Tank Reorganization Loreal - Redacted
of 13
/13
-
Author
elaine-mau -
Category
Documents
-
view
69 -
download
2
Embed Size (px)
Transcript of Tank Reorganization Loreal - Redacted
- 1. TANK REORGANIZATION IN UP2 Elaine Mau
- 2. Background 30-45 minutes to take out tanks, take out 4-5 tanks Difficulty to find tanks Affects processing and packaging Overflow Inaccessible, different tank sizes Highly accessible, but effective space use?
- 3. Issues Limited Space Accessibility Safety Number of tanks , assume 17 tanks in use Tank Size # of Tanks Foot Print 2000 33 72 x 72 1600 6 54 x 58 1200 7 48 x 48 1000 30 56 x 56 550 12 46 x 46 250 19 32 x 34 Total 107
- 4. Current Layout
- 5. Current Tank Farm Layout
- 6. Approach Look for additional space Reorganizing tank farm area for more accessibility
- 7. Additional Space Preweigh Walkway Finished Goods Move to store 16 additional tanks Gain six tank spots and increase accessibility
- 8. Proposed Layout
- 9. Proposed Tank Farm Layout
- 10. Costs Category Cost Description Labor XXXX Move barriers and netting. Materials XXXX Anchors, extension posts, sealant, labeling, tape/paint, etc Labor and materials to move rack outside of pre-weigh to expand isle XXXX If necessary TOTAL XXXX Time Required to implement ~12-24 hrs Dependent on number of people
- 11. Action Plan Action Item Responsible Days Needed Date Status Railings Mike G./Elaine M. 4 10/23/2009 Ready to put in order Communication of finish goods staging Joshua Miller/Elaine M. 1 10/23/2009 Powerpoint presentation made Flexnet Locations An Tran/Kevin Stewart/ Elaine M. 2 10/30/2009 Determined cannot use put-away function, Meeting with Kevin to finalize zones Tags Brian Wagner/ Elaine M. 1 11/06/2009 Testing needed for hanging tags Grinding and Coating Tom Zollo/ Elaine M. 5/Area 11/13/2009 Three areas: Rails, 2000's, 1000's Tape Walter Rhodes/ Elaine M. 1/Area 11/13/2009 No tape trial necessary Training Mike G./Elaine M. 2 TBD
- 12. Gains Four to five tanks Check through whole tank farm Up to 40 minutes a tank At most two Find by location (lane or rack space) Up to an estimated 10 minutes to find a tank Current Proposed
- 13. Any Questions?