Team No.63
2
WU ZHI QIAO BRIDGE DESIGN COMPETITION LAYOUT PLAN MX/001 1 : 50 IN A3 Dragon Bridge Flexible alignment The alignment of the bridge can be modified by changing the angle between each connecting triangle.
-
Upload
arup-cause -
Category
Documents
-
view
218 -
download
0
description
Team No.63
Transcript of Team No.63
Concept and Inspiration
Connection details
WU ZHI QIAO BRIDGE DESIGN COMPETITION
LAYOUT PLAN
MX/001
1 : 50 IN A3
Flexible Alignment
Construction sequence
Dragon Bridge
Flexible alignmentThe alignment of the bridge can be modified by changing the angle between each connecting triangle.
TypicalSection
Elevation
Concept and Inspiration
Connection details
WU ZHI QIAO BRIDGE DESIGN COMPETITION
LAYOUT PLAN
MX/001
1 : 50 IN A3
Flexible Alignment
Construction sequence
Dragon Bridge
Flexible alignmentThe alignment of the bridge can be modified by changing the angle between each connecting triangle.
TypicalSection
Elevation