Compute Present Worth and Probability of Each

- Accumulate into Probability Distribution and Choose Best Decisions

Page 83: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Omega Circuit Reconductor Influence Diagram

/

Energy Costs

- Probabilistic Factors

< > Decision

Page 84: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 85: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 86: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 87: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Example Problem: Ratios Summary

1. Payback Ratio = 2.9 years

2. Annual Cost Method BenefitlCost - rn 2.2 to 1

3. Net Present Value Method BenefitlCost rn - 3.6

4. Decision Analysis Using Annual Cost Method BenefitlCost at 50% Probability = 1.94

Page 88: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Coping with Unknowns

Technical Unknowns - Load Patterns, Load Growth - Construction Costs - Operations and Maintenance Costs

FinanciallEconomic Unknowns - Cost of Moneyllnflation Rate - Future CostsNalues:

- Demand, Energy - Property Taxes - Project Life

- Salvage Value

Customer Unknowns - Consumption Patterns - Dependability of Loads

Page 89: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Why do Analysis when Measured Data are Incomplete?

Calibrate Your Judgement Rank Projects by BenefitICost Ratio Maximize Beneficial Use of Scarce Money

Page 90: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 91: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Loss Reduction Program under Capital Rationing

Southern California Edison Program Capital Scarce - Credit Rating in Jeopardy

Program Established by Head of Capital Expenditure Review Committee

Page 92: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Program Parameters

Capital Expenditure Limit $1 Million per Year

Projects Ranked by BenefitlCost Ratio in Descending Order

Only Projects with BenefitICost Ratios of 3.0 to 1 or greater were chosen

Included Distribution lines, Transmission Lines, Substations and other equipment

Administered by Transmission Planning Committee

Page 93: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

V r n Project Ranking

Reconductor 4.0 KM Apple kV Reconductor 4.8 KM Victor-Kramer 33kV Reconductor 3.6 KM Bluebird 16kV Reconductor 7.8 KM Mesa-Flair 66kV Add Line Capacitors to Grazide 12kV RemovelReplace SEDCO 66112kV Transformers Reconductor 1 KM Omega 4kV Reconductor 15KM Anita-Eaton 66kV Add Line Capacitors to Chalfant 12kV

BenefitICost Capital Ratio Expenditure

($1,000~) Project Description

Page 94: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Program Results

Each Year, Projects with BenefitlCost Ratios of 3.0 or better were Eligible

Viewed with Enthusiasm by Engineers

Received Favorably by Investment Community and Regulators

Page 95: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Losses and System Design Criteria

Economic Conductor Size

Distribution Transformer

Distribution System Voltage Level

Placement and Sizing of Station Capacitors

Placement and Sizing of Distribution Circuit Capacitors

Edison: Zero VAR flow at Substation

Page 96: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Voltage, Reactive Power and Losses

Substation Substation Capacitors Capacitors

@3t VARs +

Line Capacitors

Minimum VAR Flow Distribution

Minimum Voltage Fluctuation Line

Transmission

Minimum Losses

0 Subtransmission 0

Page 97: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Placement and Sizing of Distribution Circuit Capacitors

If voltage increases from I .O to 1 .01:

Current decreases from 1.0 to 0.99

Losses decrease by (0.99)* = 0.98 or 2%

If voltage increases from I .O to 1 .01: 0 * Customer load increases by 1.0 /o

Size of capacitor bank limited by voltage rise

*Southern California Edison Field Studies

Page 98: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 99: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Loss Reduction = Distribution

Circuit Balancing

Circuit Management

Power Factor Correction

Voltage Upgradelcutovers

Replace Oldest Transformers

Reconductor

Load ShapingIDemand-Side Management

Maintain Voltage with Distribution Automation

Page 100: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Loss Reduction - Transmission and Substations

Transmission

- Correct Power Factor

- Reconductor Existing Circuits

- Improve Voltage Plane

- Balance Loads on Circuits

Substations

- Add Station VARs to Match Transformer Reactive Demand

- Replace Aging Transformers

- Retire Synchronous Condensers and Add Static Capacitors

Page 101: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Synchronous Condensers Study Southern California Edison

Synchronous Condenser Status: 21 synchronous condensers, total 869 MVAR capacity,

Located at 12 substations

Problem High operation & maintenance costs, high losses

Study Objectives: 1. Reduce operation & maintenance costs and losses

2. Maintain or exceed present quality of service to customers

Page 102: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Study Procedure

I. Establish a criteria for synchronous condenser removallreplacement

2. Identify function of each synchronous condenser

3. Do economic analysis

4. Evaluate operational effects of removing andlor replacing synchronous condensers

5. Make recommendations.

Page 103: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

RemovaI/RepIacement Criteria

Identify units which perform "special" functions

(dynamic regulation, reactive buck or boost) * Laguna Bell short circuit duty requirements

Units which only provide VAR support may be replaced by shunt capacitors

Units not needed for above 3 functions may be removed without replacement.

Page 104: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Synchronous Condenser Functions

Barre No. I Barre No. 2 Center No. 1 Center No. 2 Chino No. 1 Chino No. 2

Lighthipe No. 4

Rector No. 1 Rector No. 2

Vestal No. 2 15 1 66 i 33% / BucklBoost & VAR Program I

Vista 60 1 46 1 49% /VAR Program - . . - - . . - . . .. . .. i 1 . . - . . . . . . .. .. . . . . - . .- - . . .

---_-_ -----" % of " A

Bank VAR Load Supplied by 2Fz--," --" -. . ---

..- - " --. "..-C.I----LI L.. l---.- .- - L------ .----

Condenser Function %ltageRXgTlatiofE ' VAAR P70@aii

168% 88%

388% 82% 129% 34% 51 % 128% 91 % 37%

VAR Program VAR Program Short Circuit Tests & VAR Program VAR Program VAR Program VAR Program VAR Program Short Circuit Tests & VAR Program VAR Program VAR Program

. 72%-... "-.is

83% 83% 98% 90% 33% 30%

205%

li6fi" Sts."ARprb3ra rii--" VAR Program VAR Program VAR Program VAR Program BuckIBoost & VAR Program BuckIBoost & VAR Program BuckIBoost & VAR Program

Page 105: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Chino Substation Economic Evaluation Project Description: Alternative Selected: ALT 2 - Install new 66kV, 4-28 MVAR

Shunt Capacitor Banks Oper. Date: 12/1/99

ALT. 1 - Continue Maintenance for Operation of 2-60 MVAR Synchronous Condensers ALT. 2 - Install new 66kV 4-28 MVAR Shunt Capacitors Banks

SUMMARY ~. ,.--.-- .-.-- ","-----.%" .."" *-,,-, ".-, *.,+~*.."",," ,,---- "*" ,".. . A T . - - -

I_--- ,, --~,"- . . .-..a .-, , ., ,, ' . 'AXaij?fd-'Epend~ t ures rsr."OF& 3-.&- aiife.~aiiEg ..- . . "

., .-------.mm7- -...-%~*."-*-m-..-.k. -"-" ..... , - C. Losses: Energy

Capacity .", . T*..- . -----.-+...- tal PresenfWofiti-AmZunf

- a" " , .,, -* . .. . ' .. .- . . . .

Condensers -"..- "--- *. , -"-"- -

Benefit Ratio = $4,363,661 .OO

Page 106: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Calculations

Page 107: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 108: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 109: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Vista Substation Synchronous Condenser

Work that has been or will be completed by April 1,1999

1. Equipment Replacement (Total Capital Expenditure: $507,000)

Cooling Tower Main Hydrogen cooling coils (2) Circulating water pumps and motors Repair and coating of cooling tower basin Exciter hydrogen cooler Cooling tower basin

2. Maintenance (O&M Expense: $54,000)

Repair and calibrate condenser instrumentation Repair babbit bearings Repair bearing oil seals Repair shaft exciter compartment selas Resurface exciter collector rings and exciter commutator Repair exciter brush rigging and exciter commutator and replace brushes

Page 110: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Operational Effects

Synchronous Condensers Study

Study completed by addressing 3 issues:

1. Impact on Power Quality 2. Contributions to System Voltage Stability 3. Extent of High Voltages Problems during

off peak load - Need for VAR bucking

Page 111: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

1. Impact on Power Quality

Voltage rises (0 to 3%)due to condensers during faults (3-phase & single-phase): Not Significant

Not significant to reduce risk of air conditioners stalling (to avoid voltages of less than 60%)

Beneficial at La Fresa for Mobil Oil, and Springville for voltages sensitive customers (Smoothing or eliminating voltage fluctuations)

Page 112: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

2. System Voltage Stability

Resuming operation of all synchronous condensers (655 MVAR) could have reduced 1999 RMR capacitor Banks by 675 MVAR

(Same post transient voltage drops following worst N-I Palo Verde-N Gila 500-kV line)

However it would result in Much Larger Costs: $40 M for refurbishing and $40 M PW for O&M versus $16.5 M for 675 MVAR of RMR Caps.

Page 113: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 114: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 115: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 116: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 117: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Need for Equipment Replacement at MacNeil Switching Substation

All 66-kV insulators and disconnects

All 66-kV oil breakers

Total Cost: $1.3 million

Northern TIS requested study to minimize cost

Study Considered Six Alternatives

Page 118: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Eagle Rock and Saugus 66-kV Systems in Vicinity of

MacNeil Switching 66-kV Substation

Page 119: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

MacNeil Switching 66-kV Substation Line and Bus Arrangement

Existing: 12 breakers

Page 120: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 121: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 122: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

5 breakers with Operating and Transfer Bus

Page 123: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

MacNeil Substation 3-Breakers Alternative and 5-BreakersAlternative

Comparison for Reliability of Service to Studio and Universal Substations

\

w3 LAVE w r a ~ caws ilmmfi our~~~mRanaourraw W ~ A G I F A F ~ Q ~ ~ ~ S T U L M ~ u ~ l v g i m r SUISTA~~WS t~ OUTAGE OF swo 4Clb WUTWWU SWTA nms ~ o r ( ~ C w ~ COWACE O F B ~ UMSI

A N N W WWH? U j F r R

(M~NUTEWEA~

.c

.lSlC- flLTE#YAWE- I E L O W &XL'LWS. ma€ rn-CaACruEIL Am

................. ..E-k-rdi; .iiim-aSiKv' ...... .7*f ---- -Fij-i&ii"' -*.. .......... -.-. ---. ...... .-...---. ........ ..... ,. ... , ..... ._.._.._ . . - - - - - . - 0.7 16.4

(iam R o C I C S T U B Q U r l # ~ .......... 187 FQRcEO 1 9 8B.D ..........-....I.,......-.-.... -..-.--- 144 ......... ...................................... .... ..-!"ofEOs-

I

S m U € U S A L m A n v E s

A * s u s ............................................ .i-M ai'~ii.- .&:ciD~ (.-"-" .-"--. ................................. .......... '"..'---* ---... .--- ...... .

7.2 FORCE0 0.7 16.4

... .................... ...... ................................. ... .*--WE& .-.---.-- 3s ~ O R C E D --.- D 1 3.9 -,.-.-.. -..!..%%?E .!?!.563 ....-- 7.8 .----A 6.5E44 ,.-.- .......... ......... ..................... ,.._-- ....... ....-............--. - ...,.. _-

0.7 16.4 M A C N E I L ~ T W I I Z U ~ ( N ~ ern0 5 C E - M 1,988 16.0 #.OX=

.. .----------...--.--- ....,................ ....... --.. ............. ........-......,................-...............,..., ..........+-........

TmML FOR 8ohlN-2 OUlAGki .I .... -- .......... .............. : .... .................................-.... m............. - - -

8, OFElWTthG dM3 TR- Bum . ......................... ...........- .............-.............. kMcE. * ............................. BEVERLY HILLS-STUOKI-UN#€RSAL 7.2 n r IrcAcNEICBTuDKWNWRS4L . - . - 3 5 'MRCBO C.2 ., ........................ .........................................................

- .

WTAGE DURATION R

MINUTES r OursrGEI

t

UNES E O u W

ONCE M N Y W S

Page 124: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Maintenance of SCE Circuit Breakers Typical Outage Rates and Duration

WWENANCE TYPE Br=UC&FtTYPE R4.E WPAtlbN FATE - -' RATE WRATIM IPER'fMb IbVI.. .WI I e ' Q E A R J \M* mI 1mR-W . M Y ) MOUR) .

WERWIJL ....-.-.................-. AIR BUST 0.1 - ........... ?!? ,-.-. .?g ,,..

1.n 025 ..... .. ---.-.. .!#! ....... .............. ... l,rl--gL?!.,. ..... 2 --........ J:?. .---.----, E..? ......... ! ------ - ...........--...,.. 6

a5 0 . 1 3.0 0 5 0.93 ........... ... ....... .. .. ................ .... Ai=l+ANISM ~ - t = E . A ! ..---.........-........ .-!!!L .? ......-.-..- A:?.. ....---.. . .............-...... ..........- !!!

..... - E R ~ - B P W A L E ~ e-ee*r ......-.-... .!;t 2 e -.. 9 --..

Page 125: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

MacNeiI Substation Line and Bus Arrangement Alternatives Economic and Reliability Comparison

d m G E F W E N C Y OUTAGE DURATION t$ MiLLIOWj (ONCE IN !d YEA?} {MwuTES PER OUTAGE]

-- - - -- .- - - .- - - --

OUTAGES OF BOW SUBST4 TIOWS P in 5 DUE TO BUS FAULT' OR EARTHQUAKES

Page 126: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 127: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 128: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Impact of Customer Load Profile on Cost of Service and Losses

Lower Cost Higher Cost per kwh per kwh

Level of Service Higher Voltage Lower Voltage

Efficiency Peak Load Off-Pea k On-Peak Load Factor High Low

Amount of Usage High Low

Page 129: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Demand Side Management Choices

BUILT-IN INCENTIVES TOU RATES OFF-PEAK STORAGE SWIMMING POOL TRIPPERS CONSUMER EDUCATION

UTI LITY-ACTUATED HEATING & AIR CONDITIONER CYCLES INTERRUPTIBLE LOAD DEMAND SUBSCRIPTION SERVICE

CONSERVATION PRICE INDUCED PROGRAMS COMMUNICATION

Page 130: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Demand-Side Management Em braces Several Load Shape Objectives

DEMAND*

F ILLINQ MANAGEMENT GROWTH

SHIFTING FLEXIBLE LOAD SHAPE

Page 131: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Peak Clipping? Load Shifting

PEAK CUPPING

Exampaes D M fud hmtlng Heat pumps

* lntrrmptible lbedr Some c ~ n r r m t l o n oplislne

Ewmplee Walar heater mf 4 RIr emdltibner ~uMml 5 t a 8 h l k i ~ ~ & @ Q B W Q ~ ~ W

4 Intarlatks ' ~~ge l fon ccmtral

Page 132: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 133: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Growth? Flexible Load Shape

FLEXIBLE LOAD SHAPE

Examples

rn Iptcrruptlbl~ Lrradrr m Dual Pud Hsatlag - Stand-by Genwatlan + Levelc at R s l l n b i ~ ~ ~ y

Page 134: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Automatic Regulation of Customer Voltage and VAR Control

Voltage Range 126 Volts Maximum I Required by 120 volts

I Voltage Range

California Code 114 Volts Minimum Agreed TO n

Page 135: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 136: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Relationship of Loss Reduction to Least-Cost Plan

Least Cost Planning Includes: - Supply and Demand-Side Planning - Proper accounting for losses - Weighing of Fixed versus Variable Costs - Assessment of the Future

Example: Duke Power - Low Losses: 5.7% - Low Cost of Service - 7.38 - High profitability: PriceIEarnings - 17

Page 137: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 138: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 139: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 140: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Grid-support PV in action: The Kerman Project

P i

feeder Kerman I103

Substation

Kerman PV plant connected on 12 kV Feeder 1103, 8 circuit miles from substation

Page 141: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

PV plant reduces number of LTC changes

LTC Changes without PV Plant {I 991 EL 1992)

' PV Plant [I 9931

2 3

LTC Volhge Range (Volb)

-Model ~r Measured

Page 142: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 143: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 144: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Kerman plant performs close to design

---..--- ' IS PV Energy Produclion -r- Performance Index

JuM3 SgP Nw Jan-94 Mar May -

Page 145: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 146: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Kerman PV plant reduces transformer loads

Extends euuipment life and defers need for upgrades

Pacific St and ard Time - Motjspot Temp. wlo PV Top Oil Temp. w h PV

+ Hat-spot Temp. wl PV - -Top Oil Temp. w l PV

Page 147: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 148: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Kerman PV Plant Reduces System Losses

Reduces energy losses by 98,600 kWhs (that's 9.3% of plant output)

Value of Reduced Losses $6,900

That's $1 3.8lkW-year

Page 149: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 150: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 151: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 152: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 153: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Network or MW-Mile Transmission Map

Page 154: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

California's Loss Accounting for Direct-Service Customers

% Loss Factors - Modified "Postage Stamp" Approach - % Loss Factors by Voltage Levels - % Loss Factors by Hours (87601year)

Generators - "Loss Multipliers" Depending on Connection Point

Consumers - "% Loss Factors" Depending on Connection Point

Data Available "On Line" on Public Utilities Commission Web Site

Page 155: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Economic Dispatch with Transmission Loss Factors

Appropriate where Generation is Remote from load

Loss penalty factors assigned to Power Plants

Dynamic methods available

Page 156: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Class Study Exercise

Analyze Loss Reduction Projects under conditions of Limited Investment Capital

3 Different Projects

Use at least Two Methods to analyze each Project

Use Results to convince management to Approve I, 2, or all 3 Projects

Page 157: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Loss Reduction Project #I

Project: Reconductor section of Omega 4kV Circuit

Project Factors: Reconductor 2 KM section from 210 ASCR to 336 ACSR (requires replacement of about 112 the crossarms)

Material $6000 Labor $2500 Salvage Value (600)

Total $7900 Customer Factors:

Only one customer, a 1000 HP pump, 30,90% PF (1 15 amps per phase)

Customer plans to retire the pump in 10 years, no other customer load expected on the circuit

Page 158: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Loss Reduction Project #2

Project: Reconductor section of Alpha 4kV Circuit

Project Factors: Reconductor 2 KM section from 210 ASCR to 336 ACSR

Total Investment $7900

Customer Factors: Only one customer, a 1000 HP pump, 30,90% PF (1 15 amps per phase)

There is a 50% chance the customer will retire the pump in 10 years, and a 50% chance the pump will run for 20 years. No other customer load expected at this time

Page 159: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Loss Reduction Project #3

Project: Add Capacitor Bank to 4kV Beta Circuit

Project Factors: 300 CkVa Capacitor Bank Installed cost $4000 2% voltage rise due to capacitor Bank expected life = 20 years

Customer Factors: Customer load at the end of the 4 KM long circuit 3,200,000 kwhslyear, with an estimated 90% power factor The load factor is typical for such a circuit, about 50% Load is not expected to change in the future.

Page 160: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Economic Parameters

Use Economic Parameters from Omega Circuit example e.g.

10% cost of money 15.8% carrying charge (for 30 years) 2.7$lkWh Energy Value of Losses (1999) Also energy cost increases, etc.

Use energy loss multipliers from course e.g

Subtransmission 1.028 B Banks low side 1.036

Use conductor loss characteristics from course

Page 161: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Commercial Losses - Causes: Metering, Billing and Collections

Metering and Meter Testing

Billing and Billing Systems

Collections and Non-payment

Energy Theft

Page 162: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Sources of Metering Errors

Current Transformers and potential transformers used for customers above 240 volt service

Older jeweled-type meters

Mechanical meter charateristics

Calibration

Page 163: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Meter Characteristics (Examples)

Meter # Assignment Status Manufacturer Type Device Type Material Code Profile Types Measurement Values Set & Remove Dates

Page 164: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 165: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 166: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Metering System for 500kW and Larger Customers

BEST AVAILABLE COPY

Page 167: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Electronic Metricom Meter

Page 168: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 169: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

ABB Electronic Meter with RS232 Port

BEST AVAILABLE COPY

Page 170: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 171: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 172: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 173: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

IWPt**

rodulwa

6b6b't Y ¶ J W ilb t 6 4U.Lm3

Page 174: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 175: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

CSS Features

Summary Billing For any customer Reorganization of services among multiple summary bills upon customer request Automated collections services for summary billed accounts

Page 176: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 177: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Who's Eligible?

Medium-sized commercial and industrial customers with demands greater than 20 kilowatts and no more than 500 kilowatts

General Service 2 (GS-1) Rate /74

Page 178: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

How are you billed?

Customer Charge Recovers costs to install, operate and maintain,

read and bill your meter

Single Phase Service Credit A $1.65 per month credit is applied to customers

who receive single phase service

General Service 2 (GS-1) Rate

Page 179: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 180: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

How are You Billed? (can't)

Energy Charge - Recovers costs to operate and maintain Edison's

system - Broken down by "1st Block" and "2nd Block" - Recovers cost of fuel and purchased power - Surcharge paid to: - Customers

Who meet specified income guidelines - California Public Utilities Commission

Power Factor Adjustment - A charge for the inefficient use of equipment

General Service 2 (GS-1) Rate

Page 181: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

How are You Billed?

Voltage Discount - Applied to

Customer who can receive power at higher voltages

Charged to monthly non-time related demand charge and base rate energy charge

CityICounty Taxes - Certain cities and counties contract with Edison

to bill their energy taxes

State Energy Tax - Funds energy planning activities of the California

Energy Commission State law enacted in 1975

General Service 2 (GS-I) Rate B "-- f 5"

Page 182: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

How Does the "Blocked Energy Charge" Work?

Two-tiered charge - One rate for first block of

kilowatt hours (kwh) Approximately 9$1 kwh

- Lower rate for second block of kwh

Approximately 5$1 kwh

: . General Service 2 (GS-1) Rate

Page 183: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Residential Bill - January 1997

J Wuibltrr ~.>III~IKNI.\ S o ~ ~ l h e r n Cal~tsrnia Ediso:. Company

EDISON ttn S~ZISDN INTERIVAT,ONAL Company ESTUVIA'IrED BILL P.V. E 4 X MO. R0SOlV.08fl. C& $1 ?71-0dd I

Cu~tdrner and Servica Address Date Bill Prepared . . .- - . .- WHYTE, M DOUGLAS

505 GREENVIEW RO LAHABHTS CA 90631

Dec 26, 1996 I Your Cuslonber Account Numbel 1 Y ert Metar Read on or about 1 65-47-1111-2030-a3 3an 22, 1 99 7 I 0 0 0 - 3

24-hr. Cusbmer Service Rate Schedule D E

Cllarges Balance from previous bill $ 0 . 0 0 & Credits Account Balance, . . . . . . . . . . . . . . . . . . . . . . $ 0 . wt

Update Currellt Service / 8illing Period - 11121196 to 12124196 [ 32 days ) - Winter Seasan Billing Ener y Charge: oetait ~aseqrne 336 kuh x ?.ere + Qvcr Baselinc 419 kHh x 1 8 . 6 2 1 C = Q 7 5 - 8 4

Basic Charge 0 , B O Slale Tax 765 k Wh x v.azt 0 , 1 5

l~urrent amount must h e paid by 01114197 $76.74 T,

(Incl~des 25% employee discount) . . . . .... $2.40 is your average daily cost tl i is period. . . . Meter Estimaf t~d Nurnbsr

Daras and Readin~s From To Usage

E1ectricii~ 2 a e - s ~ ' ' - ~ . . ' 11/22! 96 LZf 29/96 Usage 05177 Q5 942 765 kwh

Usage Corn parison -This Year Last Year- kidowatthou IkWh) Used 766.00 no Nurnber of bays 32 C6tnpsrable Averape usage per day 23.4 Usage

Message THIS IS YOUR ESTIMATED B ILL FOR THE CURRIWT BILLING PERIOD. -

A SPECIAL THANKS AND HOLIDAY WISH Thank you for paying your Edison bills promptly. We appreciate the apportunity to serve yot~ and wish p u a happy Holiday Season. Look lor our all-electric float in the Rose Parade, honoring Thomas Alva Edison.

. WINTER SAFETY TIP - ALWAYS use a llashtlght ... NEVER use candles during a power outaye.

Page 184: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 185: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

. I ~ Y Su!daay J ~ J ,,sd!i ~uq, la419 J U ~ uv!pauum mtLlvlrn3 pasol3ua aid1 ylay3 AlluKty!uEi!s S ~ W J &aua Inah lrra dlaq }I!* JUL JU pealsu! d u ~ lw Iri'jgwJayi

Bu!uo!l!puoa JIB laoL Bo!lias 'aldwexa JOA 'am Athaua J n ~ d Uu!D~u&cll lfq ~OUOLU enes a~nr l 01 MOU $16315 OYEI '111~131~3010 A ~ O A 3sC?J3Ur 1 4 1 ~ I l l r ~ u o ~ ~ ~ p u o o JIR in nJnlcur3 anlw~ndnnn Rulsn 10111 ~ ~ o w o i i l o ~ ~ O W U $1 113311 P . J ~ ~ I I ~ ~ ~ Q S

""'3lZZIS tl3wwns I

.splja$aait p L ~ i ~ l i i ~ u a n a aJu srr IISJ ul satu!l p a q all1 Ailenan 0 s '~ISe~rynn~ utcIrm:$ - rr4em:g ulog Isqsnq o ~ c o~ .yaaM B sXop

L 'AHP w -nay Y E sbsanbe~ Inad 01 D V O ~ B ~ J OL elrlellsne ole sieLuP? lien dnu aamsN "6fi 1133N nDA a%73NiiHNI ROA tlQj 3U3H 3d.W -..- .

LL' L I 46-ES i r !p rild aRcsn aAoranv

.lat{ddna .#ar#~ws tuwj dj!3!.1/3~)d. oseqxnd dew na& .uqj!1Jdu!w 01 ualqns s? salnlas my1 .ai?ucry~x3 lamod eqi ydnwqt 539el)3.~td

10) sasm a 8 e ~ s ~ e ii@v#!a* ay, uodn p09.q qr P G J P ~ xd d i ~ - ~ ; r ~ v a q ~ 1 , )

I L ' b I S e n 0 lufiaurb lumln3

Page 186: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Direct Access Customers

Payments to Generation Provider - for Electric Power

Payment to IS0 - for Dispatching Service

Payment to Edison - for Transmission and Distribution

Page 187: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 188: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

cn s 0

.- 1C-r 0 a, -

- 0

b -

3

0-0

ra,

mar

m>0

0 W

V

)

.)t

Page 189: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

CSS Collection Path (can't)

COLLECTIONS PATH FOR NEW

DOMESTIC 1 7

$50 AND

OVER

GOOD PHONE #

TO THE FIELD

FOR A 48

NO REASONABLE 6 ATTEMPT - TIMES

AUTODIALER PHONE #

BAD I I ATTEMPTS TO I ,,, COLLECT

REASONABLE ATTEMPT FINAL CALL FINAL

MAILED

/ / DELIVERED I FINAL CALL

EXPIRES

FIELD FOR

DISCONNECTION

Page 190: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 191: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 192: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Collection Rules and Queues

+ Rules Corporate set of rules 974 pages of rules (more now) 108 events recognized 62 attri buteslprofiles

+ Queues 25 dispatcher queues Error, training, and review queues Worker queues

Work sorted alphabetically, by region, by organization, by work group

Page 193: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 194: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Pricing Theories in a Regulated Utility

Try to Emulate Competition

Economically Efficient Use of Resources

Provide a Stable Revenue Stream

Equity Among Customer Groups

Conservation of Energy Resources

Page 195: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 196: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 197: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 198: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Impact of Customer Load Profile on Cost of Service

Lower Cost Higher Cost per kwh per kwh

Level of Service Higher Voltage Lower Voltage

Quality of Service Curtailable Firm

Efficiency Peak Load Off-Pea k On-Peak Load Factor High Low

Level of Usage High Low

Page 199: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Southern California Edison Rates Effective: May I ? 1996

Rate Group Domestic GS-I TC-I GS-2 TOU-GS-2 TOU-8-SEC TOU-8-PRI TOU-8-SUB

PA-I PA-2

TOU-PA-5 AG-TOU StreetIArea Lighting

System Average

5-1 -96 Average Rate ($lkWh)

12.7 13.6 7.3

10.1 9.1 8.6 7.5 4.5

11.1 8.7 7.1

Page 200: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Energy Theft Mitigation

Energy Theft Program - Prevention:

Security Locking Rings, "Meter Sentries", Sealing, "Eagle Eye", Video "To Catch a Thief".

- Detection Observation, Tip Cards, Computer Detection, Detection Bonus, Energy Theft Hotline, Tap Detector.

- Investigation: Resealing Meters, Meter Testing, Service Investigations

- Prosecution - Restitution

Revenue Recovery Revenue Protection Group Revenue Protection Manual International Utilities Revenue Protection Newsletter

Page 201: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 202: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's

Security Locking Ring Address

Inner-Tite Corp. 1094 Globe Avenue Mountainside, New Jersey, 07092, U.S.A.

Telephone 9081232-4000 FAX 9081232-7281

Page 203: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 204: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 205: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 206: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's
Page 207: Technical Report Electric Transmission and Distribution ...pdf.usaid.gov/pdf_docs/PNACE776.pdf · Technical Report Electric Transmission and Distribution ... implemented in Armenia's