Tank Yıkama

44
Time Table Day 1 1 2 3 4 5 6 7 8 9 10 11 12 13 Filling Slops Filling Slops Line Flushing Line Flushing No 1 COT P Purging (G1A) No 1 COT S No 2 COT P Purgi No 2 COT S No 3 COT P Purging (G3A) No 3 COT S No 4 COT P Purging (G1B) No 4 COT S No 5 COT P No 5 COT S No 6 COT P Purging (G3B) No 6 COT S No SLOP P No SLOP S Filling Slops Purging Slop P Purging Slop S Engine Pre Job Time

description

Tank Wash'ng

Transcript of Tank Yıkama

Page 1: Tank Yıkama

Time TableDay 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17Filling Slops Filling Slops

Line Flushing Line FlushingNo 1 COT P

Purging (G1A)No 1 COT SNo 2 COT P

Purging (G2A)No 2 COT SNo 3 COT P

Purging (G3A)No 3 COT SNo 4 COT P

Purging (G1B)No 4 COT SNo 5 COT P

Purging (G2B)No 5 COT SNo 6 COT P

Purging (G3B)No 6 COT SNo SLOP PNo SLOP S Filling Slops Purging Slop P

Purging Slop S

Engine Pre

JobTim

e

Page 2: Tank Yıkama

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Gas Freeing (G1A)

Purging (G2B)

Tank Washing (G1) Stripping 15min per tanks

Tank Washing (G2) Stripping 15min per tanks

Tank Washing (G1) Stripping 15min per tanks

Tank Washing (G1) Stripping 15min per tanks

Tank Washing (G2) Stripping 15min per tanks

Tank Washing (G1) Stripping 15min per tanks

Page 3: Tank Yıkama

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56

Gas Freeing (G1A)

Gas Freeing (G2A)

Gas Freeing (G3A)

Gas Freeing (G1B)

Slop P Gas Freeing with Water Driven Fan

Page 4: Tank Yıkama

56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75

Gas Freeing (G1B)

Gas Freeing (G2B)

Gas Freeing (G3B)Slop Discharging

Page 5: Tank Yıkama

76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95

Slop Discharging 1

Page 6: Tank Yıkama

95 96

Page 7: Tank Yıkama

Day 1 Time Table0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Line Flushing Line FlushingNo 1 COT P Purging (G1A) Tank Washing ( G 1) Gas Freeing with Water Driven FanNo 1 COT SNo 2 COT P Purging (G2A) Tank Washing ( G3)No 2 COT SNo 3 COT P Tank Washing ( G2) Purging (G3A)No 3 COT SNo 4 COT P Purging (G1B) Tank Washing ( G 1)No 4 COT SNo 5 COT P Purging (G2B) Tank Washing ( G3)No 5 COT SNo 6 COT P Tank Washing ( G3) Purging (G3B)No 6 COT S

SLOP P Purging SLOP S Slops Filling SlopsHeating

Cargo Line TestCargo Line Vent.

Bunker Tank Vent.Void Space Vent.

Resposile Officer Chief Officer is the overall responsible officer entire operation. The Responsible officer may change during operation.

MasterTrainee MasterChf OfficerSecond OfficerThird OfficerFourth OfficerExtra OfficerPump ManBosunAB 1AB 2AB 3AB 4AB 5Cadet

Heating Slops up to 65C Slop Washing Gas Freeing (Main Inert Fan) Bridge Watch G 1A 1P/S COT G 1B 4P/S COTFilling Slops Main Inert Fan Gas Freeing (Water Driven Fan) Deck Watch G 2A 2P/S COT G 2B 5P/S COTSlop water stabilition Line Flushing Slop Washing/Discharging will be Purging (Main Fan) G 3A 3P/S COT G 3B 6P/S COTSlop Discharging Engine Preparedness simultaneously performed

JobTim

e

Page 8: Tank Yıkama

Line FlushingNo 1 COT PNo 1 COT SNo 2 COT PNo 2 COT SNo 3 COT PNo 3 COT SNo 4 COT PNo 4 COT SNo 5 COT PNo 5 COT SNo 6 COT PNo 6 COT S

SLOP PSLOP SHeating

Cargo Line TestCargo Line Vent.

Bunker Tank Vent.Void Space Vent.

Resposile OfficerMasterTrainee MasterChf OfficerSecond OfficerThird OfficerFourth OfficerExtra OfficerPump ManBosunAB 1AB 2AB 3AB 4AB 5Cadet

JobTim

e

Day 2 Time Table24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Gas Freeing G 2A

Gas Freeing G3A

Gas Freeing G2B

Slop Washing

Chief Officer is the overall responsible officer entire operation. The Responsible officer may change during operation.

Heating Slops up to 65C Slop Washing Gas Freeing (Main Inert Fan) Bridge Watch G 1A 1P/S COT G 1B 4P/S COTFilling Slops Main Inert Fan Gas Freeing (Water Driven Fan) Deck Watch G 2A 2P/S COT G 2B 5P/S COTSlop water stabilition Line Flushing Slop Washing/Discharging will be Purging (Main Fan) G 3A 3P/S COT G 3B 6P/S COTSlop Discharging Engine Preparedness simultaneously performed

Page 9: Tank Yıkama

Line FlushingNo 1 COT PNo 1 COT SNo 2 COT PNo 2 COT SNo 3 COT PNo 3 COT SNo 4 COT PNo 4 COT SNo 5 COT PNo 5 COT SNo 6 COT PNo 6 COT S

SLOP PSLOP SHeating

Cargo Line TestCargo Line Vent.

Bunker Tank Vent.Void Space Vent.

Resposile OfficerMasterTrainee MasterChf OfficerSecond OfficerThird OfficerFourth OfficerExtra OfficerPump ManBosunAB 1AB 2AB 3AB 4AB 5Cadet

JobTim

e

Day3 Time Table48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Gas Freeing G1B

Gas Freeing G3B

Chief Officer is the overall responsible officer entire operation. The Responsible officer may change during operation.

Heating Slops up to 65C Slop Washing Gas Freeing (Main Inert Fan) Bridge Watch G 1A 1P/S COT G 1B 4P/S COTFilling Slops Main Inert Fan Gas Freeing (Water Driven Fan) Deck Watch G 2A 2P/S COT G 2B 5P/S COTSlop water stabilition Line Flushing Slop Washing/Discharging will be Purging (Main Fan) G 3A 3P/S COT G 3B 6P/S COTSlop Discharging Engine Preparedness simultaneously performed

Page 10: Tank Yıkama

Line FlushingNo 1 COT PNo 1 COT SNo 2 COT PNo 2 COT SNo 3 COT PNo 3 COT SNo 4 COT PNo 4 COT SNo 5 COT PNo 5 COT SNo 6 COT PNo 6 COT S

SLOP PSLOP SHeating

Cargo Line TestCargo Line Vent.

Bunker Tank Vent.Void Space Vent.

Resposile OfficerMasterTrainee MasterChf OfficerSecond OfficerThird OfficerFourth OfficerExtra OfficerPump ManBosunAB 1AB 2AB 3AB 4AB 5Cadet

JobTim

e

Day 4 Time Table72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Gas Freeing G1A

Slop Discharging

Line Test

Chief Officer is the overall responsible officer entire operation. The Responsible officer may change during operation.

Heating Slops up to 65C Slop Washing Gas Freeing (Main Inert Fan) Bridge Watch G 1A 1P/S COT G 1B 4P/S COTFilling Slops Main Inert Fan Gas Freeing (Water Driven Fan) Deck Watch G 2A 2P/S COT G 2B 5P/S COTSlop water stabilition Line Flushing Slop Washing/Discharging will be Purging (Main Fan) G 3A 3P/S COT G 3B 6P/S COTSlop Discharging Engine Preparedness simultaneously performed

Page 11: Tank Yıkama

Line FlushingNo 1 COT PNo 1 COT SNo 2 COT PNo 2 COT SNo 3 COT PNo 3 COT SNo 4 COT PNo 4 COT SNo 5 COT PNo 5 COT SNo 6 COT PNo 6 COT S

SLOP PSLOP SHeating

Cargo Line TestCargo Line Vent.

Bunker Tank Vent.Void Space Vent.

Resposile OfficerMasterTrainee MasterChf OfficerSecond OfficerThird OfficerFourth OfficerExtra OfficerPump ManBosunAB 1AB 2AB 3AB 4AB 5Cadet

JobTim

e

Day 5 Time Table96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Slop Washing Gas Freeing Slop Washing

Gas Freeing

Gas Freeing

Chief Officer is the overall responsible officer entire operation. The Responsible officer may change during operation.

Heating Slops up to 65C Slop Washing Gas Freeing (Main Inert Fan) Bridge Watch G 1A 1P/S COT G 1B 4P/S COTFilling Slops Main Inert Fan Gas Freeing (Water Driven Fan) Deck Watch G 2A 2P/S COT G 2B 5P/S COTSlop water stabilition Line Flushing Slop Washing/Discharging will be Purging (Main Fan) G 3A 3P/S COT G 3B 6P/S COTSlop Discharging Engine Preparedness simultaneously performed

Page 12: Tank Yıkama

Engine Speed 1 Mile RUN

Load RPMRun Time Fwd Position (SOG) STWNo H M'S" Return Lat Long Log GPS Log

40

59 1S 14 36 20 Fwd 03 17.4 N 105 03.2 E 10.90 10.60 11.20

304.6 11.82 KtsF 16 28 58 Return 03 00.1 N 104 51.5 E 11.40 12.00 11.50

59 2S 16 57 34 Fwd 03 00.8 N 104 51.7 E 10.60 10.80 11.10

308.5 11.67 KtsF 17 55 10 Return 03 09.1 N 104 57.8 E 11.20 11.70 12.10

60

69 3S 19 00 45 Fwd 03 17.2 N 105 03.2 E 11.50 12.60 12.50

263.86 13.64 KtsF 20 32 26 Return 02 59.8 N 104 51.7 E 13.20 13.90 14.10

69 4S 20 57 24 Fwd 03 00.0 N 104 51.7 E 11.70 12.40 13.00

271 13.28 KtsF 22 29 34 Return 03 17.5 N 105 03.3 E 13.60 14.20 14.40

75

75 5S 22 45 38 Fwd 03 17.3 N 105 03.3 E 13.00 13.70 13.30

238.19 15.11 KtsF 00 12 11 Return 02 59.8 N 104 51.5 E 14.50 15.30 14.40

75 6S 00 33 05 Fwd 03 00.0 N 104 51.6 E 12.30 13.00 14.00

259.65 13.86 KtsF 02 02 10 Return 03 17.5 N 105 03.3 E 14.00 14.70 15.60

90

80 7S 02 23 50 Fwd 03 17.5 N 105 03.2 E 14.90 15.70 14.90

222.91 16.15 KtsF 03 41 45 Return 03 30.0 N 104 51.5 E 15.40 16.20 15.90

80 8S 04 06 31 Fwd 03 00.1 N 104 51.5 E 13.80 14.50 15.36

245.88 14.64 KtsF -- Return -- -- -- -- --

Time in

second

Average

Speed

Page 13: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 14: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 15: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 16: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 17: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 18: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 19: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 20: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 21: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 22: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 23: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 24: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction

Page 25: Tank Yıkama

Speed Weather Element EngineRun Time Fwd Position Heading (SOG) Speed(STW) Sea Swell Wind® Wind(T) RPM LoadNo (utc+8) Return Lat Long Gyro COG Log GPS Log GPS Temp Depth Current State Driction Height Period Height Driction Period Speed Direction Speed Direction