RTL 265
LUFFING JIB TOWER CRANE
RTL 265A - 18 HR23/HP20 I / II / FALLS
B - 18 HR23/HP20 II / III / IV / FALLS
TOWER TYPE HR 23he well known H beam mast sections with vertical bolts connection will allow greater free standing heights.Available in three versions: base reinforced (HR 23-30), heavy duty (HR 23-26) and std duty type (HR 23-22).
TOWER TYPE HP 20The famous boxed beams -twin pins connections.Safety and performances trough pins.
CABINNew design CAB , wider, longer, with improved visibility.Grammer seat and gessman joy-stick for driver cofort and ABB controls for maximum safety.USB door, air con, easy cleaning of windows, 10” or 7” screen included.
WINCHESNew generation of high power winches, from 67 to 110 kw.New braking system, new reduction gear to grant highest performances ever seen on a luffer.
p. 4 RTL 265 A - 18 HR23/HP20
p. 10 RTL 265 B - 18 HR23/HP20
3
RTL 265A - 18 HR23/HP20 I / II / FALLS
TECHNICAL DATA SHEET
4
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
RTL
265
A -
18 H
R23/
HP2
0
t m 15 20 25 30 35 40 45 50 55 60
9 t t 9,00 9,00 9,00 7,99 6,33 5,08 4,12 3,34 2,70 2,20
13,5 t t 13,50 13,33 9,86 7,54 5,89 4,65 3,68 2,91 2,28 1,80 59,46 m
9 t t 9,00 9,00 9,00 8,36 6,67 5,40 4,41 3,62 3,00
16 t t 16,00 13,80 10,26 7,90 6,22 4,96 3,97 3,18 2,60 54,46 m
9 t t 9,00 9,00 9,00 9,00 7,79 6,41 5,33 4,50
18 t t 18,00 15,78 11,89 9,30 7,45 6,06 4,98 4,20 49,47 m
9 t t 9,00 9,00 9,00 9,00 8,16 6,76 5,70
18 t t 18,00 16,20 12,28 9,66 7,79 6,39 5,40 44,47 m
9 t t 9,00 9,00 9,00 9,00 8,47 7,10
18 t t 18,00 16,42 12,52 9,92 8,06 6,80 39,47 m
9 t t 9,00 9,00 9,00 9,00 8,60
18 t t 18,00 16,48 12,58 9,99 8,30 34,47 m
9 t t 9,00 9,00 9,00 9,00
18 t t 18,00 16,49 12,58 10,20 29,47 m
lb ft 49,21 65,62 82,02 98,43 114,83 131,23 147,64 164,04 180,45 196,85
19841,6 lb 19842 19842 19842 17617 13956 11210 9072 7361 5959 4850
29762,4 lb 29762 29389 21736 16633 12987 10251 8122 6418 5021 3968 195,08 ft
19841,6 lb 19842 19842 19842 18442 14709 11908 9727 7981 6614
35273,9 lb 35274 30418 22623 17426 13712 10925 8756 7019 5732 178,67 ft
19841,6 lb 19842 19842 19842 19842 17166 14123 11754 9921
39683,2 lb 39683 34778 26218 20510 16431 13370 10986 9259 162,30 ft
19841,6 lb 19842 19842 19842 19842 17987 14903 12566
39683,2 lb 39683 35714 27068 21301 17181 14087 11905 145,90 ft
19841,6 lb 19842 19842 19842 19842 18665 15653
39683,2 lb 39683 36195 27605 21876 17780 14991 129,49 ft
19841,6 lb 19842 19842 19842 19842 18960
39683,2 lb 39683 36323 27743 22018 18298 113,09 ft
19841,6 lb 19842 19842 19842 19842
39683,2 lb 39683 36360 27734 22487 96,69 ft
Rope weight:I FALL 2,383 kg/m → 1,60 lb/ftII FALL 4,766 kg/m → 3,20 lb/ft
Hoisting rope weight not included into the above chart - reduce the lifting performance with the following amount dependig on final crane height:
18,55 m
110,89 ft
60,86 ft
98,43 ft
60,93 ft
107,22 ft
60,10 ft
109,97 ft
60,70 ft
91,04 ft
64,99 ft
93,90 ft
58,33 ft
103,90 ft
27,75 m
19,81 m
28,62 m
RTL 265 A - 18
58,86 ft
32,68 m
18,32 m
33,52 m
17,78 m
31,67 m
17,94 m
30,00 m
18,57 m
RTL 265 A - 18
18,50 m
33,80 m
5RT
L 26
5 A
- 18
HR2
3/H
P20
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
6
RTL
265
A -
18 H
R23/
HP2
0
60.40 m
RT1
0.4m R1 R2
( H )6
m
2.28 m
N°1
0 H
R23
-22.
6
1
2
3
4
5
6
7
8
9
10
RT2
0.4m R1 R2
( H )
6 m
2.28 m
1
2
3
4
5
6
7
8
9
10
C25
JIBH
(m)22.6 (6-m)
22.3 (3-m)
30 57.40 9 135 54.40 9 -40 51.40 8 145 48.40 8 -50 48.40 8 -55 45.40 7 160 42.40 7 -
FEM 1.001
JIBH
(m)22.6 (6-m)
22.3 (3-m)
30 60.40 10 -35 60.40 10 -40 57.40 9 145 54.40 9 -50 54.40 9 -55 51.40 8 160 48.40 8 -
11
12
2.32 m
N°3
HR
23-2
6.6
N°9
HR
23-2
2.6
6 m
72.40 m
C25
JIBH
(m)26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 66.40 3 8 -35 63.40 3 7 140 60.40 3 7 -45 60.40 3 7 -50 57.40 3 6 155 54.40 3 6 -60 54.40 3 6 -
FEM 1.001
JIBH
(m)26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 72.40 3 9 -35 69.40 3 8 140 66.40 3 8 -45 66.40 3 8 -50 63.40 3 7 155 60.40 3 7 -60 57.40 3 6 1
RTB
0.4m R1 R2
( H )
2.28 m
2
3
4
5
6
7
8
9
10
11
12
2.32 m
TB H
R23
N°3
HR
23-2
6.6
6 m
81.40 m
C25
JIBH
(m)TB/12 (12-m)
26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 75.40 1 3 7 135 72.40 1 3 7 -40 72.40 1 3 7 -45 69.40 1 3 6 150 66.40 1 3 6 -55 63.40 1 3 5 160 60.40 1 3 5 -
FEM 1.001
JIBH
(m)TB/12 (12-m)
26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 81.40 1 3 8 135 78.40 1 3 8 -40 78.40 1 3 8 -45 75.40 1 3 7 150 72.40 1 3 7 -55 69.40 1 3 6 160 66.40 1 3 6 -
12m
6m 1
N°8
HR
23-2
2.6
3m
N°1
HR
23-2
2.3
FPR1
6 m
N°9
HR
23-2
2
1
2
3
2.28 m
4
5
6
7
8
9
8 X 8 m
8
52.00 m (C25)
58.00 m (FEM 1.001)( H ) ( JIB )
EXTERNAL CLIMBING
AB
C
*
INTERNAL CLIMBING
B
H
*
FEM 1.001
JIBH
(m)22.6 (6-m)
30 58.00 935 52.00 840 52.00 845 46.00 750 46.00 755 40.00 660 40.00 6
HR23
RT1 RT2
FP8
RTB
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
56.90 m (FEM 1.001)
RTB
0.4m R1 R2
1
C25
JIBH
(m)TB/11.5(11.5-m)
PRL/3.75 (3.75-m)
30 53.15 1 1135 49.40 1 1040 49.40 1 1045 45.65 1 950 45.65 1 955 41.90 1 860 41.90 1 8
FEM 1.001
JIBH
(m)TB/11.5(11.5-m)
PRL/3.75 (3.75-m)
30 56.90 1 1235 53.15 1 1140 53.15 1 1145 49.40 1 1050 49.40 1 1055 45.65 1 960 41.90 1 8
11.5
m
2
3
4
5
6
7
8
9
10
11
12
TB H
P20
3.75
m
1,95m
N°1
2 T
HP2
0
N°1
1 T
HP2
0
53.15 m (C25)
( H )
0.4m
1
10m
2
3
4
5
6
7
8
9
10
3.75
m
1,95m
( H )47.95 m (FEM 1.001)
1
2
3
4
5
6
7
8
9
3.75
m
1,95m
( H )
42.50 m (FEM 1.001)
F - FP - T
R1 6 X 6 m
6 6 6TC
HP2
0N
°9 T
HP2
0
EXTERNAL CLIMBING
AB
C
*
INTERNAL CLIMBING
B
H
*
RTB1
R1 R2
FEM 1.001
JIBH
(m)TB/10(10-m)
PRL/3.75 (3.75-m)
30 47.95 1 1035 44.20 1 940 44.20 1 945 40.45 1 850 40.45 1 855 36.70 1 760 32.95 1 6
FEM 1.001
JIBH
(m)TC/10(10-m)
PRL/3.75 (3.75-m)
30 42.50 1 935 38.75 1 840 38.75 1 845 35.00 1 750 35.00 1 755 31.25 1 660 31.25 1 6
* Please ask tech. Dept.
7RT
L 26
5 A
- 18
HR2
3/H
P20
HP20
RTB RTB1 F6 - FP6 - T6
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
8
Doc.N°Page.N°Data
38 16000 19 3200044 10000 22 20000
100 5240 50 10480154 3400 77 6800202 2050 102 4100
t
9 0 627 0 774 0 130
1,3 0 27518 0 3114 0 388 0 65
2,6 0 135
kW
MECHANISMS
HOISTING MECHANISM - Speed
110 HVF 180
1 - 107/03/2016
900
II
110 HVF 180
LOAD
( kg
) ILO
AD (
kg) I
I
HOISTING
m/min
I
110
02468
101214161820
0 50 100 150 200 250
II
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150 200 250 300 350
I
Doc.N°Page.N°Data
38 16000 19 3200044 10000 22 20000
100 5240 50 10480154 3400 77 6800202 2050 102 4100
t
9 0 627 0 774 0 130
1,3 0 27518 0 3114 0 388 0 65
2,6 0 135
kW
MECHANISMS
HOISTING MECHANISM - Speed
110 HVF 180
1 - 107/03/2016
900
II
110 HVF 180
LOAD
( kg
) ILO
AD (
kg) I
I
HOISTING
m/min
I
110
02468
101214161820
0 50 100 150 200 250
II
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150 200 250 300 350
I
RTL
265
A -
18 H
R23/
HP2
0
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t) I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t) I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
Doc.N°Page.N°Data
38 16000 19 3200044 10000 22 20000
100 5240 50 10480154 3400 77 6800202 2050 102 4100
t
9 0 627 0 774 0 130
1,3 0 27518 0 3114 0 388 0 65
2,6 0 135
kW
MECHANISMS
HOISTING MECHANISM - Speed
110 HVF 180
1 - 107/03/2016
900
II
110 HVF 180
LOAD
( kg
) ILO
AD (
kg) I
I
HOISTING
m/min
I
110
02468
101214161820
0 50 100 150 200 250
II
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150 200 250 300 350
I
LOA
D (t
) II
LOA
D (t
) II
LOA
D (t
) I
LOA
D (t
) I
Slewing 2 x 11.0 kW
Machine rating L67kW H80kW : 230 kVAL67kW H110kW : 270 kVA
850 m
850 m
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
9RT
L 26
5 A
- 18
HR2
3/H
P20
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
RTL 265B - 18 HR23/HP20 II / III / IV / FALLS
10
TECHNICAL DATA SHEET
RTL
265
B -
18 H
R23/
HP2
0V
6 - 0
9/19
- S
ubje
ct t
o ch
ange
wit
hout
not
ice
t m 15 20 25 30 35 40 45 50 55 60
9 t t 9,00 9,00 9,00 8,33 6,60 5,31 4,31 3,51 2,85 2,30
13,5 t t 13,50 13,50 10,49 8,13 6,43 5,16 4,18 3,39 2,74 2,20
9 t t 9,00 9,00 9,00 8,85 7,07 5,74 4,71 3,88 3,20
13,5 t t 13,50 13,50 10,89 8,45 6,70 5,40 4,38 3,57 2,90 *
16 t t 16,00 14,55 10,89 8,45 6,70 5,40 4,38 3,57 2,90
9 t t 9,00 9,00 9,00 9,00 8,14 6,71 5,59 4,70
13,5 t t 13,50 13,50 12,31 9,68 7,79 6,38 5,28 4,40 *
18 t t 18,00 16,27 12,31 9,68 7,79 6,38 5,28 4,40
9 t t 9,00 9,00 9,00 9,00 8,47 7,03 5,90
13,5 t t 13,50 13,50 12,71 10,04 8,14 6,71 5,60 *
18 t t 18,00 16,70 12,71 10,04 8,14 6,71 5,60
9 t t 9,00 9,00 9,00 9,00 8,74 7,30
13,5 t t 13,50 13,50 12,96 10,31 8,42 7,00 *
18 t t 18,00 16,93 12,96 10,31 8,42 7,00
9 t t 9,00 9,00 9,00 9,00 8,80
13,5 t t 13,50 13,50 13,04 10,39 8,50 *
18 t t 18,00 17,01 13,04 10,39 8,50
9 t t 9,00 9,00 9,00 9,00
13,5 t t 13,50 13,50 13,06 10,40 *
18 t t 18,00 17,06 13,06 10,40
* = + 200 kg using single block
RTL 265 B - 18
28,41 m
20,64 m
29,64 m
21,21 m
18,53 m
32,57 m
23,26 m
18,39 m
33,48 m
23,82 m
18,78 m
34,22 m
24,18 m
18,98 m
34,40 m
24,30 m
19,05 m
30,00 m
24,34 m
19,10 m
lb ft 49,21 65,62 82,02 98,43 114,83 131,23 147,64 164,04 180,45 196,85
19841,6 lb 19842 19842 19842 18355 14561 11715 9502 7730 6280 5071
29762,4 lb 29762 29762 23137 17914 14183 11385 9208 7466 6040 4850
19841,6 lb 19842 19842 19842 19506 15594 12660 10378 8551 7055
29762,4 lb 29762 29762 24003 18624 14782 11900 9658 7863 6393 *
35273,9 lb 35274 32070 24003 18624 14782 11900 9658 7863 6393
19841,6 lb 19842 19842 19842 19842 17955 14793 12332 10362
29762,4 lb 29762 29762 27147 21333 17180 14065 11641 9700 *
39683,2 lb 39683 35867 27147 21333 17180 14065 11641 9700
19841,6 lb 19842 19842 19842 19842 18681 15491 13007
29762,4 lb 29762 29762 28013 22140 17944 14796 12346 *
39683,2 lb 39683 36821 28013 22140 17944 14796 12346
19841,6 lb 19842 19842 19842 19842 19263 16094
29762,4 lb 29762 29762 28575 22736 18564 15432 *
39683,2 lb 39683 37333 28575 22736 18564 15432
19841,6 lb 19842 19842 19842 19842 19401
29762,4 lb 29762 29762 28747 22911 18739 *
39683,2 lb 39683 37499 28747 22911 18739
19841,6 lb 19842 19842 19842 19842
29762,4 lb 29762 29762 28801 22928 *
39683,2 lb 39683 37603 28801 22928
* = + 441 lb using single block
Rope weight:II FALL 2,534 kg/m → 1,70 lb/ftIII FALL 3,801 kg/m → 2,55 lb/ftIV FALL 5,068 kg/m → 3,41 lb/ft
62,50 ft
98,43 ft
79,86 ft
62,66 ft
Hoisting rope weight not included into the above chart - reduce the lifting performance with the following amount dependig on final crane height:
112,27 ft
79,33 ft
62,27 ft
112,86 ft
79,72 ft
76,31 ft
60,33 ft
109,84 ft
78,15 ft
61,61 ft
67,72 ft
97,24 ft
69,59 ft
60,79 ft
106,89 ft
RTL 265 B - 18
93,21 ft
11RT
L 26
5 B
- 18
HR2
3/H
P20
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
12
RTL
265
B -
18 H
R23/
HP2
0
60.40 m
RT1
0.4m R1 R2
( H )6
m
2.28 m
N°1
0 H
R23
-22.
6
1
2
3
4
5
6
7
8
9
10
RT2
0.4m R1 R2
( H )
6 m
2.28 m
1
2
3
4
5
6
7
8
9
10
C25
JIBH
(m)22.6 (6-m)
22.3 (3-m)
30 57.40 9 135 54.40 9 -40 51.40 8 145 48.40 8 -50 48.40 8 -55 45.40 7 160 42.40 7 -
FEM 1.001
JIBH
(m)22.6 (6-m)
22.3 (3-m)
30 60.40 10 -35 60.40 10 -40 57.40 9 145 54.40 9 -50 54.40 9 -55 51.40 8 160 48.40 8 -
11
12
2.32 m
N°3
HR
23-2
6.6
N°9
HR
23-2
2.6
6 m
72.40 m
C25
JIBH
(m)26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 66.40 3 8 -35 63.40 3 7 140 60.40 3 7 -45 60.40 3 7 -50 57.40 3 6 155 54.40 3 6 -60 54.40 3 6 -
FEM 1.001
JIBH
(m)26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 72.40 3 9 -35 69.40 3 8 140 66.40 3 8 -45 66.40 3 8 -50 63.40 3 7 155 60.40 3 7 -60 57.40 3 6 1
RTB
0.4m R1 R2
( H )
2.28 m
2
3
4
5
6
7
8
9
10
11
12
2.32 m
TB H
R23
N°3
HR
23-2
6.6
6 m
81.40 m
C25
JIBH
(m)TB/12 (12-m)
26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 75.40 1 3 7 135 72.40 1 3 7 -40 72.40 1 3 7 -45 69.40 1 3 6 150 66.40 1 3 6 -55 63.40 1 3 5 160 60.40 1 3 5 -
FEM 1.001
JIBH
(m)TB/12 (12-m)
26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 81.40 1 3 8 135 78.40 1 3 8 -40 78.40 1 3 8 -45 75.40 1 3 7 150 72.40 1 3 7 -55 69.40 1 3 6 160 66.40 1 3 6 -
12m
6m 1
N°8
HR
23-2
2.6
3m
N°1
HR
23-2
2.3
FPR1
6 m
N°9
HR
23-2
2
1
2
3
2.28 m
4
5
6
7
8
9
8 X 8 m
8
52.00 m (C25)
58.00 m (FEM 1.001)( H ) ( JIB )
EXTERNAL CLIMBING
AB
C
*
INTERNAL CLIMBING
B
H
*
FEM 1.001
JIBH
(m)22.6 (6-m)
30 58.00 935 52.00 840 52.00 845 46.00 750 46.00 755 40.00 660 40.00 6
HR23
RT1 RT2
FP8
RTB
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
* Please ask tech. Dept.
13RT
L 26
5 B
- 18
HR2
3/H
P20
56.90 m (FEM 1.001)
RTB
0.4m R1 R2
1
C25
JIBH
(m)TB/11.5(11.5-m)
PRL/3.75 (3.75-m)
30 53.15 1 1135 49.40 1 1040 49.40 1 1045 45.65 1 950 45.65 1 955 41.90 1 860 41.90 1 8
FEM 1.001
JIBH
(m)TB/11.5(11.5-m)
PRL/3.75 (3.75-m)
30 56.90 1 1235 53.15 1 1140 53.15 1 1145 49.40 1 1050 49.40 1 1055 45.65 1 960 41.90 1 8
11.5
m
2
3
4
5
6
7
8
9
10
11
12
TB H
P20
3.75
m
1,95m
N°1
2 T
HP2
0
N°1
1 T
HP2
0
53.15 m (C25)
( H )
0.4m
1
10m
2
3
4
5
6
7
8
9
10
3.75
m
1,95m
( H )47.95 m (FEM 1.001)
1
2
3
4
5
6
7
8
9
3.75
m
1,95m
( H )
42.50 m (FEM 1.001)
F - FP - T
R1 6 X 6 m
6 6 6TC
HP2
0N
°9 T
HP2
0
EXTERNAL CLIMBING
AB
C
*
INTERNAL CLIMBING
B
H
*
RTB1
R1 R2
FEM 1.001
JIBH
(m)TB/10(10-m)
PRL/3.75 (3.75-m)
30 47.95 1 1035 44.20 1 940 44.20 1 945 40.45 1 850 40.45 1 855 36.70 1 760 32.95 1 6
FEM 1.001
JIBH
(m)TC/10(10-m)
PRL/3.75 (3.75-m)
30 42.50 1 935 38.75 1 840 38.75 1 845 35.00 1 750 35.00 1 755 31.25 1 660 31.25 1 6
HP20
RTB RTB1 F6 - FP6 - T6
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
14
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t) I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
RTL
265
B -
18 H
R23/
HP2
0
Doc.N°Page.N°Data
38 16000 19 3200044 10000 22 20000
100 5240 50 10480154 3400 77 6800202 2050 102 4100
t
9 0 437,5 0 515 0 74
1,5 0 20413,5 0 2911,3 0 34
8 0 472,3 0 13618 0 22,015 0 2510 0 373 0 102
970 m(1150 m OPTIONAL)
m/min kW
LOAD
( kg
) IV
1 - 107/03/2016
8080 HVF 90
LOAD
( kg
) II
LOAD
( kg
) III
HOISTING
80 HVF 90
MECHANISMS
HOISTING MECHANISM - Speed
0
2
4
6
8
10
12
14
0 20 40 60 80 100 120 140 160 180 200 220
III
0
1
2
3
4
5
6
7
8
9
10
0 20 40 60 80 100 120 140 160 180 200 220
II
0
2
4
6
8
10
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220
IV
Doc.N°Page.N°Data
38 16000 19 3200044 10000 22 20000
100 5240 50 10480154 3400 77 6800202 2050 102 4100
t
9 0 437,5 0 515 0 74
1,5 0 20413,5 0 2911,3 0 34
8 0 472,3 0 13618 0 22,015 0 2510 0 373 0 102
970 m(1150 m OPTIONAL)
m/min kW
LOAD
( kg
) IV
1 - 107/03/2016
8080 HVF 90
LOAD
( kg
) II
LOAD
( kg
) III
HOISTING
80 HVF 90
MECHANISMS
HOISTING MECHANISM - Speed
0
2
4
6
8
10
12
14
0 20 40 60 80 100 120 140 160 180 200 220
III
0
1
2
3
4
5
6
7
8
9
10
0 20 40 60 80 100 120 140 160 180 200 220
II
0
2
4
6
8
10
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220
IV
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t) I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t) I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t) I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t) I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t) I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
Max\um: 970 (1150 optional)Max rope on drum: 970 (1150 optional)
LOA
D (t
) II
LOA
D (t
) II
Slewing 2 x 11.0 kW
Machine ratingL45kW H67kW : 185kVAL67kW H67kW : 215kVAL67kW H80kW : 230kVA
Doc.N°Page.N°Data
38 16000 19 3200044 10000 22 20000
100 5240 50 10480154 3400 77 6800202 2050 102 4100
t
9 0 437,5 0 515 0 74
1,5 0 20413,5 0 2911,3 0 34
8 0 472,3 0 13618 0 22,015 0 2510 0 373 0 102
970 m(1150 m OPTIONAL)
m/min kW
LOAD
( kg
) IV
1 - 107/03/2016
8080 HVF 90
LOAD
( kg
) II
LOAD
( kg
) III
HOISTING
80 HVF 90
MECHANISMS
HOISTING MECHANISM - Speed
0
2
4
6
8
10
12
14
0 20 40 60 80 100 120 140 160 180 200 220
III
0
1
2
3
4
5
6
7
8
9
10
0 20 40 60 80 100 120 140 160 180 200 220
II
0
2
4
6
8
10
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200 220
IV
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
15RT
L 26
5 B
- 18
HR2
3/H
P20
V6
- 09/
19 -
Sub
ject
to
chan
ge w
itho
ut n
otic
e
Moritsch Cranes S.r.l.
via Ramentera 5232035 Santa Giustina | BL | Italy
T. +39 0437 [email protected]