Taining Compleate Latter

download Taining Compleate Latter

of 1

Transcript of Taining Compleate Latter

  • 8/14/2019 Taining Compleate Latter

    1/1

    MULTAN ELECTRIC POWER COMPAN

    132 KV GRID STATION KHANEWAL

    To,The Principal,

    GOVT. College of Technology

    ..

    No.___________ Dated: _____________

    Subject: 12 weeks training of B.Tech (Pass) Electronics.

    It is certified that

    1. Mr. MUDASUR S/O ASHFAQ AHMAD SHAHID

    Is student of B-Tech (Pass) Electronics under the college roll no . and reference n

    GPI//09/. has been complete 12 weeks training program. He completes his training

    at 132 KV Grid Station .. from 02-12-2009 to 02-03-2010. During this period we found

    him that he takes keen interest in his job which was assigned to him.

    Signature of A. Resident Engineer