TCDI Setup• Changed by hand the beta functions in the TRIM
application collimator positions moved to 5 s and position thresholds to ±0.25 s (dump) and ±0.125 s (warning) automatically.
![Page 3: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/3.jpg)
TCDI Setup• Changed by hand the beta functions in the TRIM
application collimator positions moved to 5 s and position thresholds to ±0.25 s (dump) and ±0.125 s (warning) automatically.
• Energy thresholds set up by hand to 10 s + 1 s (equivalent in mm)
![Page 4: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/4.jpg)
Calibration
Beam axis1 s
BLM
• Close 1 jaw to 1 nominal snom shot the beam onto the collimator record losses at the near by BLM.
![Page 5: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/5.jpg)
Calibration• Close 1 jaw to 1 nominal snom shot the beam onto
the collimator record losses at the near by BLM.• Normalize BLM reading with respect to the
extracted beam intensity• Define real beam size sreal(measured emittance,
dispersion, nominal Dp/p = 1e-4)• Define the fraction of beam intercepted by the
collimator jaw (NORMDIST(snom,beam centre, sreal) )
![Page 6: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/6.jpg)
Validation• Knob producing n s oscillation in H and V plane for different
phases 0-30-60…-360° (the knobs had to be regenerated on the spot because of the change in the optics)
Nominal beam axis
5 s
BLM
5 s
![Page 7: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/7.jpg)
Validation• Knob producing n s oscillation in H and V plane for
different phases 0-30-60…-360° (the knobs had to be regenerated on the spot because of the change in the optics)
• Oscillations with 5 snom amplitude look at BLM readings normalize with respect to the extracted intensity
• Convert BLM readings in fraction of beam intercepted• Convert fraction of beam intercepted in amplitude cut in sreal by the collimator jaws (to be added to the amplitude of the applied oscillation) TCDI aperture in sreal
![Page 8: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/8.jpg)
Validation Results
Knobs and validation fine for TI2 horizontal and TI8 vertical
Should measure ~3 points per phase (4,4.5,5 σ) – here we aimed only at the 5 σ oscillation due to time constraints and previous validation
![Page 9: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/9.jpg)
Validation Results• Some problems with:– TI2 vertical knob: 10 s amplitude needed to have ~ 5 mm
oscillation (1 s = 0.9 mm) in the TL
Recalculated amplitudes
![Page 10: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/10.jpg)
Validation Results• Some problems with:– TI2 vertical knob: 10 s amplitude needed to have ~ 5 mm
oscillation (1 s = 0.9 mm) in the TL– TI8 horizontal knob: 1.5-2 s amplitude needed to have ~ 5
mm oscillation in the TL
Recalculated amplitudes
![Page 11: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/11.jpg)
Validation Results• Some problems with:
– TI2 vertical knob: 10 s amplitude needed to have ~ 5 mm oscillation (1 s = 0.9 mm) in the TL
– TI8 horizontal knob: 1.5-2 s amplitude needed to have ~ 5 mm oscillation in the TL
– For 5 mm oscillation (seen in YASP) we see a loss level at the TCDIs as expected from the ‘good’ knobs validation OK
• In principle the validation was redundant since we already measured that the TCDIs at 5 s settings provide the required protection
![Page 12: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/12.jpg)
Injection of 144 Bunches after Setup
![Page 13: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/13.jpg)
Injection of 144 Bunches after Setup
![Page 14: TCDI Setup and validation](https://reader035.fdocuments.in/reader035/viewer/2022062410/568161d1550346895dd1c84e/html5/thumbnails/14.jpg)
General Critical Issues• TCDIs are the only protection in case of large trajectory drifts• TCDI setup and validation takes minimum 2-3 shifts• Knob generation is critical and should never be done on the
spot• Two people are needed for both procedures• At least two teams covering 8h shifts are needed or at least 8h
machine downtime has to be accepted between setup and validation
• Automatize as much as possible both procedures– Automatics setup tool will be tested in MD on Wednesday