Tampa-Hillsborough Greenways and Trails Plan Update
Committee Presentations May 2016
Project Goals
Regional Connections: Pinellas, Pasco, Polk, Manatee Counties
Coast-to-Coast Connection, SUNTrail
Update the Hillsborough Greenways Master Plan, integrate with City of Tampa Plan
Local network
Stakeholder Involvement
• Hillsborough County, City of Tampa, Plant City,
Temple Terrace • Greenways and Trails Committee • Hillsborough MPO • Why this matters
REGIONAL Trail Connections
Existing Trails
• Courtney Campbell Trail • “U”Path • I-275 Greenway • Riverwalk • Selmon Greenway • Upper Tampa Bay Trail
Trail Priorities
Hillsborough County • Upper Tampa Bay Trail – Suncoast Trail Connection
(UTBT Phase IV) • South Coast Greenway • Bypass Canal Trail
(CCC Priorities, TBARTA 2015 Master Plan Update)
Tampa City Priorities
• South Tampa Greenway • Courtney Campbell Trail improvements • I-275 Greenway • West River Trail • Green Spine • The Perimeter Trail (formerly known as the Green ARTtery trail)
Studied Trail Corridors/ Connections
1.0 I-275 Greenway 2.0 Selmon Greenway Connector 3.0 South County Greenway Connector 4.0 Kirby Creek Trail 5.0 NW Hillsborough/Upper Tampa Bay Trail Connector 6.0 USF / Tampa Bypass Canal Connector 7.0 Memorial Bikeway /Oldsmar-Pinellas County Connection 8.0 US 301/Pasco County Connection 9.0 Plant City/Polk Connection
Studied Trail Corridors/ Connections
1.0
1.0
1.0 I-275 Greenway – Cypress Point Park to Julian B. Lane Park and Riverwalk
N M
acdi
ll Av
e
N A
rmen
ia A
ve
N H
owar
d Av
e
N R
ome
Ave
N Spruce St
N D
ale
Mab
ry H
wy
N H
imes
Ave
Mid-Block Crossing (RRFB most likely)
Existing Trail
Existing bike facility New Trail Crossing
Existing signal
On-road Bikeway Off-Road Trail or Side-path >10ft
Proposed
Existing Conditions
1.0 I-275 Greenway
1.0 I-275 Greenway – pedestrian bridge over Dale Mabry Highway
Studied Trail Corridors/ Connections
2.0 Selmon Greenway Connector – 19th and Adamo to Maydell Dr
Mid-Block Crossing (RRFB most likely)
Existing Trail
Existing bike facility New Trail Crossing
Existing signal
On-road Bikeway Off-Road Trail or Side-path >10ft
Proposed
Existing Conditions
2.0 Selmon Greenway Connector
South Coast Greenways Gaps
3.0 South County Connector – Palm River to Symmes Rd
Mid-Block Crossing (RRFB most likely)
Existing Trail
Existing bike facility New Trail Crossing
Existing signal
On-road Bikeway Off-Road Trail or Side-path >10ft
Proposed
Maydell Drive
Existing Conditions
5.0 South County Connector
South County Greenway
Mid-Block Crossing (RRFB most likely)
Existing Trail
Existing bike facility New Trail Crossing
Existing signal
On-road Bikeway Off-Road Trail or Side-path >10ft
Proposed
FDOT PD&E: US 41 From Kracker Ave to South of SR676 – includes a 12’ trail on west side of the bridge Alafia River and Bullfrog Creek Bridges
Existing Conditions
5.0 South County Greenway
Connections to Manatee County – I-75 Rest Area to Manatee County Line
South County Greenway
US 41 – FDOT PD&E 2017
US 301 - FDOT
Manatee County Connections
4.0 Kirby Canal Trail – Town N’Country Trail to W Kirby St
CSX
railw
ay
Man
hatt
an A
ve
Dale
Mab
ry H
wy
W Kirby St
Vete
ran’
s Exp
ress
way
Mid-Block Crossing (RRFB most likely)
Existing Trail
Existing bike facility New Trail Crossing
Existing signal
On-road Bikeway Off-Road Trail or Side-path >10ft
Proposed
Existing Conditions
4.0 Kirby Canal Trail
5.0 NW Hillsborough/Tri-County Trail Connector, Upper Tampa Bay Trail to Tri-County Trail
Mid-Block Crossing (RRFB most likely)
Existing Trail
Existing bike facility New Trail Crossing
Existing signal
On-road Bikeway Off-Road Trail or Side-path >10ft
Proposed
Tri-County Trail
Upper Tampa Bay Trail
Existing Conditions
4.0 NW Hillsborough/Tri-County Trail Connector
6.0 Memorial Bikeway Overview – Town N’Country Trail to Oldsmar trails
Notes: New bike lanes – Hillsborough Ave Memorial Ave/Sheldon Rd – no signal Existing crossing at Sheldon Rd/Trail New sidewalk/trail: west side of Sheldon Rd Bikeway: Mohr Rd to Memorial Hwy
Sheldon Rd
Upper Tampa Bay Trail
Town and County Trail
Connect to Pinellas County
Existing Conditions
6.0 Memorial Bikeway
7.0 USF Trail – USF to Tampa Bypass Canal Trail
E Fletcher Ave
N 50
th St
USF Riverfront Park
Lettuce Lake Park
Telecom Pkwy USF
Notes: Min 8’ trail along the south side of E Fletcher Ave 12’ multi-use trail on Hollow Stump Rd to 127th Ave
Mid-Block Crossing (RRFB most likely)
Existing trail
Existing bike lane/shared lane marking
New Trail Crossing
Existing signal
Proposed On-road Bikeway Proposed Off-Road Trail or Side-path >8ft
Proposed
Hollow Stum
p Rd
Walk Bike III, project candidate 12
Existing Conditions
7.0 USF Trail
FDOT PRN #: 255796-1 (PD&E 2016) Plan includes multi-use trail and bike lanes. Other phases Unfunded
Mid-Block Crossing (RRFB most likely)
Existing Trail
Existing bike facility New Trail Crossing
Existing signal
On-road Bikeway Off-Road Trail or Side-path >10ft
Proposed
8.0 Old Fort King Trail/US 301 – Tampa Bypass Canal tp Pasco County Line
Existing Conditions
8.0 Old Fort King Trail/US 301
Mid-Block Crossing (RRFB most likely)
Existing Trail
Existing bike facility New Trail Crossing
Existing signal
On-road Bikeway Off-Road Trail or Side-path >10ft
Proposed
9.0 Plant City – Plant City Parks, connection to Pasco and Polk Counties)
Existing Conditions
9.0 Plant City
Next Steps
• Priorities identified during this study • On-going advocacy • Funding and additional study where needed • Local Coordination – Tampa, County, Temple Terrace
and Plant City • Regional Coordination- TBARTA, Pinellas, Pasco, Polk
and Manatee
Questions?
Recommendation
• Recommend approval of the updated Plan to the MPO Board
Tampa-Hillsborough Greenways and Trails Plan Update