Team Fillet

19
TEAM FILLET Luis Ruiz, Connor Pederson, Jacob Mullican, Andrew Thatcher

description

Team Fillet. Luis Ruiz, Connor Pederson, Jacob Mullican , Andrew Thatcher . Team Norms. - PowerPoint PPT Presentation

Transcript of Team Fillet

Page 1: Team Fillet

TEAM FILLETLuis Ruiz, Connor Pederson, Jacob

Mullican, Andrew Thatcher

Page 2: Team Fillet

Team Norms  1) All designated tasks are to be completed by the preset date. If not, personal evaluation is

subject to strict penalty from other team members.

2)If someone does continue to not complete the tasks by the preset date, the slacking individual will have a meeting with either of our engineering teachers be it our instructors.

3)No vulgar or inappropriate language is allowed during meetings or posts.

4)Team members are expected to fully contribute to the overall success of the team.

5)Any problems with either meeting dates, completing tasks on time and or cooperation must be reported so that the team can be flexible.

6)Be sure to choose the job or part of the project that can easily suit your individual skills.

7)Be sure to keep in contact with team for updates and or basic information.

8)If needed we can exchange other information such as numbers and or email addresses to keep in contact.

9)Be sure your finished part of the project is of very good quality and that effort shows, slacking off will not be accepted.

Page 3: Team Fillet

Norms Continued 10)Make sure your design decisions are as well thought out and played as

possible, we want our product and project to go well for everyone.

11)All new ideas and opinions are welcomed and encouraged to be presented to other members within the team. Our greatest tool is our diversity and all ideas will be taken into consideration.

12)Be sure to write in your own personal Engineering Notebook every class period for it will be graded and checked as well. Must have a summary of the day.

13) No doing all the work and leaving no work for Andrew to do, forcing him to make useless posts like this.

14)Try to cooperate fully with other team members in order to get work done fast and efficient.

15) All group members must complete the same amount of work and not expect other team-mates to do it for them.

End of Norms.

Page 4: Team Fillet

Time LinePeople Tasks

Connor & Luis Team Norms (Day 1 - 4/15, Day 2 - 4/18)

Andrew Timeline (Day 1 – 4/21, Day 2 4/19)

Jacob Design Brief (Day 1 – 4/21, Day 2 – 4/19)

Andrew/Connor Dimensioned, detailed sketches in engineering notebook of design and each individual part of the design (Day 1 – 4/25, Day 2 – 4/20)

Luis IDW creations of each individual part (Day 1 – 5/3, Day 2 – 5/2)

Connor IDW of exploded view (Day 1 – 5/3, Day 2 – 5/2)

Jacob PowerPoint presentation (Day 1 – 5/9, Day 2 – 5/6)

Andrew Team Conclusion

Page 5: Team Fillet

Design Brief Client: Frank Lloyd Wright Foundation Target Consumer: Frank Lloyd Wright architecture enthusiasts Designer: Ruiz, Pederson, Millican, Thatcher co.   Problem Statement: The Frank Lloyd Wright Foundation wants to market and sell a holiday season

ornament that is inspired by one of Frank Lloyd Wright’s architectural designs. Design Statement: Design an ornament that emulates the style and geometry of one of Frank Lloyd

Wright’s stained glass windows from the Prairie Style period.  Constraints: The total area of the ornament must be no more than 12.25 in2. The ornament may be up to 3/16” thick. 

Page 6: Team Fillet

Original Sketch

Page 7: Team Fillet

Full AssemblyIAM

Page 8: Team Fillet

Full AssemblyIPN

Page 9: Team Fillet

Part IPT’sDesign

Page 10: Team Fillet

Part IPT’sRhombus

Page 11: Team Fillet

Part IPT’sTriangle

Page 12: Team Fillet

Part IPT’sOuter ring

Page 13: Team Fillet

Part IPT’sDiamond

Page 14: Team Fillet

Sketch of IDWRhombus

Page 15: Team Fillet

Sketch of IDWTriangle

Page 16: Team Fillet

Sketch of IDWOuter ring

Page 17: Team Fillet

Sketch of IDWDiamond

Page 18: Team Fillet

Exploded View IDW

Page 19: Team Fillet

Team ConclusionWhat forms of communication did you utilize while working with your virtual

teammate? A member would not respond to the discussion post.  Did you experience any conflicts with your partner, and if so, how did you resolve

them? A team member would not work, so we did the work for them.  What was the most challenging part of this design experience?Communicating with the other teammates.  How was the design process utilized through this design challenge?We worked as a team and used the steps of the Design process to get our project

completed.  What are the advantages of working in a virtual team over working in a team that

relies solely on face-to-face contact? You do not have to travel to meet or communicate with them. Work can be done more efficiently and faster without travel.

  Did you add any other constraints to your design challenge? If so, why? No