Check all that apply:
Federal Low Income Housing Tax Credit
State Low Income Housing Tax Credit
Tax Exempt Bonds
Rental Production Program (RPP) Loan
Requested RPP Loan Amount:RPP Loan Product Requested: Multi-Family Production
Print Preview - Final Application
Tax Credits, RPP Loans, and/or Tax Exempt Bond Loans
Resources Requested
219,765
Page 1 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
2/34
Is project in Qualified Census Tract & Difficult to Develop area:
Project Name and Location
Project Name: Tarboro Square Apartments
Address: Wilson Street
City: Tarboro County: Edgecombe Zip: 27886
Census Tract: Block Group:
No
Political Jurisdiction: Town of Tarboro
Jurisdiction CEO Name: First: Last:Samuel Noble Title: Town Manager
Jurisdiction Address: P.O. Box 220
Jurisdiction City: Tarboro Zip: 27886
Jurisdiction Phone: (252)641-4250
Site Latitude:
Site Longitude:
Page 2 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
3/34
Is this project a follow-on (Phase II, etc) to a previously-awarded tax credit development project?
If yes, list names of previous phase(s):If yes, list names of previous phase(s):
Will the project be receiving federal rental assistance?
If yes, provide the subsidy source:If yes, provide the subsidy source: RD and number of units:and number of units:
Target Population: Family
Indicate below any additional targeting for special populations proposed for this project:
Square Footage Information
Project Description
Project Type:* New Construction Rehab Adaptive Reuse
No
Yes
2424
Mobility impaired handicapped: 5% of units comply with QAP Section IV(F)(3) (in addition to other federal and staterequirements)
Persons with disabilities or homeless populations: the greater of 5 units or 10% of the total units
Remarks:
Proposed number of residential buildings: 4 Maximum number of stories in buildings: 2
Types of Units:* Townhouse Duplex Garden Apartment Detached Single-Family
Project Includes:Separate community building -- Sq. Ft. (Floor Area):Sq. Ft. (Floor Area): 990990
Community space within residential bulding(s) -- Sq. Ft. (Floor Area):Sq. Ft. (Floor Area):
Elevators -- Number of Elevators:Number of Elevators:
Gross Floor Square Footage: 25,597
Total Net Sq. Ft. (All Heated Areas): 19,191
Page 3 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
4/34
Applicant Information
Applicant Name: Tarboro Square Limited Partnership
Address: P.O. Box 1027
City: State: NC Zip:Dunn 28335
Contact: First: Last: Title:Ed Turlington
Telephone: (910)892-5999
Alt Phone: (910)892-0731
Fax: (910)892-3727
Email Address: [email protected]
Page 4 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
5/34
Total Site Acreage: Total Buildable Acreage:
If buildable acreage is less than total acreage, please explain:
Identify utilities and services currently available (and with adequate capacity) for this site:
Storm Sewer Water Sanitary Sewer Electric
Is the demolition of any buildings required or planned?
If yes, please describe:
Are existing buildings on the site currently occupied?
If yes:(a) Briefly describe the situation:
(b) Will tenant displacement be temporary?
(c) Will tenant displacement be permanent?
Is the site in a distressed neighborhood?
If yes, does a community revitalization plan exist?
Is the site directly accessed by an existing, paved, publicly maintained road?
If no, please explain:
Is any portion of the site located inside the 100 year floodplain?
If yes:(a) Describe placement of project buildings in relation to this area:
Site Description
6.0 6.0
No
No
No
Yes
No
Page 5 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
6/34
(b) Describe flood mitigation if the project is in the East Region and will have improvements within the 100 year floodplain:
Page 6 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
7/34
Does the owner have fee simple ownership of the property (site/buildings)?
If yes provide:
Purchase Date: Purchase Price:
If no:
Site Control
No
(a) Does the owner/principal or ownership entity have vaild option/contract to purchase the property? Yes
(b) Does an identity of interest (direct or indirect) exist between the owner/principal or ownership entity with the option/contract for
purchase of the property and the seller of the property?If yes, specify the relationship:
No
(c) Enter the current expiration date of the option/contract to purchase: 07/02/2003
(D) Enter Purchase Price: 110,000
Page 7 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
8/34
Present zoning classification of the site:
Is mutifamily use permitted?
Are variances, special or conditional use permits or any other item requiring a public hearing needed to develop this proposal?
If yes, have the hearings been completed and permits been obtained?
If yes, specify permit or variance required and date obtained. If no, describe permits/variances required and schedule for obtainingthem:
Is a public hearing of any kind required in the future for you to fully develop this property?
If yes, describe the nature of the hearing and when you expect the hearing will be held:
Are there any existing conditions of historical significance located on the project site that will require State Historic Preservation office review?
If yes, describe below:
Are there any existing conditions of environmental significance located on the project site?
If yes, describe below:
Zoning
RA-6
Yes
Yes
Yes
Rezoned to RA-6 on 4-21-2003.
No
No
No
Page 8 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
9/34
Ownership Entity
Owner Name: Tarboro Square Limited Partnership
Address: P.O. Box 1567
City: State: NC Zip:Dunn 28335
Federal Tax ID Number of Ownership Entity: (If assigned)56-6578945
Federal Tax ID Number of Managing GP or Member: (If Not Assigned)
Entity Type: Limited Partnership
Entity Status: Already Formed
Is the applicant requesting that the Agency treat the application as Non-Profit sponsored? No
Is the applicant requesting that the Agency treat the application as CHDO sponsored? No
List all general partners, members,and principals. Specify nonprofit corporate general partners ormembers. Click [Add] to add additional partners, members, and principals.
Org: Tarboro Square Limited Partnership
First Name: Edward Last Name: Turlington Function: Managing General Partner
Address: P.O. Box 1027
City: Dunn State: NC Zip: 28335
Phone: (910)891-5465 Fax: (910)891-5566
EMail: [email protected] Nonprofit: No TaxID 239-70-4486
Org: Tarboro Square Limited Partnership
First Name: Rebecca Last Name: Turlington Function: General Partner
Address: P.O. Box 1027
City: Dunn State: NC Zip: 28335
Phone: (910)891-5465 Fax: (910)891-5566
EMail: [email protected] Nonprofit: No TaxID 416-62-3682
Page 9 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
10/34
List each applicable unit mix combination in a separate row below. Click [Add] to create another row. Click "X" (at the left of each row) todelete a row.
Low Income Units
Market Rate Units
Statistics
Notes
Unit Mix
Type # BRs Net Sq.Ft.Total
# Units#Units
MonthlyRent
UtilityAllowance
MandatoryServ. Fees
**TotalHousing Exp.
Gdn Apt 1 605 2 1 379 78 0 457
Gdn Apt 2 800 8 0 452 97 0 549
Gdn Apt 1 605 2 0 444 78 0 522
Gdn Apt 2 800 12 1 529 97 0 626
Utilites included in rents: Water/Sewer Electric Gas Other
Type # BRs Net Sq.Ft.Total
# Units#Units
MonthlyRent
UtilityAllowance
MandatoryServ. Fees
**TotalHousing Exp.
Utilites included in rents: Water/Sewer Electric Gas Other
AllUnits
Units
Gross MonthlyRental Income
Low Income....... 24 2 11610
Market Rate.......
Totals............... 24 2 11610
* Paint-to-Paint Square Footage
** Please refer to the Income Limits and Maximum Housing Expense Table to ensure that Total Monthly Tenant Expenses for low incomeunits are within established thresholds.
Page 10 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
11/34
Specify Low Income Unit Targeting in table below. List each applicable targeting combination in a separate row below. Click [Add] to createanother row. Click "X" (at the left of each row) to delete a row. Add as many rows as needed.
Total Low Income Units:
Note: This number should match the total number of low income units in the Unit Mix section.
Targeting
# BRs Units %
1 2 targeted at 50 percent of median income.
2 10 targeted at 50 percent of median income.
1 2 targeted at 60 percent of median income.
2 10 targeted at 60 percent of median income.
24
Page 11 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
12/34
Estimated pricing on sale of Federal Tax Credits: $0.
Remarks concerning project funding sources:(Please be sure to include the name of the funding source(s))
Funding Sources
Source AmountNon-
Amortizing*Rate(%)
Term(Years)
Amort.Period(Years)
AnnualDebt
Service
Bank Loan
RPP Loan 219,765 0.00 30 30 7,325Local Gov. Loan - Specify:
RD Loan 602,800 1.00 30 50 15,325
AHP Loan
Other Loan 1 - Specify:
Other Loan 2 - Specify:
Other Loan 3 - Specify:
Tax Exempt Bonds
State Tax Credit(Loan) 318,311 0 30 30 0
State Tax Credit(Direct Refund)
Equity: Federal LIHTC 676,568
Non-Repayable Grant
Equity: Historic Tax Credits
Deferred Developer Fees 0
Owner Investment
Other - Specify:
Total Sources** 1,817,444
* "Non-amortizing" indicates that the loan does not have a fixed annual debt service. For these items, you must fill in 20-year debt servicebelow.
** Total Sources must equal total replacement cost in Project Development Cost (PDC) section.
81
USDA-RD Loan obligated with 24 units (100%) RA
Page 12 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
13/34
Development Costs
Item Cost Element TOTAL COSTEligible Basis
30% PV 70% PV
1 Purchase of Buildings (Rehab) 0
2 Demoli tion
3 On-site Improvements 223,798 223,798
4 Rehabilitation
5 Construction of New Building(s) 881,187 881,187
6 Accessory Building(s)
7 General Requirements 66,299 66,299
8 Contractor Overhead 23,425 23,425
9 Contractor Profit 70,277 70,277
10 Construction Contingency 37,950 37,950
11 Architect's Fee - Design 31,000 31,000
12 Architect's Fee - Inspection 10,000 10,000
SUBTOTAL (lines 1 through 12) 1,343,936
13 Construction Insurance (prorate)
14 Construction Loan Orig. Fee (prorate) 7,800 7,800
15 Construction Loan Interest (prorate) 54,600 54,600
16 Construction Loan Credit Enhancement (prorate)
17 Construction Period Taxes (prorate)
18 Water, Sewer and Impact Fees 15,000 15,000
19 Survey 6,000 6,000
20 Property Appraisal 500 500
21 Environmental Report 1,800 1,800
22 Market Study 6,500 6,500
23 Bond Costs (specify)
24 Cost of Issuance
25 Placement Fee
26 Permanent Loan Origination Fee
27 Permanent Loan Credit Enhancement
28 Title and Recording
SUBTOTAL (lines 13 through 28) 92,200
29 Real Estate Attorney 9,500 9,500
30 Other Attorney's Fees
31 Tax Credit App Fees 7,292 7,292
32 Cost Certification/Accounting Fees (specify) 4,500 4,500
33 Tax Opinion
34 Organizational (Partnership)
35 Tax Credit Monitoring Fee 14,400
SUBTOTAL (lines 29 through 35) 35,692
36 Furnishings and Equipment
37 Relocation Expenses
38 Developer's Fee (max 15% lines 2-36, less 8 & 9) 206,408 206,408
39 Other Basis Expense (specify)
40 Other Basis Expense (specify)
41 Rent-up Expenses
42 Other Non-basis Expense (specify)
43 Other Non-basis Expense (specify)
SUBTOTAL (lines 36 through 43) 206,408
44 Rent up Reserve 29,208
Page 13 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
14/34
Comments:
45 Operating Reserve
46 Other Reserve (specify)
47 Other Reserve (specify)
48 DEVELOPMENT COST (lines 1-47) 1,707,444 0 1,663,836
49 Less Federal Financing 602,800
50 Less Disproportionate Standard 0
51 Less Nonqualified Nonrecourse Financing 0
52 Less Historic Tax Credit (residential) 0
53 TOTAL ELIGIBLE BASIS 1,061,036 0 1,061,036
54 Times Applicable Fraction 100.00% 100% 100%
55 TOTAL QUALIFIED BASIS 1,061,036 0 1,061,036
56 Tax Credit Rate 0.00% 7.87%
57 FEDERAL TAX CREDITS at Estimated Rate 83,503 0 83,503
57a FEDERAL TAX CREDITS at 8.5% or 3.75% 90,188 0 90,188
58 FEDERAL TAX CREDITS REQUESTED 83,341 83,341
59 STATE TAX CREDITS 318,311
60 Land Cost 110,000
61 TOTAL REPLACEMENT COST 1,817,444
Page 14 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
15/34
Please provide a detailed description of the proposed project:
Construction (check all that apply):
Brick Vinyl Wood HardiPlank Balconies/Patios Sunrooms Front Porches
Front Gables or Dormers Wide Banding or Vertical/Horizontal Siding
Other:
Have you built other tax credit developments that use the same building design as this project?
If yes, please provide name and address:
Site Amenities (check all that apply):
Onsite Activities:
Landscaping Plans:
Market Study Information
24 unit family complex. Two (2) 8 unit two-story bldgs.2-4 unit one (1) story bldgs, office/clubhouse20 2-br units, 4 1-br units
None
No
Community Bldg - Sq Ft: 956 Community Room - Sq Ft: Garages - Number:
Laundry Rm Screened Porch Resident Computer Center Exam Rm Reading Rm/Library
Game/Craft Rm Exercise Rm TV Rm Beauty Salon Vending Rm
Chapel/Prayer Rm Picnic Area Onsite Leasing Office Onsite Mgr Onsite Maint. Person
Irrigated Lawns Security Gate Car Care Area Storage Units Gazebos
Walking Trails Garden Spots Basketball/Tennis Court Playground Ball Field
Pool Fitness Stations Horseshoe Pit Shuffleboard Covered Drive Thru
Trees Shrubs8 Laurel Oak-30 gal 82 Indian Hawthorne-3-gal6 Yoshino Cherry-15 gal 72 Japanese Mock Orange-3-gal
Page 15 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
16/34
Interior Apartment Amenities (check all that apply):
Flooring: Carpet Vinyl Wood Wood Parquet Ceramic Tile Other
Heating/Cooling: Central Air Gas Heat Heat Pump Electric Pump
Do you plan to submit additional market data (market study, etc.) that you want considered?
If yes, please make sure to include the additional information in your pre-application packet.
11 Red Maple-15-gal 75 Glossy Abelia-3-g10 Crepe Myrtle-15-gal 124 Dwarf Yaupon-3-gal12 River Birch-15-gal 20 Burford Holly 7-gal117 Southern Wax Myrtle-3-gal158 Parsons Juniper-3-gal20 Souther Indian Azalea-3-g
Range Hood Dishwasher Disposal Refrigerator (frost free) Storage interior/exterior
W/D Hookups Mini-blinds Pantry Ceiling fans Walk-in closets
No
Page 16 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
17/34
Briefly describe your site in each of the following categories:
Applicant's Site Evaluation
NEIGHBORHOOD CHARACTERISTICS
Physical condition of buildings and improvements. Trend and direction of real estate developmentrelative to the project. Area economic health (degree of decline or investment).
Proposed site is located in area with mix of residential and multi-family housing. Older homes 15-25yrs old with additional areas being developed as development continues to infill undeveloped areaswithin the corporate limits.
Suitability of surrounding development. Land use pattern is primarily residential with a balance ofother uses, including non-competing multifamily and single family units, relevant amenities, shoppingand services.Land use is predominately residential with shopping and other amenities within 1/2 mile on WesternBlvd.
SITE SUITABILITY
Adequacy of street(s) and/or access road(s) serving the proposed project and traffic controls (lights,stop signs, turning lanes). Access to mass transit (if applicable).Street (Hwy. 111) is adquate to handle existing traffic as well as proposed traffic
Amount and character of vacant, undeveloped land. Effect of industrial, large-scale institutional orother incompatible uses: wastewater treatment facilities, high traffic corridors, junkyards, prisons,landfills, large swamps, distribution facilities, frequently used railroad tracks, power transmission linesand towers, factories or similar operations, sources of excessive noise, and sites with environmentalconcerns (such as odors or pollution).There is a very limited amount of property within the corporate limits that is not developed. There ishighly developable land adjacent to the corporate limits. there are no negative features that willaffect the proposed complex.
Degree of on-site negative features and physical barriers that will impede project construction oradversely affect future tenants; for example: power transmission lines and towers, flood hazards,steep slopes, large boulders, ravines, year-round streams, wetlands, and other similar features. Foradaptive re-use projects- suitability for residential use and difficulties posed by the building(s), suchas limited parking, environmental problems or the need for excessive demolition.There are no on-site or off-site negative features or physical barriers to impede the development ofthe proposed project.
Similarity of scale and aesthetics/architecture between project and surroundings.Complex will contain both one and two story buildings, this mix will be similar to existing
Page 17 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
18/34
For each applicable neighborhood feature, enter distance from project in miles.
Other facilities or services:
development and will not negatively impact the surrounding areas.
Concentration of affordable housing (housing credit, project-based rental assistance, public housing).There are eight (8) complexes within one (1) mile radius of site, five (5) conventional (297) units, five
(5) USDA-RHS 515 (254 units with 72 units of RA) and one (1) LIHTC project (48 units)
Availability of Supportive Services (if applicable):
Grocery Store.50 Community/Senior Center.0
Mall/Strip Center.50 Hospital2.0
Outdoor Athletic Fields1.5 Pharmacy.50
Day Care/After School.10 Basic Health Care.50
Schools.75 Medical Offices.50
Public Transportation Stop.0 Bank/Credit Union.50
Convenience Store.30 Restaurants.50
Basketball/Tennis Courts1.5 Professional Services.50
Public Parks.0 Movie Theater.50
Gas Station.30 Video Rental.50
Library1.5 Public Safety (Fire/Police)1.5
Fitness/Nature Trails.0 Post Office1.5
Public Swimming Pools.0
Page 18 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
19/34
-
8/6/2019 Tarboro Square
20/34
DevelopmentList number low-income/tax credit housing projects and units developed, operated, and maintained in compliance by the principal(s) betweenDecember 1, 1996 and January 1, 2003:
ManagementList number of low-income housing tax credit units managed in the past 10 years:
Has any owner, principal, or management agent been debarred or received a limited denial participation in the past 10 years by any federal or
state agency?
Has any owner, principal, or management agent been involved in a bankruptcy, an adverse fair housing settlement, an adverse civil rights
settlement, or an adverse federal or state government proceeding and settlement in the past 10 years?
Has any owner or principal been in a mortgage default or delinquency of three months or more within the last 5 years on a FHA-insuredproject, a Rural Development funded rental project, a tax-exempt funded mortgage, a tax credit project, or any other publicly subsidized
project?
Has any owner or principal been involved within the last 10 years in a project which previously received an allocation of tax credits but failed tomeet compliance standards of the tax credit allocation, including return of a reservation of tax credits to the Agency after the carryover
agreement has been signed?
Has any owner or principal had a Form 8823 filed with the IRS for noncompliance on a project using low-income housing tax credits or
received a letter of non-compliance from the Agency?
Project Team Experience
North Carolina Other States
Projects: 45 1
Units: 1,425 32
North Carolina Other States
Projects: 45 1
Units: 1,425 32
No
No
No
No
Yes
Page 20 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
21/34
Financing Commitments
Does the project have a firm commitment for construction financing? Yes
Does the project have a letter of intent for private permenant financing? Yes
Does the project have a firm commitment for government financing? Yes
Does the project have a letter of intent from an investor? Yes
Is any portion of the eligible basis of new contruction or rehabilitation financed with federal subsidies other than CDBG funds or fundsfrom the HOME program? Yes
If yes, indicate the type and amount below:
Tax Exempt Financing: $
RD 515 Financing: $ 602,800
Hope VI Financing: $
Other: $
If Other, specify the type of Federal subsidy:
Page 21 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
22/34
Project Operations (Year One)
Projected Operating Costs
Administrative Expenses
Advertising 800
Other Administrative Expense (specify):
Office Salaries 0Office Supplies 1,200
Office or Model Apartment Rent 0
Management Fee 19,459
Manager or Superintendent Salaries 0
Manager or Superintendent Rent Free Unit 0
Legal Expenses (Project) 400
Auditing Expenses (Project) 2,850
Bookkeeping Fees/Accounting Services 0
Telephone and Answering Service 1,800
Bad Debts 0
Other Administrative Expenses (specify):963
SUBTOTAL 27,472
Utilities Expense
Fuel Oil 0
Electricity (Light and Misc. Power) 1,600
Water 150
Gas 0
Sewer 100
SUBTOTAL 1,850
Operating and Maintenance Expenses
Janitor and Cleaning Payroll 0
Janitor and Cleaning Supplies 5,400
Janitor and Cleaning Contract 0
Exterminating Payroll/Contract 400
Exterminating Supplies 0
Garbage and Trash Removal 2,400
Security Payroll/Contract 0
Grounds Payroll 0
Grounds Supplies 0
Grounds Contract 7,000
Repairs Payroll 0
Repairs Material 1,200
Repairs Contract 1,000
Elevator Maintenance/Contract 0
Heating/Cooling Repairs and Maintenance 600
Swimming Pool Maintenance/Contract 0
Snow Removal 0
Decorating Payroll/Contract 2,900
Decorating Supplies 0
Other (specify):2,000
Miscellaneous Operating & Maintenance Expenses 0
SUBTOTAL 22,900
Taxes and Insurance
Real Estate Taxes 12,500
Page 22 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
23/34
Payroll Taxes (FICA) 1,100
Miscellaneous Taxes, Licenses and Permits 0
Property and Liability Insurance (Hazard) 6,600
Fidelity Bond Insurance 35
Workmen's Compensation 250
Health Insurance and Other Employee Benefits 2,411
Other Insurance:0
SUBTOTAL 22,896
Supportive Service Expenses
Service Coordinator 0
Service Supplies 0
Tenant Association Funds 0
Other Expenses (specify):0
SUBTOTAL 0
Reserves
Replacement Reserves 15,389
SUBTOTAL 15,389
TOTAL OPERATING EXPENSES 90,507
ADJUSTED TOTAL OPERATING EXPENSES(Does not include taxes, reserves and resident support services) *
62,618
TOTAL UNITS(from total units in the Unit Mix section)
24
PER UNIT PER YEAR 2,609
Page 23 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
24/34
-
8/6/2019 Tarboro Square
25/34
Design Features
ITEM DESCRIPTION
Foundation/Slab Components 4'' concrete, 6 mil vapor barrier, 6x6 10/10 wire
Primary Windows Make: Model:Silver Line 2900 Type/Construction: Vinyl
Exterior Doors Type: Frames:Vinyl Wood
Siding Type: Grade/Thickness:Vinyl .044
Warranty:
Exterior Trim Aluminum and Vinyl
Shingles Type: Weight:3-Tab Fiberglass 222 per s.f.
Warranty: 25 years
Sprinkler System
Cabinets manufacturers Marsh or Eqaul
Heat Pump SEER: Make:12 Seer Trane/or Egaul
Model:
Air Conditioner SEER: Make:12 Seer Trane/or Egaul
Model:
Other Heat Systems SEER: Make:N/A
Model:
Page 25 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
26/34
This is a detailed breakdown of rehabilitation or construction costs you summarized in the Development Costs table (Rehabilitation andConstruction of New Building(s)). The total should match those roll-up values.
Costs - Construction
ITEM LABOR MATERIAL TOTAL
Concrete Footings 4,791 11,845 16,636
Backfill-slab, Crawl 0
Slab-concrete/Rebar/Gravel 10,479 36,365 46,844
Waterproofing 0
Masonry Foundation 1,797 4,813 6,610
Brick Veneer 18,683 13,662 32,345
Steel/Structure/Rails 0
Framing/Lumber/Nails 55,689 80,446 136,135
Trusses 35,676 35,676
Crane Rental 0
Windows/Grilles/Screen 15,000 15,000Exterior Doors 12,648 12,648
Roofing 7,368 7,132 14,500
Fencing 0
Vinyl Siding/Trim/Box 24,619 36,929 61,548
Gutters/Shutters 2,740 5,260 8,000
Insulation 4,937 8,188 13,125
Drywall 40,335 28,915 69,250
Interior Doors 21,352 21,352
Int. & Final/Stair/Trim/Shelves 11,935 24,315 36,250
Cabinets & Tops 3,750 36,250 40,000
Painting 14,375 14,375 28,750
Marble - Tub/Shwr/Tops 0
Plumbing 36,147 54,221 90,368
Electrical 26,800 38,200 65,000
Heating/Air Conditioning 28,640 41,360 70,000
Floor Covering and Underlayment 0
Wall Paper 0
Mailboxes/Special Features/Signage 6,000 6,000
Gypcrete 0
Blinds/Shades/Art Work 978 2,022 3,000
Light Fixtures/Fans 0
Sprinkler System 13,170 19,755 32,925
Security Alarm 0
Hardwood Floors 0
Elevator 0
Ceramic Tiles 0
Acoustical Ceilings 0
Page 26 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
27/34
Remarks:
Mirror/Shower Door/Encls. 0
Hardware/Bath Access. 0
Appliances 1,022 18,203 19,225
Playground Equipment 0
Interior Clean 0
Exterior Clean/Dumpster 0
Other 1 (specify in Remarks) 0
Other 2 (specify in Remarks) 0
Total Cost 308,255 572,932 881,187
Page 27 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
28/34
This is a detailed breakdown of the General Requirements cost element you summarized in the Development Costs table (GeneralRequirements). The total should match that roll-up value.
Remarks:
Costs - General
ITEM TOTAL
Supervision 28,325
Job Site Office/Trailer Rental 2,750
Impact Fees
Office Supplies
Security/Watchman
Water and Sewer Connection Fees
Project Signage
Tools and Equipment
Gas, Oil, and Maintenance
Cleanup/Dumpster Rental 8,688
Temporary Water, Electric, and Telephone 2,500Storage/Hauling
Driveway Access Permit
Porta-John Rental/Dumping 950
Builders Risk Insurance 3,812
Re-inspection Fees 5,750
Extra Plans and Specifications
Miscellaneous, Casual Labor
Equipment Rental 7,299
Other 1 (specify in Remarks) 4,725
Other 2 (specify in Remarks) 1,500
Total Cost 66,299
Re-inspections fees-field/engineeringother 1 - payroll taxes,insurancesother 2 - permit
Page 28 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
29/34
This is a detailed breakdown of the Site Improvements cost element you summarized in the Development Costs table (On-siteImprovements). The total should match that roll-up value.
Remarks:
Costs - Improvements
ITEM TOTAL
Subsurface Exploration/Perk Testing/Site Engineering 0
Clearing/Grading/Final Grading/Excess and Borrow 0
Demolition 0
Earthwork/Excavation/Aerating 104,500
Soil Treatment 0
Pile Foundations 0
Caissons 0
Shoring/Bracing 0
Site Drainage 0
Site Utilities/Site Lighting 44,260
Paving and Surfacing/Curb and Gutter 33,578Walkways 17,460
Site Signage 0
Parking Lot Painting 0
Dumpsite Pads/Fencing 0
Fencing/Gates 0
Landscaping/Topsoil 24,000
Waterproofing/De-Watering 0
Operation of Construction Equipment/Fuel/Oil 0
Crane Rental 0
Rock and Hardpan Excavation 0
Site Supervision Personnel 0
Other (specify in Remarks) 0
Total Cost 223,798
None
Page 29 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
30/34
This is a detailed breakdown of the Bond Costs cost element you summarized in the Development Costs table (Bond Costs). The totalshould match that roll-up value.
Remarks:
Costs - Bond Costs
ITEM TOTAL
Letter of Credit Fee 0
Credit Enhancement 0
Underwriter Discount 0
Capital Interest Fund 0
Other 1 (specify in Remarks) 0
Other 2 (specify in Remarks) 0
Total Cost 0
None
Page 30 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
31/34
This is a detailed breakdown of the Bond Issuance cost element you summarized in the Development Costs table (Cost of Issuance). Thetotal should match that roll-up value.
Remarks:
Costs - Bond Issuance
ITEM TOTAL
Bond Counsel 0
Issuer Counsel 0
Credit Enhancement/LOC Counsel 0
Underwriter Counsel 0
Developer's Counsel 0
Rating Agency Fee 0
Printing 0
Trustee Fee 0
Trustee Counsel 0
Other 1 (specify in Remarks) 0
Other 2 (specify in Remarks) 0Other 3 (specify in Remarks) 0
Total Cost 0
None
Page 31 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
32/34
MINIMUM REQUIRED SET ASIDES (No Points Awarded):
Minimum Set-Asides
Select one of the following two options:
20% of the qualified units are rent restricted and occupied by households with incomes at or below 50% of the median income (Note:No Tax Credit Eligble Units in the the project can exceed 50% of median income)
40% of the qualified units are rent restricted and occupied by households with incomes at or below 60% of the median income (Note:No Tax Credit Eligble Units in the the project can exceed 60% of median income)
If requesting RPP funds:
40% of the qualified unit are occupied by households with incomes at or below 50% of median income.
State Tax Credit and QAP Targeting Points:
High Income county:
At least twenty-five percent (25%) of qualified units will be affordable to households with incomes at or below thirty percent (30%) ofcounty median income.
At least twenty-five percent (25%) of qualified units will be affordable to and occupied by households with incomes at or below thirtypercent (30%) of county median income.
At least fifty percent (50%) of qualified units will be affordable to households with incomes at or below forty percent (40%) of countymedian income.
At least fifty percent (50%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent(40%) of county median income.
Moderate Income County:
At least twenty-five percent (25%) of qualified units will be affordable to and occupied by households with incomes at or below fortypercent (40%) of county median income.
At least fifty percent (50%) of qualified units will be affordable to households with incomes at or below fifty percent (50%) of county
median income.At least fifty percent (50%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent(50%) of county median income.
Low Income County:
At least forty percent (40%) of qualified units will be affordable to households with incomes at or below fifty percent (50%) of countymedian income.
At least forty percent (40%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent(50%) of county median income.
Tax Exempt Bonds
Threshold requirement (select one):
At least ten percent (10%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent
(50%) of county median income.
At least five percent (5%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent(40%) of county median income.
Eligible for mortgage subsidy points (select one):
At least twenty percent (20%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent(50%) of county median income.
At least ten percent(10%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent(40%) of county median income.
Page 32 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
33/34
Page 33 of 34Print - APP03-0080
1/14/2005https://www.nchfa.org/Rental/RTCApp/(a132dki5uwhmmgencuyavoyu)/site/PrintApp.asp...
-
8/6/2019 Tarboro Square
34/34
PLEASE indicate which of the following exhibits are attached to your application. Others may be required as noted.
Full Application Checklist
A Nonprofit Organization Documentation or For-profit Corporation Documentation
B Current Financial Statements/Principals and Owners
C Ownership Entity Agreement, Development Agreement or any other agreements governing development services
D Management Agent Agreement
E Development and manager multi-family experience & Management Questionnaire (Appendix C)
F Letters from State Housing Agencies or designated monitoring agent verifying Out of State Management Experience
G Completed IRS Form 8821 (Appendix I)
H Permitted zoning letter (including conditional and special use)
I Site plan, floor plans and elevations
J Hazard and structural inspection and termite reports (Renovation projects only)
K Description of any existing conditions of historical significance.
L Description of environmental significance.
M Anticipated budget demonstrating how the project would meet the 10% test by November 14th.
N Evidence of Architect's Errors and Omissions insurance (or equivalent).
O Description of acquisition for existing/occupied projects or for projects with occupied buildings to be demolished.
P Description of proposed Relocation Plan & Relocation Budget, Etc. If any relocation is anticipated, reference Appendix F.
Q Targeting Plan and supporting documentation (Required for projects targeted to Special Populations)
R Local Housing Authority Agreement (Reference Model in Appendix I)
S Appraisal (for land costs greater than $5,000 and for buildings in rehab projects)
T Evidence of Permanent Loan Commitment, other sources of funds, and project-based subsidies.
U Statement regarding terms of Deferred Developer Fee and, if nonprofit, resolution of Board approving fee.
V Inducement Resolution (Tax-Exempt Bond Financed Projects only)
W Documentation to support estimated utility costs.
Page 34 of 34Print - APP03-0080