Kick-off Meeting 8-9/jan/2014 Task 6.4 Third integration -System validation • Leader: Graphitech • Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE Objectives • Whole system validation and testing • Cost and productivity final calculation
-
Upload
slope-project -
Category
Documents
-
view
38 -
download
3
Transcript of Task 6.4 by graphitech
Kick-off Meeting 8-9/jan/2014
Task 6.4
Third integration -System validation• Leader: Graphitech• Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE
Objectives• Whole system validation and testing• Cost and productivity final calculation
Kick-off Meeting 8-9/jan/2014
How to achieve these objectives?
• Environment setup (SOA)• Interactons validation one by one• Fix issues one by one until threshold has been reached
(e.g. 80% of tests cases passed)
Kick-off Meeting 8-9/jan/2014
Deliverables
Reports:
• D.6.023 System Integration Report III (M34)• D.6.043 SLOPE System Techno-Economic Evaluation Report III
(M34)• D.6.03 SLOPE System Field Trials Readiness Assessment Report
(M36)