TECHNICAL BUILDING TUNNEL A40 BOCHUM...betriebsgebaeude_tunnel_bochum_en_180207 The information in...
Transcript of TECHNICAL BUILDING TUNNEL A40 BOCHUM...betriebsgebaeude_tunnel_bochum_en_180207 The information in...
Always. Reliable. Tight.
www.hauff-technik.de
SUBSEQUENT SEALING OF CABLES AND DUCTS WITH THE AID OF SPLIT FLANGE PLATES AND SPLIT CABLE AND PIPE SEALINGS
TECHNICAL BUILDING TUNNEL A40 BOCHUM
2
of existing as well as newly to be installed cables and corrugated ducts
GAS- AND WATERTIGHT SEALING
Installation of the pre-mounted flange plate and marking of installation positions in front of the wall entry.
Adhesive bonding of the flat seal via Sikaflex sealing compound.
Step by step installation of the flange plate with long-shaft fixing dowels and stainless steel bolts.
Ready installed flange plate with cable and pipe penetrations. New wall entry with cable and duct ditch before grouting.
Safety relevant rehabilitation work at the existing lighting and LED activation control of variable message sign in the tunnel at the A40 in Bochum. Rehabilitation and structural alteration measures at the illumination system at the technical building as well as retrofitting of the existing safety systems required a multitude of new cables and control lines. These had to be inserted reliable and watertight. The existing cables and ducts had to remain in operating state during the installation. Beside the existing lines new control lines and corrugated ducts were installed. The existing cables and ducts were integrated in the new HRD sealing system. The flange plates were installed on the rectangular opening (770 x 410 mm).
bet
rieb
sgeb
aeu
de_
tun
nel
_bo
chu
m_e
n_1
8020
7Th
e in
form
atio
n in
th
is p
amp
hle
t is
bas
ed o
n o
ur
curr
ent
tech
nic
al k
no
wle
dg
e an
d e
xper
ien
ce. T
his
do
es n
ot
rele
ase
pro
cess
ors
an
d u
sers
fro
m t
he
resp
on
sib
ility
of
con
du
ctin
g t
hei
r o
wn
ch
ecks
an
d t
rails
du
e to
th
e n
um
ber
of
po
ssib
le in
flu
ence
s in
th
e p
roce
ssin
g a
nd
u
se o
f o
ur
pro
du
cts.
We
will
rep
lace
all
par
ts t
hat
are
un
usa
ble
bec
ause
of
def
ecti
ve m
ater
ials
. No
rep
lace
men
t fo
r d
efec
ts a
risi
ng
du
rin
g t
ran
spo
rt o
r st
ora
ge
or
du
e to
imp
rop
er in
stal
lati
on
an
d t
hei
r co
nse
qu
ence
s.
www.hauff-technik.de
Hauff-Technik GmbH & Co. KG
Robert-Bosch-Straße 989568 Hermaringen, GERMANY
Tel. +49 7322 1333-0Fax +49 7322 1333-999
Project information and solutions provided by Hauff-Technik
FACTS
PROJECT INFORMATION
Location Technical building of the Autobahn A40, Bochum
Requirement gas- and watertight sealing of existing as well as newly to install cables and corrugated cable ducts
Construction company Spie GmbH, Building Technology & Service Solutions Nordwest, Düsseldorf
SOLUTIONS PROVIDED BY HAUFF-TECHNIK
Specification split multiple stainless steel flange with 8 pipe sockets each, split pipe and cable sealings
Solution professional removing of the old existing sealing systeminstallation of the split multiple flange plate on the existing rectangular openinggas- and watertight sealing of the cables and ducts with split cable and pipe sealings
Products used 7 pcs. individual sealings type HRD 150-2G-1/110incl. clip rings for corrugated ducts9 pcs. individual sealings type HRD 150-2G-x/d2 pcs. multiple HRD flanges 150-2x4-FG