TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE)
TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT)
(April 2009)
PREPARED BY:
BRAJ K. SHARMA,
INTERNATIONAL ENERGY COMMERCIAL EXPERT
ICE WORKING GROUP
Annex 1
Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team
1
Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks
Establishment of the ICE Secretariat (Component 1)
1. Establish ICE secretariat operation based at MEW, including procurement of office equipment and technically competent local and international consultants.
Established ICE Secretariat (physical); recruited local consultants, office manager and office staff; procured office equipment, furniture, and supplies; and established office procedures
None
2. Provide a formal setting in which in which interministerial dialogue and information exchange can be conducted regularly.
Held consultation/discussion sessions with ministries (MEW, MOM, MRRD) and government agencies (DABM/S, CSO) on development of energy database; Organized discussion sessions on power purchase agreements and participated in these; Organized working meetings and made presentations on DABS Articles of Incorporation.
None
3. Enhance the government ability to interact with donors and potential investors as a coordinated counterpart through regular meetings and review of energy assistance portfolios.
Developed energy database for use by potential investors and planners; Conducted discussion sessions on power purchase agreements including pointers on negotiations
None
4. Provide regularly published information updates through a national energy awareness campaign and maintain an ICE website.
This activity was not undertaken ICE website was not established as the person responsible for developing/ maintaining website was not available. Software simulation experience was added to this position by ADB but since ICE was not extended by six months as planned, the position remained vacant .
Annex 1
Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team
2
Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks
5. Encourage participation of other government entities, Afghan citizens and sector operators to disseminate how the sector is being developed for the long term, community by community.
This activity has not started yet None
B. Establishment of Commercial Advisory team to help build energy sector strategic planning and commercial capacity (Component 2)
6. Establish a quality on the ground technical advisory team comprised of International and Afghan experts within the ICE secretariat to facilitate capacity building that leads to the development of baseline market-sector strategic information.
Identified and recruited local experts, translators and other office staff .
International experts were recruited by ADB
7. Coordinate ministry, donor, sector and key stakeholder energy activities
Facilitated extensive coordination among Office of the President, MEW,Ministry of Justice, Ministry of Economy, DABM, and others during the drafting and approval of DABS Articles of Incorporation; facilitated coordination between various stakeholders during drafting of power purchase agreements with Tajikistan/Uzbekistan and subsequent negotiations; established dialogue between various parties during the drafting of ANDS and costing of projects
Annex 1
Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team
3
Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks
8. Compile and review of existing energy information; identify information gaps; and review past and current projects funded by the Government, Donors and Private Sector
Developed an Energy Database with extensive consultation with energy sector organizations (MEW, MOM, MRRD, DABS, others). Its objective is to provide data for planning of energy projects as well as to provide important information for potential investors for making investment decisions. The Database documents the following: all projects/activities completed as of Government of Afghanistan's fiscal year 1387 (2008-2009) and those activities planned during the next five years (1388-1392) in the energy sector comprised of electric power, renewable energy (solar, wind, micro hydro, etc), coal, oil, and gas; actual consumptions, supply and demand of electricity; resources available for generating electric power; and population information for estimating demand.
The Database should be continuously updated and maintained for which an inter-ministerial task force should be created to coordinate the effort; the actual update and the maintenance should be the responsibility of the respective ministries and agencies. The TOR required the Energy Commercial Expert to prepare a private sector energy database based on available data. Since there were no data available and there was no time and resources to conduct an indepth survey, this was not done. Instead, as it was and also it was more relevant for planning and investment purpose to develop an overall energy database covering all subsectors (electric power, renewable energy, coal, natural gas, oil, etc), the said expert put a lot of effort to complete it.
Annex 1
Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team
4
Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks
9. Review existing governance , legal and regulatory frameworks and recommend areas for improvements
Drafted, edited, presented and explained Articles of Incorporation of DABS. Several working meetings and presentations were done for MOF, MEW, MOJ officials including Ministers and Deputy Ministers. ICE Team also explained the Articles to the Legal Subcommittee of Cabinet, attended by Vice-President, Minister of Finance, Minister of Economy, Minister of Energy, Minister of Justice and Minister of Religious Affairs. Provided other extensive inputs, as follows: Prepared a paper titled ‘Status of Afghan Energy Sector Regulation’ which documented the of the energy sector, legal and regulatory aspects; reviewed ‘Hydrocarbons Law (Bill) and Regulations’; and drafted Independent Power Producer Framework;
Cabinet approved the Articles of Incorporation
10. Assist in improving financial aspects in the energy sector and train personnel
- Provided technical assistance in selection and procurement of Accounting package for DABM/S - Assisted DABM to prepare financial statements for 2007 (it was the first time that data was collected from Breshnas, summarized and a trial balance and financial statement prepared) - Provided technical assistance in gathering
Annex 1
Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team
5
data and maintaining fixed assets register of DABM and Breshnas - Drafted TOR for external auditing of DABM, attended meetings with MOF and ARDS on inviting proposals, and assisted in evaluating these items
11. Update Power Sector Master Plan (PSMP) developed by the Norwegian consulting firm Norconsult in 2003.
Developed and submitted for ADB consideration a detailed proposal to update the PSMP including resources required, timeline and budget. The update is quite an extensive undertaking for the Energy Commercial Consultant to handle.
ADB has realized this oversight and is now considering how to go about it.
12. Prepare an emergency fuel strategy for 2006-2007, including assessment of diesel use, coal supply and transport, kerosene and other fuel sources for winter;
This activity was cancelled (see Comments and Remarks section)
The activity became redundant as the period for the emergency fuel strategy had already elapsed.
13. Develop specific energy sector planning skills to conduct economic assessments and budget planning utilizing existing date.
Assisted in drafting of Afghan National Development Strategy for Energy including several revisions and data gathering.; developed a five-year investment plan for the power sector prior to and after the Paris Donor’s meeting as requested by the Ministry of Finance; prepared a list of priority projects for MEW.
Assisted the Planning Department of the MEW
Annex 1
Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team
6
Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks
14. Prepare sector plans and corresponding budget based demand.
Assisted ANDS and MEW on preparing the national energy sector strategy; assisted ANDS/MEW and the Ministry of Finance on preparing 5 –year costing of power projects and adjusting the costing after Paris Donors Meeting in June 2008; submitted proposal to ADB for updating the power sector master plan developed by Norconsult in 2003.
None
15. Promote regional and provincial participation in energy planning resulting in the production of energy plans.
Met with Provincial Reconstruction Teams of Parwan, Kapisa, Nangarhar, and others to determine energy requirement, to connect distribution systems and transmission lines from substations to provinces, repair of Darunta HPP including discussions with USAID
None
16. Actively disseminate sector strategies to key government donor, and private sector player.
Worked actively with MOF, ANDS and MEW during the drafting of the Energy Sector Strategy and the development of ANDS costing before and after the Paris Donor’s Conference in June 2008; advised ADB of assistance through Weekly/Monthly reports; participated actively in the General ICE Meetings on a monthly basis.
None
Annex 1
Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team
7
Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks
17. Adopt and issue sector plans for public consumption.
ICE Working Group is not authorized to issue the sector plans for public consumption
None
18. Develop sufficient legal and contracting skills.
Strengthened capacity of MEW in the development of Power Purchase Agreements and its negotiations; also oriented MEW on development of Independent Power Producer framework.
None
19. Prepare Inception Report, Weekly Report, Monthly Report and Final Report to inform ADB and others of the progress of the TA and the outputs.
These reports were prepared and submitted to ADB. Monthly reports were also submitted to other stakeholders.
None
2
Support to Inter-ministerial Commission for Energy (ICE)
TA Evaluation Report
Table of Contents
Introduction
Activities Undertaken, Outputs Produced and Objectives Met by ICE Team
Description of Major Activities Project Constraints Recommendations
Annex 1 - Activities Undertaken by the ICE Secretariat/Commercial Advisory Team
Annex 2 - Proposed Consulting Approach, Organization, and
Estimated Budget for Updating PSMP Prepared by ICE Commercial Advisory Team
3
TA – 4918 (AFG): Support to Inter-ministerial Commission for Energy (ICE)
TA Evaluation Report
1. Introduction The Government of Afghanistan approved the establishment of the Interministerial Commission for Energy (ICE) to serve as a coordinating and policy-making body for energy sector activities in Afghanistan through the enactment of a Presidential Decree dated 2 November 2006. The Asian Development Bank (ADB) approved the Government request for Technical Assistance to support ICE on 31 January 2007. The overall objective of the Technical Assistance to support ICE (TA-ICE) is to establish a central and credible government body to support, develop and facilitate a coherent energy and power strategy for Afghanistan. These objectives are realized through the following two components of TA-ICE: establishment of the ICE Secretariat and the establishment of the Commercial Advisory Team within the Secretariat. Specifically the TA project was implemented to achieve the following:
• Coordinate ministry, donor, sector, and key stakeholders energy activities; • Develop commercial understanding and planning skills among government and
energy sector leaders including sector governance and legal, financial and technical capacity;
• Prepare sector plans and corresponding budgets based on demand; • Support the development of regulatory functions, including market –based
contracting and oversight; and • Build local capacity to oversee and monitor energy planning and development in
Afghanistan through transfer of international know how.
The ICE Secretariat/Commercial Advisory Team, collectively called the Team started ICE activities with the appointment of the Energy Legal and Governance Expert in July 2007 followed by the appointment of other international consultants: Energy Finance Expert in August 2007, the Executive Director in November 2007 and the Energy Commercial Expert in May 2008, almost a year after the TA start-up. The report is prepared by Braj K. Sharma, the International Energy Commercial Expert in the absence of the other three experts who completed their assignment and left the project on the following dates: Executive Director - 1 March 2009 Energy Finance Expert - 6 September 2008 Energy Legal and Governance Expert- 30 June 2008
4
The report summarizes the activity undertaken, outputs produced, and the objectives met by the Team and the constraints faced and provide several recommendations. Annex 1 summarizes the activities undertaken vis-à-vis the tasks assigned in the TOR and Annex 2 provides a proposal to update the Power Sector Master Plan.
2. Activities Undertaken, Outputs Produced and Objectives Met by ICE Team The Tasks assigned to ICE Secretariat / Commercial Advisory Team (Team) as per the TOR in the ADB TA Report dated December 2006 and the corresponding list of activities undertaken by the Team are detailed in Annex 1. It is presented according to the two ICE components: (A) Establishment of the ICE Secretariat; and (B) Establishment of a Commercial Advisory Team within the ICE Secretariat to help build energy sector strategic planning and commercial capacity. Any comments/remarks are presented in the third column. As seen in the Table in the next page, the Team met many of the TA objectives and completed assigned tasks (for detailed report on activities undertaken and accomplishment, see Annex 1).
Table: Activity Undertaken, Output Produced and Objective Met (Referenced to ADB Technical Assistance Report)
Activity
Undertaken/Accomplishment Output Produced Objective Met
Established fully operational ICE Secretariat based at MEW including recruitment of local consultants/staff, procurement of office equipment/furniture and establishment of office procedures
Established Office within MEW to serve as a point of contact and to liaise effectively with stakeholders
Set up fully operational ICE Secretariat/operations
Implemented all reporting requirement of ICE:
Inception Report, Weekly Report, Monthly Report and TA Evaluation Report. (Monthly Report to ICE Chairman and MEW Deputy Minister; all reports to ADB)
Inform and build local capacity to monitor developments in the energy sector
5
Assisted in drafting of Afghanistan National Development Strategy for energy and preparation of five-year investment plan taking into consideration the annual development budget for 1387(2008-2009) working closely with MEW
Annual budget planning and preparation (ANDS and five-year investment plans/ projects costing)
-Develop planning skills among government/energy sector leaders;
-Prepare sector plans and corresponding budgets
Performed data gathering and analysis for Energy Database covering all sub sectors: electricity, coal, gas, oil, and renewable energy through extensive coordination with ministries and agencies involved in the energy sector, that is, MEW, MOM, MRRD, DABS and others; Submitted to Deputy Minister of MEW and MOM, and to ADB
ADB has introduced simulation software for planning of power projects
Energy Database – national energy generation, resources available for energy, use and demand covering electricity, coal, gas, oil and renewable energy, population / household data
Provided Plexos simulation software and trained two staff members, one each from MEW and DABS
-Develop commercial understanding and planning skills among government/energy sector leaders
-Build local capacity to oversee and monitor energy planning and development
- Strengthen planning capacity
Prepared proposal to update Power Sector Master Plan (PSMP) which would facilitate the actual update. This activity is comprehensive and could not be done by one consultant.
Proposal to update Power Sector Master Plan
Objective partially achieved – proposal will facilitate the update as it provides an approach, the expertise required for both international and domestic consultants, and estimated budget for the study
No activity was performed in developing the Emergency Energy Fuel Strategy for 2007/08 winter
None Objective not met - this requirement became redundant since the International Energy Commercial Expert was recruited after 2007/08 winter
6
Provided on the job training to counterpart staff and local consultant on national energy strategy, five-year investment plans, and developing energy database.
Training to counterpart staff on energy strategy, planning of energy projects, governance and legal, and data gathering
-Develop commercial understanding and planning skills among government /energy sector leaders
-Build local capacity to oversee and monitor energy planning and development
Team assisted in selection, procurement, and installation of Accounting package for DABM; assisted in preparing financial statement for 2007; provided technical help in developing a fixed asset register for DABM and Breshnas; and helped in recruiting an external auditor for DABM
-Accounting software package for DABM
- Financial statement for 2007
- Fixed asset register for DABM/Breshnas
- Recruitment of DABM external auditor
Instituted financial management improvements in the energy sector
Team was not able to launch ICE website
None, could not find the webmaster
Objective not met - launching of ICE Website to present a national energy awareness campaign
Team assisted and worked closely with various ministries and agencies in accomplishing/assisting in the following: drafting of Independent Power Producer Framework; review of power purchase agreement; drafting and approval of DABS Articles of Incorporation; development of Energy Database;
-Independent Power producer Framework
-DABS Articles of Incorporation
-Comments on Power Purchase Agreement
- Energy Database (draft)
- Afghanistan National Development Strategy/Costing of projects; Five-year investment plans
-Coordinate ministry, donor, sector and key stakeholders energy activities
-Develop commercial understanding /planning skills among government/energy sector leaders including legal, financial, and technical capacity
7
Reviewed and supported the development of legal and regulatory functions by preparing a paper titled ‘Status of Afghan Energy Sector Regulations’, reviewed hydrocarbon law, drafted independent power producer framework, and others.
-Status of Afghan energy sector regulations
- Review of Hydrocarbon law
-Independent Power Producer Framework (Draft)
- Review of existing governance, legal and regulatory framework
Provided planning assistance to MEW Planning Department
-Developed TOR for feasibility study on electrification of Sheendand and Andraskan districts in Herat province
-Developed TOR for feasibility study of Baharak HPP in Badakshan
-Review of TOR for Olambagh HPP
-Develop commercial understanding and planning skills at MEW
3. Description of Major Activities
3.1 Coordination with energy sector agencies/coordination among agencies and donors
• The Commercial Advisory Team (Team) worked with all energy sector agencies, namely, Office of the President, MEW, MOM, MRRD (NSP, NABDP), MOCI, DABM/S, MOF, Ministry of Justice (MOJ) and the Central Statistics Organization for demographic data. The coordination covered various areas: development of energy sector strategy, costing of development projects, development of Energy Database, drafting and approval of Articles of Incorporation, among others.
• Likewise, the Team facilitated coordination among these agencies and between the agencies and the donors.
3.2 Assistance in developing energy strategy and planning
• The Team assisted MEW in drafting of Afghanistan National Development Strategy (ANDS) for energy including preparation of several revisions of the ANDS; assisted MEW in identifying power projects to fit the strategy; developed costing of the projects for five-years as required by MOF and ANDS office before
8
Paris Donors Meeting in June 2008, and adjustment of the investment plan after the Paris Conference to reflect Donors’ amount approved; and assisted MEW in developing a list of priority projects for inclusion in the strategy.
• The Ministry of Energy has emphasized the update of the power sector master plan as a top priority project of the Government. This is also realized by the donors. Realizing this, the Team submitted a proposal to ADB for the update of the PSMP which proposed an approach and methodology, the expertise required, and estimated a budget for the study. ADB has not responded to the consultant’s proposal. Originally the update was included in the TOR of the Commercial Energy Expert without realizing the extent of work involved. The update work requires several international and domestic consultants and data gathering and validation process is critical. This oversight was realized by ADB.
• In promoting regional and provincial participation in energy planning, the team consulted with Provincial Reconstruction Teams from Parwan, Kapisa, Nangarhar, and others on energy requirement, connection of transmission/distribution lines from substations to provinces, and repair of HPP projects.
• Provided planning assistance to MEW planning department in the following: developed the TOR for the feasibility study for electrification of Sheendand and Andraskan districts in Herat Province; developed TOR for feasibility study of Baharak HPP in Badaskhan Province; review of TOR for feasibility study for Olambagh HPP; and review of TOR for Operation and Maintenance contract of North East Power Systems (NEPS).
3.3 Development of an Energy Database covering all subsectors of energy
The Commercial Advisory Team developed an Energy Database (Database) covering all subsectors of energy. The objectives are to provide data for planning of energy projects and provide valuable information to potential investors for making investment decisions. The Database documents the following: all projects/activities completed as of Government of Afghanistan's fiscal year 1387 (2008-2009) and those activities planned during the next five years (1388-1392) in the energy sector comprised of electric power, renewable energy (solar, wind, micro hydro, etc), coal, oil, and gas; actual consumptions, supply and demand of electricity; resources available for generating electric power; and population information for estimating demand. The ICE mandate was to gather data from existing and secondary sources. However, except for MRRD’s National Solidarity Program (NSP), the data was not readily available. Thus the Team developed information through extensive consultation with all organizations involved in the energy, as noted in Section 3.1 above. Draft Database was submitted to ADB/TASU, Deputy Minister Energy, MEW and Deputy Minister, Ministry of Mines.
9
3.4 Assistance in Governance and Regulations
The Team assisted energy sector ministries and agencies in legal and regulatory functions. The Team prepared the following deliverables:
• Paper titled ‘Status of Afghan Energy Sector Regulation’ which outlines the existing governance of the energy sector, legal and regulatory aspects, implications of a non-regulated Afghan energy market, and regulatory requirements;
• Reviewed and commented on the Hydrocarbon Law (Bill) and Regulations;
• Drafted Independent Power Producer Framework; • Drafted, reviewed and discussed DABS Articles of Incorporation with
Ministry of Justice, MOF, High Council of Economic Affairs and Special Committee of the Cabinet; and
• Reviewed power purchase agreement 3.5 Project Administration and Reporting
• Establishment of ICE Secretariat in MEW - The Team established the ICE Secretariat at the MEW as a point of contact for all energy sector organizations on office space provided by the MEW. The Team recruited all local consultants and staff, procured office equipment, furniture, and supplies, and established office procedures.
• With respect to routine reporting requirement, the Team submitted the following reports: inception report, weekly update report, monthly report and the TA evaluation report.
• The Team attended the general ICE meetings held once a month which was attended by all donors and sector ministries/organizations.
4. Project Constraints
In general, the low institutional capacity in the country has affected ICE like other projects in the country. A major constraint has been the weak management and technical capability of the three most important organizations in the sector, namely, the Ministry of Energy and Water, the Ministry of Mines, and the electric utility DABS. The ongoing and planned capacity building effort by the donors should alleviate some of the deficiencies. Some of the ICE -specific constraints are summarized below.
• Only a few energy sector organizations have taken advantage of the ICE consultant’s coordination role to the extent feasible. The concept of assigning counterparts to work with the consultants to receive on-the-job training is attractive and should be taken advantage of by these organizations.
10
• Limited staff capability exists in the ministries/agencies but those qualified and capable staff is demanded by both the donors and consultants to work with them. Thus the capable staff is overloaded while the vast majority remains idle.
• It was difficult to find qualified domestic consultants in the energy sector to work with the team. As a result, a number domestic consultant positions remained vacant. The Team was forced to use one MEW senior staff as one of the domestic consultants. In spite of him having joined ICE, he had at the same time some ministry assigned responsibilities which he had to complete.
• Data gathering for the Energy Database at the DABS, MEW and more so at MOM was extremely difficult. Extensive consultations were necessary to develop the Database as the Management Information Systems (MIS) was non-existing. The data that was available were very disorganized and time consuming technique had to be used to extract the data. Furthermore, data gathered had to be validated as these were not fully reliable.
• Substantial delays in recruiting the Energy Commercial Expert resulted in lack of coordination between him and the other two international consultants. Such a project should have all international consultants start at the same time because of the extensive coordination required. Ideally this would have been achieved by recruiting a firm rather than independent consultants which would have not only facilitated coordination among consultants but would have also addressed many administrative problems as discussed below.
• The project faced a few administrative problems, such as delay in procuring office equipment because of unavailability of funds in a timely manner, delay in receive office operation and travel advances, delay in payment to consultants/staff, etc. Such deficiencies resulted in delays in various activities. Use of a firm would have avoided such delays as it would have been responsible for planning for funds.
5. Recommendations
5.1 Strengthening of Planning Function at MEW and MOM
While all aspects of operation of the three important energy sector organizations, namely, MEW, DABS and MOM needs strengthening, the planning function should be given a top priority in all three organizations. It is vital that reliable and quick data be made available to planners and potential investors. ADB provided Plexos simulation software is such as planning tool for updating power sector master plan, energy database and other planning aspects. MEW and DABS should be responsible for fully utilizing the software. ADB recently trained two employees on the software, one each from MEW and DABS.
11
5.2 Power Sector Master Plan Update
There is an urgent need to update the power sector master plan (PSMP), a top priority of the MEW and the donor community. The PSMP prepared by the Norwegian firm Norconsult back in 2003, although a comprehensive document, it was completed at a time when data available was insufficient and in addition significant infrastructure and institutional changes have been introduced in to the Afghan power sector that should now be considered in the overall sector planning.
A proposal to update the PSMP is presented in Annex 2. Ideally, a Utility Planner should lead the effort. The proposal includes a proposed approach, consulting organization showing international and domestic expertise required, inputs required from MEW/DABS and the estimated budget for the study.
5.3 Continuing Update of Energy Database
The draft Energy Database must be continuously updated. The update and maintenance of the Database should be the responsibility of individual organizations responsible for generating data, that is, the MEW, MOM, DABS, MRRD/NSP and the CSO for population data. Because it involves various organizations, it is suggested that an interministerial task force, led by the Ministry of Finance be responsible for coordinating the update/maintenance of the Database.
5.4 Legal and Regulatory Framework – Power Sector
Recommendations on Legal and Regulatory Framework are presented in the ICE Team’s Report titled ‘Status of Afghan Energy Sector Regulation’ dated February 2008 referred in this report.
ASIAN DEVELOPMENT BANK
TA‐4918 (AFG) – SUPPORT TO INTER‐MINISTERIAL COMMISSION FOR ENERGY (ICE)
ENERGY DATABASE
(March 2009)
Prepared by:
International Energy Commercial Expert
ICE Working Group
2
Support to Inter-ministerial Commission for Energy (ICE)
Energy Database
Table of Contents
Page
Introduction
Objectives
Key Features of the Database
Database Coverage, Description and Assumptions/Comments
Recommendations for Updating Database
Section 1 - Tables (by Region and Province)
Table 1‐A ‐ Projects Completed (as of 1387) and Ongoing/Future (1388‐1392) Projects‐ Generation/Transmission/ Distribution
Table 1‐B ‐ Projects Completed (as of 1387) and Ongoing/Future (1388‐1392) Projects – Coal‐fired, Gas‐fired and Diesel‐fired
Table 1‐C ‐ Projects Completed (as of 1387) and Ongoing/Future
(1388‐1392) Projects‐ Renewable energy Table 2‐ A‐ Resources Available for Energy‐ Hydropower
3
Table 2‐ B‐ Resources Available for Energy‐ Coal, Gas and Oil
Table 2‐C‐ Resources Available for Energy‐ Renewable Energy
Table 3 ‐ Table 3 ‐ Population Data by Province/District
Section 2 Tables (by Country-wide and Province)
Table 4 - Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province (1386)
Table 5 ‐ Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province (1387)
Table 6 - Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province (1390) Table 7- Projected Supply and Demand of Other Energy Sources,
and Surplus/Deficiency by Province
Table 8- Projected Supply and Demand of Renewable Energy Sources, and Surplus/Deficiency by Province
Table 9 ‐ Private Sector Involvement in Energy Development
Projects Completed (as of 1387) and Planned (1388‐1392) ‐ Generation/Transmission/Distribution Projects
Table10 - Private Sector Involvement in Energy Development
Projects Completed (as of 1387) and Planned (1388-1392) - Coal-fired / Gas- fired/Small diesel
Table11 - Private Sector Involvement in Energy Development
Projects Completed (as of 1387) and Planned (1388-1392) - Renewable energy
Table12 - Private Sector Production of Resources Used in Energy Generation Projects as of 1387 and Planned Projects (1388-1392) - Coal, gas, oil
Table13-A - Energy Firms Doing/Interested in Business in Afghanistan
– Electric Power
4
Table13-B- Energy Firms Doing/Interested in Business in Afghanistan
- Coal/gas/oil Table13-C - Energy Firms Doing/Interested in Business in Afghanistan
- Renewable Energy Table14- - Number of Customers, Consumption and Tariffs by
Province - Residential Customers ( 1387) Table14-B - Number of Customers, Consumption and Tariffs by Province - Government, NGOs and Holy Places (1387) Table14-C - Number of Customers, Consumption and Tariffs by Province - Industrial and Commercial Category (1387)
5
Draft
Asian Development Bank
TA-4918 (AFG) - Support to Inter-Ministerial Commission for Energy
Energy Database
(March 2009)
A. Introduction
The Energy Database is developed by the Working Group of the ADB-assisted Inter-ministerial Commission for Energy (ICE), in accordance with the terms of reference of the ADB. It was prepared by Braj K. Sharma, the ICE International Energy Commercial Expert who was supported by Eng. Mohammad Hashim Alimi, the local Strategic Planning Expert, and Sher Agha Nassiry, the local Commercial Expert.
The Energy Database (Database) covers all sub-sectors related to the energy sector: electric power, renewable energy, coal, natural gas, and diesel/oil. The data was gathered through extensive interaction with ministries/agencies involved in the energy sector, such as, the Ministry of Energy and Water (MEW), Ministry of Mines (MOM), Da Afghanistan Breshna Sherkat (DABS) offices in Kabul and four provinces, and the Ministry of Rural Rehabilitation and Development (MRRD) including the Ministry’s National Solidarity Program (NSP) and the National Area Based Development Program (NABDP), and the Central Statistical Organization (CSO). Existing documents and reports relating to energy sector were also reviewed. Additionally, a brief survey/data gathering was conducted in four provinces, especially on existing use of assets or planned acquisition of assets for electric power generation, transmission, and distribution, and supply and consumption of electricity. The ICE mandate was to gather data from existing and secondary sources. However except for MRRD’s NSP which maintained some data on renewable energy, other data were not available readily and had to be developed with extensive consultation with responsible ministries/agencies.
6
The Database is presented in the following three parts:
• A write-up on the Database including objectives, key features of the Database, and description of each table, assumptions used and comments on data availability, and recommendations for updating the Database;
• Section1 - Detailed data by province/region covering generation, transmission, distribution, energy resources, and population; and
• Section 2 - Integrated national data or data by province – Actual capacity (supply) and demand for electricity, projected supply and demand of other energy sources, private sector involvement in generation of electricity and other energy sources, listing of firms interested in energy projects in Afghanistan, and electricity consumption and tariffs for various categories of customers by province.
B. Objective
The objective of the Energy Database (Database) is to provide data for planning of energy projects as well as to provide important information for potential investors for making investment decisions. The Database documents the following: all projects/activities completed as of Government of Afghanistan's fiscal year 1387 (2008-2009) and those activities planned during the next five years (1388-1392) in the energy sector comprised of electric power, renewable energy (solar, wind, micro hydro, etc), coal, oil, and gas; actual consumptions, supply and demand of electricity; resources available for generating electric power; and population information for estimating demand.
C. Key Features of the Database
The Database provides important information for users engaged in planning of energy projects, especially power projects, and those who are interested in general in knowing the energy situation in the country. Attempt has been made to bring data across the energy sector in one document.
Key features of the Database are as follows:
• Compiles available data required in planning of energy projects under one document and provides recommendations for update of the Database;
7
• Provides an up to date inventory of completed power projects by province including hydropower, thermal power, imported power, diesel/oil-fired, micro hydro, solar, transmission lines and distribution networks, and substations;.
• Resources available for generating energy by province including hydropower, coal, gas, oil, and renewable energy resources;
• Actual capacity (supply) and estimated demand for electric power for 1386 (2007-2008), 1387 (2008-2009) and 1390 (2011-2012);
• Projected supply and demand of other energy sources (natural gas, coal, oil, renewable energy);
• Electric power consumption and average tariffs by category of customers (residential, government, commercial and industrial) for each province;
• Comprehensive list of firms (engineering, consulting, and construction) interested in doing business in Afghanistan in electric power, coal, natural gas, oil and renewable energy; and
• Existing (1387) and projected (1390) population by province and each district within the province.
D. Database Coverage, Description and Assumptions/Comments
The Data was developed using either existing information or through extensive interaction and discussions with organizations/agencies in the energy sectors, primarily, MEW, MOM, MRRD, DABM/S, and the CSO. This data is presented in two sections: Section 1 covers detailed information by province / region and Section 2 provides either integrated national data or data by province. The coverage of each section is presented below. Section 1 – Data by Province/Region - Generation, Transmission, Distribution, Energy Resources, and Population The data is presented in Tables 1-A through 3 for each province within each DABS region consisting of the following:
8
Region Province Kabul - Kabul province Central - Bamyan, Kapisa, Panjsher, Parwan, and Wardak North - Balkh, Faryab, Jawzjan, Samangan and Saripul North-East - Badakhshan, Baghlan, Kunduz and Takhar Eastern - Kunar, Laghman, Nangharar and Nuristan South-East - Gazni, Khost, Loghar, Paktia and Paktika South - Dikundi, Helmand, Kandahar, Uruzgan and Zabul West - Badghis, Farah, Ghor, Herat and Nimroz Each region is separated by a divider sheet and each province within the region is likewise separated by a divider sheet for easy referral. The tables are described in detail below including assumptions used and the availability of Data. Table 1-A Completed (as of 1387) and Ongoing/Future (1388-1392) Projects -Generation/Transmission/Distribution Projects Covers hydropower, diesel generated power, imported power, transmission projects, distribution projects, and substations, and their location/details. The information covered for projects completed to date (1387) and those to be completed by 1392, are as follows: installed and actual capacity for generation projects in MW; transmission lines (Kms./KV); distribution projects (capacity MVA/KV network), substation projects (capacity MVA/KV); project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Assumptions:
1. Projects expected to be completed beyond 1392 are excluded even though implementation started within 1388-1392.
2. Project costs (both actual and estimated for future projects) in most cases are not available.
9
3. Larger diesel projects are included in this table where as small diesel plants are included in Table 1-B Completed (as of 1387) and Ongoing/Future (1388-1392) Projects – Coal-fired/Gas-fired/Small diesel -fired
Information Availability: Yes, through extensive data gathering process; annual O & M costs are not available.
Table 1-B Completed (as of 1387) and Ongoing/Future (1388-1392) Projects – Coal-fired/Gas-fired/Small diesel Covers power generation from gas-fired, coal-fired, small diesel-fired and their location/details. The information covered are as follows: installed and actual capacity in MW; project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Information Availability: Information on small diesel-fired projects is available. Except for the fertilizer plant in Balkh, no other projects (coal/gas-fired exist). Table 1-C Completed (as of 1387) and Ongoing/Future (1388-1392) Projects – Renewable energy Covers power generation from micro-hydro, solar, wind, wood, and other sources and their location/details. The information covered are as follows: installed and actual capacity in KW/MW; project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Assumptions: 1. Renewable energy project consist mostly of micro-hydro and solar energy projects; small
diesel plants are included in Table 1-B under small diesel projects.. Information Availability: Yes, through MRRD’s National Solidarity Program and others; annual O &M Costs are not available. Table 2-A Resources Available for Energy - Hydropower Covers hydropower generation potential, existing production, and their location/details. The information covered is as follows: total hydropower potential for each project/river and existing production in MW, if any. Assumptions:
10
1. All future HPP potential projects with known information are included.
Table 2- B Resources Available for Energy – Coal, gas, and oil
Covers coal mines, gas wells, and oil wells, existing production for each and their location/details. The information covered are as follows: details on each coal mines including total potential and existing production in Metric Tons; details on each gas well including total potential and existing production for each in Cubic Meters; details on each oil well including total potential and existing production for each in Metric Tons. Information availability: Yes, through extensive effort at the Ministry of Mines office in Kabul and field visits to Sheberghan, Puli Khumri, Herat and Kunduz.
Table 2- C Resources Available for Energy – Renewable energy
Covers resources available for micro-hydro, solar, wind, geothermal, and others, and their location/details. Since this information is not available, the table is left blank.
Information availability: None, table not filled up as no information exist but should be developed through detailed survey.
Table 3 –Population Data by District/Province
Covers population data by province and each district within the province for 1387 as provided by the Central Statistical Organization(CSO), projected population in 1390 based on growth rate provided by the CSO, and the number of households for each province/district based on 7 members per household across all provinces used in planning of power projects to date.
Assumptions:
1. 1390 projections are based on annual growth rate of 2.03 from 1387 to1390 as provided by the CSO.
2. A Household is comprised of seven (7) members as per assumptions used by MEW in the past for feasibility studies.
Data availability: Yes
11
Section 2 – Integrated National Data or Data by Province– Actual capacity (supply) and demand for electricity, projected supply and demand of other energy sources, private sector involvement in generation of electricity and other energy sources, listing of firms interested in energy projects in Afghanistan, and electricity consumption and tariffs for various categories of customers by province.
The following tables provide detailed information:
Table 4 Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province for 1386 Covers actual capacity (supply) of electricity, estimated demand based on base year (1387) demand, and deficiency (demand over supply) by each province in 1386 (2007-2008). Assumptions:
1. Refer to Table 5 (1387) for Base Year assumptions and calculations. 2. Demand is assumed at 85 % of the Base Year demand. 3. Actual capacity (supply) is assumed the same as Base Year (1387) since it is assumed
that there is no change in the generation capacity between 1386 and 1387 based on information available.
Information Availability: Demand information not available
Table 5 - Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province for 1387 Covers actual capacity (supply) of electricity, estimated demand based on 1387 household population, and deficiency (demand over supply) by each province in 1387 (2007-2008). Assumptions:
1. 1387 is assumed as the Base Year for Demand calculations. Demand is calculated based on the following parameters: for residential household customers, demand of 1 KW per household for 60% of households and 0.5 KW for 40% households; 7 % of total demand for government customers; and 7% and 6% of total for industrial and commercial customers, respectively. Population and number of households are presented in Table 3.
2. Actual capacity is based on completed generation projects as presented in Table 1-A for each province.
3. As expected, there is a deficiency in each province as shown in the Table.
12
Information Availability: Population information available as per CSO; other information based on assumptions. Table 6 - Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province for 1390 Covers actual capacity (supply) of electricity, estimated demand based on 1387 demand population, and deficiency (demand over supply) by each province in 1390 (2007-2008). Assumptions:
1. Demand is assumed to increase by 15 % in each of the years 1388 and 1389, and by 5 % in 1390 as more customers would have been connected and thus demand would arrive closer to their real demand.
2. Projected actual capacity is calculated based on more generation facilities coming into operation by 1390 as presented in the table. Additional capacities are: 333 MWs in Kabul, 42 MWs in Heart (Salma HPP), 12.5 MWs in Nangarhar (Darunta HPP), 2.1 MWs in Badakhshan (Baharak HPP), and others (see Table 6).
Information Availability: Yes Table 7- Projected Supply and Demand of Other Energy Sources, and Surplus/Deficiency by Province for 1387 Covers estimated demand and supply of coal, natural gas, and oil/diesel, and surplus/deficiency for 1387 Information Availability: Supply and Demand are both not available. Supply in terms of existing production of coal, gas and oil is available (see Table 2B) but reliable numbers in imports are not available. Table 8- Projected Supply and Demand of Renewable Energy Sources, and Surplus/Deficiency by Province for 1390 Covers supply and demand of renewable energy sources comprised of micro-hydro, solar, wind, wood and others. Information Availability: Existing supply in terms of micro hydro (KWs) and Solar (Watts) as presented in Table 2-C in Section 1 is represented. Demand information is not available. Table 9- Private Sector Involvement in Energy Development Projects - Completed (as of 1387) and Planned (1388- 1392) - Generation/Transmission/Distribution Projects
13
Covers hydropower, diesel generated power, imported power, transmission projects, distribution projects, and substations, and their location/details initiated by the private sector. The information covered are as follows: installed and actual capacity for generation projects in MW; transmission lines (Kms./KV); distribution projects (capacity MVA/KV network), substation projects (capacity MVA/KV); project completion cost and annual operation / maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Information Availability: Private sector information not applicable/not available Table 10 Private Sector Involvement in Energy Development Projects - Completed (as of 1387) and Planned (1388-1392) - Coal-fired/Gas-fired/Small diesel Covers power generation from gas-fired, coal-fired, small diesel and their location/details initiated by the private sector. The information covered are as follows: installed and actual capacity in MW; project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Information Availability: Private sector information not applicable/not available Table 11 Private Sector Involvement in Energy Development Projects - Completed (as of 1387) and Planned (1388-1392) - Renewable energy Covers power generation from micro-hydro, solar, wind, wood, and other sources and their location/details. The information covered are as follows: installed and actual capacity in MW; project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Information Availability: Private sector information not applicable/not available Table 12 Private Sector Production of Resources Used in Energy Generation Projects as of 1387 and Planned Projects (1388-1392) – Coal/gas/oil Covers coal mines, gas wells, and oil wells, existing production for each and their location/details initiated by the private sector. The information covered are as follows: details on each coal mines including total potential and existing production in Metric Tons; details on each gas well including total potential and existing production for each in Cubic Meters; details on each oil well including total potential and existing production for each in Metric Tons. Information Availability: Private sector information not applicable/not available
14
Table 13-A Energy Firms Doing/Interested in Business in Afghanistan - Electric Power Covers the following information on firms (consulting, engineering, construction, etc) engaged in electric power which have experience or are interested in doing business in Afghanistan: name of firm/contact address, its expertise in power sector, size of firm (latest revenues/staff complement), description of experience, ranking of firm based on actual experience (Number 1 is the most qualified). Information Availability: Contact address and size of firm (revenue, staffing), and ranking not available Table 13-B Energy Firms Doing/Interested in Business in Afghanistan - Coal/gas/oil Covers the following information on firms (consulting, engineering, construction, etc) engaged in development/exploration/ extraction of coal, gas, and oil which have experience or are interested in doing business in Afghanistan: name of firm/contact address, its expertise in power sector, size of firm (latest revenues/staff complement), description of experience, ranking of firm based on actual experience (Number 1 is the most qualified). Information Availability: Contact address not available, size of firm (revenue, staffing) not available for some of the firms; experience of the firms not available; ranking of firms not done. Table 13-C Energy Firms Doing/Interested in Business in Afghanistan - Renewable Energy Covers the following information on firms (consulting, engineering, construction, etc) engaged in renewable energy projects which have experience or are interested in doing business in Afghanistan: name of firm/contact address, its expertise in renewable energy, size of firm (latest revenues/staff complement), description of experience, ranking of firm based on actual experience (Number 1 is the most qualified). Information Availability: Contact address not available, size of firm (revenue, staffing) not available for some of the firms; experience of the firms not available; ranking of firms not done. Table 14- A Number of Customers, Consumption and Tariffs by Province – Residential Customers (1387)
15
Provides the following information on province to province basis on residential (household) customers : source of power generation (hydro, imports, thermal, etc), number of household customers, total consumption in the province in KWH, average consumption/household customer in KWH, and average tariffs/customer (in AFG). Information Availability: Number of households and total consumption available. Consumption by level of consumption, that is, 0-300 KWH, 301-700 KWH, over 700 KWH) not available Table 14 -B Number of Customers, Consumption and Tariffs by Province - Government, NGOs and Holy Places Provides the following information on province to province basis on general government category of customers consisting of government, non-government (NGO), and holy places: source of power generation (hydro, imports, thermal, etc), number of government/NGO/holy places, household customers, total consumption in the province in KWH, average consumption/government customer in KWH, and average tariffs/customer (in AFG). Information Availability: Only total consumption under the government category (government, NGOs, and holy places) available, separate consumption numbers not available. Table 14 -C Number of Customers, Consumption and Tariffs by Province - Industrial and Commercial Category Provides the following information on province to province basis on industrial and commercial customers: source of power generation (hydro, imports, thermal, etc); number of industrial customers, total consumption (KWH) and average consumption/customer(KWH); number of commercial customers, total consumption (KWH), and average consumption/customer(KWH); and average tariffs/customer. Information Availability: Information available.
E. Recommendations for Maintaining/Updating Database
It is strongly recommended that an inter-ministerial task force, led by the Ministry of Finance and comprised of all ministries/agencies engaged in the energy sector, be responsible for coordinating the maintenance/update of the Database. However the actual update and data
16
gathering must be the responsibility of the planning function of individual ministries and agencies identified in the tables and further outlined below. The Tables which are blank or are partially filled should be given top priority by the respective organizations as shown below. These data should be captured through surveys using sampling techniques. The table below lists the responsibility for maintaining/updating the Database for each Table in Sections 1 and 2, identifies the basis for such information, and the extent of priority for the update.
Table: Responsibility for Maintaining/Updating the Energy Database
Database Information as
per Table
Responsible Organization Basis for Data Gathering/Update
Priority
Primary Secondary
Table 1 -A MEW DABS Existing information High, continuously
Table 1 -B MEW MOM Survey / existing information
High, continuously
Table 1 -C MRRD MEW Existing information High, continuously
Table 2-A MEW Survey / study Medium
Table 2 -B MOM Existing information / survey High
Table 2-C MRRD MEW Survey High
Table 3 CSO Population census High
Table 4, Table 5, Table 6 MEW DABS
Existing information / survey High
Table 7 MOM MOCI Existing information / survey High
Table 8 MRRD MEW Survey / existing information High
Table 9 MEW DABS Survey Medium
17
Table 10 MEW MOM Survey Medium
Table 11 MRRD MEW Survey Medium
Table 12 MOM Survey High
Table 13 -A MEW DABS Existing information Low
Table 13 -B MOM Existing information Low
Table 13 -C MRRD MEW Existing Information Low
Table 14 -A DABS Survey / existing information High
Table 14 -B DABS Survey/existing information High
Table 14 -C DABS Survey/existing information High
Energy Database
Section – 1 ‐ Generation, Transmission, Distribution, Energy Resources, and Population
Data by Province/Region 1. Kabul ‐ Kabul Province
2. Central Region‐ Bamyan, Kapisa, Panjsher, Parwan, and Wardak
3. North Region ‐ Balkh, Faryab, Jawzjan, Samangan and Saripul
4. North‐East Region ‐ Badakhshan, Baghlan, Kunduz and Takhar
5. Eastern Region ‐ Kunar, Laghman, Nangharar and Nuristan
6. South‐East Region ‐ Gazni, Khost, Loghar, Paktia and Paktika
7. South Region ‐ Dikundi, Helmand, Kandahar, Uruzgan and Zabul
8. West Region ‐ Badghis, Farah, Ghor, Herat and Nimroz
Name of District1387 (2008‐2009) in Thousands ('000)
1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands
('000)
Total 3449.8 3738.4 534.05
Kabul Center (Kabul ) 2831.4 3068.2 438.32
DehSabz 49.1 53.2 7.60
Mir Bacha kot 47.6 51.6 7.37
Kalakan 27.6 29.9 4.27
Qara Bagh 69.5 75.3 10.76
Farza 19.6 21.2 3.03
Estalef 30.6 33.2 4.74
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: Kabul Province
Guldara 20.9 22.6 3.24
Shakar Dara 74.9 81.2 11.60
Paghman 110.0 119.2 17.03
Chahar Asyab 33.3 36.1 5.16
Musahi 21.3 23.1 3.30
Khak –i-Jabar 13.0 14.1 2.01
Bagrami 50.5 54.7 7.82
Surubi 50.5 54.7 7.82
2. 1390 figures based on growth rates provided by CSO (7 members/household)1. 1387 figures from Central Statistics Office (CSO)
Hydro power Nanghlo HPP 100 95 NA
Sarobi HPP 22 25 NA
Mahipar HPP 66 38 NA
Diesel‐fired Kabul East Diesel generator (USAID)
108 275
Iran 2x25MW Thermal Units 50 NA
Thermal Units (2 Units) 50 42 NA
Imported Power Uzbekistan 300 150 NA 150
Tajikistan 300
Turkmmenistan 300
Transmission projects
Double circuit transmission line from Puli Khumri to Chimtala SS,Kabul for
electrification of Kabul and Southern/Eastern provinces
202/220 NA 86
From chimtala to NW Substation
3/110 NA
From NW to North 10/110
From NW to Kabul 9/110 NA
Distribution Capacity
(KVA network)
Substation Capacity/
Transformers Kv/MWA
Name of Project*Project Details (Describe each project and list their
components)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: KABUL
Planned Capacity / Power Input
(MW)
Transmission Length (Kms/KV)
Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms/KV)
Substation Capacity /MVA
Project Completion
Cost (USD Mil)
Completed Project (As of 1387)
Distribution Capacity MVA/KV network)
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
From Chimtala to South Kabul 25/220
From North to diesel generator
14/110 NA
From diesel generator plant to Kabul East SS
14/110 NA
from Nanglo to East SS 44.5/110 NA
From Nanglo to Sarobi 12/110 NA
From Sarobi to Breshnakot 66/110 NA
From Nanglo 110 kV line to Pulli Charkhi
3.85/110 NA
From Breshnakot to kabul South
12/220
From 110kV to Botkhak 0.15/110
From South of Kabul to Loghar 62/220
From Nanglo to Jalalabad 96/110From 110 kV Connection to
Mahipar4.5/110 NA
Distribution projects Kabul City Network
Rehabilitation300‐20/0.4 NA
Distribution netwoks in Ozben, Tezyen and Jedgalak
10‐20/0.4 NA
Kabul City Network 481.7‐15/0.4 NA
kabul City network 120‐20/0.4 NA
Substation projects Chimtala Substation 2x160‐220/110 NAChimtala Substation 2x40‐110/20 NA
NW Substation 2x25+20‐110/15 NA/NW SS 2x40 ‐ 110/20 NA
North SS 2x40‐110/15 NA
North SS 2x40‐110/20/15 NA
Kabul East SS 25+40‐110/20/15 NABreshnakot SS 2x25‐110/20/15 NAKabul South SS 50‐220/110 NAKabul South SS 25‐220/20 NAPullicharkhi SS 2x6.3‐110/10 NABotkhak SS 2x40‐110/20 NA
350
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired Projects
Gas‐ fired projects(2) None
Coal‐ fired projects(3) None
Small Diesel/oil‐fired(1)
Charasyab destrict 1 project 34.4 KW 34.4 KW $ 36,787
Deh Sabz destrict 1 project 66 KW 66 KW $ 33,028
Gul dara destrict 1 project 10 KW 10 KW $ 20,932
Paghman destrict 27 projects 1535 KW 1535 KW $ 704,406
Qarabagh destrict 27 projects 1313 KW 1313 KW $ 617,964
Shakar dara destrict 18 projects 947 KW 947 KW $ 443,315
Project Details (Describe each project and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion
Cost (USD )
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD )
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1386) Ongoing and Future Projects (1387‐1392)
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro
Farza destrict 3 projects 49 KW 49 KW $ 83,091
Guld dara destrict 9 projects 89 KW 89 KW $ 175,724
Astalif desrtict 1 project 18 KW 18 KW $ 51,383
Paghman destrict 1 project 22 KW 22 KW $ 40,004
Qara bagh destrict 3 projects 74 KW 74 KW $ 64,373
Shakar dara destrict 5 projects 72 KW 72 KW $ 177,405
Solar energry
Bagrami destrict 3 projects 392 W 392 W $ 149,933
Char asyab 1 project 26 W 26 W $ 14,286
Deh sabz destrict 2 projects 100 W 100 W $ 38,167
Province: KABUL
Estimated project cost (USD)
Project Completion Cost (USD )
1386 Annual O&M Cost (USD)
Table 1 ‐ C Completed ( as of 13817 and Ongoing/Future Projects (1388‐1392)‐ Renewable energy Energy Database
Renewable Energy Projects*
Project Details (Describe each project
and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Planned Capacity (KW)
Installed Capacity (KW)
Actual Capacity (KW)
Inter‐ministerial Commission for Energy
Farza destrict 1 project 125 W 125 W $ 50,016
Guld dara destrict 5 projects 116 W 116 W $ 36,592
Kalakan destrict 1 project 20 W 20 W $ 10,860
Khak Jabar destrict 21 projects 804 W 804 W $ 296,604 Musayi destrict 39 projects 2065 W 2065 W $ 779,965 Paghman destrict 1 project 58 w 58 w $ 23,000
others
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation
Location/Source Description*
Total Potential (MW) Existing Production
Hydropower potential (MW) Sarobi 2 on Kabul River 200 22
Province: KABUL
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation
Location/Source Description* Total Potential Existing Production
Diesel/oil(1)
Gas(2)
Coal(3)
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: KABUL
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
B. Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Province: KABUL
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy(Renewable Energy)
Wood (Cu.M) NA
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Hydro power None
Imported Power None
Transmission projects None
Distribution projects None
Substation projects None
other projects(list) None
Inter‐ministerial Commission for Energy
Name of Project*Distribution Capacity MVA/KV network)
Planned Capacity / Power Input
(MW)
Completed Project (As of 1387)
Transmission Length (Kms)
1386 Annual O&M Cost (USD Mil)
Ongoing and Future Projects (1388‐1392)
Estimated project cost (USD Mil)
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation/Transmission/Distribution
Substation Capacity/
Transformers Kv/MWA
Installed Capacity (MW)
Responsbile Organization: MEW planning Department and DABM
Energy Database
Project Completion
Cost (USD Mil)
Actual Capacity (MW)
Project Details (Describe each project
and list their components )
Transmission Length (Kms)
Distribution Capacity
(KVA network)
Substation Capacity /MVA
Coal fired None
Gas fired None
Small Diesel/oil‐(1)
Bamyan destirict 23 projects 696 KW 696 KW $ 314,618
Kahmad destrict 1 project 25 KW 25 KW $ 15,800
Syaghan destrict 17 projects 505 KW 505 KW $ 157,030
Shibar destrict 1 project 6 KW 6 KW $ 6,000
Waras destrict 1 project 23 KW 23 KW $ 9,800
Yakwalang destrict 7 projects 139 KW 139 KW $ 76,911
Inter‐ministerial Commission for Energy Energy Database
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD )
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1386) Ongoing and Future Projects (1387‐1392)
Province: BAMYAN
Project Details (Describe each project and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD )
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired Projects
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible (3)Responsible organization:MoM, MEW/DABM
Microhydro
Bamyan destrict 19 projects 346 KW 346 KW $ 382,807
Kahmard district 20 projects 369 KW 369 KW $ 440,203
Panjab District 11 projects 135.4 KW 135.4 KW s
Sayghan district 9 projects 67.77 KW 67.77 KW $ 105,012
Shirbar destrict 35 projects 451.5 KW 451.5 KW $ 552,445
Waras district 12 projects 192 KW 192 KW $ 286,750
Yakawlang 35 projects 529 89 KW 529 89 KW $ 679 523
Ongoing and Future Projects (1388‐1392)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion Cost (USD )
1386 Annual O&M Cost (USD)
Planned Capacity (KW)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost
(USD)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ C Completed ( as of 13817 and Ongoing/Future Projects (1388‐1392)‐ Renewable energy Province: BAMYAN
Renewable Energy
Projects*
Project Details (Describe each project and list
their components)
Completed Project (As of 1387)
gdistrict
35 projects 529.89 KW 529.89 KW $ 679,523
Solar
Bamyan destrict 38 projects 2060 KW 2060 KW $ 816,784 Kahmard 4 projects 148 KW 148 KW $ 58,796
Panjab Destrict 33 projects 2235 KW 2235 KW $ 956,912
Sayghan destrict 3 projects 8 KW 8 KW $ 21,858
Shirbar destrict 805 projects 805 KW 805 KW $ 417,008
Waras destrict 50 projects 2941 KW 2941 KW $ 1,133,534 Yakawlang destrict
80 projects 2690 KW 2690 KW $ 1,234,813
others
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: BAMYAN
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy‐ Hydropower
Resources Available for Energy Generation Location/Source Description*
Total Extractable Potential, MT
Existing Production,MT
Diesel/oil(1) NA NA NA
Gas(2) NA NA NA
Coal(3)
Doab and Kalich Mines in Kuhmard District, Bamyan. Large deposits but not explored. Production started before exploration. Strength of coal is more than 7,200 kilo calories per Kg. NA
99,000 MT (1387); 55,000 MT (1386)
Ashpusta Mines in Kuhmard District, Bamyan. Strength of coal is more than 7,200 kilo calories 12,700 MT (1387); 7,700
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy‐ Coal, Gas and Oil Province: Bamyan
per Kg. 2,000,000 MT MT (1386)
(2)Responsible Organization: MOM
(3)Responsible Organization: MOM
(1)Responsible Organization: MOM
Resources Available for Energy Generation (Renewable Energy) Location/Source Description* Total Potential Existing ProductionMicro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Others NA
Province: Bamyan
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy‐ Renewable Engery
Responsible Organization: MRRD (NSP,NABDP), MEW Renewable Energy Department
Name of District1387 (2008/2009) in Thousands ('000)
Estimated 1390 (2011/2012) in Thousands ('000)
Estimated 1390 N0. of Households in Thousands('000)
Total 398.0 431.3 61.61Bamyan Center (Bamyan ) 75.5 81.8 13.64
Shebar 26.8 29.0 4.84
Saighan 21.8 23.6 3.94
Kahmard 33.1 35.9 5.98
Yakawlang 79.5 86.2 14.36
Panjab 62.0 67.2 11.20
Waras 99.3 107.6 17.93
1. 1387 figures from Central Statistics Office (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: Bamyan
Hydro power None
Imported Power None
Transmission projects
None
Distribution projects
None
Substation None
other
Project Completion Cost
(USD Mil)
Actual Capacity (MW)
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Generation, transmission and Distribution Province: Kapisa
Planned Capacity / Power Input
(MW)
No Information Available
Estimated project cost (USD Mil)
Installed Capacity (MW)
Transmission Length (Kms)
Distribution Capacity (Kv
network)
Distribution Capacity (Kv
network)
Transmission Length (Kms)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Inter‐ministerial Commission for Energy Energy Database
Name of Project*Substation Capacity/
Transformers Kv/MWA
1386 Annual O&M Cost (USD
Mil)
Project Details (Describe each project and list
their components )
Substation Capacity Kv/MWA
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired Proje Province: KAPISA
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel/oil‐fired(1)
Alasay destrict 26 projects 357 KW 357 KW $ 258,564
Hisa Alwal‐e‐ Kuhistan 24 projects 730 KW 730 KW $ 345,453
Koh band 4 projects 78 KW 78 KW $ 58,831
Mamod Raqi 5 projects 124 KW 124 KW $ 80,349
Nijrab 3 projects 57 KW 57 KW $ 32,944
45 projects 1090 KW 1090 KW $ 668,002
Planned Capacity (KW)
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects (1388‐1392)Project Details
(Describe each project and list their components)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion
Cost (USD)
Estimated project cost
(USD)
1386 Annual
O&M Cost (USD)
Inter‐ministerial Commission for Energy Energy Database
(1)Responsible organization: MEW DABM/S, MRRD(NSP,NABDP)
(3)Responsible organization:MoM, MEW/DABM
(2)Responsible organization:MoM, MEW/DABM
Province: KAPISA
MicrohydroHisa Awal‐e‐ Kuhistan
20 projects 273 KW 273 KW $ 519,250
Koh band 5 projects 45 KW 45 KW $ 46,854
Mahmod Raqi 2 projects 26 KW 26 KW $ 73,679
Nijrab destrict 76 projects 405 KW 405 KW $ 990,077
SolarHisa Dowum‐e‐ Kuhistan
4 projects 197 KW 197 KW $ 55,428
Koh band 1 projects 80 KW 80 KW $ 17,975
Nijrab destrict 10 projects 470 KW 470 KW $ 181,169
G th l
Completed Project (As of 1387)Project Details (Describe each project and list
their components)
Renewable Energy Projects*
Actual Capacity (KW)
Installed Capacity (KW)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD)
Project Completion
Cost (USD)
1386 Annual
O&M Cost (USD)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Ene
Planned Capacity (KW)
Ongoing and Future Projects (1388‐1392)
Geothermal
Wind
Wood
others
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation
Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) Gulbahar HPP on Panjser River 120 MW None
Capar HPP on Panjser River 116 MW None
Baghdara HPP 280 MW None
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy‐ HydorpowerProvince: KAPISA
Resources Available for Energy Generation
Location/Source Description* Total Potential
Existing Production
Diesel/oil(1) None
Gas(2) None
Coal3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy‐ Coal, Gas and Oil Province: KAPISA
(1)Responsible Organization:
(2)Responsible Organization: MoM
(3)Responsible Organization: MoM
MoM
Province: KAPISA
B. Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy‐ Renewable Energy
Wood (Cu.M) NA
Others
Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Province: KAPISA
Name of District1387 (2008‐2009) in Thousands ('000)
1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 392.9425.8 60.82
Kapisa Center (Mahmood Raqi)
58.463.3 9.04
Hissa-i-Duwumi Kohistan
40.944.3 6.33
Hissa-i-Awali Kohistan 61.967.1 9.58
Nijrab 102.3110.9 15.84
Koh Band 21.423.2 3.31
b 73 6
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District
Tagab 73.679.8 11.39
Alasai 34.437.3 5.33
1. 1387 figures from Central Statistics organization (CSO)2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power None
Imported Power None
Transmission projects None
Distribution projects None
Substation projects None
other projects(list)
Project Completion Cost
(USD Mil)
Actual Capacity (MW)
Project Details (Describe each project and list
their components )
Substation Capacity Kv/MWA
Substation Capacity/
Transformers Kv/MWA
Distribution Capacity
(Kv network)
Distribution Capacity (Kv network)
Transmission Length (Kms)
Transmission Length (Kms)
Planned Capacity / Power Input
(MW)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution Province: PANJSHIR
Name of Project* Estimated project cost (USD Mil)
Installed Capacity (MW)
1386 Annual O&M Cost (USD
Mil)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired Projects Province: Panjshir
Gas‐ fired projects(2) None
Coal‐ fired projects(3) None
Small Diesel/oil‐fired(1)
Bazarak destrict 1 Project 36 KW 36 KW $ 17,855
Dara destrict 1 Project 65 KW 65 KW $ 40,886
Hisa Awal‐i‐ Panjshir 1 project 120 KW 120 KW $ 50,789
Shutul 1 Project 36 KW 36 KW NA
Unaba 8 projects 239 KW 236 KW $ 250,150
(2)
Estimated project cost
(USD )
Inter‐ministerial Commission for Energy Energy Database
Name of Projects*
Project Details (Describe each project and list their components)
Completed Project (As of 1386) Ongoing and Future Projects
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost
(USD )
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Gas‐ fired projects(2)
Coal‐ fired projects(3)
(3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM
Bazaral destrict 10 projects 357 KW 357 KW 367830
Dara destrict 12 projects 331 KW 331 KW $ 585,019
Hisa Awal‐e‐ Pamjshir
47 projects 1341 KW 1341 KW $ 96,772,227
Paryan destrict 9 projects 233 KW 233 KW $ 23,302,649
Rukha destrict 11 projects 251 KW 251 KW $ 443,355
Shutul destrict 7 projects 174 KW 174 KW $ 212,011
Unaba destrict 1 project 12 KW 12 KW $ 20,000
Solar energy
P d t i t 1 j t 48 W 48 W $ 16 738
Inter‐ministerial Commission for Energy
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐Renewable EnergyProvince: Panjshir
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion Cost (USD)
1387 Annual
O&M Cost (USD)
Planned Capacity (KW)
Energy Database
Renewable Energy Projects*
Project Details (Describe each project and list
their components)
Completed Projects (as of 1387)Ongoing and Future Projects
(1388‐1392)
Estimated project cost
(USD)
Paryan destrict 1 project 48 W 48 W $ 16,738
Rukha destrict 2 projects 102 W 102 W $ 73,822
Shutul destrict 2 projects 39 W 39 W $ 31,510
Unaba destrict 7 projects 257 W 257 W $ 172,978
Wind
Wood
others
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: PANJSHIR
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy‐ Hydorpower
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy‐Renewable Energy Province: PANJSHIR
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Province:PANJSHIR
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy‐ Renewable Energy
Others
Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 No. of Households in Thousands ('000)
Total 136.7 148.1 21.16Panjsher Center (Bazarak)
17.1 18.5 2.65
Rukha 20.9 22.6 3.24
Unaba 16.3 17.7 2.52
Darah 22.7 24.6 3.51
Hissa-i- Awal (Khing) 36.4 39.4 5.63
Shutul 9.9 10.7 1.53
Paryan 13.4 14.5 2.07
1. 1387 figures from Central Statistics Office (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: PANJSHIR
‐
Inter‐ministerial Commission for Energy Energy Database Province: PARWAN
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired projects
Name of Projects*Project Details (Describeeach project and list their
components)
Completed Project (As of 1387)Ongoing and Future Projects (1388
1392)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion
Cost (USD'000l)
1386 AnnuaO&M Cost(USD'000)
l
Planned Capacity (KW)
Estimated projectcost (USD'000)
Gas‐ fired projects(2)
Coal‐ fired projects(3)
Small Diesel/oil‐fired(1)
Baghram destrict 44 projects 2561 KW 2561 KW $ 1,124,399
Charikar destrict 3 projects 157 KW 157 KW $ 73,798
Jabalusiraj destrict 9 projects 368 KW 368 KW $ 169,127
Salang destrict 3 projects 60 KW 60 KW $ 23,555
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Province: PARWA
(1388‐1392)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects
Name of Project*
Project De(Describe project an
theircomponen
tails Completed Project (As of 1387) Ongoing and Future Projects
InstaCapacit
each d list ts )
lled y (MW)
Actua TrLe
l Capacity (MW)
ansmission ngth (Kms)
Distribution Capacity MVA/KV network)
SubstatioCapacity /M
n VA
ProjeComple
Cost (USD
ct tion Mil)
1386 O&M(USD
CaPow
Annual Cost Mil)
Planned pacity / er Input (MW)
Transmission Length (Kms)
DistributionCapacity
(KVA network)
Hydro power RehabilitatiJabalsaraj
HPP
on of Small 2.4 0.5 NA
Parwan HPP 3x0.8 2.4 2.4 NA
Ghorband 3x0.1 1 NA
Imported Power
Transmission projects Pulli Khumri to
Charikar144/220 NA
Charikar to Chimtala
58/220 NA
Distribution projects Parwan Electricity 10.22-6/0.4Ghorband 0.525‐6/0.4
Substation projects Charikar SS 2x16‐220/20
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Inter‐ministerial Commission for Energy Energy Database Province: Parwan
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy
Renewable Energy
Projects*
Project Details (Describe each
project and list thecomponents)
Completed Project (As of 1387) Ongoing and Future Projects
(1388‐1392)
ir Installed Capacity (KW)
Actual Capacity (KW
ProjectCompletio
Cost (US)
n D)
1386 AnnO&M Co(USD)
ual st
PlannCapac(KW
Estimated projectcost (USD)
ed ity )
Microhydro
Bagram district 1 project 17 KW 17 KW $ 33,550
Charikar district 4 projects 174 KW 174 KW $ 33,550
Ghorband district 4 projects 42 KW 42 KW $ 131,463
Jabalusiraj district 14 projects 251 KW 251 KW $ 372,744
Kohi safi district 7 projects 47 KW 47 KW $ 119,530
Salang district 28 projects 623 KW 623 KW $ 562,280
Sayed khil district 3 projects 19 KW 19 KW $ 37,247
Shekh Ali district 16 projects 160 KW 160 KW $ 308,271
Surkhi Parsa district 44 projects 771 KW 771 KW $ 974,120
Solar energy
Charikar district 8 projects 696 W 696 W $ 344,479
Ghorband district 22 projects 1693 W 1693 W $ 714,418
Jabalusiraj district 9 projects 504 W 504 W $ 195,682
Sayed khil district 16 projects 763 KW 763 KW $ 259,950
Shekh Ali district 9 projects 611 KW 611 KW $ 195,205
Surkhi Parsa district 35 projects 1413 KW 1413 KW $ 642,696
Wind NA
Wood NA
others NoneResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy‐ Hydropower Province: PARWAN
B. Resources Available for Energy Generation
Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Responsible Organiztion:DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy‐ Coal, Gas and Oil Province: PARWAN
B. Resources Available for EnergyGeneration
Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
(1)Responsible Organization: MoM
(2)Responsible Organization: MoM
(3)Responsible Organization: MoM
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy‐ Renewable Energy Province: PARWAN
B. Resources Available foEnergy Generation ( Renewable Energy)
r
Location/SouDescription
rce *
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
88.1
Inter‐ministerial Commission for Energy Province: ParwanEnergy Database
Table 3 ‐ Population Data by District
Name of District1387 (2008‐2009) in Thousa('000)
nds Estimated 1392012) in Thous('000)
0 (2011‐ands
Estimated 1390 No. of Households in Thousands ('000)
Total 589.7639.0 91.29
Parwan Center (Charikar )
158.8172.1 24.58
Sayyid Khel 41.545.0 6.42
Jabulussaraj 58.163.0 8.99
Salang 23.725.7 3.67
Shinwari 37.440.5 5.79
syahgird syahgird ('Ghurband)
88.195.5 13.64
Bagram 94.3102.2 14.60
Koh- i- Safi 28.230.6 4.37
Shaykh Ali 22.424.3 3.47
Surkhi parsa 37.240.3 5.76
1. 1387 figures from Central Statistics organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power Chak ‐I Wardak HPP 3x1.1 0.5 NA NA3.3 (after
rehabilitation)NA
Diesel GeneratorsMaidanshar Diesel
plant0.5 0.5 NA NA
Transmission projects
Distribution projects Maidanshar Distribution 1-0.4
NA
Maidanshar 4‐20/0.4 NA
Substation projects
other projects(list)
Transmission Length (Kms)
Responsbile Organization: MEW planning Department and DABM
1386 Annual O&M Cost (USD Mil)
Actual Capacity (MW)
Energy Database Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution Projects Province: WARDAK
Installed Capacity (MW)
Project Completion Cost (USD Mil)
Transmission Length (Kms)
Substation Capacity /MVA
Inter‐ministerial Commission for Energy
Name of Project*
Project Details (Describe each
project and list their components )
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Planned Capacity / Power Input
(MW)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Distribution Capacity MVA/KV
network)
Province: WARDAK
Gas‐ fired projects(2)
Coal‐ fired projects(3)
Small Diesel/oil‐fired(1)
Jalrez destrict 14 projects 906 KW 906 KW $ 402,860 NA
Markazi behsud destrict 4 projects 148 KW 148 KW $ 37,934 NA
Maydan Shahr destrict 31 projects 1408 KW 1408 KW $ 543,684 NA
Nirkh destrict 308 projects 308 KW 308 KW $ 202,579 NA
Sayed Abad destrict 66 projects 3016 KW 3016 KW $ 1,262,128 NA
Project Details (Describe each project and list their components)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion
Cost (USD)
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired projects
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD)
1386 Annual O&M Cost (USD)
Planned Capacity (KW)
Name of Projects*
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
MicrohydroChaki wardak 2 projects 20 KW 20 KW $ 34,680
Deh Mirdad 12 projects 78 KW 78 KW $ 203,056
Jalriz destrict 7 projects 65 KW 65 KW $ 156,079
Markazi behsud 11 projects 145 KW 145 KW $ 261,442
Maydan Shahr destrict 4 projects 40 KW 40 KW $ 51,543
Nirkh destrict 1 project 10 KW 10 KW $ 22,200
Solar energy
Chaki wardak 53 projects 1433 W 1433 W $ 662,320
Deh Mirdad 33 projects 762 W 762 W $ 396,019
Hisa awali behsud 26 projects 373 W 373 W $ 157,217
Inter‐ministerial Commission for Energy
Province: WARDAK
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (KW)
Actual Capacity (KW)
Energy Database Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ renewable energy
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Planned Capacity (KW)
Estimated project cost (USD)
Hisa awali behsud 26 projects 373 W 373 W $ 157,217
Jalriz destrict 20 projects 981 W 981 W $ 446,675
Markazi behsud 75 projects 1920 W 1920 W $ 1,212,462
Maidan Shahr 10 projects 837 W 837 W $ 218,079
Nirkh destrict 56 projects 2891 W 2891 W $ 1,159,148
Sayed Abad 52 projects 4052 W 4052 W $ 1,910,613
Wind None
Wood None
othersResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
B. Resources Available for Energy Generation
Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: WARDAK
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy‐ Hydropower
B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) NA
Gas2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy‐ Coal, Gas and Oil Province: WARDAK
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
B. Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: WARDAK
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy‐ Renewable Energy
Others NoneResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 No. of Households in Thousands ('000)
Total 531.2575.6 82.23
Wardak Center (Maidan Shahr)
36.639.7 5.67
Jalrez 48.252.2 7.46
Hissa-i- awali Behsud 33.736.5 5.22
Markaz-i- Behsud 108.6117.7 16.81
Daimir Dad 28.230.6 4.37
Jaghatu 41.6
Inter‐ministerial Commission for Energy Province: WardakEnergy Database
Table 3 ‐ Population Data by District
Jaghatu 41.645.1 6.44
Chak-i- Wardak 76.883.2 11.89
Sayyid Abad 105.7114.5 16.36
Nerkh 51.856.1 8.02
2. 1390 figures based on growth rates provided by the CSO (7 members/household)
1. 1387 figures from Central Statistics Organization (CSO)
Hydro power None
Imported Power power from Uzbekistan 7626 (because of low substation
capacity)NA
Transmission LinesTransmission line from
Hairatan‐Mazar80 40 84/110 NA
Transmission line from Hairatan‐Naibabad‐Mazar
300 76.5/220kV NA
Transmission Line from Naibabbad ‐Khulm‐ 600 78/220kV NA
From Andkhoy to Shebergan and
Sheberghan to Naibabad (220kV)
300MW 231/220kV NA
Transmission line from Cod‐e‐Barq to Mazar
17.5/35kV NA
Transmission Line from Cod‐e‐Barq to Balkh 14.2/35kV NA
Transmission Line from 110kV substation to 35 18/35kV NA
Estimated project
cost (USD Mil)
Distribution Capacity MVA/KV network)
Transmission Length (Kms)
Project Completion
Cost (USD Mil)
Actual Capacity (MW)
Transmission Length (Kms)
1386 Annual O&M Cost (USD Mil)
Project Details (Describe each project and list their
components)
Substation Capacity /MVA
Planned Capacity / Power Input
(MW)
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: BALKH
Installed Capacity (MW)
Energy Database
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Inter‐ministerial Commission for Energy
Name of Project*Substation Capacity/
Transformers Kv/MWA
Distribution Capacity (KVA
network)
0kV substation to 35kV substation in Mazar
8/35kV NA
Distribution projects Balkh Electricity Authority 134.9‐6/0.4 NA
Hairatan 28.763‐ NA
Khulm 7.367‐6/0.4 NA
Mazare‐Sharif 40‐20/0.4 NA
Khulm 8‐20/0.4 NA
Substation projects Mazar32‐
110/35/6NA
Mazar 32‐35/6 NA
Mazar 50‐220/110 NA 2 circuits; 300 MW
mazar 16‐220/20 NA
Mazar 50‐220/20 KV NA
Khulm 16‐220/20kV NA
Responsbile Organization: MEW planning Department and DABM
Coal‐ fired projects(3) None
Gas‐ fired projects(2) Gas from Sheberghan for Cod‐e‐Barq Fertilizer plant
48 MW 12 MW $7,788,000 36 MW NA
Diesel/oil‐fired(1)
Chimtala destrict 19 Projects 1137 KW 1137 KW $ 481,468
Dawlat abad destrict 47 Projects 3585 KW 3585 KW $ 2,123,771
Kishindih Destrict 16 projects 1236 KW 1236 KW $ 363,416
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD )
Table 1 ‐ B Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392)
(2) Responsible organization: Cod‐e‐Barq Fertilizer Plant
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387) Ongoing and Future Projects
(1)Responsible organization: MRRD (NSP)
Project Details (Describe each project and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
)
Microhydro
Kishindih destric 4 projects 60 KW 60 KW $ 83,195 NA NA
Sholgara destrict 3 projects 50 KW 50 KW $ 82,314 NA NA
Zari destrict 6 projects 100 KW 100 KW $ 227,669 NA NA
Solar NA NA
Chahar Bolak destrict
1 project 58 KW 58 KW $ 26,000 NA NA
Chahar Kint destrict
12 projects 337 KW 337 KW $ 157,247 NA NA
Khulm destrict 3 projects 71 KW 71 KW $ 36,769 NA NA
Nahri Shahi destrict 1 project 55 KW 55 KW $ 20,178 NA NA
Sholgara destrict 20 projects 1658 KW 1658 KW $ 20,178 NA NA
Z i d t i t 5 j t 569 KW 569 KW $ 307 268 NA NA
Estimated project cost (USD Mil)
Project Completion Cost (USD
Mil)
1386 Annual O&M Cost (USD Mil)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energ
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)
Planned Capacity (MW)
Installed Capacity (MW)
Actual Capacity (MW)
Province: Balkh
Zari destrict 5 projects 569 KW 569 KW $ 307,268 NA NA
Wind None
Wood NA
others NA
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description*
Total Potential (MW)
Existing Production (MW)
Hydropower potential (MW)Polebarak Akhkobrok in Sholgara
District 100 MW None
Chasme Shafa District 20 MW None
Province: Balkh
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: Balkh
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: BALKH
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy ‐ (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Province: Balkh
Name of District
1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 1144.81240.6 177.22
Balkh Center (Mazar-i- sharif)
326.1353.4 50.48
Dehdadi 61.366.4 9.49
Nahri Shahi 40.944.3 6.33
Marmul 10.311.2 1.59
Khulm 63.568.8 9.83
Kaldar 18.219.7 2.82
Shortepa 36.039.0 5.57
Dawlat Abad 95.0102.9 14.71
Balkh 108.4117 5 16 78
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District
117.5 16.78Char Bolak 73.6
79.8 11.39Chimtal 83.5
90.5 12.93Sholgara 103.3
111.9 15.99Char kent 40.5
43.9 6.27Kishindeh 44.3
48.0 6.86Zari 39.9
43.2 6.18
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power
Imported Power Import from Turkmenistan
80 40 NA NA
Transmission projects Transmission line from Jarqudook to 72/110kV NA
Transmission line fro Aquina to Andkhoy
42/500 NA
Transmission line from Andkhoy to
sheberghan69/220kV NA
Transmission line from Andkhoy to
Maimana137/110kV NA
Transmission line from Turkmenistan b d A dkh
42/110kV NA
Distribution projects Qarkin distribution 10‐20/0.4 NA
Completed Project (As of 1387)
Installed Capacity (MW)
Estimated project
cost (USD Mil)
Project Completion
Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: FARYAB
Name of Project*
Project Details (Describe each
project and list their components )
Actual Capacity (MW)
Substation Capacity/
Transformers Kv/MWA
1386 Annual O&M Cost (USD Mil)
Ongoing and Future Projects (1388‐1392)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Substation Capacity /MVA
Transmission Length (Kms)
Distribution Capacity (KVA
network)
Distribution projects 0 0/0.4 NA
khamab distribution 10‐20/0.4 NA
Andkhoy distribution 21.321‐6/0.4 NA
Faryab Distribution 12.85‐20/0.4 NA
Substation projects Andkhoy substation 10‐110/.6 NA
Andkhoy substation 400‐500/220 NA
Jumabazar 8‐110/20 NA
ShrienTagab 10‐110/20 NA
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Diesel/oil‐fired(1) None None
Gas‐ fired projects(2) None None
Coal‐ fired projects(3) None None
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
Mil)
Project Details (Describe each project and list their components)
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro
Almar destrict 1project 6.4 KW 6.4 KW $ 11,600 None
Solar Energy Almar destrict 2 projecrts 276 W 276 W $ 65,707 NoneShiring Tagab 4 projects 281 W 281 W $ 76,381 None
Geothermal None
Wind None
Wood None
others None
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Installed Capacity (KW)
Actual Capacity (KW)
Province: FARYAB Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energ
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Responsible organization: MRRD(NSP NABDP) DABM/S MEW Renewable Engergy DepartmentResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: FARYAB
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: FARYAB
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
B. Resources Available for Energy Generation
( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Mini‐hydro (KW) NA
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Province: FARYAB
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
Wood (Cu.M) NA
Others NAResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 884.4
958.4 136.91Faryab Center (Maimana)
71.5
77.5 11.07Pashtun kot 171.7
186.1 26.58Khwaja Sabz Poshi Wali 46.2
50.1 7.15Almar 63.9
69.2 9.89Qaisar 129.6
140.4 20.06Kohistan 49.6
53.7 7.68Gurziwan 69.0
74.8 10.68Bil hi h 47 5
Energy DatabaseTable 3 ‐ Population Data by District Province: FARYAB
Bilchiragh 47.5
51.5 7.35Shirin Tagab 74.1
80.3 11.47Dawlat Abad 44.1
47.8 6.83Qaram Qul 17.9
19.4 2.77Khani Charbagh 21.1
22.9 3.27Andkhoy 35.3
38.3 5.46Qurghan 42.9
46.5 6.64
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: JAWZJAN
*Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Hydro power
Gas‐fired power generation
Sheberghan Gas Power Project
105 200
Imported Power Electricity from 80 40 NA NA
Transmission projects from Andkhoy to Jarqudook SS
72/110 NA NA
from Jarqudook to Khajadoko
3/110 NA NA
from Jarqudook to Sarepul
58/110 NA NA
From Sheberghan to Mazar e Sharif
162/220 NA
From Jarqudook to Mazar e Sharif
142/110 (not operating now)
NA NA
Distribution projects Jaujhan Electricity
Authority 35 9-6/0 4NA NA
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: JAWZJAN
Name of Project*
Project Details (Describe each
project and list their components )
Planned Capacity / Power Input
(MW)
Transmission Length (Kms)
Substation Capacity MVA/KV
Project Completion
Cost (USD Mil)
Completed Project (As of 1387)
Distribution Capacity MVA/KV network)
Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms)
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Authority 35.9-6/0.4Jaujhan Electricity
Authority16‐20/0.4 NA
NA
Substation projects Jarqudook/Shebergh 32‐110/35/6 NA NA
Sheberghan SS 9‐35/6 NA NA
Khajadoko SS 2.5‐110/6 NA NA
Sheberghan SS 2x50‐220/110 NA
Sheberghan SS 16‐220/20 NA
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None None None
Gas‐ fired projects(2) None None None
Small Diesel/oil‐fired(1) NA
Darzab destrict 16 projects 447 KW 447 KW $ 367,456
Fayzabad destrict 1 projecs 20 KW 20 KW $ 8,264
Mardyan destrict 2 projects 60 KW 60 KW $ 47,216
Mingajik destrict 13 projects 541 KW 541 KW $ 485,740
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387Ongoing and Future Projects
(1388‐1392)
Province: JAWZJAN
Project Details (Describe each project and list their components)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion Cost (USD
Mil)
(3)Responsible organization:MoM, MEW/DABM
* Insert rows as necessary under each category
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM
Microhydro
Solar EnergyDarzab destrict 3 projects 241 W 241 W $ 90,085
Khamyab destrict 1 projecs 0 0 $ 32,219
Qush Tepa desrtict 1 projecs 0 0 $ 25,319
Geothermal
Province: JAWZJAN
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Estimated project cost (USD,000)
Project Completion
Cost (USD'000)
1386 Annual O&M Cost (USD,000)
Installed Capacity (KW)
Actual Capacity (KW)
WindWoodothersResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description*
Total Potential (in Million Cubic Meters or mCUM)
Approved ExtractableQuantity (in Million Cubic Meters or mCUM)
Current Production/Day (in Million Cubic Meters or mCUM)
Gas(2)
Yatim Taq 7.5 mCUM 5.9 mCUMKhwaja Gogirdak 57.8 mCUM 54.87 mCUM
Jarquduq 26.79 mCUM 26.0 mCUM
Subtotal Yatim Taq Block 92.09 mCUM 86.77 mCUM 0.4 mCUM/DayKhwaja Bolan 2.54 mCUM 2.5 mCUM 0
Juma 14.0 mCUM 21.4 mCUM 0Jangal‐e‐ Kalan 8.1 mCUM 8 mCUM 0Bashi Koot 12.7 mCUM 5.9 mCUM 0
Table 2‐B Resources Available for Energy (Coal, Gas and Oil)
0.4 mCUM/Day
Three Gas Fields in the Province , namely, Yatim Taq, Khwaja Gogirdak, and Jarquduq are classified as one Block which is presently producing
gas
Inter‐ministerial Commission for EnergyEnergy Database
12.7 mCUM 5.9 mCUM 0Cheghchi 3.0 mCUM 3 mCUM 0
Total Gas Deposits 132.43 mCUM 127.57mCUM 0.4 mCUM/Day
Coal3) No Deposits in Province
Diesel/oil(1) No Deposits in Province
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Province: Jawzjan
Resources Available for Energy Generation
( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
province: JAWZJAN
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 476.7516.6 73.80
Jawzjan Center (Sheberghan)
149.5162.0 23.14
Aqchah 53.958.4 8.34
Faizabad 37.941.1 5.87
Mardyan 35.138.0 5.43
Mingajik 39.042.3 6.04
Qarqin 22.224.1 3.44
Khamyab 12.713.8 1.97
Qush Tepa 21.423.2 3.31
Darzab 44.748.4 6.92
Khwaja Dukoh 24.526.5 3.79
Khanaqa 35.838.8 5.54
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Inter‐ministerial Commission for Energy Province: JawzjanEnergy Database
Table 3 ‐ Population Data by District
Hydro power
Diesel Generator Diegel generator 1.6 1.6 NA
Imported Power
Transmission projects one circuit from
Naibabad to Aybak178/220 NA
From Aybak to Pulli khumri
86/220 NA
Distribution projects Aybak distribution 2‐20/0.4 NA
Aybak distribution 16‐20/0.4 NA
Substation projects Aybak SS 16‐220/20 NA
Completed Project (As of 1387)
Substation Capacity /MVA
Installed Capacity (MW)
1386 Annual O&M Cost (USD Mil)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: SAMANGAN
Name of Project*
Project Details (Describe each
project and list their components )
Project Completion Cost (USD
Mil)
Ongoing and Future Projects (1388‐1392)
Planned Capacity / Power Input
(MW)
Actual Capacity (MW)
Transmission Length (Kms)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired projects
Coal‐ fired projects(3) None None
Gas‐ fired projects(2) None None
Diesel/oil‐fired(1)
Dara Sufi Bala 13 projects 345 KW 345 KW $ 173,862
Dara Sufi Payin 6 projects 155 KW 155 KW $ 68,316
Feroz Nakhchir 6 projects 180 KW 180 KW $ 98,498
Hazrati Sultan 17 projects 515 KW 515 KW $ 324,958
Khuram wa sarbagh 8 projects 182 KW 182 KW $ 140,968
Inter‐ministerial Commission for Energy
Estimated project cost
(USD)
1386 Annual O&M Cost (USD)
Planned Capacity (KW)
Renewable Energy
Projects*
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)Project Details
(Describe each project and list their components)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion
Cost (USD)
Energy Database
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro None
Aibak Destrict 4 projects 70 KW 70 KW $ 178,832
Dara Sufi Bala 10 projects 171 KW 171 KW $ 396,590
Khuram wa Sarbagh
15 projects 632 KW 632 KW $ 459,959
Ruyi Du Ab 21 projects 214 KW 214 KW $ 700,291
Solar Energy None
Dara Sufi Bala 3 projects 179 W 179 W $ 78,480 Dara Sufi Payin 3 projects 11 W 11 W $ 7,101
Geothermal None None
Actual Capacity (KW)
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Energy Database Inter‐ministerial Commission for Energy
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Installed Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Rene wable Energy
Wind None None
Wood None None
others None None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: SAMANAGAN
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description*Total Extractable Potential Existing Production
Diesel/oil(1)
No oil deposits
Gas(2)
No gas deposits
Coal(3)
Dahantor Mines, strength of more than 7000 kilo calories/kg 8,000,000 MT 2,000 MTShabashak Mines in Dara e Souf District, strength of more than 7,600 kilo calories/kg 4,000,000 MT
No existing production; 35,000 MT (planned for 1387)
Darwazah Mines in Dara e Souf District, strength of more than 8,000 Kilo calories/Kg 16,000,000 MT NALaili Mines in Dara e Souf
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy ‐ Coal, Gas and Oil) Province: SAMANGAN
District, strength of more than 8,000 Kilo calories/Kg 12,000,000 MT NA
Sarasia Mines in Dara e Souf District, strength of about 7,400 Kilo calories/Kg 4,700,000 MT NA
(1)Responsible Organization:
(2)Responsible Organization: MoM
(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: SAMANGAN
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 344.4373.2 53.32
Samangan Center (Aybak)
93.2101.0 14.43
Hazrat –i-Sultan 37.740.9 5.84
Feroz Nakhcheer 11.912.9 1.84
Dara –i-soof-i- Bala 58.863.7 9.10
Dara –i-soof-i- Payin
65.070.4 10.06
Rui- Do- Ab 41.545.0 6.42
Inter‐ministerial Commission for Energy Province: SAMANGANEnergy Database
Table 3 ‐ Population Data by District
Khuram Wa Sarbagh 36.339.3 5.62
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power
Imported Power
From Turkmenistan 40 16 NA
Transmission projects From Sheberghan to Saripul 58/110kV NA
Distribution projects Saripul distribution network 16‐6/0.4 NA
Saripul distribution network 16‐20/0.4kV NA
Substation projects Saripul SS 16‐110/35/6 NA
Saripul SS 16‐110/20 NA
other projects(list)
Project Details (Describe each project and list their components)
Completed Project (As of 1387)
Distribution Capacity
(KVA network)
Substation Capacity/
Transformers Kv/MWA
Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Substation Capacity /MVA
Project Completion Cost (USD
Mil)
Transmission Length (Kms)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: SAR‐E‐PUL
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Name of Project* Estimated project cost (USD Mil)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired projects
Diesel/oil‐fired(1)
Kohistanat Destrict 2 projects 100 KW 100 KW $ 43,195
Sangcharak Destrict 4 projects 200 KW 200 KW $ 82,403
Sari Pul City 1 projects 50 KW 50 KW $ 20,833
Sayyad Destrict 11 projects 484 KW 484 KW $ 274,976
Gas‐ fired projects(2) None
Coal‐ fired projects(3) None
Inter‐ministerial Commission for Energy
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Name of Projects*
Completed Project (As of 1387Ongoing and Future Projects
(1388‐1392)Project Details (Describe each project and list their components)
Installed Capacity (MW)
Province: Sar‐e‐pulEnergy Database
Actual Capacity (MW)
Project Completion Cost (USD
Mil)
Planned Capacity (MW)
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewabl Energy
Microhydro
Balkhab destrict 23 projects 307 KW 307 KW $ 346,517
Kohistanat 2 projects 35 KW 35 KW $ 25,199
Geothermal None
Wind None
Wood None
others None
Installed Capacity (KW)
Province: SAR‐E‐PUL
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Actual Capacity (KW)
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: SAR‐E‐ PUL
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation
Location/Source Description*
Total Potential (Million Metric Tons, mMT)
Approved Extractable Quantity (Million Metric Tons, mMT)
Existing Production (Million Metric Tons, mMT)
Diesel/oil(1)
Three (3) oil fields in Angoot, Aqdarya and Qashqary are classified as Qashqary Block which is presently under bidding Angoot 7.10 mMT 2.06 mMT 0
Aqdarya 5.96 mMT 1.84 mMT 0
Qashqary 19.60mMT 6.38mMT 0
Subtotal Qashqary Block 32.66mMT 10.28mMT 0
Bazar Kami 1.65mMT 0.61mMT 0
Ali Gul 0.58mMT 0.17mMT 0
Zamarud Sai 9.19mMT 3.40mMT 0
Total Potential and Approved Extractable Quantity for all Mines 44.08mMT 14.46mMT 0
(2)
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: SAR‐E‐PUL
Gas(2) No Deposits
Coal(3) No Deposits
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Province: SAR‐E‐PUL
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
Wood (Cu.M) NA
Others NA
Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 496.9
538.5 76.92Saripul Center (Sar‐i‐Pul)
140.3
152.0 21.72Sozma Qala 45.0
48.8 6.97Sayyad 49.7
53.9 7.69Kohistanat 72.8
78.9 11.27Balkhab 45.8
49.6 7.09Sancharak 91.7
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: SAR‐E‐PUL
99.4 14.20Gosfandi 51.6
0.00
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: LAGHMA
Hydro power Baharak micro hydropower
0.2 0.145 NA
Faizabad HPP 0.255 0.05 NA
Baharak Small HPP 2.1 $11.80
Transmission projects From Taloqan to Faizabad 175/220 NA
From Baharak to Faizabad 70/35
Distribution projects
Distribution grid to connect Baharak
Hydropower to Baharak and Jurm districts
Baharak distribution network
2‐20/0.4 NA
F i b d di t ib ti
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Estimated project cost (USD Mil)
Energy Database Inter‐ministerial Commission for Energy
Name of Project*Project Details
(Describe each project and list their components )
Province: BADAKHSHAN
Substation Capacity/
Transformers Kv/MWA
Transmission Length
(Kms/KV)
Distribution Capacity (KVA
network)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Substation Capacity /MVA
Project Completion Cost (USD
Mil)
Faizabad distribution network
5‐20/0.4 NA
Substation projects Faizabad SS 16‐220/20 NA
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3)
Gas‐ fired projects(2)
Small Diesel/oil‐fired(1)
Faiz Abad city 4 projects 490 KW 490 KW $ 108,106
Shghanan destrict 1 project 25 KW 25 KW $ 17,923
Yamgan (Girwan) 1 project 40 KW 40 KW $ 12,000
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)Project Details (Describe each project and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
Mil)
(3)Responsible organization:MoM, MEW/DABM (2)Responsible organization:MoM, MEW/DABM (1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) (Renewable Energy) Province: BADAKHSHAN
MicrohydroArghanj Khwa 3 projects _ _ $ 38,200
Argo detsrict 18 projects 471 KW 471 KW $ 485,273 Baharak destrict 30 projects 424 KW 424 KW $ 621,397 Darwaz destrict 2 projects 28 KW 28 KW $ 33,600 Faiz Abad city 2 projects 34 KW $ 83,115 Ishkashim destrict 7 projects 125 KW $ 134,200 Jurm destrict 8 projects 214 KW $ 228,200 Khash destrict 5 projects 115 KW $ 227,800
Kishm destrict 1 project 22 KW
Kuhistan destrict 7 projects 86 KW $ 152,699
Kuf Ab 4 projects 74 KW $ 149,200
Kuran wa Munjan 9 projects 109 KW $ 234,000
Ragh destrict 13 projects 127 KW $ 240,673
Shiki destrict 3 projects 115 KW $ 71,200
Shuhada destrict 17 projects 218 KW $ 295,583
Tagab (Kishmi Bala) 3 projects _ _ $ 44,400
Tishkan destrict 3 projects _ _ $ 57,453
Warduj destrict 30 projects 396 KW 396 KW $ 519,970
Yaftali Sufla destrict 3 projects 24 KW 24 KW $ 68,478
Yamgan (Girwan) 4 projects 165 KW 165 KW $ 103,745
Zebak Destrict 10 projects 78 KW 78 KW $ 97,800
Future Various Micro HPP Projects
Various 0.5 MW NA
Solar EnergyArgo detsrict 10 projects 588 W $ 334,400 Baharak destrict 5 projects 571 W $ 128,600
Faiz Abad city 9 projects 989 W $ 227,752 Ishkashim destrict 1 project 46 W $ 15,200 Khash destrict 4 projects 630 W $ 206,000 Kishm destrict 3 projects 396 W $ 113,089 Kuhistan destrict 7 projects 219 W $ 81,242
R h d t i t 4 j t 481 W $ 31 881
Planned Capacity (MW)
Installed Capacity
Actual Capacity
Estimated project cost (USD Mil)
Project Completion Cost (USD
Mil)
1386 Annual O&M Cost (USD Mil)
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Ragh destrict 4 projects 481 W $ 31,881
Shahri buzurg 11 projects 1109 W $ 311,807
Yaftali Sufla destrict 3 projects 152 W $ 55,588
Zebak Destrict 4 projects 143 W $ 74,200
Wind none
Wood none
others none
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description*
Total Potential (MW)
Existing Production(MW)
Hydropower potential (MW) Khurabad District on Kokcha River 350 None
Faizabad District on Kokcha River 200 None
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Province: BADAKHSHAN
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: BADAKHSHAN
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: BADAKHSHAN
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands
('000)1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands
('000)
Total 845.9916.7 130.95
Badakhshan center (Faiz Abad)
59.864.8 9.26
Yaftal- i-Sufla 48.152.1 7.45
Argo 71.377.3 11.04
Darayim 56.060.7 8.67
Khash 34.637.5 5.36
Jurm 34.137.0 5.28
Wardooj 19.921.6 3.08
Baharak 26.228.4 4.06
Shuhada 31.434.0 4.86
Kohistan 15.116.4 2.34
Yawan 29.532.0 4.57
Shahri Buzurg 47.651.6 7.37
Kishm 73.579.6 11.38
Tagab 25.5
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: Badakshan
Tagab 25.527.6 3.95
Tashkan 27.229.5 4.21
Kiran Wa Menjan
8.79.4 1.35
Zebak 7.17.7 1.10
Eshkashim 12.613.7 1.95
Wakhan 13.614.7 2.11
Shighnan 25.327.4 3.92
Arghanj Khwah 14.715.9 2.28
Raghistan 36.039.0 5.57
Khwahan 15.116.4 2.34
Kufab 20.422.1 3.16
Yamgan 23.425.4 3.62
Darwaz- i- Bala ( Nesay)
21.122.9 3.27
Darwaz-i- Payin (Mamay)
24.126.1 3.73
Shiki 24.026.0 3.72
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power Hydropower in Puli‐e‐
Khumri canal9 7 NA
Hydropower in Puli‐e‐Khumri canal by Cement Factory
4.8 4.8 NA
Imported Power from Tajikistan
12 12 NA
Transmission projects
Transmission Line from Kunduz to
Baghlan‐Puli Khumri104/220 NA
Transmission Line from Samangan to
Puli‐e Khumri86/220kV NA
Transmission Line from Pulli Khumri to
Charikar144/220kV NA
Distribution projects Puli‐e‐ Khuri city ,new
Baghlan and old Baghlan
25.308/6kV NA
Puli‐e‐ Khuri city ,new Baghlan and old
Baghlan40/20kV NA
Project Details (Describe each project
and list their components)
Completed Project (As of 1387)
Transmission Length
(Kms/KV)
Distribution Capacity MVA/KV network)
1386 Annual O&M Cost (USD Mil)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: BAGHLAN
Name of Project*Substation Capacity /MVA
Project Completion Cost (USD
Mil)
Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Planned Capacity / Power Input
(MW)
Transmission Length
(Kms/KV)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Actual Capacity (MW)
Distribution network in Khanjan/Doshi
4/20kV NA
Substation projects Puli‐e‐ Khumri 16‐220/20
Puli‐e‐ Khumri 16‐220/20 NA
Puli‐e‐ Khumri 25‐220/20 NA
Baghlan 4‐220/20 NA
Khanjan
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) Province: BAGHLAN
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel/oil‐fired(1)
Andarab district 2 projects 55 KW 55 KW $ 42,607
Dahana‐i‐Ghori district 2 projects 41 KW 41 KW $ 49,960
Nahrin District 14 projects 874 KW 874 KW $ 369,322
Ongoing and Future Projects (1388‐1392)
(2)Responsible organization:MoM MEW/DABM(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
Project Details (Describe each project and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
Mil)
Inter‐ministerial Commission for Energy Energy Database
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387)
(3)Responsible organization:MoM, MEW/DABM (2)Responsible organization:MoM, MEW/DABM
Microhydro
Andarab district 21 projects 422 KW 422 KW $ 809,143 Dahana‐i‐Ghori District
2 project 22.5 KW 22.5 KW $ 46,378
Dushi district 3 projects 21.74 KW 21.74 KW $ 170,784 Farang wa Gharu district
6 projects $ 221,423
Guzargah‐i‐Noor district
12 projects 10 KW 10 KW $ 301,600
Khust wa firing district
7 projects $ 243,200
Khwaja hijran (jilga nahin)
1 project $ 36,808
Tala wa barfak 1 project $ 52,000 Khinjan district 7 projects 147 KW 147 KW $ 281,744
SolarAndarab district 6 projects 320 W 320 W $ 126,773 Baghlan‐i‐Jadid 11 projects 409 W 409 W $ 206,969 Dahana‐i‐Ghori District
1 project 43 W $ 16,069
Dushi district 19 projects 1332 W 1332 W $ 537,202 Khinjan district 2 project 206 W 206 W $ 86,156 Khwaja hijran (jilga nahin)
5 projects 212 W 212 W $ 109,688
Nahrin district 5 projects 243 W 243 W $ 94,044 Tala wa barfak 17 projects 1374 W 1374 W $ 525,725 Puli Khumir city 1 project 62 W 62 W $ 28,000
Wind NA
Planned Capacity (MW)
Substation Capacity/
Transformers Kv/MWA
Installed Capacity (MW)
Actual Capacity (MW)
Estimated project cost (USD Mil)
Project Completion Cost (USD
Mil)
1386 Annual O&M Cost (USD Mil)
Province: BAGHLAN Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy
Inter‐ministerial Commission for Energy Energy Database
Renewable
Energy Projects*
Project Details (Describe each project and list
their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Wood NA
others
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) Kilagai HPP on Baghlan River 60 None
Province: BAGHALAN
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description*
Total Extractable Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3)
Karkar Mines in Pulikhumri District, Baghlan. Coal strength varies from 7,900‐7,000 kilo calorie/Kg. 3,200,000 MT
20,833 MT (1387); 20,566 MT (1386)
Doodkash Mines in Pulikhumri District, Baghlan. Coal strength varies from 7,900‐7,000 kilo calorie/Kg. 1,040,000 MT
12,350 MT (1387); 11,300 MT (1386)
.Tala o Barfak Mines in Baghlan. Quality of coal not available.
Large deposits but not explored
40,200 MT (1387); 29,300 MT (1386)
Ahendara Mines in Pulikhumri District, Baghlan. Coal strength not available. No exploration done
5,200 MT (1387); 6,100 MT (1386)
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy‐ Coal, Gas and Oil) Province :BAGHLAN
p
Nahrayn Mines in Baghlan. Coal strength not available.
Large deposits but not explored
40,650 MT (1387); 31,900 MT (13860
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
B. Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: BAGHLAN
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy ( Renwable Energy)
Others NA
Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 804.0871.3 124.46
Baghlan Center (Pul ‐i‐Khumri)
188.0203.7 29.10
Baghlan‐i‐ Jadeed 154.9167.9 23.98
Dahana‐i‐Ghuri 53.558.0 8.28
Dushi 60.865.9 9.41
Khinjan 27.730.0 4.29
Andarab 23.225.1 3.59
Nahreen 62.868.1 9.72
Burka 47.951.9 7.42
Tala Wa Barfak 27.529.8 4.26
Pul –i‐Hisar 25.227.3 3.90
Deh Salah 29.1
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: BAGHLAN
31.5 4.50Jalga 21.7
23.5 3.36Khost Wa Firing 57.4
62.2 8.89Firing Wa Gharu 15.1
16.4 2.34Gozargah‐i‐ Noor 9.2
10.0 1.42
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power Khanabad HPP 2 0 2
Khanabad HPP 10
Imported Power From Tajkistan 60 40 NA
From Tajkistan 300/220KV NA
Transmission projects From Sherkhan to
Kunduz60/110kV NA
From Sherkhan to Kunduz
60/220kV NA
from switching station to Imam
Sahib20/110KV NA
from Sherkhan bandhar to qala‐zal
20/110kV NA
Kunduz to Puli‐khumri
104/220kV NA
From Kunduz to Taloqan
67/220kV NA
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Substation Capacity /MVA
Project Completion
Cost (USD Mil)
Actual Capacity (MW)
Transmission Length (Kms)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: KUNDUZ
Planned Capacity / Power Input
(MW)
Installed Capacity (MW)
Distribution Capacity (KVA
network)
Distribution Capacity MVA/KV network)
Transmission Length (Kms)
1386 Annual O&M Cost (USD Mil)
Name of Project*
Project Details (Describe each
project and list their components)
Taloqan/
Distribution projects Kunduz city 44/6 and10 NA
Imam sahib 4/20kV NA
Qala Zal and Aq teipa 8/20kV NA
Kunduz city 25/20kV NA
Substation projects Kunduz city 25‐220/20 NA
Imam sahib 4‐110/20 NA
Qala Zal and Aq teipa 16‐110/20 NA
Responsbile Organization: MEW planning Department and DABM
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel/oil‐fired(1)
Khanabad District 8 projects 418 KV 418 KV $ 228,086
Project Details (Describe each project and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion
Cost (USD )
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Table 1 ‐ B Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392)
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable EnerProvince: KUNDUZ
Microhydro
Archi district 4 projects NA NA NA
Solar
Ali abad district 17 projects 1331 w 1331 w $ 308,921
Chardara district 1 project 25 w 25 w $ 5,019
Imam sahib 2 projects 266 w 266 w $ 65,200
Qala‐i‐Zal district 16 projects 2010 w 2010 w $ 670,600
Khan abad district 3 projects 426 w 426 w $ 85,407
Kunduz City 2 projects 208 w 208 w $ 44,219
Solar None
Estimated project cost (USD Mil)
Project Completion
Cost (USD )
1386 Annual O&M Cost (USD Mil)
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1386)Ongoing and Future Projects (1387‐1392)
Planned Capacity (MW)
Installed Capacity (Watts)
Actual Capacity (Watts)
Wind None
Wood NoneResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
(1)Responsible Organization:
(2)Responsible Organization: MoM, DABMs
MoM, DABMs,MRRD(NSP,NABDP)
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: KUNDUZ
(2)Responsible Organization: MoM, DABMs
(3)Responsible Organization: MoM, DABMs
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: KUNDUZ
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydopower)
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: KUNDUZ
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands
('000)
Estimated 1390 no. of Households in
Thousands ('000)Total 882.9
956.8 136.68Kunduz Center (Kunduz)
277.9301.1 43.02
Hazrati Imam Sahib 210.5228.1 32.59
Qala –i-Zal 62.767.9 9.71
Chahar Darah 66.872.4 10.34
Ali Abad 42.946.5 6.64
Khan Abad 145 2
Inter‐ministerial Commission for Energy Province: KUNDUZEnergy Database
Table 3 ‐ Population Data by District
Khan Abad 145.2157.3 22.48
Dasht-i- Archi 76.983.3 11.90
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power Taloquan River 10.5
Diesel Generation Taloqan City 1.6 1.6
Transmission projects Kunduz to Taloqan 70/220
Distribution projects Taloqan City network
3 MVA‐20/0.4 KV
Energy Database
Installed Capacity (MW)
Distribution Capacity (MVA/KV network)
Project Completion
Cost (USD Mil)
Estimated project cost (USD Mil)
Transmission Length
(Kms/KV)
Ongoing and Future Projects (1388‐1392)
Substation Capacity/
Transformers Kv/KV
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Completed Project (As of 1387)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Substation Capacity /MVA
Actual Capacity (MW)
Inter‐ministerial Commission for Energy
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province:TAKHA
Name of Project*
Project Details (Describe each
project and list their components )
Substation projects Taloqan 220KV/20KV
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) Coal, Gas, and Small Diesel‐fired
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel/oil‐fired(1)
Frarkhar destrict 5 projects 142 KW 142 KW $ 87,291
Ishkashim destrict 38 projects 1383 KW 1383 KW $ 636,936
Khwaja Ghar destrict 30 projects 953 KW 953 KW $ 482,011
Warsaj destrict 18 projects 945 KW 945 KW $ 229,791
Project Details (Describe each project and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
Mil)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
(3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM
Microhydro NA
Bangi destrict 18 projects 176 KW 176 KW $ 583,406
Chal destrict 6 projects 103 KW 103 KW $ 234,400 Farkhar destrict 42 projects 792 KW 792 KW $ 1,408,515
Ishkashim destrict 4 projects 46 KW 46 KW $ 52,277
Khwaja Ghar 2 projects 40 KW 40 KW $ 12,939 Rustaq destrict 3 projects 15 KW 15 KW $ 101,595 Taluqan city 6 projects 69 KW 69 KW $ 213,521 Warsaj destrict 38 projects 1573 KW 1573 KW $ 723,901
Yangi Gala destrict 1 project 10 KW 10 KW $ 16,086
Solar NAChal destrict 1 project 45 W 45 W $ 15,800 Farkhar destrict 3 projects 131 W 131 W $ 77,800
Estimated project cost (USD Mil)
Project Completion Cost (USD
Mil)
1386 Annual O&M Cost (USD Mil)
Renewable
Energy Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Planned Capacity (MW)
Substation Capacity/
Transformers Kv/MWA
Province: TAKHAR Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Inter‐ministerial Commission for Energy Energy Database
Installed Capacity (MW)
Actual Capacity (MW)
Kalafgan destrict 18 projects 1552 W 1552 W $ 680,826
Rustaq destrict 3 projects 236 W 236 W $ 113,200
Wind None NA
Wood None NA
others None NA
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Province: TAKHAR
Resources Available for Energy Generation Location/Source Description*
Total Potential (MW)
Existing Production (MW)
Hydropower potential (MW) Artinjilan HPP 550 None
Memked 170 None
Galavan 550 None
Akimamaj 65 None
kokcha 22 None
Responsible Organiztion:DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description*
Total Extractable Potential Existing Production
Diesel/oil(1) None None None
Gas(2) None None None
Coal(3)
Namakab Mines, strength of coal is 6,000 kilo Calorie per Kg 4,000,000MT Not AvailableKaishkaton Mines in Takhar Province. Strength of coal is 7,500 kilo Calorie per Kg 1,600,000 MT Not available
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: TAKHAR
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation
( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Others NA
Responsible Organization:
Provine: TAKHAR
MRRD(NSP,NABDP), MEW Renewable Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Reneabl Energy)
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 870.9943.8 134.82
Takhar Center 203.3220.3 31.47
Hazar Sumuch 12.513.5 1.94
Baharak 28.130.5 4.35
Khwaja Ghar 60.865.9 9.41
Bangi 31.934.6 4.94
Eshkamesh 53.758.2 8.31
Chal 25.727.8 3.98
Namak Ab 11.112.0 1.72
Farkhar 42.546.1 6.58
Kalafgan 32.034 7 4 95
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: Takhar
34.7 4.95Rustaq 149.0
161.5 23.07Chahab 70.8
76.7 10.96Yangi Qala 40.2
43.6 6.22Khwaja Bahawuddin 21.2
23.0 3.28Darqad 24.5
26.5 3.79Dashti Qala 29.1
31.5 4.50Warsaj 34.5
37.4 5.34
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power None
Transmission projects None
Distribution projects Kunar distribution
network 1.9-20/0.4NA
Kunar distribution network
3‐20/0.4 NA
Substation projects
other projects(list)
Energy Database Inter‐ministerial Commission for Energy
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: KUNA
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project
cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Substation Capacity /MVA
Project Completion
Cost (USD Mil)
Responsbile Organization: MEW planning Department and DABM
Name of Project*
Project Details (Describe each
project and list their components )
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms)
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel/oil‐fired(1)
Chawkay 16 projects 595 W 595 W $ 196,790
Khas kunar 3 projects 84 KW 84 KW $ 36,139
Narang 22 projects 906 KW 906 KW $ 320,991
Sirkanay 12 projects 302 KW 302 KW $ 144,288
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)Project Details (Describe each project and list their components)
Installed Capacity (KW)
Actual Capacity (KW)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD'000)
1386 Annual O&M Cost (USD'000)
Planned Capacity (KW)
Province: Kunar
Project Completion
Cost (USD)'000
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro
Kunar microhydro 2x350 KW 300 KW NA
Chawkay 16 projects 16 KW 16 KW $ 14,525 Darah Pech 8 projects 60 KW 60 KW $ 161,904 Khas Kunar 11 projects 195 KW 195 KW $ 215,308
Narang 1 project 6.5 KW 6.5 KW $ 7,959 Nurgal 7 projects 6.8 KW 6.8 KW $ 237,427 Shygal wa Shittan 1 project 10.8 KW 10.8 KW $ 28,000 Sirkanay 3 projects 105 KW 105 KW $ 73,986
Various Microhydro upto 100 kW NA
Province: KUNAR
Installed Capacity (KW)
Actual Capacity (KW)
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each project
and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Planned Capacity (KW)
projects Various
SolarAsadabad 1 project 29 W 29 W $ 14,733
Darah Pech 3 projects 530 W 530 W $ 106,000
Marawara 1 project 61 W 61 W _
Nurgal 1 project 121 W 121 W $ 24,200
Sirkanay 1 project 35 W 35 W _
Geothermal None
Wind NoneWood NoneothersResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) Kama on Kunar River 45 MW
Kunar A on Kunar River 366 MW
Kunar H on Kunar River 165 MW
Province: KUNAR
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy‐ Hydropower
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
(1)Responsible Organization:
(2)Responsible Organization: MoM
(3)Responsible Organization: MoM
MoM
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: KUNAR
Resources Available for Energy Generation (Rewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
OthersResponsible Organization:
Province: KUNAR
MRRD(NSP,NABDP), MEW Renewable Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
Name of District1387 (2008‐2009) in Thousands
('000)
Estimated 1390 (2011‐2012) in
Thousands ('000)
Estimated 1390 No. of Households in Thousands ('000)
Total 401.0434.5 62.08
Kunarha Center (Asad Abad)
30.032.5 4.64
Watapoor 24.927.0 3.85
Dara‐i ‐ Pech 49.854.0 7.71
Narang Wa Badil 27.529.8 4.26
Sar Kani 24.826.9 3.84
Mara wara 18.620.2 2.88
Dangam 15.416.7 2.38
Bar Kunar 20.021.7 3.10
Shigal Wa Sheltan 26.628.8 4.12
Chapa Dara 28.230.6 4.37
N l
Inter‐ministerial Commission for EnergyEnergy Database
Table 3‐ Population Data by District Province: KUNAR
Noorgal 28.831.2 4.46
Sawkai 32.535.2 5.03
Khas Kunar 31.834.5 4.92
Nari 25.127.2 3.89
Ghazi Abad 17.018.4 2.63
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by the CSO (7members/household)
Diesel generatorsDiesel generator
plants(4)1.18 1 NA
Transmission projects from Jalalabad to
Mehtarlan32/110 NA
Distribution projects Laghman
distribution network1.4‐11/0.4
NA
Mehterlan and Qargai
16‐20/0.4 NA
Substation projects Mehterlan SS 16‐110/20 NA
other projects(list)
Inter‐ministerial Commission for Energy Energy Database
Project Completion
Cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: LAGHMAN
Name of Project*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project
cost (USD Mil)
Distribution Capacity MVA/KV network)
Substation Capacity /MVA
Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms)
Planned Capacity / Power Input
(MW)
Transmission Length (Kms)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel/oil‐fired(1)
Alingar destrict 23 projects 240 KW 195 KW $ 100,323
Alishing destrict 11 projects 195 KW 195 KW $ 85,650
Name of Projects*
Completed Project (As of 1387) Ongoing and Future Projects
Project Details (Describe each project and list their components)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion Cost (USD)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD)
1386 Annual O&M Cost (USD)
Planned Capacity (KW)
Province: Laghman
(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
Microhydro
Alinga destrict 21 projects 180 KW 180 KW $ 278,707 Alishing destrict 19 projects 186 KW 186 KW $ 172,542
Dawlat shah 4 projects 45 KW 45 KW $ 30,443
Mihtar lam destrict 12 projects 90 KW 90 KW $ 238,539
Qarghayi destrict 5 projects 34 KW 34 KW $ 77,785
Solar EnergyMehtar lam destrict
10 projects 763 KW 763 KW $ 242,889
Qarghayi destrict 3 projecrts 295 KW 295 KW $ 86,440
Geothermal NA
Estimated project cost (USD'000)
Project Completion
Cost (USD'000)
1386 Annual O&M Cost (USD'000)
Installed Capacity (KW)
Actual Capacity (KW)
Province: LAGHMAN Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Planned Capacity (KW)
Wind NA
Wood NA
others NA
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: LAGHMAN
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: LAGHMAN
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: LAGHMAN
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 No. of Households in Thousands ('000)
Total 396.8430.0 61.43
Laghman Center (Mehterlam)
124.5134.9 19.27
Qarghayee 89.296.7 13.81
Alingar 88.095.4 13.62
Alishing 64.970.3 10.05
Dawlat Shah 30.232.7 4.68
Inter‐ministerial Commission for Energy Province: LaghmanEnergy Database
Table 3 ‐ Population Data by District
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by the CSO (7 members/household)
Hydro power
Darunta HPP 11.55 8 NA 11.55 15
Diesel GeneratorsDiesel generator
plants (3)2.712 2.712 NA
Transmission projects Nanglo to Jalalabad NA 75/110 NA
From Darunta to Jalalabad SS
16.9/35 NA
Distribution projects Nangarhar Electricity
Authority 31.2-6/0.4NA
Nangarhar Electricity Authority
16‐20/0.4 NA
Substation projects Jalalabad Substation 16‐110/20 NA
other projects(list)
Inter‐ministerial Commission for Energy Energy Database
Substation Capacity /MVA
Project Completion
Cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Transmission Length (Kms)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Actual Capacity (MW)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: NANGARHA
Name of Project*
Project Details (Describe each
project and list their components )
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Distribution Capacity (KVA
network)
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal fired (3) None None
Gas‐ fired projects(2) None None
Small Diesel/oil‐fired(1)
Achin district 6 projects 110 KW 110 KW $ 60,367
Behsud district 1 project $ 35,476
Chaparhar district 25 projects 341 KW 341 KW $ 237,226
Muhmand dara district 1 project $ 28,115
Rodat district 9 projects 155 KW 155 KW $ 104,022
Surkhrud district 24 projects 943 KW 943 KW $ 847,792
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)Project Details (Describe each project and list their components)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion Cost (USD)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD)
1386 Annual O&M Cost (USD)
Planned Capacity (KW)
(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
Province: NANGARHAR
MicrohydroAchin disrtict 10 projects 128 KW 128 KW $ 217,163 Bati Kot district 6 projects 49 KW 49 KW $ 175,611 Behsud district 1 project 18 KW $ 45,091 Dara Noor district 8 projects 72 KW $ 166,012 Dhi bala 8 projects 93 KW 93 KW $ 211,339 Dur baba 2 projects 33 KW 33 KW $ 59,868 Hisarak district 2 projects $ 76,997 Kama district 1 project 9 KW 9 KW $ 22,262 Kuz kunar 5 projects 62 KW 62 KW $ 176,125 Nazyan 12 projects 152 KW 152 KW $ 309,453 Pachir wa agam 6 projects 40 KW 40 kw $ 157,013 Surkha rud destrict 11 projects 93 KW 93 KW $ 276,600
Solar Energy Achin disrtict 2 projects 62 W 62 W $ 37,842 Bati Kot district 4 projects 193 W 193 W $ 114,565 Bihsud dstrict 19 projects 1497 W 1497 W $ 842,536 Chaparhar 12 projects 400 W 400 W $ 229,732
Dara Noor destrict 6 projects 452 W 452 W $ 281,526
Installed Capacity (KW)
Actual Capacity (KW)
Estimated project cost ($)
Project Completion Cost ($)
1386 Annual O&M Cost ($)
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Reneable Energy
Dhi bala 4 projects 101 W 101 W $ 59,307 Goshta 10 projects 1081 W 1081 W $ 393,412 Kama district 37 Projects 3624 W 3624 W $ 1,346,681 Kuz kunar 21 projects 2478 W 2478 W $ 775,233 Nazyan 7 projects 329 W 329 W $ 204,776 Rodat district 11 projects 47 W 47 W $ 30,355 Surkh Rud 31 projects 1870 W 1870 W $ 1,047,660
Geothermal None
Wind None
Wood None
others None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: NANGARHAR
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: NANGARHAR
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Province: NANGARHAR
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
Wood (Cu.M) NA
OthersResponsible Organization:
*List each depoint source and location ( province/districts
MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 No. of Households in Thousands ('000)
Tatol 1333.5 1445.0206.44
Nangarhar Center (Jalalabad)
183.0 198.328.33
Behsud 103.4 112.016.01
Surkh Rud 109.6 118.816.97
Chapar har 54.8 59.48.48
Rodat 62.9 68.29.74
Kama 69.9 75.710.82
Kuzkunar 50.1 54.37.76
Darah -i- Noor 36.7 39.85.68
Sher Zad 60.3 65.39.33
Hesarak 28.0 30.34.33
Khugyani 118.6 128.518.36
Energy DatabaseTable 3 ‐ Population Data by District Province: NANGARHAR
Pachir Wagam 38.7 41.95.99
Deh Bala 36.7 39.85.68
Kot 47.4 51.47.34
Achin 91.2 98.814.12
Nazyan 13.3 14.42.06
Dur Baba 21.2 23.03.28
Shinwar 54.5 59.18.44
Bati Kot 68.9 74.710.67
Muhmandِِ Dara 40.9 44.36.33
Goshta 24.8 26.93.84
Lalpoor 18.6 20.22.88
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by the CSO (7 members/household)
Hydro power None
Imported Power None
Transmission projects None
Distribution projects NA
Substation projects NA
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
1386 Annual O&M Cost (USD Mil)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: NOORISTAN
Name of Project*Substation Capacity /MVA
Project Completion
Cost (USD Mil)
Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Planned Capacity / Power Input
(MW)
Transmission Length (Kms)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Actual Capacity (MW)
other projects(list) NA
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel/oil‐fired(1)
Bargi Matal desrtict 12 projects 176 KW 176 KW $ 171,438
Du Ab destrict 18 projects 168 KW 168 KW $ 186,108
Kamdesh destrict 9 projects 185 KW 185 KW $ 218,201
Nurgaram destrict 11 projects 95 KW 95 KW $ 113,766
Wama destrict 13 project 194 KW 194 KW $ 309,276
Waygal destrict 5 projects 175 KW 195 KW $ 221,098
Ongoing and Future Projects (1388‐1392)
Province: Nooristan
Project Details (Describe each project and list their components)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion Cost (USD)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD)
1386 Annual O&M Cost (USD)
Planned Capacity (KW)
Name of Projects*
Completed Project (As of 1387)
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy Province: NOORISTAN
Microhydro
Chawkay 1 project 16 KW 16 KW $ 14,000 Darah Pech 8 projects 60 KW 60 KW $ 161,904
Khas Kunar 11 projects 195 KW 195 KW $ 215,308
Narang 1 project 6.5 KW 6.5 KW $ 7,959 Nurgal 7 projects 6.8 KW 6.8 KW $ 237,427 Shygal wa Shittan 1 project 10.8 KW 10.8 KW $ 28,000 Sirkanay 3 projects 105 KW 105 KW $ 73,986
SolarAsadabad 1 project 29 W 29 W $ 14,733
Darah Pech 3 projects 530 W 530 W $ 106,000
Marawara 1 project 61 W 61 W _
Nurgal 1 project 121 W 121 W $ 24,200
Sirkanay 1 project 35 W 35 W _
Ongoing and Future Projects (1388‐1392)
Planned Capacity (KW)
Substation Capacity/
Transformers Kv/MWA
Installed Capacity (KW)
Actual Capacity (KW)
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)
j _
Geothermal None
Wind None
Wood None
others None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: NOORISTAN
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy ( Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
(1)Responsible Organization:
(2)Responsible Organization: MoM
(3)Responsible Organization: MoM
MoM
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Povince: NOORISTAN
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: NOORISTAN
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands
('000)Estimated 1390 (2011‐
2012) in Thousands ('000)
Estimated 1390 no. of Households in
Thousands ('000)
Total 131.9 142.9 20.42Nooristan Center (Paroon) 12.3 13.3 1.90
Noor Gram 29.4 31.9 4.55
Duab 7.1 7.7 1.10
Waygal 17.8 19.3 2.76
Wama 10 0
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: NOORISTAN
Wama 10.0 10.8 1.55
Mandol 18.0 19.5 2.79
Kamdesh 23.1 25.0 3.58
Bargi Matal 14.2 15.4 2.20
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by the CSO (7 members/household)
Hydro power
Diesel‐fired Small diesel plants 3x500 kVA 1.2 NA
3x550kVA 1.32 NA
200 kVA 0 NA
Transmission projects Transmission line from Gardez to
Gazni 75/220
Transmission line from Gazni to Zabul
170/220
Distribution projects Gazni Distribution
network 3-20/0.4
Gazni Distribution network
16‐20/0.4
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: GHAZN
Name of Project*Substation Capacity /MVA
Project Completion
Cost (USD Mil)
Ongoing and Future Projects (1388‐1392)
Installed Capacity Transmission
Length (Kms/KV)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Project Details (Describe each
project and list their components )
Completed Project (As of 1387)
Transmission Length
(Kms/KV)
Distribution Capacity MVA/KV network)
Actual Capacity (MW)
Substation projects Gazni SS 16‐220/20
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel‐l fired projects(1)Bahrami Shaid (Jaghatu) 31 projects 628 KW 628 KW $ 213,859
Dih Yak destrict 6 projects 324 KW 324 KW $ 73,104
Ghazni city 12 projects 315 KW 315 KW $ 138,396
Khwaja Umari destrict 29 projects 725 KW 725 KW $ 219,789
Malistan destrict 58 projects 1527 KW 1527 KW $ 575,353
Rashidan destrict 1 project 10 KW 10 KW $ 5,875
Energy Database
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)Project Details (Describe each project and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Inter‐ministerial Commission for Energy
Estimated project cost
(USD )
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Project Completion Cost (USD
)
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Coal, gas and diesel‐fired
(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
Microhydro
Baharmi Shahdi(Jaghatu)
1 project 7.5 KW 7.5 KW $ 11,000
Jaghuri Destrict 7 projects 36 KW 36 KW $ 59,600
Malistan destrict 35 projects 388 KW 388 KW $ 398,615
Nawur destrict 16 projects 78 KW 78 KW $ 333,430
SolarBaharmi Shahdi(Jaghatu)
24 projects 487 W 487 W $ 227,236
Ghazni City 10 projects 865 W 865 W $ 369,649 Jaghuri Destrict 18 projects 542 W 542 W $ 197,134 Malistan destrict 7 projects 126 W 126 W $ 72,041 Nawur destrict 28 projects 824 W 824 W $ 312 822
Ongoing and Future Projects (1388‐1392)
Planned Capacity (KW)
Province: Ghazni
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Installed Capacity (KW)
Actual Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)
Nawur destrict 28 projects 824 W 824 W $ 312,822
Geothermal None
Wind None
Wood None
others None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: GHAZNI
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: GHAZNI
(1)Responsible Organization:
(2)Responsible Organization: MoM
(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) None
Wood (Cu.M) NA
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District
1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 1092.61184.0 169.14
Ghazni Center (Ghazni)
146.2158.4 22.63
Deh Yak 44.548.2 6.89
Zanakhan 11.512.5 1.78
Khwaja Omari 17.318.7 2.68
Rashidan 16.317.7 2.52
Wali M shahid (khugyani)
18.319.8 2.83
Jaghatu 28.931.3 4.47
Waghaz 35.138.0 5.43
Qara Bagh 129.9140.8 20.11
Giro 33.2
Inter‐ministerial Commission for EnergyEnergy Database
Table 3‐ Population Data by District Province: Ghazni
36.0 5.14Andar 113.5
123.0 17.57Nawur 86.0
93.2 13.31Ajristan 26.2
28.4 4.06Malistan 74.6
80.8 11.55Jaghuri 160.6
174.0 24.86Muqur 45.7
49.5 7.07Ab Band 25.0
27.1 3.87Gelan 52.7
57.1 8.16Nawa 27.1
29.4 4.20
2. 1390 figures based on growth rates provided by CSO (7 members/household)
1. 1387 figures from central Statistics Organization (CSO)
Hydro power None
Diesel‐firedSmall diesel plants
(5)1.4 1.4 NA
Transmission projects Transmission line
from Paktia to Khost90/220 NA
Distribution projects Khost distribution
network 1.4-20/0.4NA
Khost distribution network
16‐20/0.4 NA
Substation projects Khost SS 16‐220/20 NA
other projects(list)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: KHOS
Planned Capacity / Power Input
(MW)
Name of Project*
Project Details (Describe each
project and list their components)
Substation Capacity /MVA
Project Completion Cost (USD
Mil)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Transmission Length (Kms)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) NoneSmall Diel fired projects(1)
Khost Matun 22 projects 894 KW 894 KW $ 484,013
Mando Zayi destrict 18 projects 402 KW 402 KW $ 316,984
Musa Khel destrict 1 project 15 KW 15 KW $ 14,531
Spera destrict 9 projects 120 KW 120 KW $ 94,207
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387Ongoing and Future Projects
(1388‐1392)
Province: Khost
Project Details (Describe each project and list their components)
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro
Jaji Maydan 1 project 8 KW 8 KW $ 11,800
Spera 2 projects 20 KW 20 KW $ 16,776
Tani destrict 1 project 10 KW 10 KW $ 25,064
SolarGurbuz destrict 9 projects 0 0 $ 341,600 Jaji Maydan destrict
26 projects 1145 W 1145 W $ 671,933
Geothermal None
Wind None
Ongoing and Future Projects (1388‐1392)
Planned Capacity (KW)
Province: KHOST
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Installed Capacity (KW)
Actual Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energ
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)
Wind None
Wood None
others None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: KHOST
Responsible Organization: DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy ( Hydropower)
Resources Available for Energy Generation
Location/Source Description* Total Potential
Existing Production
Diesel/oil(1) None
Gas(2) None
Coal3) None
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: KHOST
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) None
Wood (Cu.M) NA
Province: KHOST
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewble Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 511.6554.4 79.20
Khost Center (Khost) 124.9135.3 19.34
Trayzayee (Ali Sher )
40.744.1 6.30
Baak 20.121.8 3.11
Jaji Maidan 21.923.7 3.39
Sabari (Yaqubi) 64.569.9 9.99
Musa khel 37.340.4 5.77
Qalandar 9.310.1 1.44
Nadir Shah kot 29.031.4 4.49
Manduzay (Esmayel khil)
51.355.6 7.94
Shamul 12.413.4 1.92
Spera 22.224.1 3.44
Tanay 54.258.7 8.39
Gurbuz 23.825.8 3.68
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: KHOST
1. 1387 figures from ntral Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power None
Diesel GeneratorDiesel generation plants (4 plants)
1.4 1 NA
Transmission projects Transmission line from South Kabul to Logar
62/220 NA
Distribution projects Logar Electricity
Authority 0.8/0.4NA
Loghar Electricity Authority
16‐20/0.4 NA
Substation projects Pulle‐Alam SS 2x16‐220/20 NA
other projects(list)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Transmission Length (Kms)
Distribution Capacity (KVA
network)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: LOGA
Name of Project*
Project Details (Describe each project
and list their components)
Substation Capacity /MVA
Project Completion
Cost (USD Mil)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diel fired projects(1)
Baraki Barak district 41 projects 2521 KW 2521 KW $ 1,223,977
Khushi district 13 projects 268 KW 268 KW $ 176,819
Muhammad Agha district 73 projects 3576 KW 3576 KW $ 1,662,533
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD )
1386 Annual O&M Cost (USD
)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387Ongoing and Future Projects
(1388‐1392)
Province: LOGAR
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD )
Project Details (Describe each project and list their
components)
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro
Azra district 23 projects 234 KW 234 KW $ 480,551 M<uhammad Agha district
5 projects 41 KW 41 KW $ 86,126
Puli Alam district 1 project 20 KW 20 KW $ 30,352
SolarAzra district 2 projecs 84 W 84 W $ 46,400 Baraki Barak district 18 projects 757 W 757 W $ 34,178 Charkh district 7 projects 483 W 483 W $ 238,675 Khushi district 3 projects 67 W 67 W $ 22,419 Muhammad Agha district
10 projects 302 W 302 W
Puli Alam district 83 projects 6157 W 6157 W $ 3,109,603
Province: LOGAR Inter‐ministerial Commission for Energy
Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐
Planned Capacity (KW)
Installed Capacity (KW)
Actual Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Estimated project cost (USD)
Project Completion Cost (USD)
1386 Annual O&M Cost (USD)
Geothermal None
Wind None
Wood None
others None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description Total Potential Existing Production
Hydropower potential (MW) None
Province: LOGAR
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: LOGAR
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) None
Wood (Cu.M) None
Province: LOGAR
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands
1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 349.0378.2 54.03
Logar Center (Puli Alam)
96.0104.0 14.86
Baraki Barak 79.686.3 12.32
Charkh 40.443.8 6.25
khushi 21.923.7 3.39
Mohammad Agha 68.774.4 10.64
Khar war 23.925.9 3.70
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: LOGAR
25.9 3.70Azra 18.5
20.0 2.86
2. 1390 figures based on growth rates provided by the CSO (7 members/household)
1. 1387 figures from Central Statistics organization (CSO)
Hydro power Samkany Minihydro
Project2x0.25 NA
Diesel‐fired Small diesel plants(2) 0.98 0.9 NA
Transmission projects Transmission line from Pul‐e‐Alam to Gardez
51/220NA
Gardez to Khost 90/220 NA
Gardez to Gazni 75/220 NA
From Gardez to Gazni transmission line
connection to Sharan16/220 NA
Transmission Length
(Kms/KV)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms/KV)
Distribution Capacity MVA/KV network)
Substation Capacity /MVA
Project Completion
Cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: PAKTIA
Name of Project*
Project Details (Describe each project
and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Distribution projects Gardez City network1-20/0.4
NA
Gardez City network 16‐20/0.4 NA
Substation projects Gardez SS 2x16‐220/20 NA
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diel fired projects (1)
Ahmadabad destrict 15 projects 308 KW 308 KW $ 127,662
Jaji destrict 5 projects 71 KW 71 KW $ 46,599
Lija Ahmad Khel destrict 3 projects 17.5 KW 17.5 KW $ 18,683
Sayid Karam destrict 3 projects 34.5 KW 34.5 KW $ 17,970
Shwak destrict 1 projects 12 KW 12 KW $ 11,400
Zurmat destrict 18 projects 228 KW 228 KW $ 204,904
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD )
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387Ongoing and Future Projects
(1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD )
Project Details (Describe each project and list their
components)
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro
Ahmadabad destrict 3 projects 23 KW 23 KW $ 97,678 Chamkanay destrict 7 projects 40 KW 40 KW $ 114,954
Dand wa Patan 2 projects 24.5 KW 24.5 KW $ 67,605
Jaji destrict 16 projects 164 KW 164 KW $ 250,042
Leja Ahmad Khel 20 projects 167 KW 167 KW $ 262,320
Sayed Karam destrict 11 projects 209 KW 209 KW $ 131,025
Shwak destrict 1 project 7.5 KW 7.5 KW $ 15,400
SolarChamkanay destrict 28 projects 866 W 866 W $ 440,934 Dand wa Patan 32 Projects 1402 W 1402 W $ 544,496 Gardez destrict 15 projects 741 W 741 W $ 326,331
Province: Paktia Inter‐ministerial Commission for Energy
Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Installed Capacity (KW)
Actual Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Estimated project cost (USD,000)
Project Completion
Cost (USD'000)
1386 Annual O&M Cost (USD,000)
Gardez destrict 15 projects 741 W 741 W $ 326,331 Jaji destrict 17 projects 999 W 999 W $ 409,676 Leja Ahmad Khel 33 projects 365 W 365 W $ 209,410 Sayed Karam destrict 4 projects 62 W 62 W $ 31,587
Zurmat Destrict 41 projects 912 W 912 W $ 298,737
Geothermal None
Wind None
Wood None
others None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Energy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: PAKTIA
Responsible Organiztion:DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) none
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: PAKTIA
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: PAKTIA
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
Others NA
Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District
1387 (2008‐2009) in Thousands ('000)
1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 490.9532.0 75.99
Paktya Center (Gardez)
75.381.6 11.66
Sayyid Karam 58.463.3 9.04
Zurmat 97.8106.0 15.14
Shwak 5.15.5 0.79
Wuza Jadran 32.335.0 5.00
Laja Ahmad khel 20.822.5 3.22
Jani Khel 31.834.5 4.92
Dand Patan 24.226.2 3.75
Samkani 45.549.3 7.04
Jaji 57.362 1 8 87
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: PAKTIA
62.1 8.87Ahmadaba 25.3
27.4 3.92laja mangel 17.1
18.5 2.65
2. 1390 figures based on growth provided by the CSO (7 members/household)
1. 1387 figures from Central Statistice Organization
Hydro power
Diesel‐fired Small diesel plants 0.5 0.5 NA
Imported Power
Transmission projects
From transmission line between Gazni and gardez connection to
Sharan
16/220 NA
Distribution projects Distribution network in
Sharan
0.5-0.4Distribution network in
Sharan16‐20/0.4 NA
Inter‐ministerial Commission for Energy
Energy Database Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: PAKTIKA
Name of Project*Project Details (Describe each project and list their
components)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms)
Distribution Capacity (KVA
network)
Substation Capacity /MVA
Project Completion Cost
(USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Substation projects Sharan SS 16‐220/20 NA
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diel fired projects (1)
Mata Khan destrict 3 projects 113 KW 113 KW $ 67,213
Sare Hawza destrict 12 projects 411 KW 411 KW $ 300,631
Sharan Destrict 21 projects 55f4 KW 554 KW $ 327,330
Urgun destrict 18 projects 517 KW 517 KW $ 339,738
Yahya Khel 6 projects 192 KW 192 KW $ 135,619
Ongoing and Future Projects (1388‐1392)
Province: Paktika
Project Details (Describe each project and list their
components)Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro None
SolarMata Khan destrict 14 projects 32 KW 32 KW $ 17,209 Omna Destrict 23 Projects 47 KW 47 KW $ 34,096 Sare Hawza 4 projects 14 KW 14 KW $ 8,759
Sarobi destrict 23 projects 404 KW 404 KW $ 176,406 Sharan destrict 33 projects 330 KW 330 KW $ 183,984 Urgun destrict 17 projects 401 KW 401 KW $ 248,132
Yahya Khel destrict 50 projects 407 KW 407 KW $ 187,595
Yosuf Khel destrict 33 projects 590 KW 590 KW $ 306,509
Zarghon Shahr 25 projects 565 KW 565 KW $ 319,764
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Installed Capacity (KW)
Actual Capacity (KW)
Province: PAKTIKA
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Zarghon Shahr 25 projects 565 KW 565 KW $ 319,764
Geothermal None
Wind NoneWood Noneothers None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) none
Province: PAKTIKA
Responsible Organiztion:DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
(1)Responsible Organization:
(2)Responsible Organization: MoM
(3)Responsible Organization: MoM
MoM
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: PAKTIKA
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) None
Geothermal None
Solar NA
NA
wind (metre/sec)
Wood (Cu.M) NA
Province: PAKTIKA
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 387.3419.7 59.96
Paktika Center (Sharan) 45.549.3 7.04
Mata Khan 22.724.6 3.51
Yosuf Khel 12.313.3 1.90
Yahya Khel 15.817.1 2.45
Omna 11.011.9 1.70
Sar Rawza 21.122.9 3.27
Zarghun Shahr 27.229.5 4.21
Jani Khel 21.823.6 3.37
Gomal 7.07.6 1.08
Surubi 11.412.4 1.76
Urgoon 50.354.5 7.79
Ziruk 17.519 0 2 71
Inter‐ministerial Commission for EnergyEnergy Database
Table 3‐ Population Data by District Province: Paktika
19.0 2.71Nika 11.3
12.2 1.75DilaWa Khushamand 22.9
24.8 3.55Wazakhwah 21.1
22.9 3.27Turwo 2.0
2.2 0.31Wormamay 3.2
3.5 0.50Barmal 31.6
34.2 4.89Giyan 31.6
34.2 4.89
2. 1390 figures based on growth rates provided by the CSO (7 members/household)
1. 1387 figures from Central Statistics Organization
Hydro power Per Master Plan 25 NA
Transmission projects None
Distribution projects None
Substation projects None
other projects(list) None
Substation Capacity/
Transformers Kv/MWA
Estimated project
cost (USD Mil)
Substation Capacity /MVA
Project Completion
Cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: DIKUND
Responsible Organization: MEW planning Department and DABM/S
Transmission Length (Kms)
Distribution Capacity (KVA
network)
Name of Project*
Project Details (Describe each
project and list their components )
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) NoneSmall Diesel fired projects (1)
Ishtarlay destrict 3 projects 45 KW 45 KW $ 60,826
Khadir destrict 11 projects 252 KW 252 KW $ 185,095
Miramor destrict 28 projects 666 KW 666 KW $ 457,060
Shahristan destrict 20 projects 586 KW 586 KW $ 354,686
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD )
1386 Annual O&M Cost (USD)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)
Project Details (Describe each project and list their
components)Installed Capacity (MW)
Actual Capacity (MW)
Project Completion
Cost (USD )
(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
Microhydro None
SolarMiramor destrict 1 projects 50 W 50 W NA Nilli destrict 16 projects 1823 W 1823 W $ 563,800
Shahristan destrict 7 projects 593 W 593 W $ 187,140
Geothermal None
Wind None
Wood None
others none
PROVINCE: DIKUNDI
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Installed Capacity (KW)
Actual Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Provnce: DIKUNDI
Responsible Organization: DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation
Location/Source Description* Total Potential Existing Production
Diesel/oil1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: DIKUNDI
(1)Responsible Organization:
(2)Responsible Organization: MoM
(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) None
Wood (Cu.M) NA
Province: DIKUNDI
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
Others NA
Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 410.3
444.6 63.52Daykundi Center (Nili) 37.1
40.2 5.74Shahristan 60.5
65.6 9.37Miramor 57.0
61.8 8.82Ishterlai 43.4
47.0 6.72Sang‐i‐ Takht 46.1
50.0 7.14Khedir 42.4
45.9 6.56Kejran 31.9
34.6 4.94Kiti 30.5
33.1 4.72Gizab 61.4
66.5 9.51
Inter‐ministerial Commission for Energy Province: DikundiEnergy Database
Table 3 ‐ Population Data by District
66.5 9.51
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power Kajaki 2 HPP 100 225
Kajaki auxillary service
18.5 18
Kajaki HPP 33 16 NA
Grishk HPP 2.4 1.2 NA
Transmission projects Kazaki to Kandahar
110/220 kV171/110 NA
From Junction to Lashkargah SS
48/110 NA
From Helmand to Kandahar
170/220 NA
From Helmand to Farah
200/220 NA
Distribution projects kajaki Electricity
Authority 48.7-20/0.4NA
Transmission Length
(Kms/KV)
Completed Project (As of 1387)
Planned Capacity / Power Input
(MW)
Distribution Capacity MVA/KV network)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: HELMAND
Name of Project*
Project Details (Describe each
project and list their components)
Substation Capacity /MVA
Project Completion
Cost (USD Mil)
Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length
(Kms/KV)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Authority 48.7 20/0.4
Helmand Electricity Authority 19.7‐3.3/0.4
NA
Grishk Electricity Authority
5.18‐3.3/0.4 NA
Extension of Helmand Electricity
Authority16‐20/0.4 NA
Substation projects Lashkargah SS 10‐110/44 NA
Lashkargah SS 5‐44/3.3 NA
Sangin SS 4‐110/20 NA
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3)
Gas‐ fired projects(2)
Small Diel fired projects (1)
Garmser district 60 Projects 1421 KW 1421 KW $ 1,198,754
Nahri Sarraj 51 projects 1339 KW 1339 KW $ 1,118,319
Naw Zad district 15 projects 824 KW 824 KW $ 407,351
Project Details (Describe each project and list their
components)Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD )
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)
Province: HELMAND
(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
Microhydro
Garm Ser district 4 projects 100 KW 100 KW $ 116,291
SolarLashkar gah city 1 project 58 W 58 W $ 26,497 Nahri Sarraj 1 project 31W 31W $ 13,600
Nawa‐i‐ Barakzayi 21 projects 2786 W 2786 W $ 999,366
Geothermal None
Wind None
Wood None
h
Installed Capacity (KW)
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Actual Capacity (KW)
Province: HELMAND Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energ
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Planned Capacity (KW)
others None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) Kajaki Extension on Helmand River 51.5 33
Kajaki addition on Helmand River 100
Olambagh on Helmand River 90
Kamal Khan on Helmand River 10
Province: HELMAND
Responsible Organiztion:DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: HELMAND
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: HELMAND
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 821.8890.5 127.22
Helmand Center (Lashkargah)
92.7100.5 14.35
Nahr‐i‐ Saraj 106.5115.4 16.49
Nad Ali 107.5116.5 16.64
Nawa‐i‐ Barikzayi 84.691.7 13.10
Garm Ser 80.086.7 12.38
Sangin 54.459.0 8.42
Kajaki 65.070.4 10.06
Baghran 74.280.4 11.49
Musa Qala 53.858.3 8.33
Nawzad 46.350.2 7.17
Inter‐ministerial Commission for Energy Province: HelmandEnergy Database
Table 3 ‐ Population Data by District
Washer 14.215.4 2.20
Reg‐i‐ Khan Nishin 24.026.0 3.72
Dishu 18.620.2 2.88
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power Filico HPP 2x0.32 0 NA
Babaiwali HPP 0.25 0 NA
Diesel plants in Kandahar‐completed in 1387
Kandahar diesel plants
6.8 6.8 NA
Kandahar diesel 3.4 3.4 NA
Kandahar diesel 8.8 8.8 NA
Transmission projects 220 kV single circuit line from Kazaki to
Kandahar171/220 NA
110 kV single circuit line from Kazaki to
Kandahar171/110 NA
From Kandahar to Zabul
120/220 NA
From Kandahar to 110/110 NA
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: KANDAHAR
Name of Project*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length
(Kms/KV)
Distribution Capacity MVA/KV network)
Transmission Length
(Kms/KV)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project
cost (USD Mil)
Substation Capacity /MVA
Project Completion Cost (USD
Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input
(MW)
Tarinkot110/110 NA
Distribution projects Kandahar 80‐20/0.4 NA
Kandahar Electricity 70-20/0.4 NA
Substation projects Pashtun substation 4‐110/20 NA
Kandahar SS 25‐110/20 NA
Kandahar SS2x25‐
220/110/20NA
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diel fired projectsArghandab destrict 3 projects 67 KW 67 KW $ 76,335
Daman Destrict 13 projects 1035 KW 1035 KW $ 282,035
Kandahar City 23 projects 1400 KW 1400 KW $ 733,931
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD )
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)
Province: KANDAHAR
Project Details (Describe each project and list their
components) Installed Capacity
Actual Capacity
Project Completion Cost (USD
)
(2)Responsible organization:MoM(3)Responsible organization:MoM
(1)Responsible organization: MoM
Microhydro None
SolarKandahar city 2 projects 70 W 70 W $ 27,475
Maywand Destrict 1 project 25 W 25 W $ 11,921
Spin Boldak destrict
8 projects 535 W 535 W $ 248,600
Zhari destrict 5 projects 515 W 515 W $ 231,961
Geothermal None
Wind None
W d NA
Province: Kandahar Inter‐ministerial Commission for Energy
Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Installed Capacity (KW)
Actual Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Wood NA
others NA
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: KANDAHAR
Responsible Organization:DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
(1)Responsible Organization:
(2)Responsible Organization: MoM
(3)Responsible Organization: MoM
MoM
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy‐ (Coal, Gas and Oil) Province: KANDAHAR
Resources Available for Energy Generation
Location/Source Description Total Potential Existing Production
Micro‐hydro (KW) None
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: KANDAHAR
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy ( Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District
1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands
('000)
Estimated 1390 no. of Households in Thousands
('000)
Total 1057.5
1146.0 163.71Kandahar Center (Kandahar)
481.1
521.3 74.48Daman 31.5
34.1 4.88Shah Wali Kot 39.4
42.7 6.10Arghandab 56.4
61.1 8.73Khakrez 20.8
22.5 3.22Ghorak 8.8
9.5 1.36Maiwand 53.4
57.9 8.27Zhire 78.1
84.6 12.09Panjwayee 79.2
85.8 12.26
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: Kandahar
Reg 8.2
8.9 1.27Shorabak 10.4
11.3 1.61Spin Boldak 103.0
111.6 15.95Arghistan 31.3
33.9 4.85Maruf 30.0
32.5 4.64Miyanishin 13.7
14.8 2.12Nesh 12.2
13.2 1.89
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power
Diesel GeneratorDiesel generator
plants (2)1 1
Transmission projects Transmission line from Kandahar to
Trinkot164/110 NA
Distribution projects Trinkot distribution
system 1-20/0.4NA
Trinkot distribution system
6‐20/0.4 NA
Substation projects Trinkot SS 10‐110/20 NA
Planned Capacity / Power Input
(MW)
Transmission Length
(Kms/KV)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Substation Capacity /MVA
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: URUZGAN
Name of Project*Estimated project cost (USD Mil)
Project Details (Describe each
project and list their components)
Completed Project (As of 1387)
Project Completion
Cost (USD Mil)
Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
1386 Annual O&M Cost (USD Mil)
Distribution Capacity
(KVA network)
Substation Capacity/
Transformers Kv/MWA
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel/oil‐fired(1) None
Inter‐ministerial Commission for Energy Energy Database
Project Details (Describe each project
and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
Mil)
Table 1 ‐ B Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392)‐Coal, Gas, and Diesel‐firedProvince: Uruzgan
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1386) Ongoing and Future Projects
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro None
SolarUrozgan City 4 projects 109 W 109 W $ 65,000
Geothermal None
Wind NA
Wood NA
others NA
Province: Uruzgan Inter‐ministerial Commission for Energy
Energy Database
Renewable Energy
Projects*
Project Details (Describe each project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐
Planned Capacity (KW)
Installed Capacity (KW)
Actual Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: URUZGAN
Responsible Organiztion:DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: URUZGAN
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
OthersResponsible Organization:
Province: URUZGAN
MRRD(NSP,NABDP), MEW Renewable Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
Name of District
1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands
('000)Estimated 1390 no. of Households in
Thousands ('000)
Total 311.9338.0 48.28
Urozgan Center (Tirinkot)
93.2101.0 14.43
Chora 46.550.4 7.20
Khas Urozgan 51.455.7 7.96
Shahidhassas 53.758.2 8.31
Dehraoud 55.460.0 8.58
Chinarto 11.7
Inter‐ministerial Commission for EnergyEnergy Database
Table 3‐ Population Data by District Province: URUZGAN
12.7 1.81
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power
Diesel Generator Diesel generation plants 1.7 1.7 NA
Transmission projects From Gazni to Zabul 170/220 NA
From zabul to Kandahar 120/220 NA
Distribution projects Rehabilitation and expansion of city networks in Zabul
4‐20/0.4 NA
Qalat City Network2‐20/0.4
NA
Substation projects NA
other projects(list)
Project Details (Describe each project and list their components)
Completed Project (As of 1387)
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
1386 Annual O&M Cost (USD Mil)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: ZABU
Name of Project*Substation Capacity /MVA
Project Completion Cost (USD
Mil)
Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Planned Capacity / Power Input
(MW)
Transmission Length (Kms)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD
Mil)
Actual Capacity (MW)
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3)
Gas‐ fired projects(2)
Small Diel fired projectsShahjoy district 6 projects 562 KW 562 KW $ 102,900
Completed Project (As of 1387Ongoing and Future Projects
(1388‐1392)
Province: ZABUL
Project Details (Describe each project and list their
components)Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD )
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Name of Projects*
(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
Microhydro NA
SolarShah joy destrict 1 project 68 W 68 W $ 28,779 Tarnak wa Jaldak destrict
7 projects 287 W 287 W $ 64,232
Geothermal None
Wind NA
Wood NA
others NA
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Province: ZABUL
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy)
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each project
and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Installed Capacity (KW)
Actual Capacity (KW)
p g ( , ), / , g gy p
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: ZABUL
Responsible Organiztion:DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy‐ Hydropower
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: ZABUL
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Others
Responsible Organization:
Province: ZABUL
MRRD(NSP,NABDP), MEW Renewable Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
Name of District1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 270.6293.2 41.89
Zabul Center (Qalat) 31.934.6 4.94
Shah Joi 53.257.7 8.24
Arghandab 29.732.2 4.60
Kakar 21.923.7 3.39
Daichopan 35.838.8 5.54
Mizan 12.513.5 1.94
Tarang Wa Jaldak 15.616.9 2.41
Shinkai 21.423.2 3.31
Atghar 7.98.6 1.22
Shemel Zayi 23 5
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: Zabul
Shemel Zayi 23.525.5 3.64
Naw Bahar 17.218.6 2.66
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power None
Diesel GeneratorsDiesel generator
plants(4)1.48 1.48 NA
Imported Power Imported power from Turkmenistan toQarkin
and Khamahab20 NA
Transmission projects From Faryab to Badghis 140/220 NA
From Badghis to Herat 160/220 NA
Distribution projects Kalainaw distribution
system0.5-0.4
NA
Kalainaw distribution system
10/20/0.4 NA
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: BADGHIS
Planned Capacity / Power Input
(MW)
Name of Project*Project Details (Describe each project and list their
components)Substation
Capacity /MVA
Project Completion Cost
(USD Mil)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length
(Kms/KV)
Distribution Capacity MVA/KV network)
Transmission Length
(Kms/KV)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD Mil)
Khamahab and qarkin city network
6‐20/0.4 NA
Substation projects Substation in Kalainaw 16‐220/20 NA
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel/oil‐fired(1)
Ab Kamari 18 projects 668 KW 668 KW 288,324.00$
Jawand destrict 4 projects 91 KW 91 KW 46,584.00$
Qadis destrict 18 projects 964 KW 964 KW 272,824.00$
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD
)
1386 Annual O&M Cost (USD )
Planned Capacity (KW)
Name of Projects*
Completed Project (As of 1387)Ongoing and Future Projects
(1388‐1392)
Province: BADGHIS
Project Details (Describe each project
and list their components)
Installed Capacity (KW)
Actual Capacity (KW)
Project Completion Cost (USD
)
(3)Responsible organization:MoM, MEW/DABM (2)Responsible organization:MoM, MEW/DABM (1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy Province: BADGHIS
MicrohydroQadis destrict 1 project 10 KW 10 KW $ 26,436.00
Solar NA
Geothermal None
Wind None
Wood NA
others NA
Actual Capacity (MW)
Estimated project cost (USD)
Project Completion Cost (USD
)
1386 Annual O&M Cost (USD )
Responsible organization: MRRD(NSP NABDP) DABM/S MEW Renewable Engergy Department
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Planned Capacity (MW)
Installed Capacity (MW)
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: BADGHIS
Responsible Organiztion:DABM/S, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropwer)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: BADGHIS
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: BADGHIS
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District
1387 (2008‐2009) in Thousands ('000)
Estimated 1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands
('000)
Total 441.4478.3 68.33
Badghis Center (Qala-i- Now)
59.864.8 9.26
Muqur 21.623.4 3.34
Ab Kamari 66.972.5 10.36
Qadis 82.889.7 12.82
Jawand 71.877.8 11.12
Ghormach 50.1
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: BADGHIS
54.3 7.76Murghab (Bala Murghab)
88.495.8 13.68
1. 1387 figures from Central Statistics Office
2‐ 1390 figures based on growth rates provided by CSO (7 members/household)
Hydro power
Diesel GeneratorsDiesel generator plants
(4)1.3 1.3 NA
Imported Power Import from Iran 40 NA
Transmission projects Transmission line from
Iran110/132kV NA
Distribution projects Electrification of Farah
City including city network and substation
16‐20/0.4 NA
Farah distribution network 1‐20/0.4 NA
Substation projects Substation in Farah City 16‐132/20 NA
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: FARAH
Planned Capacity / Power Input
(MW)
Name of Project*Project Details (Describe each project and list their components)
Substation Capacity /MVA
Project Completion Cost
(USD Mil)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length (Kms)
Distribution Capacity MVA/KV
network)
Transmission Length
(Kms/KV)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
1386 Annual O&M Cost (USD
Mil)
other projects(list)
Responsbile Organization: MEW planning Department and DABM
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diel fired projects(1)
Anar dara district 10 projects 466 KW 466 KW $ 208,654
Farah City 3 projects 128 KW 128 KW $ 82,613
Province: Farah
Project Details (Describe each project and list their
components)Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost
(USD )
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD )
1386 Annual O&M Cost (USD )
Planned Capacity (MW)
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Coal, Gas, and Diesel‐fired
Name of Projects*
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro None
Solar None
Geothermal None
Wind None
Wood None
others None
Province: Farah
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each project
and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Installed Capacity (KW)
Actual Capacity (KW)
Estimated project cost (USD,000)
Project Completion
Cost (USD'000)
1386 Annual O&M Cost (USD,000)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) Farah Rod on Farah River 40MW None
Province: FARAH
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: FARAH
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation (Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) None
Geothermal None
Solar None
wind (metre/sec) None
Wood (Cu.M) None
OthersResponsible Organization:
Province: FARAH
MRRD(NSP,NABDP), MEW Renewable Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy ( Renewable Energy)
Name of District1387 (2008‐2009) in Thousands ('000)
1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 456.6494.8 70.68
Farah Center (Farah)
100.6109.0 15.57
Pushtrud 37.040.1 5.73
Khak-i-safed 27.629.9 4.27
Anar Dara 25.327.4 3.92
Qala-i-kah 28.030.3 4.33
Shibkoh 21.323.1 3.30
Lash-i- Juwayn 25.527.6 3.95
Bakwa 32.335.0 5.00
Bala Buluk 65.070.4 10.06
Gulistan 39.442.7 6.10
Pur Chaman 48.652 7 7 52
Inter‐ministerial Commission for EnergyEnergy Database
Table 3‐ Population Data by District Province: FARAH
52.7 7.52Dularam 6.0
6.5 0.93
2- 1390 figures based on growth rates provided by CSO (7 members/household)
1- 1387 figures from Central Statistics Organization
Hydro power Ghor Medium Size HPP 4 NA
Installation of diesel generators ‐
(500+165) kVA
0.5 NA
Transmission projects Transmission Line from
Herat to Ghor90/110 NA
Distribution projects Electrification of Ghor
town5‐110/20 NA
Substation projects Substation projects 4‐110/20 NA
other projects(list)
Transmission Length
(Kms/KV)
Actual Capacity (MW)
Name of Project*
Completed Project (As of 1387)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Project Completion Cost (USD
Mil)
1386 Annual O&M Cost (USD Mil)
Ongoing and Future Projects (1388‐1392)
Planned Capacity / Power Input
(MW)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: GHOR
Responsbile Organization: MEW planning Department and DABM
Transmission Length (Kms)
Distribution Capacity MVA/KV network)
Substation Capacity /MVA
Project Details (Describe each project and list their components)
Installed Capacity (MW)
p g p g p
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diel fired projects (1)
Chaghcharan City 1 project 15 KW 15 KW $ 8,481
Lal wa Sarjangal 18 Projects 190 KW 190 KW $ 117,472
Shahrak 5 projects 85 KW 85 KW $ 69,239
Ongoing and Future Projects (1388‐1392)
Province: GHOR
Project Details (Describe each project and list their
components)Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD
)
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost
(USD)
1386 Annual O&M Cost (USD
)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Microhydro
Charghcharan City 14 projects 218 KW 218 KW $ 569,825 Charsadra destrict 6 projects 124 KW 124 KW $ 270,203
Dawlat Yar destrict 10 proejcts 170 KW 170 KW $ 446,171
Lal wa sarjangal 3 prjects 25 KW 25 KW $ 19,400
Saghar 1 project 24 KW 24 KW $ 44,545
Saghar 7 projects 124 KW 124 KW $ 183,124
Tulak 1 project 19 KW 19 KW $ 41,836
SolarChaghcharan 37 projects 1267 KW 1267 KW $ 863,539 Charsadra destrict 6 projects 415 KW 415 KW $ 224,176 Dawlat Yar destrict 24 projects 1412 KW 1412 KW $ 630,034 Du layna 6 projects na na $ 225 013
Province: GHOR Inter‐ministerial Commission for Energy
Energy Database
Renewable Energy
Projects*
Project Details (Describe each project
and list their components)
Completed Project (As of 1387)Ongoing and Future Projects (1388‐
1392)
Planned Capacity (KW)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Installed Capacity (KW)
Actual Capacity (KW)
Estimated project cost (USD)
Project Completion
Cost (USD)
1386 Annual O&M Cost (USD)
Du layna 6 projects na na $ 225,013 Lal wa sarjangal 20 projects 479 KW 479 KW $ 364,032 Saghar 6 projects 1477 KW 1477 KW $ 283,539
Shahrak 20 projects 300 KW 300 KW $ 188,090
Tulak 10 proejcts 405 KW 405 KW $ 168,648
Geothermal None
Wind None
Wood None
others None
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: GHOR
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: GHOR
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
f
Province: GHOR
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy ( Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 614.9666.3 95.19
Ghor Center (Chighcheran)
123.1133.4 19.06
Dawlatyar 29.832.3 4.61
Char Sada 24.927.0 3.85
Shahrak 54.459.0 8.42
Duleena 32.835.5 5.08
Pasaband 86.393.5 13.36
Lal Wa SarJangal 101.9110.4 15.77
Tulak 46.950.8 7.26
Saghar 31.634.2 4.89
Taywara 83.290.2 12.88
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: Ghor
1. 1387 figures from Central Statistics organization (CSO)
2. 1390 figures based on growth rates provided by the CSO (7 members/household)
Hydro power
Chalwarcha MHP Enjeel District
0.1 0 NA 0.1
Salma HPP Chest Disrtict
42 NA
Imported Power
110 kv transmission line from Turkmenistan to
Herat City 100 25 NA
10 kv transmission to Turghundi from Trukmenistan
3 3 NA
132 kv transmission line from Iran to Herat City
100 48 NA
20 kv transmission from Iran to Kohsan district
15 5 NA
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
1386 Annual O&M Cost (USD Mil)
Planned Capacity / Power Input (MW)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: HERAT
Name of Project*
Project Details (Describe each project
and list their components)
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length
(Kms/KV)
Distribution Capacity (KVA
network)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Transmission Length (Kms/KV)
Distribution Capacity MVA/KV network)
Substation Capacity /MVA
Project Completion Cost
(USD Mil)
Iran to Kohsan district
Transmission projects
transmission line from Trukmenistan for Hirat
City
402 km (102 km in Afghanistan and 300
km in Turkamenistan)/110
kV
NA
10 kv transmission to Turghundi from Trukmenistan
5 km/10kV NA
transmission line to Herat City from Iran
212 km ( 100 km in Afghanistan and 112 km in Iran)/132 kV
NA
transmission line for Kohsan district from
Iran45 km/20kV NA
Transmission line from salma HP to Herat
175km/110kV NA
Transmission line from Shindand to Kandahar
NA/220kV NA
Transmission line from Herat to Shindand
120km/220kV NA
Distribution projects
Hirat City and the Districts power
networks199.3‐20/0.4 NA
Heart City 50‐20/0.4 NA
Robat Sangi Distribution network
16‐20/0.4kV NA
Substation projects Noor‐ul‐Jehad 110/20 kv SS in Hirat City
80 ‐110/20 NA
Shuhadae 24 Hoot 132/20 kv SS in Hirat 60‐132/20 NA132/20 kv SS in Hirat
City60 132/20 NA
Ghooriyan 132/20 kv SS in Ghooriyan district
30‐132/20 NA
Robat Sangi 220/110/20 kv SS in Robat Sangi
District15 ‐220/110/20 NA
Noor‐ul‐Jehad 220/110/20 kv SS in
Hirat City40‐220/20 NA
Shuhadae 24 Hoot 132/20 kv SS in Hirat
City30‐132/20 NA
Andrascan SS 16‐220 (110)/20 NA
Responsbile Organization: MEW planning Department and DABMS
Table 1 ‐ B Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392)
Diesel/oil‐fired(1)
Guzara district 8 projects 930 KW 930 KW 154,002.00$
Zenda jan district 4 projects 206 KW 206 KW 31,015.00$
Injil district 1 project 12 KW 12 KW 186,906.00$
Gas‐ fired projects(2) None
Coal‐ fired projects(3) None
Inter‐ministerial Commission for Energy Energy Database
Estimated project cost (USD )
1386 Annual O&M Cost (USD
)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1386)Ongoing and Future Projects
(1387‐1392)Project Details (Describe each project and list their
components)Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD )
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM
Table 1 ‐ C Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392)‐ Renewable Energy
Diesel
Farsi district 1 project 0 0 $ 28,926.00
Karukh district 1 project 6 KW 6 KW $ 10,600.00
Obe district 1 project 8 KW 8 KW $ 21,784.00
Solar
Adraskan district 3 projects $ 87,020.00
Geothermal None
Wind NA
Wood NA
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*Project Details (Describe each project and list
their components)
Completed Project (As of 1386) Ongoing and Future Projects
Planned Capacity (MW)
Installed Capacity (MW)
Actual Capacity (MW)
Province: Heart
Estimated project cost (USD )
Project Completion Cost
(USD )
1386 Annual O&M Cost (USD )
Wood NA
others NAResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: Herat
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description*
Total Extractable Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3)
Sabzak Mines in Karukh District; strength more than7000 KiloCalory/Kg 7,600,000 MT 71,000 MT
(1)R ibl O i ti M M
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: HERAT
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source
Description*Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal NA
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: HERAT
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy (Renewable Energy)
OthersResponsible Organization:
*List each depoint source and location ( province/districts
MRRD(NSP,NABDP), MEW Renewable Department
Name of District1387 (2008‐2009) in Thousands ('000)
1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands ('000)
Total 1642.71780.1 254.30
Herat Center (Herat)
386.6418.9 59.85
Enjil 222.5241.1 34.44
Guzera (Nizam‐i‐ Shahid)
133.6144.8 20.68
Pashtun Zarghun 91.298.8 14.12
Karrukh 57.962.7 8.96
Kushk (Rubat‐i‐Sangi)
112.7122.1 17.45
Gulran 85.792.9 13.27
Kohsan 49.553.6 7.66
Ghoryan 79.686.3 12.32
Zendahjan 52.056.3 8.05
Adraskan 48.953 0 7 57
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District ‐ Province: HERAT
53.0 7.57Shindand 162.6
176.2 25.17Fersi 27.9
30.2 4.32Obe 68.8
74.6 10.65Chishti Sharif 21.6
23.4 3.34Kushk‐i‐ Kuhna 41.6
45.1 6.44
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growrh rates provided by the CSO ()7 members/household
Hydro power None
Imported Power Import from Iran 10 6 NA
Transmission projects
Distribution projects Nemroz Electricity
Authority 35-20/0.4NA
Substation projects
other projects(list)
Inter‐ministerial Commission for Energy Energy Database
Table 1 ‐ A Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution projects Province: NIMRO
Name of Project*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects
Installed Capacity (MW)
Actual Capacity (MW)
Transmission Length
(Kms/KV)
Distribution Capacity MVA/KV
network)
Responsbile Organization: MEW planning Department and DABM
Transmission Length
(Kms/KV)
Distribution Capacity
(KVA network)
Substation Capacity /MVA
Project Completion Cost
(USD Mil)
1386 Annual O&M Cost (USD
Mil)
Planned Capacity / Power Input
(MW)
O
s (1388‐1392)
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD Mil)
Table 1 ‐ B Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)
Coal‐ fired projects(3) None
Gas‐ fired projects(2) None
Small Diesel fired projectsChakhansur destrict 26 projects 354 KW 354 KW $ 114,401
Kang destrict 24 Projects 502 KW 502 KW $ 190,024
Zaranj destrict 6 projects 162 KW 162 KW $ 32,784
Project Details (Describe each project and list their
components)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost (USD )
Inter‐ministerial Commission for Energy Energy Database
Substation Capacity/
Transformers Kv/MWA
Estimated project cost (USD )
1386 Annual O&M Cost (USD
)
Planned Capacity (MW)
Name of Projects*
Completed Project (As of 1387 Ongoing and Future Projects (1388‐1392)
Province: NIMROZ
(3)Responsible organization:MoM, MEW/DABM
(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM
Microhydro
Zaranj destrict 1 project 5 KW 5 KW $ 6,400
Solar NA
Geothermal None
Wind NA
Wood NA
others NA
Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department
Province: NIMROZ
Estimated project cost (USD)
Project Completion Cost
(USD)
1386 Annual O&M Cost (USD)
Table 1 ‐ C Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy
Inter‐ministerial Commission for Energy Energy Database
Renewable Energy
Projects*
Project Details (Describe each
project and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Planned Capacity (KW)
Substation Capacity/
Transformers Kv/MWA
Installed Capacity (KW)
Actual Capacity (KW)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Hydropower potential (MW) None
Province: NIMROZ
Responsible Organiztion:DABMs, MEW Planning Department
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐A Resources Available for Energy (Hydropower)
Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production
Diesel/oil(1) None
Gas(2) None
Coal(3) None
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐B Resources Available for Energy (Coal, Gas and Oil) Province: NIMROZ
(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM
MoM
Resources Available for Energy Generation ( Renewable Energy)
Location/Source Description*
Total Potential Existing Production
Micro‐hydro (KW) NA
Geothermal None
Solar NA
wind (metre/sec) NA
Wood (Cu.M) NA
Province: NIMROZ
Inter‐ministerial Commission for EnergyEnergy Database
Table 2‐C Resources Available for Energy ( Renewable Energy)
OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department
Name of District
1387 (2008‐2009) in Thousands ('000)
1390 (2011‐2012) in Thousands ('000)
Estimated 1390 no. of Households in Thousands
('000)
Total 139.9
151.6 21.66Nimroz Center (Zaranj) 50.7
54.9 7.85Kang 20.4
22.1 3.16Char Burjak 24.1
26.1 3.73Asl‐i‐chakhansur 21.6
23.4 3.34Khashrod 23.1
25.0 3.58
Inter‐ministerial Commission for EnergyEnergy Database
Table 3 ‐ Population Data by District Province: NIMROZ
1. 1387 figures from Central Statistics Organization (CSO)
2. 1390 figures based on growth rates provided by CSO (7 members/household)
Energy Database
Section – 2 Actual capacity (supply) and demand for electricity, projected supply and demand of other energy sources, private sector data, data on firms interested in energy projects in Afghanistan, and electricity consumption and tariffs.
Data by Province/Country‐wide
No. of Customers Consumption (KwH) Average Consumption per
Customer (KwH) No. of Customers Consumption (KwH)Average Consumption per Customer (KwH)
KABUL Hydro 1,570 18,840,936 12,001 13,877 46,715,390 3,366 10
BADAKHSHAN Hydro 91 22,464 247 10BAGHLAN Hydro 9 8,324,209 924,912 1,206 1,243,061 1,031 10BALKH Imported (Uzbekistan 10 3,246,866 324,687 4,015 15,482,869 3,856 8BAMIAN NA 0 ‐ ‐ 0 ‐ ‐ 0SAMANGAN Diesel 0 ‐ ‐ 1,043 34,718 33 35JAWZJAN
Imported (Turkmenistan 167 NA ‐ 3,004 1,943,962 647 5.5SAR‐I‐PUL
Imported (Turkmenistan 0 ‐ ‐ 755 529,575 701 5.5FARYAB
Imported (Turkmenistan 0 ‐ ‐ 1769 1,948,455 1,101 5.5KAPISA NA 0 ‐ ‐ 0 0 ‐
KANDAHAR Hydro 25 432,607 17,304 4,599 3947651 858 10HELMUND Hydro 79 893,247 11,307 1,172 4,897,424 3,366
URUZGAN Diesel 0 ‐ ‐ 0 0 ‐
ZABUL Diesel 0 ‐ ‐ 5 175,666 35,133I t d (I d
Inter‐ministerial Commission for EnergyEnergy Database
Industrial Customers Commercial customers
Average Tariffs / KWH (Afg)
Table 14 ‐C Number of Customers, Consumption and Tariffs by Province ‐ Industrial and Commercial Category1387
Province Generation Source
HERAT Imported (Iran and Turkmenistan 609 41,401,926 67,983 7,617 18,466,820 2,424 6
FARAH Diesel 0 ‐ ‐ NA 7,512 NA
BADGHIS Diesel 0 ‐ ‐ NA NA ‐
NIMROZ Imported (Iran) NA 365,528 NA NA 1,673,126 NA 6GHOR Diesel 0 ‐ ‐ 60 7,702 128 55PARWAN Hydro 0 ‐ ‐ 298,134 NA 10GHAZNI Diesel 0 ‐ ‐ NA 33,020 NA
TAKHAR Diesel 0 ‐ ‐ 430 11,287 26 50WARDAK Hydro 0 ‐ ‐ 6 27,924 4,654 10KHOST Diesel 0 ‐ ‐ 43,122 NA
KUNAR Hydro 0 ‐ ‐ 125 20,371 163 10KUNDUZ Imported (Tajikistan) 158 2,956,419 11,307 1,933 6,452,872 3,338 6LOGAR Diesel NA NA NA NA 8950 NA 28NURISTAN NA 0 ‐ ‐
NANGAHAR Hydro 22 981,548 44,616 1,494 2,879,452 1,927 10PAKTIKA Diesel 0 ‐ ‐ NA NA ‐ PAKTIA Diesel 0 ‐ ‐ NA 7319 NA
NA - Not available
Table 4 ‐ Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW)
Province
Actual Capacity (MW) (Note 1)
Estimated Demand (MW) (Note 2)
Surplus or Deficiency(‐) (MW) (Note 3)
BADAKHSHAN
0.15 62 ‐61.9BADGHIS 1.5 38 ‐36.5BAGHLAN 23.8 85 ‐61.2BALKH( Mazar city) 26 128 ‐102.0BAMIAN 0 24 ‐24.0BAMYAN 0 34 ‐34.0DIKUNDI 0 35 ‐35.0FARAH 1.3 44 ‐42.7FARYAB 40 89 ‐49.0GHAZNI 2.5 81 ‐78.5GHOR 0.5 59 ‐58.5HELMAND 17.2 102 ‐84.8HERAT 81 212 ‐131.0JAWZJAN 26 59 ‐33.0KABUL 350 425 ‐75.0KANDAHAR 19 181 ‐162.0KHOST 1 4 57 55 6
Inter‐ministerial Commission for Energy Energy Database
by Province (1386)
KHOST 1.4 57 ‐55.6KUNAR 0.3 48 ‐47.7KUNDUZ 26 85 ‐59.0LAGHMAN 1 48 ‐47.0LOGAR 1 35 ‐34.0NANGAHAR 10.7 161 ‐150.3NIMROZ 6 24 ‐18.0PAKTIA 0.9 48 ‐47.1PAKTIKA 0.5 33 ‐32.5PARWAN 3.9 71 ‐67.1SAMANGAN 1.6 38 ‐36.4SAR‐E‐PUL 12 42 ‐30.0TAKHAR 1 102 ‐101.0URUZGAN 1 32 ‐31.0WARDAK 1 53 ‐52.0ZABUL 1.7 30 ‐28.3 TOTAL 658.95 2565 ‐1906.1Note 1: Actual capacity is based completed projects as presented in Table 1‐A for each ProvinceNote 2: Estimated demand is based on 1387 population/households as provided in Afghanistan Statistical Yearbook (see detailed assumptions in the narrative)Note 3: Indicates deficiency in each Province
Table 5 ‐ Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW)
Province
Actual Capacity (MW) (Note 1)
Estimated Demand (MW) (Note 2)
Surplus or Deficiency(‐) (MW) (Note 3)
TOTAL 0 0 0.0BADAKHSHAN 0.15 72 ‐71.9BADGHIS 1.5 44 ‐42.5BAGHLAN 23.8 100 ‐76.2BALKH( Mazar city) 26 150 ‐124.0BAMIAN 0 28 ‐28.0BAMYAN 0 39 ‐39.0DIKUNDI 0 40 ‐40.0FARAH 1.3 52 ‐50.7FARYAB 40 105 ‐65.0GHAZNI 2.5 95 ‐92.5GHOR 0.5 70 ‐69.5HELMAND 17.2 120 ‐102.8HERAT 81 250 ‐169.0JAWZJAN 26 70 ‐44.0KABUL 350 500 ‐150.0
Inter‐ministerial Commission for EnergyEnergy Database
by Province (1387)
KANDAHAR 19 213 ‐194.0KHOST 1.4 68 ‐66.6KUNAR 0.3 57 ‐56.7KUNDUZ 26 100 ‐74.0LAGHMAN 1 56 ‐55.0LOGAR 1 42 ‐41.0NANGAHAR 10.7 190 ‐179.3NIMROZ 6 28 ‐22.0PAKTIA 0.9 56 ‐55.1PAKTIKA 0.5 38 ‐37.5PARWAN 3.9 84 ‐80.1SAMANGAN 1.6 45 ‐43.4SAR‐E‐PUL 12 50 ‐38.0TAKHAR 1 120 ‐119.0URUZGAN 1 37 ‐36.0WARDAK 1 62 ‐61.0ZABUL 1.7 34 ‐32.3Note 1: Actual capacity is based completed projects as presented in Table 1‐A for each ProvinceNote 2: Estimated demand is based on 1387 population/households as provided in Afghanistan Statistical Year(see detailed assumptions in the narrative)Note 3: Indicates deficiency in each Province
Table 6 ‐ Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW)
ProvinceProjected Actual
Capacity (MW) (Note 1)Estimated Demand (MW)
(Note 2)Surplus or Deficiency(‐) (MW) (Note 3)
Remarks/Notes on Projections of Actual Capacity
BADAKHSHAN
2.25 99 ‐96.75 Includes Baharak HPP (2.1 MW)
BADGHIS 13.5 62 ‐48.5Additional 12 MW imports from Turkmenistan
BAGHLAN 23.8 138 ‐114.2BALKH( Mazar city) 26 206 ‐180BAMIAN 0 40 ‐40BAMYAN 0 55 ‐55
DIKUNDI 0 56 ‐5625 MW HPP will not be commissioned by 1390
FARAH 25.3 72 ‐46.7
Additional imports from Iran of 24 MW
FARYAB 40 150 ‐110GHAZNI 2.5 132 ‐129.5GHOR 2.9 97 ‐94.1HELMAND
35.7 165 ‐129.3Kazaki Auxilliary Services(18.5 MW)
HERAT 123 338 ‐215 Includes Salma HPP (42 MW)JAWZJAN 26 99 ‐73
KABUL
Projected additional 333 MW consisting of 108 MW kabul east Diesel Generator, 2x25 MW thermal funded by Iran, 100 MW f U b ki t d 75 MW
Inter‐ministerial Commission for EnergyEnergy Database
by Province (1390)
683 695 ‐12from Uzbekistan and 75 MW from Tajikistan
KANDAHAR 19 296 ‐277 Not availableKHOST 1.4 95 ‐93.6KUNAR
0.8 78 ‐77.2Includes Microhydel projects of 0.5 MW
KUNDUZ 33.2 139 ‐105.8 Includes Khanabad HPPLAGHMAN 1 78 ‐77LOGAR 1 58 ‐57NANGAHAR
23.2 263 ‐239.8Darunta HPP (12.5 MW) to be commissioned
NIMROZ 6 40 ‐34
PAKTIA1.4 77 ‐75.6
Samkany Microhydel Project 0.5 MW
PAKTIKA 0.5 53 ‐52.5PARWAN
4.4 117 ‐112.6Includes Microhydel projects of 0.5 MW
SAMANGAN 1.6 64 ‐62.4SAR‐E‐PUL
12 103 ‐91TAKHAR 1 157 ‐156URUZGAN 1 53 ‐52WARDAK 2.98 88 ‐85.02ZABUL 1.7 49 ‐47.3 TOTAL 1116.13 4212 ‐2348.7
Note 1: Projected actual capacity is based on projections made in Table 1‐A for each Province plus additional generations projections up to 1392 as shown in the last column above
Note 3: Indicates deficiency in each Province Note 2: Estimated demand is based on 1387 figures and using a demand growth rate of 15 percent each year through 1389 and 5
Inter‐ministerial Commission for Energy Energy Database Table 7‐ Projected Supply and Demand of Other Energy Sources, and Surplus/Deficiency by Province
Aَctual consumption
DemandAَctual
consumptionDemand
Actual consumption
Demand
Baghlan
Balkh
Ghor
Herat
Jawzjan
Kabul
Kandahar
Kunduz
Nangarhar
Parwan
Other Provinces Combined
Natural Gas(Cu. M)
Coal (MT)Oil/
Diesel/Petroleum Prodcuts (Litres)
Natural Gas(Cu. M)
Coal (MT)Oil/
Diesel/Petroleum Prodcuts (Litres)
1387, 1390
Province
Demand Supply Surplus/(Deficit)
Natural Gas(Cu. M) Coal (MT)Oil/ Diesel/Petroleum
Prodcuts (Litres)
MoM,MOCIResponsbile Organization:
Microhydro (KW)
Wind(Meters/sec)Solar (No. of Days of sun)
Wood (CU.M)
Others Microhydro (KW) Wind(Meters/sec)Solar (No. of Days of sun)
Wood (CU.M)
OthersMicrohydro
(KW)Wind(Meters/sec)
Solar (No. of Days of sun)
Wood (CU.M)
Others
Baghlan
Balkh
Ghori
Herat
Jawzjan
Kabul
Kandahar
Kunduz
Inter‐ministerial Commission for EnergyEnergy Database
Table 8‐ Projected Supply and Demand of Renewable Energy Sources, and Surplus/Deficiency by Province
Province
Demand Supply Surplus/Deficit (‐)
1387, 1390
Nangarhar
Parwan
Other provinces Combined
Responsible Organiztion: MRRD (NSP,NABDP), MEW Renewable Energy Department
Hydro power
Large Diesel Projects
Transmission projects
Distribution projects
Substation projects
Project Completion Cost (USD Mil)
Transmission Length (Kms/kV)
Name of Project*
Project Details (Describe each project, its
location/province, and list their components)
Actual Capacity (MW)
Completed Project (As of 1387)
Transmission Length (Kms/kv)
Substation Capacity MVA
Installed Capacity (MW)
Ongoing and Future Projects (1388‐1392)
Distribution Capacity (MVA/Kv network)
Inter‐ministerial Commission for Energy Energy Database Table ‐ 9 Private Sector Involvement in Energy Development Projects ‐ Completed (as of 1387) and Planned (1388‐1392)
Substation Capacity/ Transformers
Kv/MWA
Estimated project cost (USD Mil)
Latest Annual O&M Cost (USD Mil)
Distribution Capacity
(MVA/Kv network)
Planned Capacity / Power Input
(MW)
Other projects(list)
Responsbile Organization:MEW planning Department and DABM
Inter‐ministerial Commission for Energ Energy Databas
Diesel/oil‐fired(1) NA
Gas‐fired(2) NA
Coal‐ fired projects(3) NA
Planned Capacity
(MW)
Estimated project cost (USD Mil)
Name of Project*
Project Details (Describe each project, its location/province,
and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Installed Capacity (MW)
Actual Capacity (MW)
Project Completion Cost(USD Mil)
(1)R ibl i ti M M MEW DABM/S MRRD(NSP NABDP)
Table 10 Private Sector Involvement in Energy Development Projects ‐ Completed (as of 1387) and Planned (1388‐1392)‐Diesel, Gas & CoalCOUNTRYWIDE
1386 Annual O&M Cos(USD Mil)
(3)Responsible organization:MoM, MEW/DABM (2)Responsible organization: MoM, MEW/DABM(1)Responsible organization:MoM, MEW DABM/S, MRRD(NSP,NABDP)
Inter‐ministerial Commission for Energy Energy Database Table 11 Private Sector Involvement in Energy Development Projects ‐ Completed (as of 1387) and Planned (1388‐1392)
Microhydro NA
Geothermal NA
Solar NA
Wind NA
Wood NA
Estimated project cost (USD Mil)Actual Capacity
(MW)Project Completion
Cost(USD Mil)1386 Annual O&M
Cost(USD Mil)
Renewable Energy Project*
Project Details (Describe each project, its
location/province, and list their components)
Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)
Planned Capacity (MW)
Installed Capacity (MW)
Wood NA
others NA
Responsible organization:MRRD(NSP/NABDP), DABM/S, MEW Renewable Energy Department
Inter‐ministerial Commission for Energy Energy DatabaseTable 12 Private Sector Production of Resources Used in Energy Generation Projects as of 1387
And Planned Projects (1388‐1392)
Resource CategoryLocation/Source Description /Date
Actual Production as of 1386
Planned Production (1387‐1392) Total Potential
List by project for each category below
Natural gas deposits(Cu. M)1 NA NA NA NA
Coal deposits (MT)2 NA NA NA NA
Oil/diesel/other petroleum Oil/diesel/other petroleum
products (Litres)3 NA NA NA NA
2‐ Responsible Organization: MoM
3‐ Responsible Organization: MoM
1‐ Responsible Organization: MoM
Name of the Firm/Contact Name & Address/E‐mail/Telephone Number Expertise of Firm(1)
List Project Experience for each area of Expertise (Note 2) Priority Ranking*
Latest Annual Revenue(USD)
Number of Staff
List each firm, name of contact, address if the firm, and contact e‐mail and telephone number
KEC International LtdTransmission line, Sub‐ station and City Network Distribution NA NA
Construction of 220Kv Transmission Line from Hairatan to Pul‐e‐ Khumri; Construction of 220Kv Transmission Line from Hairatan to Mazar‐e‐ Sharif Construction of 110 Kv Transmission Line from Naghlu to Kabul ; Construction of 220Kv Transmission Line from Sher Khan border to Pul‐e‐ Khumri ; Erection of 110 Kv Transmission Line from Sher Khan border to Imam saheb; Construction of Imam saheb, Taloqan and Sare Pul Sub‐stations including city Distribution Networks ; Erection of 110 Kv Transmission Line from Naghlu to Jalalabad and Meterlam; Construction of Jalalabad and Meterlam Sub‐stations including city Networks for Jalalabad, Meterlam, Qarqaie and Sarobi; Rehabilitation and expansion of Kabul City Networks (MEW‐300/2); Rehabilitation and expansion of Kabul City Networks (MEW‐300/4)
IRCON International Ltd Sub‐ station, Switching station and Distribution Junction NA NA
Naibabad Switching station;Aibak and Mazar Sharif Sub‐ station
Voit Siemens All Electrical Area NA NA Rehabilitation of Sarobi and Mahipar HPPLahmeyer International GmbH
Consulting service NA NA Consulting service and Supervision of Sarobi and Mahipar HPP
Si (P ki t ) All El t i l A NA NARehabilitation and Expansion of Kabul City Networks (MEW‐300/4)
Inter‐ministerial Commission for EnergyEnergy Database
Table 13‐A Energy Firms Doing/Interested in Business in Afghanistan ‐ Electric Power (Notes Below)
Size of Firm
Siemens (Pakistan) All Electrical Area NA NA 300/4)Safanico Co. All Electrical Area NA NA Expansion of North‐ West and North Sub‐stations
Power Grid Consulting service NA NAConsulting service and Supervision of Kabul‐ pul‐e‐ Khumri Transmission line and Jemtala Sub‐ station
SMEC International Ltd Consulting service NA NA Consulting service and Supervision of WB Projects
Engineering Consulting Service (ECS) Consulting service NA NA Feasibility Study on Kokcha and Kunar riversFichtner Co. Consulting service NA NA Feasibility Study of Baghdara HPP
Angelique International Ltd All Electrical Area NA NAConstruction and expansion of Kabul and Mazare Sharif distribution systems
Alstom International Ltd
Manufacturing, installation and commissioning of thermal power plants
NA NA Repairing of North‐ West Gas Turbine Power plant
*Priority ranking by MEW /DABS ( state number 1‐10 depanding upon past dealing with the firm and/or expertise) ‐ Not Available
Source: Ministry of Energy and Water (for hydropower, thermal power, gas‐fired generation, coal‐fired generation, power transmission and distribution projects including substations)
Name of the Firm/Contact Name & Address/E‐mail/Telephone Number Expertise of Firm(1)
List Project Experience for each area of Expertise (Note 2)
Priority Ranking*
Latest Annual
Number of Staff
List each firm, name of contact, address if the firm, and contact e‐mail and telephone number
Etehad Resources, Brian Kennedy> [email protected], <Tahera > [email protected], and <Stewart> [email protected] Gas and Oil production NA NA NA NAANHAM Group, <Toni Christianson> [email protected], <Sardar Roshan> [email protected], <David Martinon> [email protected] Gas and Oil production NA NA NA NAEnergy Partners, < Huseyin Unal> [email protected] and <Mehmet Ozten> [email protected] Gas and Oil production NA NA NA NAWAHEZI Limited, <Sayed Karim Wahezi> [email protected], [email protected] Gas and Oil production NA NA NA NAWARECO, <Jang Taik> [email protected] Gas and Oil production NA NA NA NA
The Krystal Corporation, <Sadat M Naderi> [email protected] Gas and Oil production NA NA NA NARusebud International, <Chobutiuk Ivan> [email protected] and <Rosemary Stasek>
Inter‐ministerial Commission for EnergyEnergy Database
Table 13‐B Energy Firms Doing/Interested in Business in Afghanistan ‐ Coal/gas/oil (Notes Below)
Size of Firm
<Rosemary Stasek> [email protected] Gas and Oil production NA NA NA NACALIK‐EN‐Erji, <Yasar Kesgin> Gas and Oil production NA NA NA NAAfghan Energy Partners Limited, <Kevin Murphy> [email protected] Gas and Oil production NA NA NA NAUsa TacGroup, <Ray Ozaltin> [email protected] and <Necdet Gurbuz> [email protected] Gas and Oil production NA NA NA NA
Khushak Brothers, Haji deedar, Manadwi street‐ Haji Mohammad Omars Apartment ‐ 0799334334 Coal
Captial = 3 million USD 230 persons NA NA
Afghan Investment, Sher Khan‐ 10th street‐ Wazir Akbar Khan, House No. 320. phone: 0700276511 and 079411285 Coal 45 Million USD 295 persons NA NAMisaq‐e‐ Sharq, Sayed Ghulam Husain‐ Karte 3 ‐ across the parliament road. Phone: 0799727073 and 0799830286 Coal 4 million USD 265 persons NA NAMuhmand Shamal Brothers ‐ Mira Jan, 4th Street of Tymani project. Phone: 0778811248 and 0772039308 Coal 3 Million USD 325 persons NA NA
*Priority ranking by MOM not available ( state number 1‐10 depanding upon past dealings with the firm and/or the firm's expertise)
Source: Ministry of Mines
Name of the Firm/Contact Name & Address/E‐mail/Telephone Number Expertise of Firm(1)
List Project Experience for each area of Expertise (Note 2)
Priority Ranking*
Latest Annual Revenue(USD)
Number of Staff
List each firm, name of contact, address if the firm, and contact e‐mail and telephone number
Engconsult Ltd Consulting service NA NA
Pre‐ Feaslbility study ofMicro Hydels in Bamyan, Ghoor, Badakhshan and Kunar provinces
Manufacturing, Installation and commissioning of Micro Hydels
Supply, Delivery, Installation and commissioning of Bamyan, Ghorband and
Size of Firm
Inter‐ministerial Commission for EnergyEnergy Database
Table 13‐C Energy Firms Doing/Interested in Business in Afghanistan ‐ Renewable Energy (Notes Below)
INSET International Ltdcommissioning of Micro Hydels
NA NAcommissioning of Bamyan, Ghorband and Chamkani Micro Hydels
Norman International Ltd
Manufacturing, Installation and commissioning of Micro Hydels
NA NA
Supply, Delivery, Installation and commissioning of Asadabad and Panjshir Micro Hydels
TARNAK Co. Construction of Micro Hydels NA NAConstruction of Bamyan and Chamkani Micro Hydels
*Priority ranking by agencies involved in renewable energy ( state number 1‐10 depanding upon past dealing with the firm and/or expertise) ‐ Not AvailableFor renewable energy, such as, microhydro, geothermal,solar, wind, wood and other projects (Source: MEW)
Province
Generation Source
No. of Household Customers Total Consumption (KwH)
Average Consumption /Customer (KwH)
Average Tariffs per KwH (AFG)
KABUL
Hydro, thermal
BADAKHSHAN
Hydro 1,955 381,901 195
7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for upto 300 KwH
BAGHLAN
Hydro 9,300 7,145,593 768
7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for upto 300 KwH
BALKH( Mazar city) Imported (Uzbekistan 56,487 75,843,670 1,343 3.5
SAMANGAN Diesel 4,825 910,134 189 25JAWZJAN Imported
(Uzbekistan 20,210 13,457,716 1,218 2
FARYAB Imported (Turkmenistan 32,990 33,786,013 1,024 2
SAR‐I‐PUL Imported (Turkmenistan 4,471 4,787,381 1,071 2
KANDAHAR
Hydro 36,659 34,512,161 941
7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for upto 300 KwH
HELMUND 7.0 AFG for over 700 KwH consumption; 4.0 AFG for
Inter‐ministerial Commission for Energy
982
7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for upto 300 KwH
Table 14‐ A Number of Customers, Consumption and Tariffs by Province ‐ Domestic Customers Energy Database
219,036 214,987,002
1387
Hydro 17,919 42,325,694 2,362
consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for upto 300 KwH
URUZGAN Diesel 700 ‐
ZABUL Diesel 691 2,986,302 4,322 30
HERATImported (Iran and Turkmenistan 107,403 275,564,675 2,566 2
FARAH Diesel 425 67169 158 40
NIMROZ Imported (Iran) 11,390 27,957,624 2,455 2
GHOR Diesel 930 173304 186 30
PARWAN
Hydro 8,668 2,385,548 1,218
7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for upto 300 KwH
GHAZNI Diesel 2,520 581,159 231 35
TAKHAR Diesel 571 198658 348 40
WARDAK
Hydro 1,562 229,888 147
7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for upto 300 KwH
KHOST Diesel 1,529 733,176 480 32
KUNAR
Hydro 54 345527 6,399
7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for upto 300 KwH
KUNDUZ Imported (Tajikistan) 21,485 24,507,281 1,218 2
LAGHMAN Diesel 862 488067 566 28
LOGAR Diesel 494 161919 328 28
NANGAHAR
Hydro 8,867 33,457,698 3,773
7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for upto 300 KwH
PAKTIA Diesel 1,523 164,696 108 25
Province Generation SourceNo. of Government Customers
No. of NGO Customers
No. of Holy Places Customers
Total No. of Customers
Total Consumption, KwH
Average Consumption
/Customer (KwH)
Average Tariffs per KwH (Afg)
KABULHydro, Thermal, Diesel 2,589 Note 1 1,687 4,276 70,073,085
16,388 10
BADAKHSHAN Hydro 35 16 24 75 44,931 599 10
BAGHLAN Hydro 113 42 79 234 3,256,402 13,916 10BALKH Imported
(Uzbekistan 296 156 346 798 10,444,555 13,088 10
BAMIAN NA NA NA NA NA NA NA NASAMANGAN Diesel 40 Note 1 30 70 71,794 1,026 NAJAWZJAN Imported
(Turkmenistan 175 38 217 430 3,287,174 7,645 5.5SAR‐I‐PUL Imported
(Turkmenistan 99 17 72 188 900,067 4,788
FARYAB Imported (Turkmenistan 238 46 342 626 2,095,218 3,347 5.5
KANDAHAR Hydro 182 Note 1 487 669 4,215,686 6,301 HELMUND Hydro 158 Note 1 225 383 6,725,681 17,561 10URUZGAN Diesel NA NA NA NA NA NA NAZABUL Diesel 11 4 NA 15 351,329 23,422 HERAT Imported
(Turkmenistan 401 Note 1 46 447 10,723,803 23,991
6FARAH Diesel 2 Note 1 3 5 7,956 1,591
Table 14 ‐B Number of Customers, Consumption and Tariffs by Province ‐ Government, NGOs and Holy Places1387
Inter‐ministerial Commission for EnergyEnergy Database
FARAH Diesel 2 Note 1 3 5 7,956 1,591 BADGHIS Diesel 33 Note 1 10 43 - NIMROZ Import from Iran NA NA NA 3,466,253 NAGHOR Diesel 55 20 10 85 11,554 136 55PARWAN Hydro NA NA NA NA 298,154 NAGHAZNI Diesel NA NA NA NA 46,229 NA 35TAKHAR Diesel 16 Note 1 1 17 15,803 930 50WARDAK Diesel NA 1 76 77 29,543 384 10KHOST Diesel NA NA NA NA 86,255 NAKUNAR Hydro 75 Note 1 5 40,605 NAKUNDUZ import from
Tajikistan 106 108 98 312 7,295,438 23,383 6LAGHMAN Diesel 46 Note 1 5 51 39,271 770 28LOGAR Diesel 28 Note 1 4 32 9,041 283 40NANGAHAR Hydro 205 150 140 495 4,359,856 8,808 10PAKTIA Diesel NA NA NA NA 10,981 NA
Note 1 ‐ NGO customers included in Government Customers
NA ‐ Not Available