Tavazzano – Combined Steam Cycle For Endesa Enelpower
Click here to load reader
description
Transcript of Tavazzano – Combined Steam Cycle For Endesa Enelpower
Tavazzano – Combined steamcycle for Endesa Enelpower-
2003 -2005, within Alstom Power Italia Organisation
Machine hall---Pictures of train 5 and 6. Scope of work: retrofitting of Tosi Steam Turbine afterimplementation of the HP and LP rotor modifications and functional control modofication ofthe Turbine due to change of operational steam conditions of the turbine within the CC (gas
turbine : GE frame 9 )
Tavazzano – Combined steam cycle for Endesa Enelpower-2003 -2005
View of the LP stage and X-ss over steam piping after modifications and revamping works
Tavazzano – Combined steam cycle for Endesa Enelpower-2003 -2005
Detail of the spare rotor of group 6 steam turbine
Tavazzano – Combined steam cycle for Endesa Enelpower-2003 -2005
Definition of key responsible managers and respective role on behalf of end user