Task 6.4 by graphitech

3
Kick-off Meeting 8-9/jan/2014 Task 6.4 Third integration -System validation Leader: Graphitech Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE Objectives Whole system validation and testing Cost and productivity final calculation

Transcript of Task 6.4 by graphitech

Page 1: Task 6.4 by graphitech

Kick-off Meeting 8-9/jan/2014

Task 6.4

Third integration -System validation• Leader: Graphitech• Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE

Objectives• Whole system validation and testing• Cost and productivity final calculation

Page 2: Task 6.4 by graphitech

Kick-off Meeting 8-9/jan/2014

How to achieve these objectives?

• Environment setup (SOA)• Interactons validation one by one• Fix issues one by one until threshold has been reached

(e.g. 80% of tests cases passed)

Page 3: Task 6.4 by graphitech

Kick-off Meeting 8-9/jan/2014

Deliverables

Reports:

• D.6.023 System Integration Report III (M34)• D.6.043 SLOPE System Techno-Economic Evaluation Report III

(M34)• D.6.03 SLOPE System Field Trials Readiness Assessment Report

(M36)