PROJECT SCHEDULE SUMMARY
BUILDING SYSTEMS SUMMARY
Precast Concrete Above grade columns
Mechanical System Variable Air Volume
Cooling Towers
Fan Coil Units
Fire Suppression Pressurized Stairways
Sprinklers
Fire Dampers
Two hour rating
Demolition Required Plumber’s Building
Slurry Wall
East street and utilities
Structural Steel Frame Encased steel columns below grade
Steel composite deck
Cast-In-Place Concrete Slurry Wall
Underground Slabs
Column Encasement
[Cooper Carry, Inc.]
BUILDING SYSTEMS SUMMARY (CONT.)
Electrical System PEPCO
460/265 Volt Switchboards
208/120 Volt Panelboards
3 Primary Electrical Rooms per floor
Masonry New Structure
Load Bearing
Single-wythe veneer
LEED – Recycled content
Renovation
Load Bearing
Masonry Restoration and Cleaning
Curtain Wall 2,400 Wall Units
29,000 Punched Window Units
Steel Sunshades
Roof System Glass Skylight
Roof Terrace
Excavation Top-Down Excavation
Slab-On-Grade Pours
[Cooper Carry, Inc.]
PROJECT COST EVALUATION
Square Foot Analysis $172,000,000 – $229 / SF
Elevator
Laundry Equipment
Emergency Lighting / Smoke Detectors
Reasons Top-Down Construction
Slurry Wall / Concourse Excavation
Extensive below-grade excavation
Substantially more suites
Actual Costs Prime: $500,000,000 – $665 / SF
Building Systems Cost Superstructure: $66 million
Exterior Enclosure: $48.5 million
Plumbing: $95.5 million
HVAC: $51.5 million
Fire Protection: $24.5 million
Electrical: $46.5 million
EXISTING CONDITIONS SITE PLANS
Proposed Building
Existing Building
Construction Fence
Traffic Flow
Fire Hydrant
Electrical
Water
Stormwater
Sanitary
Gas
TelecomNathan Braskey
Existing Conditions
Site Utility PlanC - 300
Height – 150 ft
Height – 60 ft
H: 110 ft
CLIENT INFORMATION
Owner: Hotel Developer
Hotel Manager: Hotel Franchise
New Facility – Expansion of Franchise
Design – Build / Guaranteed Maximum Price
Budget, Quality, Schedule
Importance of opening on-time
DeveloperOwner
Quadrangle
Development Manager
Hensel Phelps
Design-Build Contractor
Cooper Carry, Inc.Architect
Schnabel EngineeringGeotechnical
BBG-BBGM
Interior Design, Lighting, Graphics
Muse Audio VideoAcoustics
A+F EngineersStructural
SDK-S.D. Keppler & Associates
LEED Consultant
GHT LimitedMEP
Hotel FranchiseHotel Manager
LPR ConstructionSteel Structure
AMT, LLC Consulting Engineers
Civil, Surveyor
A+F EngineersStructural
National Fire ProtectionFire Protection
Network Technologies
Systems, AV, Security
Truland SystemsElectrical
PROJECT TEAM
Operations Manager
Project Manager Project Superintendent
Field EngineerProject EngineerProject
SuperintendentField
Superintendent
QUESTIONS?
Schedule
Systems Summary
Cost Evaluation
Existing Conditions Fly Around
Existing Conditions Site Plan
Client Information
Project Team
EXISTING CONDITIONS SITE PLANS
Proposed Building
Existing Building
Construction Fence
Traffic Flow
Fire Hydrant
Electrical
Water
Stormwater
Sanitary
Gas
Telecom
Height – 150 ft
Height – 60 ft
H: 110 ft
Nathan BraskeyExisting Conditions
Site Utility PlanC - 300