Wuzhi bridge Big difference in height between original bridge floor and the surround- ings Can’t being used dur - ing the flood period 1. The original pier and cobbles have no rigid connection which leads to the low safety. 2. The original bridge level is under the max water level. 3. The original bridge is low in security and poor in comfort due to the big diffference in height with the side paths. 4. The original bridge floor and pier have no connection which results in the unstability of the whole structure. Safety Function Simple construction Site analysis max water level foot path level original pier original bridge level elevated bridge level foot path level foot path level foot path level min bridge span cantilevered brace accumulated cobble pier accumulated cobble pier bamboo basket original bridge level max water level foot path level mini water level cliff accumulated cobble cliff Concept 4 Placing the pier to the safe level Elevating the bridge to avoid the flood Rationalizing the struc- ture 01 Yeah 3 2 1 max water level average water level bird’s view

description

Team No.29 XYZ

Transcript of Team No.29 XYZ

Page 1: Team No.29 XYZ

Wuzhi bridge

• Bigdifferenceinheightbetweenoriginalbridgefloorandthesurround-ings

• Can’tbeinguseddur-ingthefloodperiod

1. The original pier and cobbles have no rigid connection which leads to the low safety.2. The original bridge level is under the max water level.3. The original bridge is low in security and poor in comfort due to the big diffference in height with the side paths.4. The original bridge floor and pier have no connection which results in the unstability of the whole structure.

SafetyFunction

Simple construction

Site analysis

max water level

foot path level

original pier

original bridge level

elevated bridge level

foot path level

foot path level

foot path levelmin bridge span cantilevered brace

accumulated cobble pier accumulated cobble pier

bamboo basket

original bridge level

max water level

foot path level

mini water levelcliff

accumulated cobble

cliff

Concept

4

• Placingthepiertothesafelevel

• Elevatingthebridgetoavoidtheflood

• Rationalizingthestruc-ture

01

Yeah

32

1

max water level

average water level

bird’s view

Page 2: Team No.29 XYZ

A

B

C

D

E

Material

Easy to build

bamboo

steel

bamboo

stone

steel

plan 1:10

elevation 1:10 elevation 1:10

24000 mm12000 mm6000 mm 6000 mm

1500

mm

24000 mm12000 mm4000 mm 4000 mm

2000

mm

1000

mm

2000

mm

1000

mm

2000 mm 2000 mm 1500 mm

Wuzhi bridge

02

• The loads on bridge floor transmit to the cantilever support.

• The support and bridge pier work to-gether as a self-balancing system.

• The size and form of components may be further optimized if needed.

structure analysis

construction procedure