Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.
-
Upload
melanie-macdonald -
Category
Documents
-
view
218 -
download
1
Transcript of Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.
![Page 1: Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.](https://reader031.fdocuments.in/reader031/viewer/2022020803/551549ae5503465e608b63e5/html5/thumbnails/1.jpg)
Technical Co-operation Challenges
• Why ?
• Capabilities of existing Brazilian Institutions
![Page 2: Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.](https://reader031.fdocuments.in/reader031/viewer/2022020803/551549ae5503465e608b63e5/html5/thumbnails/2.jpg)
Technical co-operation from Brazil ?
• Experience in training foreign Aviation personnel - since 1980
• Participants nominated to almost every Panel, Committee, Study Group established by ICAO
• TRAINAIR Member
• Most air traffic flows in the Region affect Brazilian airspace
![Page 3: Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.](https://reader031.fdocuments.in/reader031/viewer/2022020803/551549ae5503465e608b63e5/html5/thumbnails/3.jpg)
Institutes ready for technical co-operation
• Civil Aviation Institute - IAC
• Institute of Aeronautical Cartography - ICA
• Institute of Air Navigation Services - IPV
![Page 4: Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.](https://reader031.fdocuments.in/reader031/viewer/2022020803/551549ae5503465e608b63e5/html5/thumbnails/4.jpg)
Technical co-operation fields (Group Training)
• GNSS operations• CNS/ATM concepts• CNS/ATM senior
management• Procedures of Air
Navigation (OPS & RAC)
![Page 5: Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.](https://reader031.fdocuments.in/reader031/viewer/2022020803/551549ae5503465e608b63e5/html5/thumbnails/5.jpg)
Technical Co-operation (Assistance of Experts)
• WGS-84• Aeronautical Charting• Procedure construction
(PANS-OPS)• Training development
(TRAINAIR method.)• CNS/ATM master
planning
![Page 6: Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.](https://reader031.fdocuments.in/reader031/viewer/2022020803/551549ae5503465e608b63e5/html5/thumbnails/6.jpg)
CNS/ATM Challenges
• Aeronautical jobs survey
• Technology insertion - Impacts on staffing, for example:
• implementation of RVSM = increase of Air Traffic Controllers (by 60 % ? )
![Page 7: Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.](https://reader031.fdocuments.in/reader031/viewer/2022020803/551549ae5503465e608b63e5/html5/thumbnails/7.jpg)
ATM Challenges
• Case of Air Traffic Flow Management
• - high degree of automation
• - global aspects
• - new function for Air Traffic Controllers
• - international co-operation is a must
![Page 8: Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.](https://reader031.fdocuments.in/reader031/viewer/2022020803/551549ae5503465e608b63e5/html5/thumbnails/8.jpg)
Technical Co-operation
• Needs• Good deal• Mechanisms• Who pays for it