TECHNICAL MEMORANDUM
Golder Associates Ltd.
1931 Robertson Road, Ottawa, Ontario, Canada, K2H 5B7 Tel: +1 (613) 592 9600 Fax: +1 (613) 592 9601 www.golder.com
Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America
Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation.
1.0 INTRODUCTION
On September 9, 2015, personnel from MHBC Planning (MHBC) and R.W. Tomlinson Limited (Tomlinson) met
with staff from the City of Ottawa in a pre-consultation meeting related to the potential establishment of a quarry
on land referred to as the Brickyards property (including the O’Leary Lands) located in the Geographic City of
Gloucester in the City of Ottawa, Ontario. The property is located at 3150 and 3200 Rideau Road, City of Ottawa,
Ontario (the Site) and contains active industrial and commercial developments as well as vacant cleared land that
is roughly 52 hectares (ha) in size (see Key Plan, Figure 1).
To permit a quarry on the property, applications for an Official Plan Amendment (OPA) and Zoning Amendment
are required. In the context of the OPA, it is necessary to change the designation from General Rural Area to
Bedrock Resource Area. In terms of the applicant submission requirements, the City of Ottawa requires a
Geotechnical Report, noise study and Planning Rationale for the change. The purpose of the Geotechnical Report
is to identify the presence and extent of the mineral resource on the Brickyards property. The purpose of this
technical memorandum is to present an aggregate resource evaluation for the Brickyards property for the purpose
of meeting the City of Ottawa requirement for the Geotechnical Report.
Golder Associates Ltd. (Golder Associates) was retained by Tomlinson to conduct a hydrogeological assessment
in support of an Aggregate Resources Act (ARA) license application for the proposed Rideau Road Brickyards
Quarry (including the O’Leary Lands). This technical memorandum presents the results of the aggregate resource
evaluation component of this work plan.
DATE April 19, 2016 PROJECT No. 1543297
TO Bronwen Heins, B.A. L.L.B., Manager, Real Estate Planning & Development, Environment R.W. Tomlinson Limited
CC Craig Bellinger, Environmental Compliance Coordinator Neal DeRuyter, MHBC Planning
FROM Brian Henderson, M.A.Sc, P.Eng. Kris Marentette, M.Sc., P.Geo.
EMAIL [email protected] [email protected]
AGGREGATE RESOURCE EVALUATION (GEOTECHNICAL REPORT) R.W. TOMLINSON LIMITED, PROPOSED BRICKYARDS QUARRY, OTTAWA, ONTARIO
Bronwen Heins, B.A. L.L.B., 1543297
R.W. Tomlinson Limited April 19, 2016
2/6
2.0 HISTORICAL AND EXISTING AGGREGATE EXTRACTION IN AREA
Aggregate extraction activities in the area of Rideau Road and Bank Street within the City of Ottawa have been
ongoing for decades. At present, the active quarries in the area include the following: Tomlinson Rideau Road
Quarry, Dibblee Millar Quarry, Lafarge Hawthorne Quarry, Dibblee Boyce Quarry and the Aecon Ottawa Quarry.
The Tomlinson Rideau Road Quarry is divided into three separate quarry areas that are referred to as Quarry
No. 1, Quarry No. 2 and Quarry No. 3. Quarry No. 1, Quarry No. 2 and Quarry No. 3 are collectively referred to
herein as the Rideau Road quarries.
The locations of the quarries are shown on Figure 1 along with the position of the Brickyards property.
The bedrock geology of the area based on Ontario Geological Survey (OGS) published mapping is illustrated on
Figure 3. The clustering of quarries within this area is related to the presence of the Oxford Formation (and the
underlying March Formation) close to ground surface. The Oxford Formation is a high quality aggregate resource
used in the production of concrete and asphalt stone, and granular products while the upper part of the underlying
March Formation produces high quality, skid resistant aggregate.
In the 2013 Ontario Geological Survey (OGS) Aggregate Resources Inventory Paper (ARIP) 191 for the City of Ottawa,
areas with less than 8 metres of overburden cover over the Oxford Formation were designated as “Selected
Bedrock Resources Area 2”. Within the City of Ottawa, these areas occur in the west within pockets with
boundaries defined by faults and as a large continuous tract of land in the central portion of the City of Ottawa.
It is within this continuous tract of land in the central portion of the City where the Brickyards property is located.
Figure 4 has been developed from Map 2 contained in ARIP 191 (OGS, 2013). Figure 4 shows the location of the
proposed Brickyards Quarry within Selected Bedrock Resources Area 2 and is in an area characterized by a
thickness of overburden of less than 8 metres.
3.0 OBJECTIVES OF AGGREGATE RESOURCE EVALUATION
The objective of the aggregate resource evaluation was to define the geological conditions (stratigraphy, structure,
rock quality, etc.) beneath the Brickyards property. As noted above, of particular importance in this geological
setting is the position of the geological contact between the Oxford Formation and the underlying March Formation
beneath the Brickyards property.
The aggregate resource evaluation was divided into three (3) discrete tasks as follows:
Task 1 – Borehole Drilling;
Task 2 – Borehole Geophysical Logging; and,
Task 3 – Core Logging.
The data obtained by completion of Tasks 1, 2 and 3 were used to prepare this aggregate resource evaluation
technical memorandum.
This memorandum describes the stratigraphic sequence at the proposed Brickyards Quarry which was established
through the detailed lithological logging of three diamond drillholes (DDH15-09, DDH15-10 and DDH15-11),
subsequent correlation of the downhole geophysics of the three diamond drillholes and five air percussion
boreholes (TW93-1, BH03-3, TW09-1, TW09-2 and BH15-2) on, and in the vicinity of, the proposed Brickyards
Quarry. All of these boreholes are located on the Brickyards property with the exception of TW93-1 which is
located on Phase I of the Hawthorne industrial subdivision and borehole BH03-03 which was drilled as part of the
Bronwen Heins, B.A. L.L.B., 1543297
R.W. Tomlinson Limited April 19, 2016
3/6
work program associated with the licensing of Rideau Road Quarry No. 3. Boreholes TW09-1 and TW09-2 were
drilled on the Brickyards property in 2009 and were located in the field so that they could be incorporated into this
current investigation.
The locations of the boreholes are shown on Figure 3.
4.0 BOREHOLE DRILLING PROGRAM
Between December 16, 2015 and January 8, 2016, George Downing Estate Drilling completed the drilling of
diamond drillholes DDH15-09, DDH15-10 and DDH15-11. This drilling program was monitoring in the field by
Golder technical staff. The HQ cored diamond drillholes (96 millimetre diameter) were drilled to depths ranging
from 49.57 metres (DDH15-11) to 70.70 metres (DDH15-10) below ground surface.
On December 17, 2015, borehole BH15-12 was drilled by Bourgeois Well Drilling (using air percussion methods)
to a depth of 60.90 metres below ground surface.
Borehole TW93-1 was drilled in 1993 as part of the approval process for Phase I of the Hawthorne industrial
subdivision and borehole BH03-03 was drilled in 2003 as part of the work program associated with the licensing
of Rideau Road Quarry No. 3. Boreholes TW09-1 and TW09-2 were drilled on the Brickyards property in 2009 as
part of an initial water supply investigation on this property.
5.0 GEOPHYSICAL LOGGING
The geophysical logging of the three drillholes (DDH15-09, DDH15-10 and DDH15-11) and three boreholes (TW09-1, TW09-2 and BH15-12) on the Brickyards property was carried out on January 19 and 21, 2016 by a Golder geophysicist. Two downhole geophysical probes were used for the logging: natural gamma and apparent conductivity.
The natural gamma log records the background gamma radiation in counts per second, largely emitted from potassium 40, associated with clay minerals and any traces of uranium and thorium in the material surrounding the borehole.
Apparent conductivity is a measure of the bulk apparent conductivity of the surrounding material, which is primarily a function of interconnected porosity, clay content, moisture content and the dissolved ion concentration in the pore fluid. Temperature, phase state of the pore water, and the amount and composition of any suspended colloids in the pore water also contribute to conductivity but to a lesser degree.
Geophysical logging of borehole TW93-1 and BH03-3 had previously been conducted by Golder.
6.0 DRILLHOLE CORE LOGGING
The boxed core recovered by the drilling contractor from drillholes DDH15-09, DDH15-10 and DDH15-11 was
delivered to the Golder office in Ottawa, Ontario. The core was laid out in our laboratory for logging where it was
logged in detail on a bed-by-bed basis and stratigraphically interpreted based on Golder’s work throughout the
Ottawa region. The detailed logging was completed by Robert Blair, a senior engineering geologist.
7.0 STRATIGRAPHY AND STRUCTURE AT PROPOSED BRICKYARDS QUARRY
The stratigraphic sequence at the proposed Brickyards Quarry was established through the detailed lithological logging of drillholes DDH15-09, DDH15-10 and DDH15-11 and subsequent correlation of the geophysics of these three drillholes with the five boreholes (TW93-1, TW09-1, TW09-2, BH03-3 and BH15-12). Based on the available borehole data on the proposed Brickyards Quarry property, the overburden thickness overlying the Oxford Formation is generally less than 2 m.
Bronwen Heins, B.A. L.L.B., 1543297
R.W. Tomlinson Limited April 19, 2016
4/6
The stratigraphic sequence in all boreholes, except TW93-1, included the lower part of the Oxford Formation underlain progressively by the March Formation and the Nepean Formation. At TW93-1, the borehole started in the Nepean Formation and both the Oxford Formation and the March Formation were absent at this borehole location.
The Oxford Formation on the Brickyards property comprises a sequence of medium grey, fine grained crystalline, non-porous, thin to medium bedded ARGILLACEOUS MICRITIC DOLOSTONE with occasional black wavy argillaceous bedding partings and interbeds of weakly developed ARGILLACEOUS NODULAR MICRITIC DOLOSTONE. On the west part of the property at boreholes TW09-2 and DDH15-10, the Oxford Formation is approximately 20 metres thick. On the central part of the property at boreholes BH15-12 and DHH15-9 ranges from 16.7 to 17.6 m thick. At borehole TW09-1 on the east central property boundary the Oxford Formation is about 16 m thick while at drillhole DDH15-11 on the northeast corner of the property the Oxford Formation is 12.6 m thick. Based on this available information, the average thickness of the Oxford Formation on the Brickyards property is approximately 17 metres.
The contact between the Oxford Formation and the March Formation is gradational and the top of the March Formation is typically marked by the first occurrence of a thin calcareous quartz sandstone bed within sandy calcareous dolostone.
The March Formation on the Brickyards property comprises a sequence of light to medium brownish grey, fine to medium grained crystalline, non-porous, medium to thickly bedded, laminar textured with argillaceous partings, stylolitic, weakly reactive SANDY CALCAREOUS DOLOSTONE grading downward to light grey, weakly reactive CALCAREOUS QUARTZ SANDSTONE with thin interbeds of calcareous dolostone. The contact between the March Formation and the Nepean Formation is gradational. The thickness of the March Formation on the Brickyards property ranges narrowly from 9.75 metres at drillhole DDH15-10 to about 10.4 metres at boreholes DDH15-9 and BH15-12. Based on this available information, the average thickness of the March Formation on the Brickyards property is approximately 10 metres. The contact with the underlying Nepean Formation is gradational.
The Nepean Formation on the Brickyards property comprises a light grey, fine to medium grained, non-porous to
moderately porous, medium to thickly bedded, non-reactive to weakly reactive, interbedded QUARTZ
SANDSTONE and CALCAREOUS QUARTZ SANDSTONE with gradational contacts. The total stratigraphic
thickness of the Nepean Formation that was encountered at the boreholes on the Brickyards property ranged from
25.2 metres at drillhole DDH15-11 to 57.7 metres at borehole TW09-1. The contact between the Nepean
Formation and the underlying Precambrian basement would occur at a considerably greater depth and was not
encountered in the boreholes on the Brickyards property.
As shown on Figure 2, the regionally significant Gloucester Fault is located to the northeast of the Brickyards
property. This is a regional fault with several hundred metres of displacement. Also shown on Figure 2 is a fault
that crosses the existing Rideau Road quarries to the south of the Brickyards property as illustrated on published
geological maps. The location of this fault as shown on the published mapping is inconsistent with the logging
results for boreholes DDH15-10 and BH03-3 that straddle this feature and demonstrate no offset between these
boreholes. Based on a field reconnaissance of the Rideau Road quarries, this latter fault can be observed at
several locations in the walls of the quarry and its actual position is shown on Figure 3. The magnitude of the
displacement along this fault is comparatively minor, in the range of +/-10 m with the south side of the fault being
the downthrown side based on correlations with boreholes on the Rideau Road Quarry No. 3 property.
Bronwen Heins, B.A. L.L.B., 1543297
R.W. Tomlinson Limited April 19, 2016
5/6
8.0 PRELIMINARY AGGREGATE RESOURCE EVALUATION
Based on Tomlinson’s quarrying experience at the Rideau Road quarries, it is known that the primary geological
formations from an aggregate resource perspective are the Oxford Formation (concrete and asphalt stone,
granular products) and the upper part (about 10 metres thick) of the underlying March Formation with respect to
high quality, skid resistant aggregate. The assessment of aggregate quality is based on our understanding of
Tomlinson’s past production experience at the Rideau Road quarries.
For the purpose of this preliminary aggregate resource evaluation, the following general assumptions have
been made:
The size of the Brickyards property (including the O’Leary lands) is approximately 52.0 ha;
The extraction setback from the property line along Rideau Road and Bank Street will be 30 metres;
The extraction setback from the south and east property lines will be 15 metres;
These assumed extraction setbacks represent the current Ministry of Natural Resources and Forestry
regulatory setbacks and do not consider potential constraints that may influence the size of the final extraction
footprint (to be assessed through the preparation of the ARA application);
The quarry could be developed in two lifts with the first lift comprising the Oxford Formation (average
17 metres thick) and the second lift comprising the upper 10 metres of the March Formation;
It is assumed that that the quarry walls will be vertical with no benching; and,
The conversion factor for limestone is 2.6 tonnes per cubic metre (T/m3).
The approximate area represented by the property line setbacks is 6.4 ha which leaves an extraction footprint of
approximately 45.4 ha.
The quantity of the potential aggregate resource in Lift 1 (Oxford Formation) would be approximately 7,718,000 m3
or 20,055,800 Tonnes based on a conversion factor of 2.6 T/m3.
The quantity of the potential aggregate resource in Lift 2 (March Formation) would be approximately 4,540,000 or
approximately 11,804,000 Tonnes based on a conversion factor of 2.6 T/m3.
The total quantity of potential aggregate material beneath the Brickyards property based on the above described
assumptions is estimated to be approximately 31 million tonnes based on a two lift quarry development scenario
with no allowance for material losses during processing associated with generation of fines. The estimated
resource tonnage may be revised based on the development of the ARA Site Plans and detailed technical studies.
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
"
"
"
"
""
" ""
"
""
"
""
"
"
"""
"
""
""
"
"
""
"
"""
"
"
""" "
"
"
"
"""""
"
""
"""
"""
"
" "
"""
""""
"
""
"""""
" """
"
"""
"
"
"""
""
""""
"""""""
""""""""""""""
"""
"""
"""
"
""""""
"""""""
""""""""
""
"
""""""
"
""""
""""
"""
""
""
""""
""
"
"""""
"""
"""""""
"""
""
"""""""""""
""""
""""
"""
"""
""""
""
" "
"" "
"
"""""""""
"""""
""""
"""
""
"
""""""""
""""""
""
""""""
"""""" "
""
""
""""""""" """
" """"""""
"
"
"
"
""
""
""
""
""""
"""
"
"""
"
"
"
"
""
"
"
"
"
"""""
"
"""
""
""
"
"""
"
"
"
"""
"" "
"
""
" """"""
""
"""
"
""""
""
""""
"
""
"
"
"
""
"
""
""
""
""
"
"
""""
"" "
""
""
"
"
""""
""""
"""
"
"
" " "
"
"
"
"""
"
"
"""
""""
"
"" ""
"""
""
"
"
"
""
"
"""""
"""
""
""
""""
"
"
"
"
"""
"
"""""
"""
"""""
"
"
""""""""
""""
""""""""""""""
""""""
""""
"
"""
""""
""
""""
"
"""""
"
""""
"
" ""
"
""
"
"""""""""""""
"""
"""
"""
""""
""""""
"""
""""""
"
""""""""
"""
""
""
" """
""""
"
"""
"""""
"""
""
""
"
""""
""
"""
""
"""""
"""
"""
"""
"
""
"""""""""""""
"""""""""
""""
"
""
"""
"
""
""""
""
""
"
"
""
""
"""
""
"
"""
"""
"""
"
""
"
"
"""
""
"
""
""
"
"
"
"""""
"
"
"
"
""
"
"
"
"
"
""
""
"""""""""""""""""""""""
""""""""" "
"""""""""""""""
"
"
""
"
""
"
"""
!
!
LAFARGE
HAWTHORNE
QUARRY
RID
EA
U R
OA
D
QU
AR
RY
#1DIBBLEE
BOYCE
QUARRY
AECON
OTTAWA
QUARRY
DIBBLEE MILLAR QUARRY
RIDEAU QUARRY # 2
RIDEAU ROAD
QUARRY # 3
CON 4 FROM RIDEAU RIVER
LOT 25
CON 4 FROM RIDEAU RIVER
LOT 21
CON 4 FROM RIDEAU RIVER
LOT 24
CON 4 FROM RIDEAU RIVER
LOT 22
CON 4 FROM RIDEAU RIVER
LOT 20
CON 4 FROM RIDEAU RIVER
LOT 18
CON 4 FROM
LOT 16
CON 4 FROM RIDEAU RIVER
LOT 19
CON 4 FROM RIDEAU RIVER
LOT 17
FROM RIDEAU RIVER
0
RIVER
CON 3 FROM RIDEAU RIVER
LOT 22
RIDEAU RIVER
CON 4 FROM RIDEAU RIVER
LOT 23
CON 5 FROM RIDEAU RIVER
LOT 20
CON 5 FROM RIDEAU RIVER
LOT 21
AU RIVER
CON 5 FROM RIDEAU RIVER
LOT 22
CON 5 FROM RIDEAU RIVER
LOT 24
CON 5 FROM RIDEAU RIVER
LOT 25
CON 5 FROM RIDEAU RIVER
LOT 27
CON 5 FROM RIDEAU RIVER
LOT 26
CON 5 FROM RIDEAU RIVER
LOT 28
CON 5 FROM RIDE
LOT 19
CON 5 FROM RIDEAU RIVER
LOT 23
CON 6 FROM RIDEAU RIVE
LOT 22
RIVER
CON 4 FROM RIDEAU RIVER
LOT 26CON 3 FROM RIDEAU RIVER
LOT 23
CON 6 FROM RIDEAU RIVER
LOT 23
ER
CON 5 FROM RIDEAU RIVER
LOT 29
CON 6 FROM RIDEAU RIVER
LOT 24
CON 6 FROM RIDEAU RIVER
LOT 25
CON 6
LOT 1
CON 6 FROM RIDEAU RIVER
LOT 26
CON 4 FROM RIDEAU RIVER
LOT 27CON 3 FROM RIDEAU RIVER
LOT 24
CON 6 FROM RIDEAU RIVER
LOT 27CON 6 FROM R
IDEAU R
IVER
LOT 28
CON 5 FROM RIDEAU RIVER
LOT 30
SOUTHGLOUCESTER
JOHNSTONCORNERS
100
80
85
100
110
115
115
105
115
85
100
100
105
105
110
110
100
115
105
80
105
85
110
115
100
110
115
110
85
100
95
110
100
115
95
95
100
115
110
105
80
105
110
100
85
105
105
110
95
90
100
105
85
100
95
105
115
110
85
90
100
95
120
110
85
110
90
90
115
115
105
85
105
95
115
105
90
115
105
105
115
100
90
105
120
105
115
105
110
110
110
95
105
100
105
110
85
110
95
115
85
100
95
110
ME
AD
OW
DR
HA
WT
HO
RN
E R
D
VIS
TAP
AT
RIC
K P
VT
KIMBERLYDIANE PVT
REM
ING
TON
WAY
HA
WT
HO
RN
E
RD
BUCKNELL
DR
LKS PK DR
LK FOREST
WALK
FINDLA
Y CK D
R
TULLAMORE ST
KILLYMOON
WAY
MC
MA
RTIN
STES
THE
R S
T
OLD
CR
OW
WAY
RA
MS
AY
VILLE
RD
BA
NK
ST
TRA
NQ
UIL
GATE
VISTABARRETTPVT
MITCH OWENS RD
TWIN
LKS AVE
RIDEAU RD
MISTYMORNINGLANE
SUNVISTAPVT
MARCO ST
MASON ST
KE
LLY
FAR
M D
R
OLD
PR
ES
CO
TT R
D
LKS
PK DR
CA
CH
E B
AY
WATERSID
E
CRT
DAWN TARA DR
BEN
ROYAL
AVE
SHEPODYCIR
SUNSET BLVD
SA
LE B
AR
N R
D
HIGH RD
LEITRIM R
D
PE
GA
SU
SC
RE
S
ALB
ION
RD
QUINN RD
FENTON RD
NE
TL
EY
CIR
COLLIER
CRES
LONGPT CIR
DO
NC
AS
TE
R R
D
PO
WE
R R
D
9TH LINE RD
EARL
ARMSTRONG RD
DEL ZOTTO AVE
JOH
N Q
UIN
N R
D
BALLYCASTLE CRES
BO
WE
SV
ILLE R
D
PKY RD
BLAIS RD
451000
451000
451500
451500
452000
452000
452500
452500
453000
453000
453500
453500
454000
454000
454500
454500
455000
455000
455500
455500
456000
456000
456500
456500
457000
457000
457500
457500
458000
458000
5013
000
5013
000
5013
500
5013
500
5014
000
5014
000
5014
500
5014
500
5015
000
5015
000
5015
500
5015
500
5016
000
5016
000
5016
500
5016
500
5017
000
5017
000
5017
500
5017
500
5018
000
5018
000
5018
500
5018
500
5019
000
5019
000
Pat
h: N
:\Act
ive
\Sp
atia
l_IM
\Tom
linso
n\R
idea
u_R
oad
\RW
T_B
ricky
ard
s\99
_PR
OJ\
1543
297
_To
mlin
son
_Pro
pB
rick
yard
sQua
rry\
40_
PR
OD
\Geo
tech
\Te
chM
emo
201
603
08
\15
432
97-1
000-
1060
-01.
mxd
IF T
HIS
ME
AS
UR
EM
EN
T D
OE
S N
OT
MA
TC
H W
HA
T IS
SH
OW
N, T
HE
SH
EE
T S
IZE
HA
S B
EE
N M
OD
IFIE
D F
RO
M:
25m
m0
1:25,000 METRES
R.W. TOMLINSON LTD.
1. THIS FIGURE IS TO BE READ IN CONJUNCTION WITH THE ACCOMPANYING GOLDERASSOCIATES LTD. REPORT NO. 1543297/1000/1060.
1. SERVICE LAYER CREDITS: CONTENT MAY NOT REFLECT NATIONAL GEOGRAPHIC'SCURRENT MAP POLICY. SOURCES: NATIONAL GEOGRAPHIC, ESRI, DELORME, HERE, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN, GEBCO, NOAA, INCREMENT P CORP.2. LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD.UNDER LICENCE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, © QUEENSPRINTER 2012.3. ROAD DATA PROVIDED BY AECOM CANADA LTD.4. PROJECTION: TRANSVERSE MERCATOR DATUM: NAD 83COORDINATE SYSTEM: UTM ZONE 18VERTICAL DATUM: CGVD28
AGGREGATE RESOURCE EVALUATIONPROPOSED BRICKYARDS QUARRY, OTTAWA, ONTARIO
KEY PLAN
1543297 1000/1060 A 1
2016-03-30
BR/PJM
PJM
BD
----
CONSULTANT
PROJECT NO. PHASE REV. FIGURE
YYYY-MM-DD
DESIGNED
PREPARED
REVIEWED
APPROVED
LEGEND
" BUILDING POINT
! PLACENAME
STUDY AREA
ROAD (OPERATIONAL)
ROAD (PROPOSED)
RAILWAY
CONTOUR LINE (5M)
! UTILITY LINE
WATERCOURSE, PERMANENT
WATERCOURSE, INTERMITTENT
PROVINCIALLY SIGNIFICANT WETLAND (PSW)
WETLAND AREA
WATER AREA, PERMANENT
BUILDING FOOTPRINT
LOT FABRIC
WOODED AREA
AGGREGATE SITE AUTHORIZED ACTIVE
QUARRY SITE AUTHORIZED ACTIVE
AGGREGATE SITE AUTHORIZED INACTIVE
0 500 1,000250
NOTE(S)
REFERENCE(S)
CLIENT
PROJECT
TITLESTUDYAREA
KEY MAP
@A
@A
@A
@A
@A
@A
@A
@A
GLOUCESTER FAULT
MITCH OWENS RD
RIDEAU RD
HA
WT
HO
RN
ER
D
HA
WTH
OR
NE
RD
DO
NC
AS
TE
R R
D
PO
WE
R R
DBA
NK
ST
DA
WN
TAR
A D
R
SOMME ST
SOMME ST
SA
PP
ER
S R
DG
5
4
4
4
15
3
DDH15-9
DDH15-10
DDH15-11
BH15-12
TW09-1
TW09-2
TW93-1
BH03-3
454500
454500
455000
455000
455500
455500
456000
456000
456500
456500
457000
4570005015
000
5015
000
5015
500
5015
500
5016
000
5016
000
5016
500
5016
500
5017
000
5017
000
5017
500
5017
500
Pat
h: N
:\Act
ive
\Sp
atia
l_IM
\Tom
linso
n\R
idea
u_R
oad
\RW
T_B
ricky
ard
s\99
_PR
OJ\
1543
297
_To
mlin
son
_Pro
pB
rick
yard
sQua
rry\
40_
PR
OD
\Geo
tech
\Te
chM
emo
201
603
08
\15
432
97-1
000-
1060
-02.
mxd
IF T
HIS
ME
AS
UR
EM
EN
T D
OE
S N
OT
MA
TC
H W
HA
T IS
SH
OW
N, T
HE
SH
EE
T S
IZE
HA
S B
EE
N M
OD
IFIE
D F
RO
M:
25m
m0
1:10,000 METRES
R.W. TOMLINSON LTD.
1. THIS FIGURE IS TO BE READ IN CONJUNCTION WITH THE ACCOMPANYING GOLDERASSOCIATES LTD. REPORT NO. 1543297/1000/1060.
1. OGS BEDROCK GEOLOGYARMSTRONG, D.K. AND DODGE, J.E.P. 2007. PALEOZOIC GEOLOGY OF SOUTHERNONTARIO; ONTARIO GEOLOGICAL SURVEY, MISCELLANEOUS RELEASE--DATA 2192. LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD.UNDER LICENCE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, © QUEENS PRINTER20143. ROAD DATA PROVIDED BY AECOM CANADA LTD.4. SERVICE LAYER CREDITS: SOURCES: ESRI, HERE, DELORME, USGS, INTERMAP,INCREMENT P CORP., NRCAN, ESRI JAPAN, METI, ESRI CHINA (HONG KONG), ESRI(THAILAND), TOMTOM, MAPMYINDIA, © OPENSTREETMAP CONTRIBUTORS, AND THE GISUSER COMMUNITY5. PROJECTION: TRANSVERSE MERCATOR DATUM: NAD 83COORDINATE SYSTEM: UTM ZONE 18VERTICAL DATUM: CGVD28
AGGREGATE RESOURCE EVALUATIONPROPOSED BRICKYARDS QUARRY, OTTAWA, ONTARIO
OGS BEDROCK GEOLOGY
1543297 1000/1060 A 2
2016-03-30
BR/PJM
BR
----
----
CONSULTANT
PROJECT NO. PHASE/TASK REV. FIGURE
YYYY-MM-DD
DESIGNED
PREPARED
REVIEWED
APPROVED
LEGEND
@A BOREHOLE LOCATION
ROAD
PROPOSED BRICKYARDS QUARRY
OGS BEDROCK GEOLOGY
15: CARLSBAD FORMATION - SHALE AND LIMESTONE
5: OXFORD FORMATION - DOLOSTONE, MINOR SHALE AND SANDSTONE
4: MARCH FORMATION - SANDSTONE, DOLOMITIC SANDSTONE, DOLOSTONE
3: NEPEAN FORMATION - SANDSTONE, MINOR CONGLOMERATE
INTERPRETED POSITION OF FAULT
0 200 400100
NOTE(S)
REFERENCE(S)
CLIENT
PROJECT
TITLE
SITE
KEY MAP
@A
@A
@A
@A
@A
@A
@A
@A
RIDEAU RD
BA
NK
ST
HA
WT
HO
RN
ER
D
SOMME ST
HA
WT
HO
RN
ER
D
SA
PP
ER
SR
DG
MITCH OWENS RDD
ON
CA
ST
ER
RD
PO
WE
R R
D
DDH15-9
DDH15-10
DDH15-11
BH15-12
TW09-1
TW09-2
TW93-1
BH03-3
454500
454500
455000
455000
455500
455500
456000
456000
456500
456500
5015
000
5015
500
5015
500
5016
000
5016
000
5016
500
5016
500
5017
000
5017
000
Pat
h: N
:\Act
ive
\Sp
atia
l_IM
\Tom
linso
n\R
idea
u_R
oad
\RW
T_B
ricky
ard
s\99
_PR
OJ\
1543
297
_To
mlin
son
_Pro
pB
rick
yard
sQua
rry\
40_
PR
OD
\Geo
tech
\Te
chM
emo
201
603
08
\15
432
97-1
000-
1060
-03.
mxd
IF T
HIS
ME
AS
UR
EM
EN
T D
OE
S N
OT
MA
TC
H W
HA
T IS
SH
OW
N, T
HE
SH
EE
T S
IZE
HA
S B
EE
N M
OD
IFIE
D F
RO
M:
25m
m0
1:8,000 METRES
R.W. TOMLINSON LTD.
1. THIS FIGURE IS TO BE READ IN CONJUNCTION WITH THE ACCOMPANYING GOLDERASSOCIATES LTD. REPORT NO. 1543297/1000/1060.
1. 2014/2015 AERIAL IMAGES PROVIDED BY THE CITY OF OTTAWA.2. LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD.UNDER LICENCE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, © QUEENS PRINTER20143. ROAD DATA PROVIDED BY AECOM CANADA LTD.4. SERVICE LAYER CREDITS: CITY OF OTTAWASOURCES: ESRI, HERE, DELORME, USGS, INTERMAP, INCREMENT P CORP., NRCAN, ESRIJAPAN, METI, ESRI CHINA (HONG KONG), ESRI (THAILAND), TOMTOM, MAPMYINDIA, ©OPENSTREETMAP CONTRIBUTORS, AND THE GIS USER COMMUNITY5. PROJECTION: TRANSVERSE MERCATOR DATUM: NAD 83COORDINATE SYSTEM: UTM ZONE 18VERTICAL DATUM: CGVD28
AGGREGATE RESOURCE EVALUATIONPROPOSED BRICKYARDS QUARRY, OTTAWA, ONTARIO
SITE PLAN
1543297 1000/1060 A 3
2016-03-30
BR/PJM
BR
----
----
CONSULTANT
PROJECT NO. PHASE/TASK REV. FIGURE
YYYY-MM-DD
DESIGNED
PREPARED
REVIEWED
APPROVED
LEGEND
@A BOREHOLE LOCATION
INTERPRETED POSITION OF FAULT
LIMIT OF FAULT DISTURBED AREA AS OBSERVED IN FIELD
PROPOSED BRICKYARDS QUARRY
0 200 400100
NOTE(S)
REFERENCE(S)
CLIENT
PROJECT
TITLE
SITE
KEY MAP
Pat
h: N
:\Act
ive
\Sp
atia
l_IM
\Tom
linso
n\R
idea
u_R
oad
\RW
T_B
ricky
ard
s\99
_PR
OJ\
1543
297
_To
mlin
son
_Pro
pB
rick
yard
sQua
rry\
40_
PR
OD
\Geo
tech
\Te
chM
emo
201
603
08
\15
432
97-1
000-
1060
-04.
mxd
IF T
HIS
ME
AS
UR
EM
EN
T D
OE
S N
OT
MA
TC
H W
HA
T IS
SH
OW
N, T
HE
SH
EE
T S
IZE
HA
S B
EE
N M
OD
IFIE
D F
RO
M:
25m
m0
1:50,000 METRES
R.W. TOMLINSON LTD.
1. THIS FIGURE IS TO BE READ IN CONJUNCTION WITH THE ACCOMPANYING GOLDERASSOCIATES LTD. REPORT NO. 1543297/1000/1060.
1. ONTARIO GEOLOGICAL SURVEY, 2013. AGGREGATE RESOURCES INVENTORY PAPER 191,CITY OF OTTAWA, SOUTHERN ONTARIO, BY V.E. LEE.2. PROJECTION: TRANSVERSE MERCATOR DATUM: NAD 83COORDINATE SYSTEM: UTM ZONE 18VERTICAL DATUM: CGVD28
AGGREGATE RESOURCE EVALUATIONPROPOSED BRICKYARDS QUARRY, OTTAWA, ONTARIO
BEDROCK RESOURCES FOR THE CITY OF OTTAWA
1543297 1000/1060 A 4
2016-03-30
BR/PJM
PJM
BD
----
CONSULTANT
PROJECT NO. PHASE REV. FIGURE
YYYY-MM-DD
DESIGNED
PREPARED
REVIEWED
APPROVED
LEGEND
STUDY AREA
0 1,000 2,000500
NOTE(S)
REFERENCE(S)
CLIENT
PROJECT
TITLE
447000
447000
452000
452000
457000
457000
462000
462000
5012
000
5012
000
5017
000
5017
000
5022
000
5022
000
STUDYAREA
KEY MAP
34
SCALE: 1:750,000