Tanker Double Hull Conversion
Transcript of Tanker Double Hull Conversion
-
8/12/2019 Tanker Double Hull Conversion
1/39
Presentation
For
Single Hull/Bottom Tanker
Converted toDouble Hull/Bottom Tanker
Single to Double HullConversion
-
8/12/2019 Tanker Double Hull Conversion
2/39
-
8/12/2019 Tanker Double Hull Conversion
3/39
1. Concept Design
2. Detail Design and Class Approval
3. Shipyard Production Design
4. Block Prefabrication
5. Conversion in Shipyard
Technical Progress
-
8/12/2019 Tanker Double Hull Conversion
4/39
Option 1: Owners Responsibility
Option 2: Shipyards Responsibility
1. Concept Design
-
8/12/2019 Tanker Double Hull Conversion
5/39
2. Detail design and Class Approval
Option 1: Owners Responsibility
Option 2: Shipyards Responsibility
2. Detail Design and Class
Approval
-
8/12/2019 Tanker Double Hull Conversion
6/39
3. Shipyard Production Design
Shipyard are fully responsible for converting the basic
design to production drawings within Max. 10 days.
-
8/12/2019 Tanker Double Hull Conversion
7/39
4. Block Prefabrication Steel plate & structure cutting.
Block assembling.
Welding.
Rectification.
Block to be blasted and painted as per paint specification
Inspection & acceptance.
-
8/12/2019 Tanker Double Hull Conversion
8/39
New block to be prefabricated in workshop
Inner bottom plate block
Side BHD block
-
8/12/2019 Tanker Double Hull Conversion
9/39
5. Conversion in Shipyard
Progress 1: Conversion in Center Oil Tank
Progress 2: Conversion in Side Oil Tank
Progress 3: Painting
-
8/12/2019 Tanker Double Hull Conversion
10/39
Step 1: Vessels arrival
Staging
Lighting and ventilation
Tank cleaning and gas-free for hot work
GAS FREE for
Hot Work !!!
Progress 1: Conversion in Center Oil Tank
-
8/12/2019 Tanker Double Hull Conversion
11/39
Step 2: Deck access opening
Strength Calculation
Deck piping and fittings
Reinforcement
-
8/12/2019 Tanker Double Hull Conversion
12/39
Step 3: Cut and removal out the webs with BKTs in COT
Cargo line&Heating coil
Measuring
Cutting
-
8/12/2019 Tanker Double Hull Conversion
13/39
Step 4: Installation of Inner bottom plate block in COT
-
8/12/2019 Tanker Double Hull Conversion
14/39
Step 4: Installation of Inner bottom plate block in COT
-
8/12/2019 Tanker Double Hull Conversion
15/39
Step 4: Installation of Inner bottom plate block in COT
-
8/12/2019 Tanker Double Hull Conversion
16/39
Step 5: Installation of BKTs, Cargo lines, heating coil etc. and other
fitttings
-
8/12/2019 Tanker Double Hull Conversion
17/39
Progress 2: Conversion in Side Oil Tank
Step 1: Cut and removal out
the structures from Side Oil
Tank.
-
8/12/2019 Tanker Double Hull Conversion
18/39
Step 2: Installation of Girders and Webs in Side Oil Tank.
-
8/12/2019 Tanker Double Hull Conversion
19/39
Step 3: Installation of Inner bottom plate block in Side Oil Tank
-
8/12/2019 Tanker Double Hull Conversion
20/39
Step 4: Installation of Slop bottom plate block in Side Oil Tank
-
8/12/2019 Tanker Double Hull Conversion
21/39
Step 5: Installation of side BHD block in Side Oil Tank
-
8/12/2019 Tanker Double Hull Conversion
22/39
Step 5: Installation of webs in Side Oil Tank
-
8/12/2019 Tanker Double Hull Conversion
23/39
Step 6: Final Installation after steel work Ballast system integrating
Ladders
Cargo oil pipe/heating coil
Other fittings on deck or in
tank
Weld seam testing
Other testing
-
8/12/2019 Tanker Double Hull Conversion
24/39
Progress 3: Painting
After testing, all welded seams to be de-rusted by
Grinding and painted as per Specification.
Blasting and painting in Tank if required.
-
8/12/2019 Tanker Double Hull Conversion
25/39
Vessels DepartureDocking/undocking
Inclining testing
-
8/12/2019 Tanker Double Hull Conversion
26/39
Vessels Name Country LOA/Beam Conversion
Period
Main Work
MT Pacific Trader Greece 131M/18.5M 32days Single Hull to Double
Hull
Converted vessels
Vessels Name Country LOA/Beam ConversionPeriod Main Work
MT Dartagnan Greece 228.6M/32.2
M
75days Single Bottom to
Double Bottom
Vessels Name Country LOA/Beam Conversion
Period
Main Work
MT Jaguar UAE 167M/27.4 75days Single Hull/Bottomto Double
Hull/Bottom
-
8/12/2019 Tanker Double Hull Conversion
27/39
Vessels under conversionVessels Name Country LOA/Beam Conversion
Period
Main Work
MT Korea Sunnyhill Korea 171M/25.4M 60days Single Hull/Bottom
to Double
Hull/Bottom
Vessels Name Country LOA/Beam ConversionPeriod
Main Work
MT Ce-Shilla Greece 247M/42.7M 120days Single Hull/Bottom
to Double
Hull/Bottom
-
8/12/2019 Tanker Double Hull Conversion
28/39
Vessels confirmed and to be converted in 2005
Vessels Name Country LOA/Beam Conversion
Period
Main Work
MT Sea Giant UAE 231M/44M 120days Single Hull/Bottom
to Double
Hull/Bottom
Vessels Name Country LOA/Beam Conversion
Period
Main Work
MT Sea Victory UAE 163.5M/23M 75days Single Hull/Bottom
to DoubleHull/Bottom
Vessels Name Country LOA/Beam Conversion
Period
Main Work
MT Milagro UAE 219.9M/35.2
M
60days Single Bottom to
Double Bottom
Vessels Name Country LOA/Beam Conversion
Period
Main Work
MT Fujigawa Singapore 149M/22.8M 45days Single Bottom to
Double Bottom
-
8/12/2019 Tanker Double Hull Conversion
29/39
Conversion Pictures
Block Fabrication
-
8/12/2019 Tanker Double Hull Conversion
30/39
Conversion Pictures
Block Fabrication
-
8/12/2019 Tanker Double Hull Conversion
31/39
Conversion Pictures
Pre-fabricated Blocks
-
8/12/2019 Tanker Double Hull Conversion
32/39
Conversion Pictures
Deck access opening
-
8/12/2019 Tanker Double Hull Conversion
33/39
Conversion Pictures
Lowering Blocks into
Tank
-
8/12/2019 Tanker Double Hull Conversion
34/39
Conversion Pictures
Lowering Block into
Tank
C i Pi
-
8/12/2019 Tanker Double Hull Conversion
35/39
Conversion Pictures
Block installation
C i Pi t
-
8/12/2019 Tanker Double Hull Conversion
36/39
Conversion Pictures
Block installation on
Bottom
C i Pi t
-
8/12/2019 Tanker Double Hull Conversion
37/39
Conversion Pictures
Block installation on
Bottom
C i Pi t
-
8/12/2019 Tanker Double Hull Conversion
38/39
Conversion Pictures
Side Block installation
-
8/12/2019 Tanker Double Hull Conversion
39/39
THANK YOU !