Team 4 Premium Power Service - Michigan Technological …€¦ · PPT file · Web view ·...

11
Team 4 Team 4 Premium Power Premium Power Service Service Sponsored by: Detroit Edison Energy Industry Liaison: Allen Andershack Faculty Liaison: Dr. David Stone Members of Team 4: Tom Hemmila Joe Mooren Deanna Rahko John Sidebotham Michael Skowronek

Transcript of Team 4 Premium Power Service - Michigan Technological …€¦ · PPT file · Web view ·...

  • Team 4Premium Power Service

    Sponsored by: Detroit Edison Energy

    Industry Liaison: Allen Andershack

    Faculty Liaison: Dr. David Stone

    Members of Team 4:

    Tom Hemmila

    Joe Mooren

    Deanna Rahko

    John Sidebotham

    Michael Skowronek

  • Input Waveform

    Output To

    Customer

    A voltage sag/swell in the utility waveform is seen by the customer without a Custom Power Device in the substationSags and swells can have severe affects on the Customer LoadImplementing the Customer Power Devices into the substations will correct the waveform

  • DynamicVoltage Restorer

    Power electronic converter injects appropriate voltageActs as a buffer, used for injecting or absorbingCan Compensate a 50% three phase voltage dip for up to 50 cyclesCover a power range from 3MVA up to 50 MVA

    Filter

    Charger

    Q

    1

    Q

    2

    Q

    3

    T

    1

    T

    L

    Control

    V

    G

    V

    B

    V

    L

    Distribution

    Bus

    Load

    Bus

    DVR

    I

    B

    = I

    G

  • SMES

    Superconducting Magnetic Energy Storage

    Instantaneous dischargeUnlimited duty cyclesResponse time of .5 msRide through a 2.5 sec sag100% recharge in 120 secVery mobile

  • STATIC TRANSFER SWITCH

    Protects against sags and interuptionsSeamless transition between switchesFor facilities where load is power sensitiveFor facilities with loads above 3MWCost effective for both the utility and the customer

  • FLYWHEEL

    Deliver higher power per

    weight and size

    Cycles many thousands

    of times

    Have a precisely known

    state of charge

    Have a long life

    Operate without using

    potentially hazardous

    materials

  • Industrial Substation Modeled In ATPDraw

    Custom Power

    Device

    To Customer

    Load

    To Customer

    Load

  • Modeling a Substation in ATPDraw

    4 Substations To Be Modeled

    1 Bus Fed - 2 Transformer 1 Best Feed - 2 Transformer 1 Typical Line Fed - 2 Transformer 1 Typical Line Fed - 2 Transformers Operating in Parallel

    Problems That Arose

    ATPDraw Does Not Contain Circuit Breaker Models ATPDraw Does Not Contain Automatic Throwover Switches ATPDraw Does Not Contain Custom Power Devices

  • STS & Kinetic Battery Models

    Static Transfer Switch

    Kinetic Battery

  • ATP Fortran Modeling Techniques

    Basic Fortran can be used to model custom power devices in ATP

    Fortran modeling structure includes: Data Points, Variables, Initializing, and Executing.

    Integrating the code into ATPs defined structure by compiling a basic situation for the Custom Power Device.

  • SPRING PLANS

    Complete, integrate, and test ATP modelsEvaluate with different load configurationsMake recommendations based on simulations and results attainedWrite final report Graduate

    5.bin

    Filter

    Charger

    Q

    1

    Q

    2

    Q

    3

    T

    1

    T

    L

    Control

    V

    G

    V

    B

    V

    L

    Distribution

    Bus

    Load

    Bus

    DVR

    I

    B

    = I

    G

    40kV/13.2kV

    40kV/13.2kV

    NONC

    40kV Bus

    Industrial Substation

    40kV Bus

    Custom Power

    Device

    Maint.

    NODE1

    Main

    NODE4

    Maint.

    NODE3

    source1

    source2

    thyrist

    NODE2

    thyrist

    POS

    40kV #1

    40kV #2