www.kpit.com
Tax Migration in Indian
Localization
TAXINJ -> TAXINN
© KPIT Technologies Limited
Agenda
1/28/20162
1 Customer requirement
2 Scope
3 Out of scope
4 Assumptions
5 Phases of implementation
6 Challenges
7 Delivery model
© KPIT Technologies Limited
Customer Requirement
1/28/20163
GST is being rolled out in India to simplify the indirect taxation regime and to remove the
cascading effect of indirect taxes on the end consumer
It is now mandatory to use TAXINN tax procedure (condition based rather than tax code
based) in SAP
Hence the primary requirement is to migrate from TAXINJ to TAXINN
© KPIT Technologies Limited
Scope
1/28/20164
Understanding current logistic scenario (procurement, sales, subcontracting) and the tax
calculations using TAXINJ frame work
Map the scenario to TAXINN frame work
Execute calculation of taxes in TAXINN scenario and validate with TAXINJ framework results
(procurement and sales scenarios)
Setting up necessary enhancement for TAXINN if needed
Maintain mapping table of TAXINJ tax code to new TAXINN tax codes
Execute migration of open MM documents (PO and contract) to TAXINN frame work
© KPIT Technologies Limited
Out of Scope
1/28/20165
Changes in process of procure to pay, order to cash, record to report etc.
Change management needed for the new tax procedure
End user training
Changes to indirect tax return preparation and filing process
Changes to any enhancement or development other than covered in the scope
Any kind of basis activity
Re-design of user authorizations
Changes to any legacy system or interfaces
Changes to business place setting in the system
Changes in any other SAP systems (SRM, CRM, Ariba etc.,)
Data cleansing
Performance optimization
© KPIT Technologies Limited
Assumptions
1/28/20166
Availability of core SAP team (FI, MM and SD)
Availability of business team to validate the results in the new TAXINN procedure
Separate system or a new client with copy of production data (may not be full data) for
executing mock migration before migrating in quality environment
Quality system should be copied with the latest production data (may not be full data) for
executing quality system migration
Need production system shutdown (no logistic operations) during productive migration
Patch level required for tax procedure migration would be ensured by customer before
start of the project
© KPIT Technologies Limited
Phases of implementation
1/28/20167
Project preparation
Blueprint
Realization
Deploy, Go-live and support
© KPIT Technologies Limited
Project preparation
1/28/20168
High Level Activity Activity DetailsCustomer Pre
RequisitesAssumptions Exclusions
Check the patch level
Check the compliance
to patch level as pre
requirement
Update to the patch level
required
Patch level would be
updated before project
start
Helping in update to the
required patch level
Ensure availability of
system
Check the availability of
system for the project
(mock system)
Make the mock system
available
Mock system with copy
of production data (may
not be full data)
Setting the mock system
with production data
Empower the project
team
Will conduct brief session
on TAXINN Tax procedure
and Tax Migration in Indian
Localization
Availability of Project
team
© KPIT Technologies Limited
Blue print (1 of 2)
1/28/20169
High Level Activity Activity Details Customer Pre Requisites Assumptions Exclusions
Study of existing
TAXINJ procedure
• Tax procedure and routines
• Tax conditions and controls
• Account key used for posting to FI
• User exit or BADI in tax calculation
• List of Tax codes and usage
• Custom development in tax
calculation
• Availability of Core tax
processing team
• Availability of
documented business
process relating to Taxes
• Availability of Test scripts
used for validating tax
process
• Customer to share all the
Business Scenarios
• SAP can provide
standard scenarios which
can be considered for
initial testing
• Changes to existing
custom development
would
• For changes in Non SAP
applications or changes
in Collabra analysis
should be done by
Customer
• ABAP and Basis Resource
will be provided by
Customer
• Only higher level impact
of custom program for
reporting and return
process would be
Studied
• Any changes on non SAP
applications/Custom
applications
Study of reporting
and return
process
• Understand the reports usage for tax
• Understand the reports or
development for return preparation
Interface with
other
applications
• Understand interface with Collabra
• Understand interface with any other
custom applications
• Understand interface with any other SAP
applications
Logistic scenario
• Understand the procurement process
from tax angle
• Understand the sales process from tax
angle
© KPIT Technologies Limited
Blue print (2 of 2)
1/28/201610
High Level Activity Activity Details Customer Pre Requisites Assumptions Exclusions
Recommendation
of TAXINN (Blue
print document)
• TAXINN procedure to be used
• Tax conditions to be used
• Access sequence to be used
• Usage of user exit or BADI for
meeting customer specific
requirement
• Enhancement needed in logistic
transactions to meet TAX
requirement
• Changes or enhancement to
Reporting and return process
• Changes or enhancement to
interface with other systems
• Identification of Number of
Condition Records to be maintained
and how it will be maintained (Tool
to upload condition records per
condition types)
• Identification of Changes with
regards to Master Data (Material,
Vendor, Customer & Services)
© KPIT Technologies Limited
Realization
1/28/201611
High Level Activity Activity Details Customer Pre Requisites Assumptions Exclusions
TAXINN
Configuration
• Configure TAXINN
• Realize all development
objects
• Creating the required Tax Codes (MM,
SD and FI side)
• Support in building the effective
condition technique / Access sequence
• Creating condition records for all the
scenarios & Tax Codes in TAXINN
• Identifying the custom
reports/programs, external interfaces
and testing with new tax procedure
• Existence of mock system
• Transport route for
moving changes to
development System
• Setting up system or
transport route
Testing
• Test various scenarios
• Confirm tax calculation as
per current
• TAXINJ procedure
• Testing all the tax related scenarios
effectively in short period
• SAP will support throughout the testing
phase for all critical issues
Migration to
TAXINN (QA
with Production
data)
• Maintain mapping table
between
• TAXINJ and TAXINN
• Execute migration of open
logistic (MM)
• documents
• Test the result of migration
• SAP will provide custom reports and
tools related to migration in few cases
to reduce the efforts and improving the
project quality
• SAP will support throughout the testing
phase for all critical issues after
migration
• QA system with latest copy
of production data.
© KPIT Technologies Limited
Deploy & Go Live Phase
1/28/201612
High Level Activity Activity Details Customer Pre Requisites Assumptions Exclusions
Plan for system
shutdown (no
logistic
transactions)
• Transport all changes to
production Migrate
production system
• Ensure no logistic users are using the
system during production migration
After go-live
support
• Support business users (Level
2)
• Level 1 support to be provided by
customer
• Availability of system to
log the issues and
tracking Status
• Level 1 support
Setting up system for
support
Migration to
TAXINN (QA
with Production
data)
• Maintain mapping table
between
• TAXINJ and TAXINN
• Execute migration of open
logistic (MM)
• documents
• Test the result of migration
• SAP will provide custom reports and
tools related to migration in few cases
to reduce the efforts and improving the
project quality
• SAP will support throughout the testing
phase for all critical issues after
migration
• QA system with latest copy
of production data.
© KPIT Technologies Limited
Challenges
1/28/201613
Identification of all logistic scenario
Availability of core team and business users
Availability of system for doing configuration and mock migration
Through testing to ensure results of all scenario under TAXINN
© KPIT Technologies Limited
Delivery Model
1/28/201614
Scope & Timelines
Location Scope: India
Resources : KPIT
• Project Manager
• DFG Expert ( need based)
• SAP MM Functional Consultant
• SAP SD Functional Consultant
• SAP FI Functional Consultant
• SAP ABAP Technical Consultant
• SAP BASIS Technical Consultant
Resources : Customer
• Project Manager
• System Administrator or Basis expert
• ‘Accounts Payable’ process expert
• ‘Accounts Receivable’ process expert
• ‘Financial Accounting’ process expert
• Logistics Process Expert
Delivery – Highlights
• Configurations as per the SAP Standard CIN
processes
• Approach for deploying SAP CIN
functionalities in SAP system
• Support customer team in Unit &
Integration Test
• Support End user and configuration
documentation preparation by customer
team
• Knowledge transfer
Execution highlights
• Global Template developed & maintained
by customer team
• Knowledge Transfer at Customer site
© KPIT Technologies Limited
Time Lines
1/28/201615
Phase/ Timeline
(Weeks)
Week
1
Week
2
Week
3
Week
4
Week
5
Week
6
Week
7
Week
8
Week
9
Week
10
Week
11
Week
12
Week
13
Week
14
Week
15
Preparation
Business Blue print
Realization
Deploy
Go-live
© KPIT Technologies Limited3/9/201716