TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

10
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

Transcript of TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

Page 1: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEYSUNNYVALE PLAZA

[Cooper Carry, Inc.]

Page 2: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

PROJECT SCHEDULE SUMMARY

Page 3: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

BUILDING SYSTEMS SUMMARY

Precast Concrete Above grade columns

Mechanical System Variable Air Volume

Cooling Towers

Fan Coil Units

Fire Suppression Pressurized Stairways

Sprinklers

Fire Dampers

Two hour rating

Demolition Required Plumber’s Building

Slurry Wall

East street and utilities

Structural Steel Frame Encased steel columns below grade

Steel composite deck

Cast-In-Place Concrete Slurry Wall

Underground Slabs

Column Encasement

[Cooper Carry, Inc.]

Page 4: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

BUILDING SYSTEMS SUMMARY (CONT.)

Electrical System PEPCO

460/265 Volt Switchboards

208/120 Volt Panelboards

3 Primary Electrical Rooms per floor

Masonry New Structure

Load Bearing

Single-wythe veneer

LEED – Recycled content

Renovation

Load Bearing

Masonry Restoration and Cleaning

Curtain Wall 2,400 Wall Units

29,000 Punched Window Units

Steel Sunshades

Roof System Glass Skylight

Roof Terrace

Excavation Top-Down Excavation

Slab-On-Grade Pours

[Cooper Carry, Inc.]

Page 5: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

PROJECT COST EVALUATION

Square Foot Analysis $172,000,000 – $229 / SF

Elevator

Laundry Equipment

Emergency Lighting / Smoke Detectors

Reasons Top-Down Construction

Slurry Wall / Concourse Excavation

Extensive below-grade excavation

Substantially more suites

Actual Costs Prime: $500,000,000 – $665 / SF

Building Systems Cost Superstructure: $66 million

Exterior Enclosure: $48.5 million

Plumbing: $95.5 million

HVAC: $51.5 million

Fire Protection: $24.5 million

Electrical: $46.5 million

Page 6: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

EXISTING CONDITIONS SITE PLANS

Proposed Building

Existing Building

Construction Fence

Traffic Flow

Fire Hydrant

Electrical

Water

Stormwater

Sanitary

Gas

TelecomNathan Braskey

Existing Conditions

Site Utility PlanC - 300

Height – 150 ft

Height – 60 ft

H: 110 ft

Page 7: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

CLIENT INFORMATION

Owner: Hotel Developer

Hotel Manager: Hotel Franchise

New Facility – Expansion of Franchise

Design – Build / Guaranteed Maximum Price

Budget, Quality, Schedule

Importance of opening on-time

DeveloperOwner

Quadrangle

Development Manager

Hensel Phelps

Design-Build Contractor

Cooper Carry, Inc.Architect

Schnabel EngineeringGeotechnical

BBG-BBGM

Interior Design, Lighting, Graphics

Muse Audio VideoAcoustics

A+F EngineersStructural

SDK-S.D. Keppler & Associates

LEED Consultant

GHT LimitedMEP

Hotel FranchiseHotel Manager

LPR ConstructionSteel Structure

AMT, LLC Consulting Engineers

Civil, Surveyor

A+F EngineersStructural

National Fire ProtectionFire Protection

Network Technologies

Systems, AV, Security

Truland SystemsElectrical

Page 8: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

PROJECT TEAM

Operations Manager

Project Manager Project Superintendent

Field EngineerProject EngineerProject

SuperintendentField

Superintendent

Page 9: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

QUESTIONS?

Schedule

Systems Summary

Cost Evaluation

Existing Conditions Fly Around

Existing Conditions Site Plan

Client Information

Project Team

Page 10: TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

EXISTING CONDITIONS SITE PLANS

Proposed Building

Existing Building

Construction Fence

Traffic Flow

Fire Hydrant

Electrical

Water

Stormwater

Sanitary

Gas

Telecom

Height – 150 ft

Height – 60 ft

H: 110 ft

Nathan BraskeyExisting Conditions

Site Utility PlanC - 300