Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO...
Transcript of Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO...
Technical Committee on Sprinkler System Discharge Criteria
M E M O R A N D U M
DATE: May 26, 2016
TO: Members of the Technical Committee on Sprinkler System Discharge Criteria
FROM: David R. Hague, Principal Fire Protection Engineer/NFPA Staff Liaison
SUBJECT: AUT-SSD AGENDA PACKAGE – A2018 Pre-First Draft Meeting
________________________________________________________________________
Enclosed is the agenda for the Pre-First Draft meeting for NFPA 13, Standard for the Installation of
Sprinkler Systems, NFPA 13 has entered the Annual 2018 revision cycle and will produce a 2019 Edition.
It is imperative that you review the attached in advance, with your ideas and substantiations for your
views. If you have alternate suggestions for text changes, please come prepared with the words and
respective substantiation.
For administrative questions, please feel free to contact Elena Carroll at (617) 984-7952. For technical
questions, please feel free to contact Dave Hague at (617) 984-7273. You can also reach either of us via
e-mail at [email protected] or [email protected]. We look forward to meeting everyone in San Antonio
Riverwalk.
Technical Committee on Sprinkler System Discharge Criteria
Pre-First Draft Meeting
June 29 - 30, 2016
Courtyard by Marriott San Antonio Riverwalk
207 N. St. Mary's St.
San Antonio, TX 78205
AGENDA
Wednesday June 29, 2016
1. Call to Order – 8:00 AM
2. Introductions of Members and Staff
3. Review and Approval of A2015 2nd Draft Meeting Minutes
4. Review of A2018 Revision Cycle and Meeting Schedule
5. Review of Distributed Material and Workload
a. Overview of Public Input
b. Overview of Potential Committee First Revisions
c. Review of document reformat
d. Overview of NFPA 13M
6. Establish Task Groups
7. Recess for Task Group Meetings (TBD)
Thursday June 30, 2016
8. Task Group Meetings (Cont.) – 8:00AM
9. Adjourn 12:00 PM
10. Lunch 12:00 PM – 1:00 PM
11. Reconvene for Task Group Reports
12. Task Group Assignments and Schedules for First Draft Meeting
Table of Contents
Part 1 - Meeting Agenda
Part 2 - Committee Address List
Part 3 – New Process Worksheets
Part 4 – A2015 Second Draft Meeting Minutes
Part 5 - A2018 Key Dates
PART 2 –
COMMITTEE ADDRESS LIST
Address List No PhoneSprinkler System Discharge Criteria AUT-SSD
Automatic Sprinkler Systems
David R. Hague05/25/2016
AUT-SSD
Russell B. Leavitt
ChairTelgian Corporation10230 S. 50th PlacePhoenix, AZ 85044Alternate: Tracey D. Bellamy
SE 03/05/2012AUT-SSD
Carl P. Anderson
PrincipalThe Fire Protection International Consortium1420 Marvin Road NE, #432Lacey, WA 98516Washington State Association of Fire Marshals
E 7/20/2000
AUT-SSD
Weston C. Baker, Jr.
PrincipalFM Global1151 Boston Providence TurnpikePO Box 9102Norwood, MA 02062-9102Alternate: Angele Morcos
I 7/19/2002AUT-SSD
Charles O. Bauroth
PrincipalLiberty Mutual Property36 Willow LaneUxbridge, MA 01569
I 1/18/2001
AUT-SSD
Kerry M. Bell
PrincipalUL LLC333 Pfingsten RoadNorthbrook, IL 60062-2096Alternate: Pravinray D. Gandhi
RT 10/10/1997AUT-SSD
Thomas G. Deegan
PrincipalViking Group, Inc.3033 Orchard Vista SE, Suite 308Grand Rapids, MI 49546-7077Alternate: Martin H. Workman
M 7/12/2001
AUT-SSD
John August Denhardt
PrincipalStrickland Fire Protection, Inc.5113 Berwyn RoadCollege Park, MD 20740American Fire Sprinkler AssociationInstaller/MaintainerAlternate: Steven J. Scandaliato
IM 1/16/1998AUT-SSD
James Dockrill
PrincipalJ&S Fire Sprinkler Design & Consulting55 Woodrow StreetSt. Catharines, ON L2P 2A4 CanadaCanadian Automatic Sprinkler AssociationAlternate: Jason W. Ryckman
IM 08/09/2012
AUT-SSD
Abram Selim Fouad
PrincipalElite Consolidated Engineers11, 12 Moustafa Refaat StreetSheraton HelioplisCairo, Egypt
SE 08/17/2015AUT-SSD
Bo Hjorth
PrincipalAlbaCon ABBox 619Nacka, 13121 SwedenAlternate: Joakim Bauer
SE 3/21/2006
AUT-SSD
Donald Hopkins, Jr.
PrincipalJENSEN HUGHES3610 Commerce Drive, Suite 817Baltimore, MD 21227-1652Alternate: Timothy R. Costello
SE 9/30/2004AUT-SSD
Roland J. Huggins
PrincipalAmerican Fire Sprinkler Association, Inc.12750 Merit Drive, Suite 350Dallas, TX 75251-1273American Fire Sprinkler AssociationDesignAlternate: James M. Fantauzzi
IM 10/10/1997
1
Address List No PhoneSprinkler System Discharge Criteria AUT-SSD
Automatic Sprinkler Systems
David R. Hague05/25/2016
AUT-SSD
Kenneth E. Isman
PrincipalUniversity of Maryland7402 Forests Edge CourtLaurel, MD 20707Alternate: Milosh T. Puchovsky
SE 7/26/2007AUT-SSD
Sultan M. Javeri
PrincipalSC Engineering2 Impasse Du GuernehlieLa Trinite, Surzur, 56190 France
IM 10/10/1997
AUT-SSD
Larry Keeping
PrincipalPLC Fire Safety Solutions3413 Wolfedale Road, Suite 6Mississauga, ON L5C 1V8 Canada
SE 10/10/1997AUT-SSD
Kevin J. Kelly
PrincipalVictaulic4901 Kesslersville RoadEaston, PA 18040-6714National Fire Sprinkler AssociationManufacturerAlternate: Peter W. Thomas
M 04/05/2016
AUT-SSD
Elham Klausbruckner
PrincipalKlausbruckner & Associates, Inc.2495 Truxtun Road, Suite 205San Diego, CA 92106-6159
SE 10/29/2012AUT-SSD
William E. Koffel
PrincipalKoffel Associates, Inc.8815 Centre Park Drive, Suite 200Columbia, MD 21045-2107Alternate: Mark J. Aaby
SE 10/1/1999
AUT-SSD
A. Christine LaFleur
PrincipalSandia National LaboratoriesBuilding Safety & Assurance DepartmentPO Box 5800, MS-0909Albuquerque, NM 87185-0909Alternate: Alice B. Muna
U 04/05/2001AUT-SSD
Kenneth W. Linder
PrincipalSwiss Re2 Waterside Crossing, Suite 200Windsor, CT 06095-1588Alternate: Joseph A. Lynch
I 7/28/2006
AUT-SSD
Stuart Lloyd
PrincipalZurich Risk Engineering UK5 Margrove CloseFailsworth, Manchester, M35 9XQ Great BritainAlternate: Richard A. Gallagher
I 08/17/2015AUT-SSD
Brian Mosberian
PrincipalCity of Phoenix200 West WashingtonPhoenix, AZ 85003
E 03/07/2013
AUT-SSD
Garner A. Palenske
PrincipalAon Fire Protection Engineering Corporation11770 Bernardo Plaza Court, Suite 116San Diego, CA 92128Alternate: Daniel J. O'Connor
I 7/20/2000AUT-SSD
Richard Pehrson
PrincipalPehrson Fire PC7455 France Avenue South, Suite 271Edina, MN 55435International Fire Marshals AssociationAlternate: Daniel A. Kaiser
E 7/22/1999
2
Address List No PhoneSprinkler System Discharge Criteria AUT-SSD
Automatic Sprinkler Systems
David R. Hague05/25/2016
AUT-SSD
Kenneth R. Schneider
PrincipalUA - ITFTraining Specialist3723 S. BroadwaySt. Louis, MO 63118United Assn. of Journeymen & Apprentices of thePlumbing & Pipe Fitting IndustryAlternate: Robert C. Holliday
L 03/05/2012AUT-SSD
Peter T. Schwab
PrincipalWayne Automatic Fire Sprinklers, Inc.222 Capitol CourtOcoee, FL 34761-3033
IM 8/2/2010
AUT-SSD
Michael D. Sides
PrincipalGlobal Asset Protection Services1360 Olympia Park CircleOcoee, FL 34761Alternate: Mark A. Bowman
I 7/16/2003AUT-SSD
Gary T. Smith
PrincipalDACS, Inc.PO Box 161Great Meadows, NJ 07838Rack Manufacturers InstituteAlternate: Gerald R. Schultz
M 08/09/2012
AUT-SSD
William B. Smith
PrincipalCode Consultants, Inc.2043 Woodland Parkway, Suite 300St. Louis, MO 63146-4235Alternate: Thomas Larry Frank
SE 08/09/2012AUT-SSD
Jack W. Thacker
PrincipalAllan Automatic Sprinkler Corp. of So. California3233 Enterprise StreetBrea, CA 92821-6239National Fire Sprinkler AssociationContractorAlternate: George W. Stanley
IM 10/10/1997
AUT-SSD
Victoria B. Valentine
PrincipalNational Fire Sprinkler Association, Inc.40 Jon Barrett RoadPatterson, NY 12563-2164National Fire Sprinkler AssociationDesign TechnicianAlternate: Jon R. Ackley
M 04/08/2015AUT-SSD
Douglas Wilson
PrincipalCity of San Diego1222 First Avenue, MS 401San Diego, CA 92101Alternate: Michael Six
E 03/03/2014
AUT-SSD
Steven D. Wolin
PrincipalReliable Automatic Sprinkler Company, Inc.1470 Smith Grove RoadLiberty, SC 29657-4305Alternate: Thomas L. Multer
M 10/28/2014AUT-SSD
Terry L. Victor
Voting AlternateTyco/SimplexGrinnell705 Digital Drive, Suite NLinthicum, MD 21090-2267
M 10/29/2012
AUT-SSD
Mark J. Aaby
AlternateKoffel Associates, Inc.8815 Centre Park Drive, Suite 200Columbia, MD 21045-2107Principal: William E. Koffel
SE 3/4/2008
3
Address List No PhoneSprinkler System Discharge Criteria AUT-SSD
Automatic Sprinkler Systems
David R. Hague05/25/2016
AUT-SSD
Jon R. Ackley
AlternateDalmatian Fire, Inc.5670 West 73rd StreetIndianapolis, IN 46278National Fire Sprinkler AssociationDesign TechnicianPrincipal: Victoria B. Valentine
M 10/29/2012AUT-SSD
Joakim Bauer
AlternateAlbaCon ABBox 619Nacka, 13121 SwedenPrincipal: Bo Hjorth
SE 10/29/2012
AUT-SSD
Tracey D. Bellamy
AlternateTelgian Corporation900 Circle 75 Parkway, Suite 680Atlanta, GA 30339-3084Principal: Russell B. Leavitt
SE 1/10/2008AUT-SSD
Mark A. Bowman
AlternateXL Global Asset Protection Services13467 Chevington DrivePickerington, OH 43147Principal: Michael D. Sides
I 7/16/2003
AUT-SSD
Timothy R. Costello
AlternateJENSEN HUGHES360 West 31st Street, Suite 900New York, NY 10001-2872Principal: Donald Hopkins, Jr.
SE 08/11/2014AUT-SSD
James M. Fantauzzi
AlternateNorth East Fire Protection Systems Inc.318 Charlton RoadBallston, NY 12020American Fire Sprinkler AssociationDesignPrincipal: Roland J. Huggins
IM 04/05/2016
AUT-SSD
Thomas Larry Frank
AlternateCode Consultants, Inc.2043 Woodland Parkway, Suite 300Saint Louis, MO 63146Principal: William B. Smith
SE 10/28/2014AUT-SSD
Richard A. Gallagher
AlternateZurich Services Corporation5124 New Kent RoadWilmington, DE 19808-2706Principal: Stuart Lloyd
I 08/17/2015
AUT-SSD
Pravinray D. Gandhi
AlternateUL LLC333 Pfingsten RoadNorthbrook, IL 60062-2096Principal: Kerry M. Bell
RT 4/5/2001AUT-SSD
Robert C. Holliday
AlternateSprinkler Fitters LU 268 JAC1544 South 3rd StreetSt. Louis, MO 63104United Assn. of Journeymen & Apprentices of thePlumbing & Pipe Fitting IndustryPrincipal: Kenneth R. Schneider
L 10/29/2012
AUT-SSD
Daniel A. Kaiser
AlternateMinnesota Department of Public SafetyState Fire Marshal Division203 SW 3rd StreetMedford, MN 55049International Fire Marshals AssociationPrincipal: Richard Pehrson
E 03/05/2012AUT-SSD
Joseph A. Lynch
AlternateSwiss Re, Global Asset Protection Services1105 Sanctuary Parkway, Suite 200Alpharetta, GA 30004-4741Principal: Kenneth W. Linder
I 04/05/2016
4
Address List No PhoneSprinkler System Discharge Criteria AUT-SSD
Automatic Sprinkler Systems
David R. Hague05/25/2016
AUT-SSD
Angele Morcos
AlternateFM Global1151 Boston-Providence TurnpikeNorwood, MA 02062-9102Principal: Weston C. Baker, Jr.
I 07/29/2013AUT-SSD
Thomas L. Multer
AlternateReliable Automatic Sprinkler Company, Inc.1470 Smith Grove RoadLiberty, SC 29657-4305Principal: Steven D. Wolin
M 12/08/2015
AUT-SSD
Alice B. Muna
AlternateSandia National LaboratoriesPO Box 5800, MS-0909Albuquerque, NM 87185Principal: A. Christine LaFleur
U 10/29/2012AUT-SSD
Daniel J. O'Connor
AlternateAon Fire Protection Engineering4 Overlook PointLincolnshire, IL 60069-4302Principal: Garner A. Palenske
I 10/27/2009
AUT-SSD
Milosh T. Puchovsky
AlternateWorcester Polytechnic InstituteDepartment of Fire Protection Engineering100 Institute RoadWorcester, MA 01609Principal: Kenneth E. Isman
SE 10/28/2014AUT-SSD
Jason W. Ryckman
AlternateCanadian Automatic Sprinkler Association335 Renfrew Drive, Suite 302Markham, ON L3R 9S9 CanadaPrincipal: James Dockrill
IM 10/28/2014
AUT-SSD
Steven J. Scandaliato
AlternateSDG, LLCP.O. Box 19798Fountain Hills, AZ 85269American Fire Sprinkler AssociationInstaller/MaintainerPrincipal: John August Denhardt
IM 8/9/2011AUT-SSD
Gerald R. Schultz
AlternateThe FPI Consortium, Inc.1202N 75th Street, #279Downers Grove, IL 60516Rack Manufacturers InstitutePrincipal: Gary T. Smith
M 08/09/2012
AUT-SSD
Michael Six
AlternateBremerton Fire Department911 Park AvenueBremerton, WA 98337Principal: Douglas Wilson
E 10/28/2014AUT-SSD
George W. Stanley
AlternateWiginton Fire Protection Engineering, Inc.699 Aero LaneSanford, FL 32771National Fire Sprinkler AssociationContractorPrincipal: Jack W. Thacker
IM 1/16/2003
AUT-SSD
Peter W. Thomas
AlternateVictaulic Company of America137 Finch LaneSaunderstown, RI 02874National Fire Sprinkler AssociationManufacturerPrincipal: Kevin J. Kelly
M 01/18/2001AUT-SSD
Martin H. Workman
AlternateThe Viking Corporation210 North Industrial Park RoadHastings, MI 49058Principal: Thomas G. Deegan
M 1/15/2004
5
Address List No PhoneSprinkler System Discharge Criteria AUT-SSD
Automatic Sprinkler Systems
David R. Hague05/25/2016
AUT-SSD
Barry M. Lee
Nonvoting MemberTyco International16 Payten StreetKogarah Bay, NSW 2217 Australia
M 10/10/1997AUT-SSD
David R. Hague
Staff LiaisonNational Fire Protection Assocation1 Batterymarch ParkQuincy, MA 02169-7471
3/18/2016
6
PART 3 –
NEW PROCESS WORKSHEETS
March 13, 2012
TERMS New Terms Old Terms
Input Stage – Stage where Public Input is sought to develop the First Draft.
Report on Proposals (ROP) Stage
Public Input (PI) – A recommended change submitted for consideration by the Technical Committee. Each Public Input (PI) shall include new, modified or deleted text as appropriate and technical substantiation to support the recommended change.
Download a Public Input Form for documents in Fall 2013 and subsequent cycles
Proposal
First Draft Meeting ROP Meeting
First Revision (FR) – Proposed changes to the text of an NFPA Standard developed by the responsible Committee(s) in the Input Stage. Each First Revision shall contain the new, modified or deleted text as appropriate. A First Revision shall be established through a Meeting Vote and shall only require a simple majority to proceed to ballot. Only First Revisions that pass ballot will show in the First Draft. Each First Revision shall contain a Committee Statement that substantiates the proposed change to the document.
Committee Proposal or Accepted Public Proposal
Committee Input (CI) – A CI can be established during the First Draft Technical Committee meeting (without balloting) in order to highlight the concept to obtain public comment; often used for newer ideas, topics that aren’t fully fleshed out or controversial topics. A Committee Input (CI) can also be a First Revision (FR) that fails to receive support of the technical committee through letter ballot. Committee Inputs shall maintain the original FR Committee Statement and shall contain a notification to the reviewer documenting that the CI represents a failed FR.
“Trial Balloon” or an Accepted Proposal (or Committee Proposal) that Failed Ballot
Committee Statement (CS) – A Committee Statement is the committee’s response to a Public Input (PI), Public Comment (PC) or the committee’s technical substantiation for a proposed First Revision. A committee statement shall be established through a Meeting Vote and shall only require a simple majority to proceed.
Committee Statement
First Draft Report – The First Draft Report documents the Input Stage; it shall contain the First Draft, Public Input, Committee Input, Committee and Correlating Committee Statements, Correlating Input, Correlating Notes and Ballot Statements.
ROP
First Draft – The draft of the proposed new or revised standard showing in legislative text all First Revisions and First Correlating Revisions that have passed ballot.
ROP Draft
Correlating Committee (CC) Technical Correlating Committee
Correlating Committee Statement – The Correlating Committee’s response to a Public Input (PI), Committee Input (CI), Public Comment (PC) or the Correlating Committee’s technical substantiation for a correlating change to proposed Revision or a correlative CCFR. It shall be established through a Meeting Vote and shall only require a simple majority to proceed.
TCC Note
Correlating Committee First Revision (CCFR) – Correlating Committee First Revisions are proposed revisions to the Technical Committee’s First Revisions that are required to correlate the proposed document. Each CCFR shall contain a Correlating Committee Statement that substantiates the Revision. A CCFR shall be established through a Meeting Vote and shall only require a simple majority to proceed to letter ballot. CCFRs that fail to receive CC support through letter ballot shall not be published as part of the First Draft.
TCC Note
Technical Committee First Draft meeting - Spring 2012 Page 2 of 34 V.2 3/13/2012
Comment Stage Report on Comments (ROC) Stage
Public Comment – Changes submitted by the public during public Comment Stage.
Public Comment
Second Draft Meeting ROC Meeting
Second Revision (SR) – Similar to First Revision, but in the Comment Stage. Proposed changes to the text by the TC that have passed ballot.
Committee Comment or Accepted Public Comment
Committee Comment – A Committee Comment shall be a Second Revision (SR) that fails to receive support of the TC through ballot. Committee Comments shall maintain the original Committee Statement and shall contain a notification to the reviewer documenting that the Committee Comment represents a failed SR.
Committee Comment that failed ballot
Committee Action – An action by a TC to accept or reject a Comment. This occurs only in the Comment Stage and the action itself is not balloted.
Committee Action
Second Draft Report – The Second Draft Report documents the Comment Stage; it shall contain the Second Draft, Public Comments with corresponding Committee Actions and Committee Statements, Committee Comments, Correlating Revisions and Ballot Statements.
ROC
Second Draft – The draft of the proposed new or revised standard showing in legislative text all Second Revisions and Second Correlating Revisions that have passed ballot.
ROC Draft
Technical Committee First Draft meeting - Spring 2012 Page 3 of 34 V.2 3/13/2012
NEW PROCESS ACTIONS AND MOTIONS
New Process Actions and Motions‐ Final‐ 2/13/2012
Possible Action 1: Resolve PIs, (no change to Section)
Action Required Sample MotionsStep One: Committee generates a statement to respond to (resolve)
each PI #
I make a motion (move) to resolve PI#___ with the following committee statement: Approval by a meeting vote (simple majority) and not subject to ballot (Regs 4.3.7.3 & 4.3.7.3.2)
Possible Action 2: Create First Revision ‐ Change to a Section
Action Required Sample MotionsStep One: (1st option)
Committee generates a First Revision I make a motion (move) to revise Section ___ as follows:………… Approval by a meeting vote (simply majority) and final approval through ballot (Regs 4.3.9.2.3)
Step Two: (1st option)
Committee generates a statement substantiating the change.
Approval by a meeting vote (simply majority) (Regs 4.3.7.3)
Step One: (2nd option)
Committee generates a First Revision using one or more PIs as the starting point.
I make a motion to revise Section __ using PI#__ as the basis for change. Approval by a meeting vote (simply majority) and final approval through ballot (Regs 4.3.9.2.3)
Step Two: (2nd option)
If the revision is associated with one or more PIs the committee generates a statement to respond to (resolve) each PI
I make a motion (move) to resolve PIs # through ## with the following statement: Approval by a meeting vote (simply majority) and not subject to ballot (Regs 4.3.7.3 &
4.3.7.3.1)
Possible Action 3: Create Committee Input – (Trial Balloon/Placeholder)
Action Required Sample Motions Step One:
Committee generates a Committee Input (proposed revision) for public consideration and solicitation of Public Comments
I make a motion (move) to create a CI with a proposed revision to X.X.X as follows: Approval by a meeting vote (simply majority) and not subject to ballot (Regs 4.3.8)
Step Two: Committee generates a statement to explain the intent and why it is seeking public consideration and soliciting Public Comments
Approval by a meeting vote (simply majority) (Regs 4.3.7.1)
Technical Committee First Draft meeting - Spring 2012 Page 8 of 34 V.2 3/13/2012
PART 4 –
A2015 SD MEETING MINUTES
Technical Committee on
Sprinkler System Discharge Criteria
Second Draft Meeting Minutes
June 26-27, 2014 San Diego Marriott Del Mar
11966 El Camino Real
San Diego, CA 92130
1. The meeting was called to order by TC Chair Russ Leavitt at 8:00 AM.
2. The TC reviewed and approved the A2015 First Draft Meeting Minutes.
3. NFPA Staff (Matt Klaus) reviewed the regulations governing technical committee
meetings and outlined the protocol for making motions for the Second Draft meeting.
4. TC Chair Russ Leavitt reviewed the following items with the TC:
b. Overview of Public Comments
c. Potential Committee Second Revisions based on Task Group Reports Task Group
Reports
5. The Technical Committee heard the following task group reports:
6. Task Group Reports (order subject to change)
a. Metric Task Group Update
b. Commodity Classification Task Group Report
c. Storage Task Group Report
d. Chapter 23 and 24 Task Group
e. Chapter 11 Task Group Report
f. Extract Task Group Update
7. TC Chair Russ Leavitt called for new business. The following items were presented to
the task group:
a. The TC prepared a list of items that should be presented at the Correlating
Committee meeting to address redundancies. This list is based upon the “reject
but hold” discussion on the redundancy PIs that were submitted to the TC. The
list is attached to these minutes.
b.
8. The meeting was adjourned at 4:30 PM local time.
Redundancy Comments to the Correlating Committee
The concept of limiting the redundancy in chapters 12-21 of NFPA has been
discussed throughout this revision cycle. While the TC is in general support of this
concept, making these redundancy revisions at the Second Phase of the cycle is not
appropriate. The reject but hold action for this item will allow the TC on Discharge
Criteria to submit the concept to the correlating committee for review and
refinement before proceeding into the 2019 edition revision cycle.
Discharge Committee recommendations to the TCC Correlating Task Group in
addition to work done so far are as follows:
Descriptive and repetitive text in Titles and subsections need to be resolved.
Create a consolidated In-Rack design section.
Solid Shelf Consolidation
Consider a separate chapter for ESFR and CMSA – eliminate from each section.
Consider a general rule that all sections under a Section or Subsection heading
apply to the heading limitations
Clarify when a subsection is an exception to a general rule – possibly annex
Create a Pre Storage Chapter with a roadmap of defining decision making sequence
Take action on Chapter 22 – reply to other standards to remove sprinkler
requirements
Chapter 3 –
1. Consolidate definitions in alphabetical order – one book
Chapter 7 –
1. Look at consolidating common rules between system types – such as dry pipe
and preaction etc.
Chapter 8 –
2. Section 8.5 was supposed to be general – consolidate 8.6, 8.7, 8.8,8.9 and 8.10
criteria where applicable
3. Remove In-rack criteria – coordinate with Storage sections
Chapter 9 –
1. Remove Hanging and Bracing to it’s own standard
Chapter 13 –
1. 13.2.1 and 13.2.2 – look at similar text and possibly combine
2. Consider moving chapter 13 to prior to chapter 12
Chapter 14 –
1. Combine Chapter 14 with 15
Chapter 15 –
1. Combine Chapter 14 with 15
Chapter 16 –
1. Consolidate the In-Rack Criteria
2. Consolidate below 25 ft with above 25 ft criteria
3. Combine Chapter 16 and 17
Chapter 17 –
1. Consolidate the In-Rack Criteria
2. Consolidate below 25 ft with above 25 ft criteria
3. Combine Chapter 16 and 17
SD (SSD) Attendees 6/26-27/2014
Principals: Russ Leavitt Carl Anderson Thomas Deegan John Denhardt James Dockrill James Golinveaux Bo Hjorth Donald Hopkins Roland Huggins Kenneth Isman Sultan Javeri Larry Keeping William Koffel A. LaFleur Kenneth Linder Thomas Multer Garner Palenske Richard Pehrson Kenneth Schneider Peter Schwab Michael Sides Jack Thacker Douglas Wilson
Voting Alternates: William Smith Craig Studer
Alternates Jon Ackley Tracey Bellamy Elley Klausbruckner Jack Medovich Angele Morcos Alice Muna George Stanley Peter Thomas Terry Victor
Matt Klaus, NFPA Staff Liaison
Guests: Steven Wolin Ray Lambert John Deutsch Ken Wagoner Brian Mosberian Gary Smith Scott Franson Cecil Bilbo Jacqueline Wilmot
PART 5 –
A2018 KEY DATES
Process
StageProcess Step Dates for TC
Dates for TC
with CC
Public Input Closing Date 6/29/2016 6/29/2016
Final date for TC First Draft Meeting 12/7/2016 9/7/2016Posting of First Draft and TC Ballot 1/25/2017 10/19/2016Final date for Receipt of TC First Draft ballot 2/15/2017 11/9/2016Final date for Receipt of TC First Draft ballot ‐ recirc 2/22/2017 11/16/2016Posting of First Draft for CC Meeting 11/23/2016Final date for CC First Draft Meeting 1/4/2017Posting of First Draft and CC Ballot 1/25/2017Final date for Receipt of CC First Draft ballot 2/15/2017Final date for Receipt of CC First Draft ballot ‐ recirc 2/22/2017Post First Draft Report for Public Comment 3/1/2017 3/1/2017
Public Comment closing date 5/10/2017 5/10/2017
Notice published on Consent Standards (Standards that receive No Comments). Note: Date varies and determined via TC ballot.
_ _
Appeal Closing Date for Consent Standards (15 Days) (Standards That Received
No Comments)_ _
Final date for TC Second Draft Meeting 11/8/2017 8/2/2017Posting of Second Draft and TC Ballot 12/20/2017 9/13/2017Final date for Receipt of TC Second Draft Ballot 1/10/2018 10/4/2017Final date for receipt of TC Second Draft ballot ‐ recirc 1/17/2018 10/11/2017Posting of Second Draft for CC Mtg 10/18/2017Final date for CC Second Draft Meeting 11/29/2017Posting of Second Draft for CC Ballot 12/20/2017Final date for Receipt of CC Second Draft ballot 1/10/2018Final date for Receipt of CC Second Draft ballot ‐ recirc 1/17/2018Post Second Draft Report for NITMAM Review 1/24/2018 1/24/2018
Notice of Intent to Make a Motion (NITMAM) Closing Date 2/21/2018 2/21/2018Posting of Certified Amending Motions (CAMs) and Consent Standards 4/4/2018 4/4/2018Appeal Closing Date for Consent Standards (15 Days after posting) 4/19/2018 4/19/2018SC Issuance Date for Consent Standards (10 Days) 4/29/2018 4/29/2018
Tech Session Association Meeting for Standards with CAMs 6/4‐7/2018 6/4‐7/2018
Appeal Closing Date for Standards with CAMs (20 Days after ATM) 6/27/2018 6/27/2018Council Issuance Date for Standards with CAMs* 8/14/2018 8/14/2018
Comment
Stage (Second
Draft)
Tech Session
Preparation
(& Issuance)
Appeals and
Issuance
2018 ANNUAL REVISION CYCLE
Public Input
Stage
(First Draft)
* Public Input Closing Dates may vary according to standards and schedules for Revision Cycles may change. Please check the
NFPA Website for the most up‐to‐date information on Public Input Closing Dates and schedules at www.nfpa.org/document # (i.e.
www.nfpa.org/101) and click on Next Edition tab.