HRH – P.1320 – PRIVATE PALACES - RIYADH Page 1 of 33 Project : HRH – P.1320 – PRIVATE PALACES - RIYADH CO. : SAUDI BIN LADIN GROUP DOCUMENT : TECHNICAL OFFIC REQUIREMENTS PREPARED BY: TECHNICAL OFFICE TEAM

description

Project : HRH – P.1320 – PRIVATE PALACES - RIYADH CO. : SAUDI BIN LADIN GROUP DOCUMENT : TECHNICAL OFFIC REQUIREMENTS

Transcript of TECHNICAL OFFIC REQUIREMENTS

Page 1: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 1 of 33

Project : HRH – P.1320 – PRIVATE PALACES - RIYADH

CO. : SAUDI BIN LADIN GROUP

DOCUMENT : TECHNICAL OFFIC REQUIREMENTS

PREPARED BY: TECHNICAL OFFICE TEAM

Page 2: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 2 of 33

Table of Contents

Section No. Title Page

Cover Sheet 1

Table of Contents 2

1.0 Introduction / Duties Description 3

2.0 Ideal Case Procedures 7

Technical Office Procedure 8

Design Control 9

Control of Materials 10

Documents Control 11

Man power required 12

Mobilization required 14

Safety Equipment required 18

Page 3: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 3 of 33

Section No. Title Page

3.0 Proposed Procedures 19

Proposed Procedure Strategy 19

Pro. Design Control Procedure 20

Pro. QA/QC and control of materials 21

Mobilization requirement & Comparison 28

3.0 Comparison between Ideal & Proposed Case Result 33

Page 4: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 4 of 33

T

INTRODUCTION

ime, Quality and Cost always considered the major aims to finalize projects by right way, especially if we are talking

about kind of projects with higher specifications, executing by high ranged prestigious group and a very unique client,

all of expert team works and projects managers exactly know that they must install the right plan to insure they will get

the right project life cycle & project termination.

But Saudi Bin Ladin Group has a totally different standpoint which says; you have to do more than your best, more than

plan, and more than client expectation that is always make you the leader, because you are not a big contractor

company; you are an inspiring manager.

This is the vision which we have to look for our projects more than respect, to be qualified to put ourselves in that

stature.

Page 5: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 5 of 33

Page 6: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 6 of 33

Duties Description The Technical Office provides technical & administrative information to the others working on a project to ensure that the work complies with all engineering standards, codes, specifications, and design instruction; trouble-shoots engineering related installation problems.

Technical Office responsibilities include but are not limited to:

� Processing submittals � Processing RFIs � Keeping up daily work tickets � Posting RFIs and change orders � Tracking and managing change orders � Maintaining as-built as work is completed. � Documenting project issues/conditions � Maintaining organized and detailed project records � Submitting hours and cost codes � Obtaining permits, badges and access requests in advance � Assists with preparing change orders. � Manage project library � Participates in KPR (Key Project Review)

Page 7: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 7 of 33

2.0 IDEAL CASE PROCEDURE

TECHNICAL OFFICE - PROCEDURES & REQUIREMENTS:

TECHNICAL OFFICE PROCEDURES:

1- DESIGN CONTROL

2- MATERIALS CONTROL

3- QA/QC

4- DOCUMENTS CONTROL

Page 8: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 8 of 33

1- DESIGN CONTROL:

The purpose of this Document and Drawing Control Plan is to identify and maintain documentation for project HRH P.1320, and ensure that this documentation remains consistent with the design requirements of the project. This is done by: • Identifying types of and specific documentation • Storing identified documentation • Controlling, tracking and retrieving documentation • Review and approval of documentation, changes and revisions • Distribution.

1-1-DUTIES:

To follow design review, prepare clarification requests, answer site inquiries and propose solutions & details.

1-2-HUMAN RESOURCES:

� CIVIL ENGINEER

� ARCHITECT

� ELECTRICAL ENGINEER

� MECHANICAL ENGIENEER

1-3MOBILIZATION:

� TWO FURNISHED OFFICES

� FOUR COMPUTERS

Page 9: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 9 of 33

2- MATERIALS CONTROL

2-1-DUTIES:

Receive samples from subcontractors, submit samples to consultant, check materials arrived to site and update materials LOG/LIST & send it to

site managers.

2-2-HUMAN RESOURCES:

� MATERIALS ENGINEER

� EXPERT SUPERVISOR

� LABOUR

2-3-MOBILIZATION:

� ONE FURNISHED OFFICES

� ONE COMPUTER

Page 10: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 10 of 33

3- QA/QC CONTROL:

The dictionary defines Quality Control as the inspection, analysis and action required to ensure quality of output; the operational techniques and the

activities used to fulfill and verify requirements of quality; a procedure for keeping quality of inputs or outputs to specifications.

3-1-DUTIES:

CHECK AND CONTROL ALL PROCEDURES LIKE INSPECTIONS, LABORATORY & TESTS, CLARIFICATION REQUESTS FROM CONSULTANT, NCR's,

AND SUBCONTRACTORS INTERFERENCE ACTIVITIES

3-2-HUMAN RESOURCES:

� CIVIL ENGINEER

� LAB. TECHNICIAN

3-3-MOBILIZATION:

� ONE FURNISHED OFFICES

� TWO COMPUTER

Page 11: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 11 of 33

4- DOCUMENTS CONTROL:

4-1-DUTIES:

CONTROL ALL DOCUMENTS TO/FROM TECHNICAL OFFICE e.g. DWG's PRINT, CORRESPONDENCE AND TRANSMITTAL

4-2-HUMAN RESOURCES:

� OFFICER

� TWO DRAFTSMAN

� IT OPERATOR

4-3-MOBILIZATION:

� TWO FURNISHED OFFICES

� THREE COMPUTER

Page 12: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 12 of 33

Man power required:

Profession In Present Req. In Future Req. Total Req.

1 Civil Eng. 2 2 4

2 Architect 1 2 3

3 Electrical Eng. 1 1 2

4 Mechanical Eng. 1 1 2

5 Material Eng. 1 1 2

6 Supervisor 1 3 4

7 Laboratory Technician 1 0 1

8 Draftsman 1 1 2

9 Secretary 1 1 2

10 Tea Boy 1 1 2

11 Laborer 2 3 5

SUM 13 16 29

Page 13: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 13 of 33

Page 14: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 14 of 33

Mobilization Required (In present):

Profession Port Cabinet Timber Office Wheelchair Ordinary Chair Deskjet

printer A3

Laser HD

printer A3

1 Civil Eng. 0.5 2 2 4 0 1

2 Architect 0.25 1 1 2

3 Electrical Eng. 0.25 1 1 2

4 Mechanical Eng. 0.25 1 1 2

5 Material Eng. 0.25 1 1 2

6 Supervisor 0.25 1 1 2

7 Laboratory Technician 0.25 1 1 2

8 Draftsman 0.25 1 1 2

9 Secretary 0.25 1 1 2

10 Meetings 0.5 1 Meeting Table 8 0

SUM 3 11 18 20 0 1

� Wheelchair + 2 ordinary Chairs/ Timber Office

� 8 Wheelchairs/Meeting Table

Page 15: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 15 of 33

Page 16: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 16 of 33

Mobilization Required (In Future):

Profession Port Cabinet Timber Office Wheelchair Ordinary Chair Deskjet

printer A3

Laser HD

printer A3

1 Civil Eng. 1 4 4 8 1 1

2 Architect 0.75 3 3 6

3 Electrical Eng. 0.5 2 2 4 1

4 Mechanical Eng. 0.5 2 2 4

5 Material Eng. 0.5 2 2 4

6 Supervisor 0.5 2 2 4 0

7 Laboratory Technician 0.25 1 1 2 1

8 Draftsman 0.5 2 2 4

9 Secretary 0.5 2 2 4 1

10 Meetings 0.5 1 Meeting Table 8 0

SUM 5.5 20 28 42 4 1

� Wheelchair + 2 ordinary Chairs/ Timber Office

� 8 Wheelchairs/Meeting Table

Page 17: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 17 of 33

Page 18: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 18 of 33

Safety Equipment:

Extinguisher sand pail Assembly Point Safety Shoes Vest Helmet

In Present 6 6 1 13 13 13

In Future Various Various Various Various Various Various

Page 19: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 19 of 33

3.0 PROPOSED PROCEDURE

HOW TO PROCEED? PROPOSED:

� Procedure Strategy:

Due to the nature of the project and to avoid excessive increase in labor, Technical Office strategy should use the least possible number of

human resources and employment potential available in the project as commensurate with the nature of the work in every discipline, in

below charts the discretion of required processes:

Page 20: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 20 of 33

1- DESIGN CONTROL PROCESS

Page 21: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 21 of 33

2- QA/QC & CONTROL OF MATERIALS PROCEDURE

Page 22: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 22 of 33

� After applying Procedures Strategy:

Schedules & Charts below describes comparison of required Manpower, Mobilization and Safety

1. Man Power expected after applying Procedures Strategy:

Profession In Present Req. In Future Req. Total Req.

1 Civil Eng. 1 0 1

2 Architect 1 2 3

3 Electrical Eng. 1 0 1

4 Mechanical Eng. 1 0 1

5 Material Eng. 0 0 0

6 Supervisor 0 0 0

7 Laboratory Technician 0 0 0

8 Draftsman 1 1 2

9 Secretary 1 0 1

10 Tea Boy 1 0 1

11 Laborer 0 2 2

SUM 7 5 12

Page 23: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 23 of 33

Page 24: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 24 of 33

1.1. Man Power expected curtailment after applying Procedures Strategy (In Present):

Profession Case No.1 Case No.2 Total curtailment

1 Civil Eng. 2 1 1

2 Architect 1 1 0

3 Electrical Eng. 1 1 0

4 Mechanical Eng. 1 1 0

5 Material Eng. 1 0 1

6 Supervisor 1 0 1

7 Laboratory Technician 1 0 1

8 Draftsman 1 1 0

9 Secretary 1 1 0

10 Tea Boy 1 1 0

11 Laborer 2 0 2

SUM 13 7 6

Page 25: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 25 of 33

Page 26: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 26 of 33

1.2. Man Power expected curtailment after applying Procedures Strategy (In Future):

Profession Case No.1 Case No.2 Total curtailment

1 Civil Eng. 4 1 3

2 Architect 3 3 0

3 Electrical Eng. 2 1 1

4 Mechanical Eng. 2 1 1

5 Material Eng. 2 0 2

6 Supervisor 4 0 4

7 Laboratory Technician 1 0 1

8 Draftsman 2 2 0

9 Secretary 2 1 1

10 Tea Boy 2 1 1

11 Laborer 5 2 3

SUM 29 12 17

Page 27: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 27 of 33

Page 28: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 28 of 33

2. Mobilization expected after applying Procedures Strategy

2.1. Mobilization expected after applying Procedures Strategy (In present):

Profession Port Cabinet Timber Office Wheelchair Ordinary Chair Laser HD

printer A3

Curtailment

%

1 Civil Eng. 0.25 1 1 2 1

2 Architect 0.25 1 1 2

3 Electrical Eng. 0.25 1 1 2

4 Mechanical Eng. 0.25 1 1 2

5 Material Eng. 0 0 0 0

6 Supervisor 0 0 0 0

7 Laboratory Technician 0 0 0 0

8 Draftsman 0.25 1 1 2

9 Secretary 0.25 1 1 2

10 Meetings 0.5 1 Meeting Table 8 0

SUM 2 6 14 12 1

� Wheelchair + 2 ordinary Chairs/ Timber Office

� 8 Wheelchairs/Meeting Table

Page 29: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 29 of 33

Page 30: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 30 of 33

2.2. Mobilization expected after applying Procedures Strategy (In Future):

Profession Port Cabinet Timber Office Wheelchair Ordinary Chair Laser HD

printer A3

Curtailment

%

1 Civil Eng. 0.25 1 1 2 1

2 Architect 0.75 3 3 6

3 Electrical Eng. 0.25 1 1 2

4 Mechanical Eng. 0.25 1 1 2

5 Material Eng. 0 0 0 0

6 Supervisor 0 0 0 0

7 Laboratory Technician 0 0 0 0

8 Draftsman 0.25 1 1 2

9 Secretary 0.25 1 1 2

10 Meetings 0.5 1 Meeting Table 8 0

SUM 2.5 8 16 16 1

Page 31: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 31 of 33

Page 32: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 32 of 33

2.3. Mobilization Comparison:

Page 33: TECHNICAL OFFIC REQUIREMENTS

HRH – P.1320 – PRIVATE PALACES - RIYADH

Page 33 of 33

Comparison between Ideal & Proposed Case Result :

After studies and previous comparisons it is clear

that the strategy put forward will have a positive

impact in reducing the manpower and equipment

required to serve them; as it will reduce the size

of the security and safety requirements necessary

to reduce potential risks.