Technical Committee on Sprinkler System Discharge Criteria M E M O R A N D U M DATE: May 26, 2016 TO: Members of the Technical Committee on Sprinkler System Discharge Criteria FROM: David R. Hague, Principal Fire Protection Engineer/NFPA Staff Liaison SUBJECT: AUT-SSD AGENDA PACKAGE A2018 Pre-First Draft Meeting ________________________________________________________________________ Enclosed is the agenda for the Pre-First Draft meeting for NFPA 13, Standard for the Installation of Sprinkler Systems, NFPA 13 has entered the Annual 2018 revision cycle and will produce a 2019 Edition. It is imperative that you review the attached in advance, with your ideas and substantiations for your views. If you have alternate suggestions for text changes, please come prepared with the words and respective substantiation. For administrative questions, please feel free to contact Elena Carroll at (617) 984-7952. For technical questions, please feel free to contact Dave Hague at (617) 984-7273. You can also reach either of us via e-mail at [email protected] or [email protected]. We look forward to meeting everyone in San Antonio Riverwalk.

Transcript of Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO...

Page 1: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Technical Committee on Sprinkler System Discharge Criteria

M E M O R A N D U M

DATE: May 26, 2016

TO: Members of the Technical Committee on Sprinkler System Discharge Criteria

FROM: David R. Hague, Principal Fire Protection Engineer/NFPA Staff Liaison

SUBJECT: AUT-SSD AGENDA PACKAGE – A2018 Pre-First Draft Meeting

________________________________________________________________________

Enclosed is the agenda for the Pre-First Draft meeting for NFPA 13, Standard for the Installation of

Sprinkler Systems, NFPA 13 has entered the Annual 2018 revision cycle and will produce a 2019 Edition.

It is imperative that you review the attached in advance, with your ideas and substantiations for your

views. If you have alternate suggestions for text changes, please come prepared with the words and

respective substantiation.

For administrative questions, please feel free to contact Elena Carroll at (617) 984-7952. For technical

questions, please feel free to contact Dave Hague at (617) 984-7273. You can also reach either of us via

e-mail at [email protected] or [email protected]. We look forward to meeting everyone in San Antonio

Riverwalk.

Page 2: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Technical Committee on Sprinkler System Discharge Criteria

Pre-First Draft Meeting

June 29 - 30, 2016

Courtyard by Marriott San Antonio Riverwalk

207 N. St. Mary's St.

San Antonio, TX 78205

AGENDA

Wednesday June 29, 2016

1. Call to Order – 8:00 AM

2. Introductions of Members and Staff

3. Review and Approval of A2015 2nd Draft Meeting Minutes

4. Review of A2018 Revision Cycle and Meeting Schedule

5. Review of Distributed Material and Workload

a. Overview of Public Input

b. Overview of Potential Committee First Revisions

c. Review of document reformat

d. Overview of NFPA 13M

6. Establish Task Groups

7. Recess for Task Group Meetings (TBD)

Thursday June 30, 2016

8. Task Group Meetings (Cont.) – 8:00AM

9. Adjourn 12:00 PM

10. Lunch 12:00 PM – 1:00 PM

11. Reconvene for Task Group Reports

12. Task Group Assignments and Schedules for First Draft Meeting

Page 3: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Table of Contents

Part 1 - Meeting Agenda

Part 2 - Committee Address List

Part 3 – New Process Worksheets

Part 4 – A2015 Second Draft Meeting Minutes

Part 5 - A2018 Key Dates

Page 4: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

PART 2 –

COMMITTEE ADDRESS LIST

Page 5: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Address List No PhoneSprinkler System Discharge Criteria AUT-SSD

Automatic Sprinkler Systems

David R. Hague05/25/2016

AUT-SSD

Russell B. Leavitt

ChairTelgian Corporation10230 S. 50th PlacePhoenix, AZ 85044Alternate: Tracey D. Bellamy

SE 03/05/2012AUT-SSD

Carl P. Anderson

PrincipalThe Fire Protection International Consortium1420 Marvin Road NE, #432Lacey, WA 98516Washington State Association of Fire Marshals

E 7/20/2000

AUT-SSD

Weston C. Baker, Jr.

PrincipalFM Global1151 Boston Providence TurnpikePO Box 9102Norwood, MA 02062-9102Alternate: Angele Morcos

I 7/19/2002AUT-SSD

Charles O. Bauroth

PrincipalLiberty Mutual Property36 Willow LaneUxbridge, MA 01569

I 1/18/2001

AUT-SSD

Kerry M. Bell

PrincipalUL LLC333 Pfingsten RoadNorthbrook, IL 60062-2096Alternate: Pravinray D. Gandhi

RT 10/10/1997AUT-SSD

Thomas G. Deegan

PrincipalViking Group, Inc.3033 Orchard Vista SE, Suite 308Grand Rapids, MI 49546-7077Alternate: Martin H. Workman

M 7/12/2001

AUT-SSD

John August Denhardt

PrincipalStrickland Fire Protection, Inc.5113 Berwyn RoadCollege Park, MD 20740American Fire Sprinkler AssociationInstaller/MaintainerAlternate: Steven J. Scandaliato

IM 1/16/1998AUT-SSD

James Dockrill

PrincipalJ&S Fire Sprinkler Design & Consulting55 Woodrow StreetSt. Catharines, ON L2P 2A4 CanadaCanadian Automatic Sprinkler AssociationAlternate: Jason W. Ryckman

IM 08/09/2012

AUT-SSD

Abram Selim Fouad

PrincipalElite Consolidated Engineers11, 12 Moustafa Refaat StreetSheraton HelioplisCairo, Egypt

SE 08/17/2015AUT-SSD

Bo Hjorth

PrincipalAlbaCon ABBox 619Nacka, 13121 SwedenAlternate: Joakim Bauer

SE 3/21/2006

AUT-SSD

Donald Hopkins, Jr.

PrincipalJENSEN HUGHES3610 Commerce Drive, Suite 817Baltimore, MD 21227-1652Alternate: Timothy R. Costello

SE 9/30/2004AUT-SSD

Roland J. Huggins

PrincipalAmerican Fire Sprinkler Association, Inc.12750 Merit Drive, Suite 350Dallas, TX 75251-1273American Fire Sprinkler AssociationDesignAlternate: James M. Fantauzzi

IM 10/10/1997

1

Page 6: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Address List No PhoneSprinkler System Discharge Criteria AUT-SSD

Automatic Sprinkler Systems

David R. Hague05/25/2016

AUT-SSD

Kenneth E. Isman

PrincipalUniversity of Maryland7402 Forests Edge CourtLaurel, MD 20707Alternate: Milosh T. Puchovsky

SE 7/26/2007AUT-SSD

Sultan M. Javeri

PrincipalSC Engineering2 Impasse Du GuernehlieLa Trinite, Surzur, 56190 France

IM 10/10/1997

AUT-SSD

Larry Keeping

PrincipalPLC Fire Safety Solutions3413 Wolfedale Road, Suite 6Mississauga, ON L5C 1V8 Canada

SE 10/10/1997AUT-SSD

Kevin J. Kelly

PrincipalVictaulic4901 Kesslersville RoadEaston, PA 18040-6714National Fire Sprinkler AssociationManufacturerAlternate: Peter W. Thomas

M 04/05/2016

AUT-SSD

Elham Klausbruckner

PrincipalKlausbruckner & Associates, Inc.2495 Truxtun Road, Suite 205San Diego, CA 92106-6159

SE 10/29/2012AUT-SSD

William E. Koffel

PrincipalKoffel Associates, Inc.8815 Centre Park Drive, Suite 200Columbia, MD 21045-2107Alternate: Mark J. Aaby

SE 10/1/1999

AUT-SSD

A. Christine LaFleur

PrincipalSandia National LaboratoriesBuilding Safety & Assurance DepartmentPO Box 5800, MS-0909Albuquerque, NM 87185-0909Alternate: Alice B. Muna

U 04/05/2001AUT-SSD

Kenneth W. Linder

PrincipalSwiss Re2 Waterside Crossing, Suite 200Windsor, CT 06095-1588Alternate: Joseph A. Lynch

I 7/28/2006

AUT-SSD

Stuart Lloyd

PrincipalZurich Risk Engineering UK5 Margrove CloseFailsworth, Manchester, M35 9XQ Great BritainAlternate: Richard A. Gallagher

I 08/17/2015AUT-SSD

Brian Mosberian

PrincipalCity of Phoenix200 West WashingtonPhoenix, AZ 85003

E 03/07/2013

AUT-SSD

Garner A. Palenske

PrincipalAon Fire Protection Engineering Corporation11770 Bernardo Plaza Court, Suite 116San Diego, CA 92128Alternate: Daniel J. O'Connor

I 7/20/2000AUT-SSD

Richard Pehrson

PrincipalPehrson Fire PC7455 France Avenue South, Suite 271Edina, MN 55435International Fire Marshals AssociationAlternate: Daniel A. Kaiser

E 7/22/1999

2

Page 7: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Address List No PhoneSprinkler System Discharge Criteria AUT-SSD

Automatic Sprinkler Systems

David R. Hague05/25/2016

AUT-SSD

Kenneth R. Schneider

PrincipalUA - ITFTraining Specialist3723 S. BroadwaySt. Louis, MO 63118United Assn. of Journeymen & Apprentices of thePlumbing & Pipe Fitting IndustryAlternate: Robert C. Holliday

L 03/05/2012AUT-SSD

Peter T. Schwab

PrincipalWayne Automatic Fire Sprinklers, Inc.222 Capitol CourtOcoee, FL 34761-3033

IM 8/2/2010

AUT-SSD

Michael D. Sides

PrincipalGlobal Asset Protection Services1360 Olympia Park CircleOcoee, FL 34761Alternate: Mark A. Bowman

I 7/16/2003AUT-SSD

Gary T. Smith

PrincipalDACS, Inc.PO Box 161Great Meadows, NJ 07838Rack Manufacturers InstituteAlternate: Gerald R. Schultz

M 08/09/2012

AUT-SSD

William B. Smith

PrincipalCode Consultants, Inc.2043 Woodland Parkway, Suite 300St. Louis, MO 63146-4235Alternate: Thomas Larry Frank

SE 08/09/2012AUT-SSD

Jack W. Thacker

PrincipalAllan Automatic Sprinkler Corp. of So. California3233 Enterprise StreetBrea, CA 92821-6239National Fire Sprinkler AssociationContractorAlternate: George W. Stanley

IM 10/10/1997

AUT-SSD

Victoria B. Valentine

PrincipalNational Fire Sprinkler Association, Inc.40 Jon Barrett RoadPatterson, NY 12563-2164National Fire Sprinkler AssociationDesign TechnicianAlternate: Jon R. Ackley

M 04/08/2015AUT-SSD

Douglas Wilson

PrincipalCity of San Diego1222 First Avenue, MS 401San Diego, CA 92101Alternate: Michael Six

E 03/03/2014

AUT-SSD

Steven D. Wolin

PrincipalReliable Automatic Sprinkler Company, Inc.1470 Smith Grove RoadLiberty, SC 29657-4305Alternate: Thomas L. Multer

M 10/28/2014AUT-SSD

Terry L. Victor

Voting AlternateTyco/SimplexGrinnell705 Digital Drive, Suite NLinthicum, MD 21090-2267

M 10/29/2012

AUT-SSD

Mark J. Aaby

AlternateKoffel Associates, Inc.8815 Centre Park Drive, Suite 200Columbia, MD 21045-2107Principal: William E. Koffel

SE 3/4/2008

3

Page 8: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Address List No PhoneSprinkler System Discharge Criteria AUT-SSD

Automatic Sprinkler Systems

David R. Hague05/25/2016

AUT-SSD

Jon R. Ackley

AlternateDalmatian Fire, Inc.5670 West 73rd StreetIndianapolis, IN 46278National Fire Sprinkler AssociationDesign TechnicianPrincipal: Victoria B. Valentine

M 10/29/2012AUT-SSD

Joakim Bauer

AlternateAlbaCon ABBox 619Nacka, 13121 SwedenPrincipal: Bo Hjorth

SE 10/29/2012

AUT-SSD

Tracey D. Bellamy

AlternateTelgian Corporation900 Circle 75 Parkway, Suite 680Atlanta, GA 30339-3084Principal: Russell B. Leavitt

SE 1/10/2008AUT-SSD

Mark A. Bowman

AlternateXL Global Asset Protection Services13467 Chevington DrivePickerington, OH 43147Principal: Michael D. Sides

I 7/16/2003

AUT-SSD

Timothy R. Costello

AlternateJENSEN HUGHES360 West 31st Street, Suite 900New York, NY 10001-2872Principal: Donald Hopkins, Jr.

SE 08/11/2014AUT-SSD

James M. Fantauzzi

AlternateNorth East Fire Protection Systems Inc.318 Charlton RoadBallston, NY 12020American Fire Sprinkler AssociationDesignPrincipal: Roland J. Huggins

IM 04/05/2016

AUT-SSD

Thomas Larry Frank

AlternateCode Consultants, Inc.2043 Woodland Parkway, Suite 300Saint Louis, MO 63146Principal: William B. Smith

SE 10/28/2014AUT-SSD

Richard A. Gallagher

AlternateZurich Services Corporation5124 New Kent RoadWilmington, DE 19808-2706Principal: Stuart Lloyd

I 08/17/2015

AUT-SSD

Pravinray D. Gandhi

AlternateUL LLC333 Pfingsten RoadNorthbrook, IL 60062-2096Principal: Kerry M. Bell

RT 4/5/2001AUT-SSD

Robert C. Holliday

AlternateSprinkler Fitters LU 268 JAC1544 South 3rd StreetSt. Louis, MO 63104United Assn. of Journeymen & Apprentices of thePlumbing & Pipe Fitting IndustryPrincipal: Kenneth R. Schneider

L 10/29/2012

AUT-SSD

Daniel A. Kaiser

AlternateMinnesota Department of Public SafetyState Fire Marshal Division203 SW 3rd StreetMedford, MN 55049International Fire Marshals AssociationPrincipal: Richard Pehrson

E 03/05/2012AUT-SSD

Joseph A. Lynch

AlternateSwiss Re, Global Asset Protection Services1105 Sanctuary Parkway, Suite 200Alpharetta, GA 30004-4741Principal: Kenneth W. Linder

I 04/05/2016

4

Page 9: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Address List No PhoneSprinkler System Discharge Criteria AUT-SSD

Automatic Sprinkler Systems

David R. Hague05/25/2016

AUT-SSD

Angele Morcos

AlternateFM Global1151 Boston-Providence TurnpikeNorwood, MA 02062-9102Principal: Weston C. Baker, Jr.

I 07/29/2013AUT-SSD

Thomas L. Multer

AlternateReliable Automatic Sprinkler Company, Inc.1470 Smith Grove RoadLiberty, SC 29657-4305Principal: Steven D. Wolin

M 12/08/2015

AUT-SSD

Alice B. Muna

AlternateSandia National LaboratoriesPO Box 5800, MS-0909Albuquerque, NM 87185Principal: A. Christine LaFleur

U 10/29/2012AUT-SSD

Daniel J. O'Connor

AlternateAon Fire Protection Engineering4 Overlook PointLincolnshire, IL 60069-4302Principal: Garner A. Palenske

I 10/27/2009

AUT-SSD

Milosh T. Puchovsky

AlternateWorcester Polytechnic InstituteDepartment of Fire Protection Engineering100 Institute RoadWorcester, MA 01609Principal: Kenneth E. Isman

SE 10/28/2014AUT-SSD

Jason W. Ryckman

AlternateCanadian Automatic Sprinkler Association335 Renfrew Drive, Suite 302Markham, ON L3R 9S9 CanadaPrincipal: James Dockrill

IM 10/28/2014

AUT-SSD

Steven J. Scandaliato

AlternateSDG, LLCP.O. Box 19798Fountain Hills, AZ 85269American Fire Sprinkler AssociationInstaller/MaintainerPrincipal: John August Denhardt

IM 8/9/2011AUT-SSD

Gerald R. Schultz

AlternateThe FPI Consortium, Inc.1202N 75th Street, #279Downers Grove, IL 60516Rack Manufacturers InstitutePrincipal: Gary T. Smith

M 08/09/2012

AUT-SSD

Michael Six

AlternateBremerton Fire Department911 Park AvenueBremerton, WA 98337Principal: Douglas Wilson

E 10/28/2014AUT-SSD

George W. Stanley

AlternateWiginton Fire Protection Engineering, Inc.699 Aero LaneSanford, FL 32771National Fire Sprinkler AssociationContractorPrincipal: Jack W. Thacker

IM 1/16/2003

AUT-SSD

Peter W. Thomas

AlternateVictaulic Company of America137 Finch LaneSaunderstown, RI 02874National Fire Sprinkler AssociationManufacturerPrincipal: Kevin J. Kelly

M 01/18/2001AUT-SSD

Martin H. Workman

AlternateThe Viking Corporation210 North Industrial Park RoadHastings, MI 49058Principal: Thomas G. Deegan

M 1/15/2004

5

Page 10: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Address List No PhoneSprinkler System Discharge Criteria AUT-SSD

Automatic Sprinkler Systems

David R. Hague05/25/2016

AUT-SSD

Barry M. Lee

Nonvoting MemberTyco International16 Payten StreetKogarah Bay, NSW 2217 Australia

M 10/10/1997AUT-SSD

David R. Hague

Staff LiaisonNational Fire Protection Assocation1 Batterymarch ParkQuincy, MA 02169-7471

3/18/2016

6

Page 11: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

PART 3 –

NEW PROCESS WORKSHEETS

Page 12: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

March 13, 2012

TERMS New Terms Old Terms

Input Stage – Stage where Public Input is sought to develop the First Draft.

Report on Proposals (ROP) Stage

Public Input (PI) – A recommended change submitted for consideration by the Technical Committee. Each Public Input (PI) shall include new, modified or deleted text as appropriate and technical substantiation to support the recommended change.

Download a Public Input Form for documents in Fall 2013 and subsequent cycles

Proposal

First Draft Meeting ROP Meeting

First Revision (FR) – Proposed changes to the text of an NFPA Standard developed by the responsible Committee(s) in the Input Stage. Each First Revision shall contain the new, modified or deleted text as appropriate. A First Revision shall be established through a Meeting Vote and shall only require a simple majority to proceed to ballot. Only First Revisions that pass ballot will show in the First Draft. Each First Revision shall contain a Committee Statement that substantiates the proposed change to the document.

Committee Proposal or Accepted Public Proposal

Committee Input (CI) – A CI can be established during the First Draft Technical Committee meeting (without balloting) in order to highlight the concept to obtain public comment; often used for newer ideas, topics that aren’t fully fleshed out or controversial topics. A Committee Input (CI) can also be a First Revision (FR) that fails to receive support of the technical committee through letter ballot. Committee Inputs shall maintain the original FR Committee Statement and shall contain a notification to the reviewer documenting that the CI represents a failed FR.

“Trial Balloon” or an Accepted Proposal (or Committee Proposal) that Failed Ballot

Committee Statement (CS) – A Committee Statement is the committee’s response to a Public Input (PI), Public Comment (PC) or the committee’s technical substantiation for a proposed First Revision. A committee statement shall be established through a Meeting Vote and shall only require a simple majority to proceed.

Committee Statement

First Draft Report – The First Draft Report documents the Input Stage; it shall contain the First Draft, Public Input, Committee Input, Committee and Correlating Committee Statements, Correlating Input, Correlating Notes and Ballot Statements.

ROP

First Draft – The draft of the proposed new or revised standard showing in legislative text all First Revisions and First Correlating Revisions that have passed ballot.

ROP Draft

Correlating Committee (CC) Technical Correlating Committee

Correlating Committee Statement – The Correlating Committee’s response to a Public Input (PI), Committee Input (CI), Public Comment (PC) or the Correlating Committee’s technical substantiation for a correlating change to proposed Revision or a correlative CCFR. It shall be established through a Meeting Vote and shall only require a simple majority to proceed.

TCC Note

Correlating Committee First Revision (CCFR) – Correlating Committee First Revisions are proposed revisions to the Technical Committee’s First Revisions that are required to correlate the proposed document. Each CCFR shall contain a Correlating Committee Statement that substantiates the Revision. A CCFR shall be established through a Meeting Vote and shall only require a simple majority to proceed to letter ballot. CCFRs that fail to receive CC support through letter ballot shall not be published as part of the First Draft.

TCC Note

Technical Committee First Draft meeting - Spring 2012 Page 2 of 34 V.2 3/13/2012

Page 13: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Comment Stage Report on Comments (ROC) Stage

Public Comment – Changes submitted by the public during public Comment Stage.

Public Comment

Second Draft Meeting ROC Meeting

Second Revision (SR) – Similar to First Revision, but in the Comment Stage. Proposed changes to the text by the TC that have passed ballot.

Committee Comment or Accepted Public Comment

Committee Comment – A Committee Comment shall be a Second Revision (SR) that fails to receive support of the TC through ballot. Committee Comments shall maintain the original Committee Statement and shall contain a notification to the reviewer documenting that the Committee Comment represents a failed SR.

Committee Comment that failed ballot

Committee Action – An action by a TC to accept or reject a Comment. This occurs only in the Comment Stage and the action itself is not balloted.

Committee Action

Second Draft Report – The Second Draft Report documents the Comment Stage; it shall contain the Second Draft, Public Comments with corresponding Committee Actions and Committee Statements, Committee Comments, Correlating Revisions and Ballot Statements.

ROC

Second Draft – The draft of the proposed new or revised standard showing in legislative text all Second Revisions and Second Correlating Revisions that have passed ballot.

ROC Draft

 

Technical Committee First Draft meeting - Spring 2012 Page 3 of 34 V.2 3/13/2012

Page 14: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

NEW PROCESS ACTIONS AND MOTIONS  

New Process Actions and Motions‐ Final‐ 2/13/2012   

Possible Action 1:  Resolve PIs, (no change to Section) 

  Action Required Sample MotionsStep One:  Committee generates a statement  to respond  to (resolve) 

each PI #    

I make a motion (move) to resolve PI#___ with the following committee statement:    Approval by a meeting vote (simple majority) and not subject to ballot  (Regs 4.3.7.3 & 4.3.7.3.2) 

Possible Action 2:  Create First Revision ‐ Change to a Section  

  Action Required Sample MotionsStep One: (1st option) 

 Committee generates a First Revision   I make a motion (move) to revise Section ___      as follows:…………   Approval by a meeting vote (simply majority) and final approval through ballot (Regs 4.3.9.2.3) 

Step Two: (1st option) 

Committee generates a statement substantiating the change.    

  Approval by a meeting vote (simply majority) (Regs 4.3.7.3) 

     

Step One: (2nd option) 

Committee generates a First Revision using one or more PIs as the starting point. 

I make a motion to revise Section __ using PI#__ as the basis for change.  Approval by a meeting vote (simply majority) and final approval through ballot (Regs 4.3.9.2.3)

Step Two:  (2nd option)  

If the revision is associated with one or more PIs the committee generates a statement  to respond  to (resolve) each PI   

I make a motion (move) to resolve PIs # through ## with the following statement:      Approval by a meeting vote (simply majority) and not subject to ballot  (Regs 4.3.7.3 & 

4.3.7.3.1) 

Possible Action 3:  Create Committee Input – (Trial Balloon/Placeholder)

  Action Required  Sample Motions Step One:  

Committee generates a Committee Input (proposed revision) for public consideration and solicitation of Public Comments   

I make a motion (move) to create a CI with a proposed revision to  X.X.X as follows:   Approval by a meeting vote (simply majority) and not subject to ballot  (Regs 4.3.8) 

Step Two:  Committee generates a statement   to explain the intent and why it is seeking public consideration and soliciting Public Comments   

  Approval by a meeting vote (simply majority) (Regs 4.3.7.1) 

 

Technical Committee First Draft meeting - Spring 2012 Page 8 of 34 V.2 3/13/2012

Page 15: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

PART 4 –

A2015 SD MEETING MINUTES

Page 16: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Technical Committee on

Sprinkler System Discharge Criteria

Second Draft Meeting Minutes

June 26-27, 2014 San Diego Marriott Del Mar

11966 El Camino Real

San Diego, CA 92130

1. The meeting was called to order by TC Chair Russ Leavitt at 8:00 AM.

2. The TC reviewed and approved the A2015 First Draft Meeting Minutes.

3. NFPA Staff (Matt Klaus) reviewed the regulations governing technical committee

meetings and outlined the protocol for making motions for the Second Draft meeting.

4. TC Chair Russ Leavitt reviewed the following items with the TC:

b. Overview of Public Comments

c. Potential Committee Second Revisions based on Task Group Reports Task Group

Reports

5. The Technical Committee heard the following task group reports:

6. Task Group Reports (order subject to change)

a. Metric Task Group Update

b. Commodity Classification Task Group Report

c. Storage Task Group Report

d. Chapter 23 and 24 Task Group

e. Chapter 11 Task Group Report

f. Extract Task Group Update

7. TC Chair Russ Leavitt called for new business. The following items were presented to

the task group:

a. The TC prepared a list of items that should be presented at the Correlating

Committee meeting to address redundancies. This list is based upon the “reject

but hold” discussion on the redundancy PIs that were submitted to the TC. The

list is attached to these minutes.

b.

8. The meeting was adjourned at 4:30 PM local time.

Page 17: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Redundancy Comments to the Correlating Committee

The concept of limiting the redundancy in chapters 12-21 of NFPA has been

discussed throughout this revision cycle. While the TC is in general support of this

concept, making these redundancy revisions at the Second Phase of the cycle is not

appropriate. The reject but hold action for this item will allow the TC on Discharge

Criteria to submit the concept to the correlating committee for review and

refinement before proceeding into the 2019 edition revision cycle.

Discharge Committee recommendations to the TCC Correlating Task Group in

addition to work done so far are as follows:

Descriptive and repetitive text in Titles and subsections need to be resolved.

Create a consolidated In-Rack design section.

Solid Shelf Consolidation

Consider a separate chapter for ESFR and CMSA – eliminate from each section.

Consider a general rule that all sections under a Section or Subsection heading

apply to the heading limitations

Clarify when a subsection is an exception to a general rule – possibly annex

Create a Pre Storage Chapter with a roadmap of defining decision making sequence

Take action on Chapter 22 – reply to other standards to remove sprinkler

requirements

Chapter 3 –

1. Consolidate definitions in alphabetical order – one book

Chapter 7 –

1. Look at consolidating common rules between system types – such as dry pipe

and preaction etc.

Chapter 8 –

2. Section 8.5 was supposed to be general – consolidate 8.6, 8.7, 8.8,8.9 and 8.10

criteria where applicable

3. Remove In-rack criteria – coordinate with Storage sections

Chapter 9 –

1. Remove Hanging and Bracing to it’s own standard

Chapter 13 –

1. 13.2.1 and 13.2.2 – look at similar text and possibly combine

2. Consider moving chapter 13 to prior to chapter 12

Chapter 14 –

1. Combine Chapter 14 with 15

Chapter 15 –

Page 18: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

1. Combine Chapter 14 with 15

Chapter 16 –

1. Consolidate the In-Rack Criteria

2. Consolidate below 25 ft with above 25 ft criteria

3. Combine Chapter 16 and 17

Chapter 17 –

1. Consolidate the In-Rack Criteria

2. Consolidate below 25 ft with above 25 ft criteria

3. Combine Chapter 16 and 17

Page 19: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

SD (SSD) Attendees 6/26-27/2014

Principals: Russ Leavitt Carl Anderson Thomas Deegan John Denhardt James Dockrill James Golinveaux Bo Hjorth Donald Hopkins Roland Huggins Kenneth Isman Sultan Javeri Larry Keeping William Koffel A. LaFleur Kenneth Linder Thomas Multer Garner Palenske Richard Pehrson Kenneth Schneider Peter Schwab Michael Sides Jack Thacker Douglas Wilson

Voting Alternates: William Smith Craig Studer

Alternates Jon Ackley Tracey Bellamy Elley Klausbruckner Jack Medovich Angele Morcos Alice Muna George Stanley Peter Thomas Terry Victor

Matt Klaus, NFPA Staff Liaison

Guests: Steven Wolin Ray Lambert John Deutsch Ken Wagoner Brian Mosberian Gary Smith Scott Franson Cecil Bilbo Jacqueline Wilmot

Page 20: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

PART 5 –

A2018 KEY DATES

Page 21: Technical Committee on Sprinkler System Discharge Criteria...Gary T. Smith Principal DACS, Inc. PO Box 161 Great Meadows,NJ07838 Rack Manufacturers Institute Alternate:GeraldR. Schultz

Process 

StageProcess Step Dates for TC

Dates for TC 

with CC

Public Input Closing Date  6/29/2016 6/29/2016

Final date for TC First Draft Meeting 12/7/2016 9/7/2016Posting of First Draft and TC Ballot  1/25/2017 10/19/2016Final date for Receipt of TC First Draft ballot 2/15/2017 11/9/2016Final date for Receipt of TC First Draft ballot ‐ recirc 2/22/2017 11/16/2016Posting of First Draft for CC Meeting 11/23/2016Final date for CC First Draft Meeting 1/4/2017Posting of First Draft and CC Ballot  1/25/2017Final date for Receipt of CC First Draft ballot 2/15/2017Final date for Receipt of CC First Draft ballot ‐ recirc 2/22/2017Post First Draft Report for Public Comment 3/1/2017 3/1/2017

Public Comment closing date  5/10/2017 5/10/2017

Notice published on Consent Standards (Standards that receive No Comments). Note: Date varies and determined via TC ballot.

_ _

Appeal Closing Date for Consent Standards (15 Days)     (Standards That Received 

No Comments)_ _

Final date for TC Second Draft Meeting 11/8/2017 8/2/2017Posting of Second Draft and TC Ballot  12/20/2017 9/13/2017Final date for Receipt of TC Second Draft Ballot 1/10/2018 10/4/2017Final date for receipt of TC Second Draft ballot ‐ recirc 1/17/2018 10/11/2017Posting of Second Draft for CC Mtg 10/18/2017Final date for CC Second Draft Meeting 11/29/2017Posting of Second Draft for CC Ballot 12/20/2017Final date for Receipt of CC Second Draft ballot 1/10/2018Final date for Receipt of CC Second Draft ballot ‐ recirc 1/17/2018Post Second Draft Report for NITMAM Review 1/24/2018 1/24/2018

Notice of Intent to Make a Motion (NITMAM) Closing Date 2/21/2018 2/21/2018Posting of Certified Amending Motions (CAMs) and Consent Standards 4/4/2018 4/4/2018Appeal Closing Date for Consent Standards (15 Days after posting) 4/19/2018 4/19/2018SC Issuance Date for Consent Standards  (10 Days)  4/29/2018 4/29/2018

Tech Session Association Meeting for Standards with CAMs 6/4‐7/2018 6/4‐7/2018

Appeal Closing Date for Standards with CAMs (20 Days after ATM) 6/27/2018 6/27/2018Council Issuance Date for Standards with CAMs* 8/14/2018 8/14/2018

Comment 

Stage (Second 

Draft)

Tech Session 

Preparation     

(& Issuance)

Appeals and 

Issuance

   2018 ANNUAL REVISION CYCLE 

Public Input 

Stage

(First Draft)

* Public Input Closing Dates may vary according to standards and schedules for Revision Cycles may change.  Please check the 

NFPA Website for the most up‐to‐date information on Public Input Closing Dates and schedules at www.nfpa.org/document # (i.e. 

www.nfpa.org/101) and click on Next Edition tab.