Team11FinalPresentation.pdf

download Team11FinalPresentation.pdf

of 21

Transcript of Team11FinalPresentation.pdf

  • 8/13/2019 Team11FinalPresentation.pdf

    1/21

    Team 11: Khmer Genesis

    Anna Groendyk Josh Uitvlugt Amanda Hayes

  • 8/13/2019 Team11FinalPresentation.pdf

    2/21

    Outline

    Project Overview

    Design Decisions

    Challenges Solution

  • 8/13/2019 Team11FinalPresentation.pdf

    3/21

    Project Overview

    Why this Project?

    Genesis Community of Transformation

    Suited Team Interests

    Reliable Contact

  • 8/13/2019 Team11FinalPresentation.pdf

    4/21

    Project Overview

    What is the Project?

    Multi-purpose building structural design

    Site plan and drawings

    Cost estimation

    Project

    Location

  • 8/13/2019 Team11FinalPresentation.pdf

    5/21

    Project Overview

    Cultural Appropriateness and Stewardship Communication with Navy

    Construction Methods

    Choice of Materials

  • 8/13/2019 Team11FinalPresentation.pdf

    6/21

    Project Overview

    Transparency and Trust Great responsibility

    Recommend check by a licensed engineer

    Make all design information and files available Follow codes

  • 8/13/2019 Team11FinalPresentation.pdf

    7/21

    Design Decisions

    Limits on scope Architectural

    Structural STAAD.Pro Model

    Beams

    Columns

    Shear Walls

    Floor Slabs

    Foundation

  • 8/13/2019 Team11FinalPresentation.pdf

    8/21

    Architectural Design

    Fitness Center Assembly Hall

    Guest Rooms

    Offices Residence

  • 8/13/2019 Team11FinalPresentation.pdf

    9/21

    Architectural Design

    Powered by Source

  • 8/13/2019 Team11FinalPresentation.pdf

    10/21STAAD.Pro Model

    Structural Design

  • 8/13/2019 Team11FinalPresentation.pdf

    11/21

    Structural Design: Loads

    105 combinations according to ACI

    Design Stresses

    Concrete Reinforcing Steel FY= 414 MPaConcrete f'c= 27.9 MPa

    Design Loads

    Roof Dead Load

    Ceiling 0.43kPa

    Coverings, Roof and Wall 0.96kPa

    Composite Floor Slab 4.14kPaFloors and Floor Finishes 1.24kPa

    Frame Walls 4.2kPa

    Miscellaneous 2.40kPa

    Total 13.3kPa

    Floor Dead Load

    Ceiling 0.43kPa

    Coverings, Roof and Wall 0.96kPa

    Composite Floor Slab 4.14kPa

    Floors and Floor Finishes 1.24kPa

    Frame Walls 4.16kPa

    Miscellaneous 2.40kPa

    Total 12.4kPa

    Live Loads

    Roof 4790kPaFloor 9 4790kPa

    Floor 8 1916kPa

    Floors 1-7 4790kPa

    Wind Loads

    Wind Speed 60m/s

    Factor to account for wind speed increases

    due to hills (Kzt) 1

    Factor accounding for wind direction (Kd) 1

    Importance factor (I) 1

    Internal pressure coefficient (GCpi) 0.18

  • 8/13/2019 Team11FinalPresentation.pdf

    12/21

    Modeling Checks

    Hand calculations

    Beam reinforcement area design

    Picture of Joshs moments vs. STAAD.Pro moments

  • 8/13/2019 Team11FinalPresentation.pdf

    13/21

    Beams

    -300

    -200

    -100

    0

    100

    200

    300

    400

    0 6 12 18 24

    B

    ENDINGMOMENTMz(kNm)

    LENGTH (m)

    BEAM 5 MOMENT DIAGRAM

  • 8/13/2019 Team11FinalPresentation.pdf

    14/21

    BeamsLevels 1-8 Level 9

  • 8/13/2019 Team11FinalPresentation.pdf

    15/21

    Columns

    Axial

    Compression

    Bending

    Moment

  • 8/13/2019 Team11FinalPresentation.pdf

    16/21

    -2,000

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    0 200 400 600 800 1,000 1,200

    Pn[kN]

    Mn [kN-m]

    Moment vs. Axial Force

    Columns

    Column 3Column 2

    Column 1

  • 8/13/2019 Team11FinalPresentation.pdf

    17/21

    Shear Walls, Slab

    Shear walls designed according to minimum

    code requirements

    Slab designed as a beam of unit width

  • 8/13/2019 Team11FinalPresentation.pdf

    18/21

    Cost Estimate

    By square foot:

    $2 - $3.5 million

    Based on design: Steel: $725/metric ton

    Concrete: $100/metric ton

    Total: $700,000

    Phnom Penh Tower 21 Stories

    http://www.office-cambodia.com/phnom-penh-tower-cambodia.html

  • 8/13/2019 Team11FinalPresentation.pdf

    19/21

    Challenges

    Reinforcement Will it fit?

    Cracked model

    Foundation

  • 8/13/2019 Team11FinalPresentation.pdf

    20/21

    Acknowledgements

    Professor Wunder, Advisor

    Navy Chann, Director of GCT

    Roger Lamer, Industrial Consultant

    Dr. Don Wotring, Soils Professor

    Professor DeRooy, Structural Professor

    Thank you!

  • 8/13/2019 Team11FinalPresentation.pdf

    21/21

    Questions?

    Email us at:ContactJAADesign