ADDENDUM #02 TO: ALL BIDDERS RE: CHANGES TO PROJECT MANUAL AND DRAWINGS DATED 3/27/15 DATE: APRIL 23, 2015 SUBJECT: LINCOLNSHIRE PLACE MEMORY CARE CENTER ARCHITECT PROJECT #14-10690 PLEASE ATTACH THIS ADDENDUM AND ATTACHMENTS TO THE PROJECT MANUAL FOR THIS PROJECT AND KINDLY TAKE SAME INTO CONSIDERATION IN PREPARING YOUR CONSTRUCTION COST BREAKDOWN.
TYSON AND BILLY ARCHITECTS, P.C. _______________________________________ RONALD G. BILLY JR.
THIS ADDENDUM CONSISTS OF 3 (THREE) PAGES AND ATTACHMENTS:
ADD-02 ASK-03 ADD-02 ASK-04 SHEETS M1, M2, M3
NOTICE: BID DUE DATE HAS BEEN EXTENDED TO 10A.M. (CDT) APRIL 30, 2015. Addendum #02 SPECIFICATIONS
1. In the Table of Contents, REMOVE second reference of 10 1440 Interior Signage
2. Section 08 7100: Door Hardware, Article 2.1 Manufacturers, Paragraph A
a. Key System: REMOVE Falcon, ADD Sargent
b. Locks: REMOVE Falcon, ADD Sargent
c. Exit Devices: REMOVE Flacon, ADD Precision
d. Closers: REMOVE Falcon, ADD Sargent, Stanley
3. Section 10 2601: Corner Guards, Article 2.1 Manufacturers, ADD Subparagraph A4 Pawling Corporation Pro-Tek Wall Protection Systems: CG-10 Corner Guard for CG-2 (surface mounted) locations, CGT-7 for CG-1 (flush mounted), www.pawling.com
DRAWINGS
1. SHEET A112: FIRST FLOOR DIMENSION PLAN – REMOVE note “Align” at Nurse’s station, wall of Med Cl. 124. Nurse’s station to be offset 12” to the east from finished GWB corner of Med Cl. 124
2. SHEET A113: REFLECTED CEILING PLAN – DETAIL 1 “First Floor Reflected Ceiling Plan”
2
a. CHANGE ceiling height in Med. Cl. 124 and Med. Cl. 225 to 7’-4”
b. CHANGE ceiling height in Theater 308 to 8’-8”
c. CHANGE ceiling height in Hair Salon 315 to 8’-0”
d. REVISE ceiling in Diner 314 per attached sketch 1/ADD-02 ASK-04
e. ADD Section Detail through Corridor 302 per attached sketch 2/ADD-02 ASK-04. Refer to revised mechanical sheet M3 for locations. Minimum (2) two locations at theater/Chapel 308 and (3) three locations at Activity Director’s office 316 or Storage 317 (section shown at Storage 317)
3. SHEET A401: LARGE SCALE FLOOR PLANS AND WALL TYPE SCHEDULE – DETAIL 1 “Enlarged Floorplan – Entry Area”
a. ADD wall tag “W4L1” to wall between Laundry 128 and staff station in Kitchen 303, south of Door 129-1 only.
b. ADD wall tag “W4D” to east wall of Storage 129
c. CHANGE west interior wall of Storage 129 FROM W4C1 to W4L1
d. CHANGE tag at east wall of Janitor 306 from W4D2 to W4L2
e. ADD wall tag “W4B” to west and north wall of Electrical 320
f. ADD wall tag “W4D” to west wall of Security/ IT Closet 323
4. SHEET A402: LARGE SCALE FLOOR PLANS – DETAIL 1 “Enlarged Floorplan Center Court and Pod Common Areas”
a. ADD wall tag “W6L” to east wall of Therapy 120
b. ADD wall tag “W4L3” to north wall of Spa 122
c. ADD wall tag “W4B3” to east wall of Spa 122 and north wall of Closet 121
d. ADD wall tag “W4B” to east and south wall of Closet 121 (W4D3 between shower in Spa 122 and Therapy 120)
e. ADD wall tag “W6B3” to west wall of Closet 121
f. CHANGE wall tag in Spa 122, North wall of shower from “W4A4” to “W4B4”
g. ADD wall tag “W4L” to west and north wall of Storage 123 (W4L3 at Spa 122)
h. ADD wall tag “W4L” to west and north wall of Med. Cl. 124
i. ADD wall tag “W6L” to east wall of Nurse 220
j. CHANGE wall tag in Spa 223, South wall of shower from “W4A4” to “W4B4”
k. CHANGE wall tag in west wall of Spa 223 from “W6L” to “W6L3”
l. ADD wall tag “W4L” to west and north wall of Theater/Chapel 308
5. SHEET A403: LARGE SCALE FLOOR PLANS
a. REVISE Detail 3 “Enlarged Floor Plan Nurse’s Station” as indicated in attached sketch 1/ADD-02 ASK-03. REMOVE overhang at west side of station (100 and 200 pods)
b. Detail 4: Large Scale Floor Plan Unit D - ADD wall tag “W4L” at south wall of Unit D ADA
6. SHEET A421: LARGE SCALE FLOOR PLANS – REVISE Detail 6 “Section Detail Nurse’s Station” as indicated in attached sketch 2/ADD-02 ASK-03. REMOVE overhang at west side of station (100 and 200 pods)
7. SHEEET M1: MECHANICAL FIRST FLOOR PARTIAL PLAN – REVISE duct runs in Corridors 134 and 235 per attached drawing M1
3
8. SHEEET M2: MECHANICAL FIRST FLOOR PARTIAL PLAN – REVISE duct runs in Corridors 134 and 235 per attached drawing M2
9. SHEEET M3: MECHANICAL FIRST FLOOR PARTIAL PLAN – REVISE sheet per attached drawing M3
10. SHEET E12: LIGHTING & EQUIPMENT SCHEDULES – REMOVE fixture #F39 – Decorative Emergency Light
11. SHEET E13: SYMBOLS AND SPECIFICATIONS – ADD switch type “VS” Manual on, auto off vacancy sensor. ADD switch type “MS” Auto on, auto off Motion Sensor.
CLARIFICATIONS
1. MC cable is permitted in wall cavities but will not be permitted above ceilings or in attic spaces
2. Reference Sheet C201 – Site Plan: The scope of work does not include any work west of the 50’ R.O.W. along Diebold Road, including the sidewalk, extending the paving, asphalt trail, or Type H ADA ramp. If the roadway is not widened prior to the substantial completion of the project, temporary pavement will be required extending the concrete pavement at the R.O.W. to the current roadway location
END ADDENDUM #02
9'-0"
4'-0
"3'
-4"
1'-6
"
1'-0" 3'-6" 3'-6" 1'-0"
A413
10
10'-5
"
3 1/2"
1'-0
"
R7' - 4" R7' -
0 1
/2"
3 1/2"
A421
18 9
7
A421
2" PLASTICGROMMET
KEYBOARDTRAY 2'-10"
1"
A421
18Sim
7
CPU SHELF
2
2
ADD-02 ASK-03
2'-7
"
PLASTIC LAMINATECOUNTER ON TWO (2) 3/4"LAYERS OF SUBSTRATE
SOLID SURFACE COUNTERWITH DOUBLE BULLNOSEWITH 5/8" RADIUS
GWB WITH VINYL WALLCOVERING, BOTHS SIDES
PAINTED WOOD TRIM
PAINTED WOOD TRIM
1'-7"
DRAWER
DRAWER
2X4 WOOD STUDS @ 16" O.C.
WOOD VENEER ALLEXPOSED FACES
4" 4 1/2" 3 1/2"
1'-0"
3"
2
Tyson and Billy Architects, P.C.4000 Morsay Drive, Rockford, IL 61107 ph (815)229-8222
fax (815)229-8218 www.tysonandbilly.com
Sheet No:Proj. No.
Owner
Architect
Contractor
Bonding Co
Drawn By
Checked By
Date
4/19/2015 10:59:17 AM
ADD-02ASK-03ADD-O2 REVISED NURSE'S STATION
MCCI OF INDIANA, LLC 14-10690
04/23/15
BOM
BOM
1/4" = 1'-0"1ADD-02 ENLARGED FLOOR PLAN NURSE'S STATION
1" = 1'-0"2ADD-02 SECTION DETAIL NURSE'S STATION
REFER TO 3/A403
REFER TO 6/A421
S
S
S
-
---
ACP-1
9' - 0"
ACP-1
9' - 0"
ACP-1
8' - 0"
S.L.
ACP-1
8' - 0"
2
PROVIDE GWBSOFFIT @ 8'-0"
T/ PLATE
9' - 1 1/8"
T/ PLATE @ CORRIDOR
12' - 1 1/8"
T/ PLATE INT.
10' - 1 1/8"
FIRE DAMPER, WHEREREQUIRED
1-HR RATEDCONSTRUCTION, 3SIDES
CONTINUE GWB-2 ASREQUIRED FOR DUCTTRANSITION
CORRIDOR
302
ACP-1
10' - 0"
ACP-1
8' - 0"
GWB-2
12' - 0"
GWB-2
10' - 0"
Tyson and Billy Architects, P.C.4000 Morsay Drive, Rockford, IL 61107 ph (815)229-8222
fax (815)229-8218 www.tysonandbilly.com
Sheet No:Proj. No.
Owner
Architect
Contractor
Bonding Co
Drawn By
Checked By
Date
4/22/2015 3:55:19 PM
ADD-02ASK-04DINER 314 RCP, DUCT PENETRATION
MCCI OF INDIANA, LLC 14-10690
04/23/15
BOM
BOM
3/32" = 1'-0"1ADD-02 FIRST FLOOR REFLECTED CEILING PLAN
REFER TO 1/A113
1/2" = 1'-0"2ADD-02 SECTION DETAIL DUCT PENETRATION
ADD TO 9/A423
M1
MECHANIC
AL F
IRST F
LO
OR
PAR
TIA
LPLAN1/8" = 1'-0"
1 MECHANICAL FIRST FLOOR PARTIAL PLAN
Tys
on
and B
illy
Arc
hite
cts
, P.C
.40
00
Mors
ay D
rive
Rockfo
rd, IL
611
07
(815
) 229-
8222
FAX: (8
15)
229-
8218
Sheet No:
www.tys
ona
ndbill
y.com
Drn
.Appd.
Pro
ject
Num
ber
Dat
e
REVISION DATE
BO
ND
ING
CO
.CO
NTR
ACTO
R
OW
NER
AR
CHIT
ECT
4/1
3/2
015
10
:05:3
9 AM
MCCI O
F IND
IANA, LLC
LIN
CO
LNSHIR
E P
LACE M
EM
OR
Y C
AR
E F
ACIL
ITY
11828 D
IEB
OLD
RO
AD
, FO
RT W
AYNE, IN
14-1
0690
03/2
7/15
ISSUE
D F
OR
BID
MN, B
C, KM
STT
2 4/23/15
UNIT B1ADA206
UNIT DADA100
UNIT DADA101
UNIT A ADA102
UNIT A ADA103
UNIT A ADA104
UNIT B ADA105
UNIT B1ADA106
UNIT A ADA119
UNIT DADA200
UNIT DADA201
UNIT A ADA202
UNIT A ADA203
UNIT A ADA204
UNIT B ADA205
UNIT A ADA219
VESTIBULE232
VESTIBULE131
RE
F.
OVEN
DD
DD
WW
WW
RE
F. D
DD
D
WW
WW
RE
F.
M2
MECHANIC
AL F
IRST F
LO
OR
PAR
TIA
LPLAN
1/8" = 1'-0"1 MECHANICAL FIRST FLOOR PARTIAL PLAN
Tys
on
and B
illy
Arc
hite
cts
, P.C
.40
00
Mors
ay D
rive
Rockfo
rd, IL
611
07
(815
) 229-
8222
FAX: (8
15)
229-
8218
Sheet No:
www.tys
ona
ndbill
y.com
Drn
.Appd.
Pro
ject
Num
ber
Dat
e
REVISION DATE
BO
ND
ING
CO
.CO
NTR
ACTO
R
OW
NER
AR
CHIT
ECT
4/1
3/2
015
10
:05:3
9 AM
MCCI O
F IND
IANA, LLC
LIN
CO
LNSHIR
E P
LACE M
EM
OR
Y C
AR
E F
ACIL
ITY
11828 D
IEB
OLD
RO
AD
, FO
RT W
AYNE, IN
14-1
0690
03/2
7/15
ISSUE
D F
OR
BID
MN, B
C, KM
STT
2 4/23/15
UNIT B1ADA107
UNIT A ADA118
UNIT B1ADA108
UNIT A ADA117
UNIT B ADA109
UNIT A ADA116
UNIT A ADA110
UNIT A ADA115
UNIT C ADA111
UNIT A ADA114
UNIT E112
UNIT F113
UNIT A ADA
UNIT A ADA218 UNIT B1
ADA207
UNIT A ADA217
UNIT A ADA216 UNIT B ADA
209
UNIT A ADA215
UNIT A ADA210
UNIT A ADA214 UNIT C ADA
211
UNIT F213
UNIT E212
VESTIBULE234
CLOSET233
VESTIBULE133
CORRIDOR134
CLOSET132
UNIT B1ADA208
CORRIDOR235
Tys
on
and B
illy
Arc
hite
cts
, P.C
.40
00
Mors
ay D
rive
Rockfo
rd, IL
611
07
(815
) 229-
8222
FAX: (8
15)
229-
8218
Sheet No:
www.tys
ona
ndbill
y.com
Drn
.Appd.
Pro
ject
Num
ber
Dat
e
REVISION DATE
BO
ND
ING
CO
.CO
NTR
ACTO
R
OW
NER
AR
CHIT
ECT
4/1
3/2
015
10
:05:3
9 AM
MCCI O
F IND
IANA, LLC
LIN
CO
LNSHIR
E P
LACE M
EM
OR
Y C
AR
E F
ACIL
ITY
11828 D
IEB
OLD
RO
AD
, FO
RT W
AYNE, IN
14-1
0690
03/2
7/15
ISSUE
D F
OR
BID
MN, B
C, KM
STT
M3
MECHANIC
AL F
IRST F
LO
OR
PAR
TIA
LPLAN
1/8" = 1'-0"1 MECHANICAL FIRST FLOOR PARTIAL PLAN
1/4" = 1'-0"2 SECTION AA
2 4/23/15
RE
F.
RE
F.
LAUNDRY229
CLOSET231
MECHANICAL321
WOMEN319
MEN318
HAIRSALON
315
STORAGE221
STORAGE224
NURSE220
MED. CL.225
VESTIBULE300
FOODSTORAGE
304
LAUNDRY128
STORAGE129
JANITOR306
VEST.305
MECHANICAL123
SPA122
MED. CL.124
LIVING/DININGAREA
228
SOLARIUM226
SOLARIUM125
OFFICE324
SPA223
DINER314
TOWNSQUARE
313
CORRIDOR302
LOBBY301
KITCHEN303
LIVING/DININGAREA
THERAPY120
CLOSET130
ELECTR
ICAL
320
STORAGE222
STORAGE
CLOSET325
CLOSET121
ACTIVITYDIRECTOR'S
OFFICE316
THEATER
/CHAPEL
30
8
MEETINGROOM
322
SECURITY/IT CLOSET
323
127
ACTIVITY312
RE
F.
OVEN
DD
DD
WW
WW
RE
F. D
DD
D
WW
WW
RE
F.
19' - 0"