Tai's Intern Work Progress Presentation
-
Upload
tai-ho-wong -
Category
Documents
-
view
91 -
download
2
Transcript of Tai's Intern Work Progress Presentation
![Page 1: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/1.jpg)
Intern Work Progress PresentationTAI HO (HARVEY), WONGMECHANICAL ENGINEERING INTERNMENTOR: BRIAN ESPERTI, P.E.
![Page 2: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/2.jpg)
AutoCAD Editing Editing blocks that were inserted into drawings Reconfiguring the appearance of the radiator, making it more prominent. Lightening lower right portion of plan drawing’s lineweight to .002 by utilizing layers Revision cloud text to highlight revision made to the plan
End Results:
Before:Creo 2.0
![Page 3: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/3.jpg)
45211-Franklin Correctional Facility
There have been a number of leaks in the domestic hot water piping(DHW) and domestic hot water circulation piping(DHWC) in the buildings at Franklin Correctional Facility.
Department of Corrections and Community Supervision requested for “…The existing copper lines … are in need of replacing. Replace with CPVC where applicable.”
Source: http://coloradogeologicalsurvey.org/geologic-hazards/corrosive-soils/corrosive-soil-damage/
Source: http://progresoweekly.us/death-profit/
![Page 4: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/4.jpg)
45211- Pipe Sizing and Fixture Units
Fixtures Fixture Units
Lavatory, General 1Shower, Private 3Sink, Utility 3Hose Bibb 3
![Page 5: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/5.jpg)
SB510-DOT Region 3 Mapleview
Department of Transportation requested for service, stated “Evaluate existing heating system and provide recommendations and cost estimates for repair/replacement.
The facility was built in the early 60’s with a small addition put on in the mid-90’s. Oil fired heating hot water boiler was installed in the early 60’s.
Based on the drawings, the heating hot water boiler is likely to be replaced because of the new addition and the age, so heat load calculation is needed to size the boiler.
Panoramic view of boiler room
Mapleview Facility
![Page 6: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/6.jpg)
SB510-DrawingsAddition:
Original:
![Page 7: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/7.jpg)
SB510- Heat Load Calculation
![Page 8: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/8.jpg)
SB510-Boiler
629.2Mbh/0.8=786,500BTU/HR
Validate my answer with original design.
10% safety factor taken into account
New boiler should be sized up to about 941,000 BTU/HR (753.2/.8)
80% efficiency (worst case scenario)
![Page 9: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/9.jpg)
SB510- Findings
![Page 10: Tai's Intern Work Progress Presentation](https://reader035.fdocuments.in/reader035/viewer/2022062900/58ee5c651a28abf65b8b462f/html5/thumbnails/10.jpg)
Thank You.