TOOLBOX MEETING FORM
GASCO HABSHAN-5 PROCESS Plant
Doc. No. RP-500-61-307 Rev.: A1
SUBCONTRACTOR COMPANY NAME: JGC DATE: 17 MARCH, 2012
LOCATION OF THE MEETING:
TOPIC DISCUSSED: TEMPORARY PIPE SUPPORTS
TBT/2301/03-12/128| Rev. 0 | 17.03.2012
Temporary pipe supports/stands are used both at ground level and at elevated locations to keep the
pipe spools secured in required position/angle during painting, blasting & fit up jobs like welding and
grinding. As per project safety procedures we need to ensure these supports are in a safe condition to
hold the load of the pipe as if they are not safe or capable enough to hold the spools in position then
they may collapse/fail causing the spools to fall resulting in personal injuries/property damages.
GOOD PRACTICES! BAD PRACTICES!
What to do? As we are using a number of pipe supports and stands on project so we need to follow these important points to avoid any accident related to pipe supports on site.
• Only use certified and color coded lifting belts & chain blocks in good condition
• Never use ropes to support pipes at elevated locations
• Never directly connect two lifting belts , always use a shackle for this purpose
• SWL must be marked on all supporting material & the load of pipe must not exceed it
• The pipe stands must have stoppers on edges
• Pipe stands must be used on compacted/leveled ground
• Use wedges to control the movement of pipes
• Don’t support pipes on scaffold platforms, always use permanent structures
• Use softeners on structure beams to avoid damaging the lifting belts
• Don’t release/remove the support till the time pipe is completely welded/secured
“ALWAYS ALERT-NO ONE GETS HURT”
![Page 2: TBT17032012](https://reader031.fdocuments.in/reader031/viewer/2022020423/568c33481a28ab02358c35a6/html5/thumbnails/2.jpg)
TOOLBOX MEETING FORM
GASCO HABSHAN-5 PROCESS Plant
Doc. No. RP-500-61-307 Rev.: A1
SUBCONTRACTOR COMPANY NAME: JGC DATE: 17 MARCH, 2012
LOCATION OF THE MEETING:
TOPIC DISCUSSED: TEMPORARY PIPE SUPPORTS
TBT/2301/03-12/128| Rev. 0 | 17.03.2012
Language(s) used:
Person run the Meeting (name/surname)
Name/ Surname Nationality ID Card Number Signature
Signature of the person who runs the course
The original of this form shall be filed in the SUBCONTRACTOR Site HSE Office while a copy shall be submitted to CONTRACTOR SITE HSE Department