CERC tariff framework2004 &
2009
Components of ARR of GenCo
• Fixed Charges– Return on Equity
– Interest on loan capital
– Depreciation & AAD;
– Interest on working capital;
– Operation and maintenance expenses;
– Cost of secondary fuel oil (for coal-based and lignite fired generating stations only);
– Special Allowance in lieu of R&M or separate Compensation Allowance
• Energy Charges
• Special allowance in lieu of R&M or separate compensation allowance, wherever applicable.
Norms of Operations
• Availability of generation plant – 85% • PLF for incentives – 80%• Secondary Fuel Oil Consumption for Coal genCo – 1 ml/ kWh• Secondary Fuel Oil Consumption for Lignite fired genCo – 2 ml/ kWh• Auxiliary energy consumption for Coal Plants – 8.5%• Auxiliary energy consumption for Gas and Liquid Plants – 3% for Combined
Cycle, 1% for Open cycle• Limestone consumption norms• Normative Annual Plant Availability factor for Hydro plants redefined in
new regulation• NAPAF for AC Transmission system – 98%• NAPAF for DC bipole Transmission link – 92%• NAPAF for DC back to back Transmission link – 95%
Return on Equity
• 30% of the Capital Investment in Plant, Machinery and its offices – Where actual equity is more than 30%, excess equity shall be treated
as debt
– Where actual equity is less than 30%, actual equity shall be considered for Return
• Base Pretax Return 15.5%/(1-tax rate) (Earlier Post tax 14%)
• Base pretax Return 16.0 %/(1-tax rate) for projects commissioned after 01.04.2009 within prescribed Timeline
• The Tax on income shall be trued at actual every year after assessment
Interest on Loan Capital
• The benefit of swapping of loan shall be shared between genCo/ TransCo and beneficiary in ratio 1: 2
• Normative loan repayment equal to depreciation
• Accordingly interest shall be calculated on balance normative loan at weighted average interest rate.
• Cost of hedging and foreign exposure shall be recoverable from beneficiary
Depreciation & AADRegulation 2004 Regulation 2009
Coal Thermal Plant 3.60% +AAD 5.28% for 12 years
Gas/Diesel/ Liquid
Fuel Thermal Plant6.00% +AAD 5.28% for 12 years
Hydro Plant 2.57% +AAD 5.28% for 12 years
Transmission Line 5.28% for 12 years
Land and Civil
Building0%
Licence fee/ lease
life
0.00%
3.34%
Depreciation D & AAD D
Depreciation after
debt repayment periodRemaining unavailed depreciation to
spread on remaining useful life of
asset.
Interest on Working CapitalRegulation 2004 Regulation 2009
Coal/ Lignite/
limestone cost
1.5 month for pit head plants at
normative Plant availability
1.5 month for pit head plants at
normative Plant availability
Coal/ Lignite/
limestone cost
2 month for non-pit head plants
at normative Plant availability
2 month for non-pit head plants at
normative Plant availability
Secondary Fuel
oil Stock
2 month at normative Plant
availability
2 month at normative Plant
availability
Gas Station One month of Oil/ Gas One month of Oil/ Gas
Maintenance
Spares
1% of GFA in first year
Thereafter escalated by 6%
every year
20% of O&M Cost for Coal/ Lignite
Plant
30% of O&M Cost for Gas Plant
15% of O&M Cost for Hydro Plant
Receivables 2 months fixed + variable
charges calculated at target
availability
2 months fixed + variable charges
calculated at target availability
O&M Cost One month One month
Interest rate SBI PLR as on 1.4.2004 SBI PLR as on 1.4.2009
Notional charge Notional charge
Operations & Maintenance Cost
• As given in table.
• The charges schedule approved
Other matters in generation & Transmission
• Rebate 2% for payment through L/c
• Late Payment Surcharge 1.25% after 60 days from date of billing.
• UI Charges – Variation between actual generation and scheduled generation
Comparison of Key parametersParameter Regulation 2004 Regulation 2009
Useful Life of Coal/
Lignite Thermal Plants
25 years 25 years
Useful Life of Gas &
Liquid Fuel
15 Years 25 Years
AC/ DC S/s 25 years 25 years
Hydro Stations 35 years 35 years
Transmission Lines 25 years 35 years
Return on Equity 14% 15.50%
16.00%
Refinancing the Loan Cost to be borne by
beneficiary if there is net
benefit
All benefit to the
beneficiary
Cost to be borne by
beneficiary if there is net
benefit
Benefit to be shared in
GenCo 67%: beneficiary
33%
CDM benefit
• CDM revenue of 1st year for GenCo/ TransCo – 100%
• CDM revenue of 2nd year for GenCo/ TransCo – 90%
• CDM revenue of 3rd year for GenCo/ TransCo – 80%
• CDM revenue of 4th year for GenCo/ TransCo – 70%
• CDM revenue of 5th year for GenCo/ TransCo – 60%
• CDM revenue of 6th year for GenCo/ TransCo – 50%