Task 6.1 by graphitech

7

Click here to load reader

Transcript of Task 6.1 by graphitech

Page 1: Task 6.1 by graphitech

Kick-off Meeting 8-9/jan/2014

Task 6.1

Definition of the integration steps• Leader: Graphitech• Participants: KESLA, MHG, FLY, ITENE

Objectives• Develop the integration steps• Develop validation concepts

• Functionalities• Communication

Page 2: Task 6.1 by graphitech

Kick-off Meeting 8-9/jan/2014

How to achieve these objectives?

1. System Architecture Analysis (from T.1.1)• Component Diagram

2. Use case / general process Analysis (from T.1.5)• Functional Requirements (execute A, execute B, etc.)• Non-functional reqirements (speed, reliability, etc.)

Page 3: Task 6.1 by graphitech

Kick-off Meeting 8-9/jan/2014

How to achieve these objectives?

3. Enumerate all needed software components, hardware, tools etc.• Forest model• Mesurement systems• 3D Model Visualisation Software • Other Software

4. Identify and verify connection between components5. Plan how to connect between

1. Forest Model with Harvesting2. Forest Model & Harvesting with Forest Management

Page 4: Task 6.1 by graphitech

Kick-off Meeting 8-9/jan/2014

How to achieve these objectives?

6. For each integration step between two or more subsystems1. For each identified interaction between subsystems components:

1. Describe the interaction2. Describe the expected result3. Define importance level (i.e. low, medium, high)

2. Define minimum threshold to be achieved

Test

Interaction

DescriptionExpected result Obtained Result Achieved

Anomaly

Description

... ... ... ... ... ...

8The user use the 3D

model to…The application shows …. The application HAS shown… YES None

... ... ... ... ... ...

Page 5: Task 6.1 by graphitech

Kick-off Meeting 8-9/jan/2014

Components to be integrated

WP2

WP3WP5

WP4

SLOPE DBSLOPE DBSLOPE DB

Page 6: Task 6.1 by graphitech

Kick-off Meeting 8-9/jan/2014

Deliverables

Reports:

• D.6.01 System Integration and Validation Plan (M13)

Page 7: Task 6.1 by graphitech

Kick-off Meeting 8-9/jan/2014

Expectations

• Contribution from each partner for itscomponent

• Joint contribution for each couple of integrated components by the corresponding partners