Tavazzano – Combined Steam Cycle For Endesa Enelpower

4

Click here to load reader

description

Role and scope of work

Transcript of Tavazzano – Combined Steam Cycle For Endesa Enelpower

Page 1: Tavazzano – Combined  Steam  Cycle  For Endesa Enelpower

Tavazzano – Combined steamcycle for Endesa Enelpower-

2003 -2005, within Alstom Power Italia Organisation

Machine hall---Pictures of train 5 and 6. Scope of work: retrofitting of Tosi Steam Turbine afterimplementation of the HP and LP rotor modifications and functional control modofication ofthe Turbine due to change of operational steam conditions of the turbine within the CC (gas

turbine : GE frame 9 )

Page 2: Tavazzano – Combined  Steam  Cycle  For Endesa Enelpower

Tavazzano – Combined steam cycle for Endesa Enelpower-2003 -2005

View of the LP stage and X-ss over steam piping after modifications and revamping works

Page 3: Tavazzano – Combined  Steam  Cycle  For Endesa Enelpower

Tavazzano – Combined steam cycle for Endesa Enelpower-2003 -2005

Detail of the spare rotor of group 6 steam turbine

Page 4: Tavazzano – Combined  Steam  Cycle  For Endesa Enelpower

Tavazzano – Combined steam cycle for Endesa Enelpower-2003 -2005

Definition of key responsible managers and respective role on behalf of end user