T9.7 Multi-criteria evaluation of emission control strategies in semi-hypothetical case city archetypes
Lian Scholes, Mike Revitt and Eva Eriksson
• Decision-support tool
• Can incorporate non-financial information
• Performance matrix: possible solutions scored against range of criteria
• Can apply weightings to reflect stakeholder preferences
What is multi-criteria analysis (MCA)?
• Decision-making context: semi-hypothetical case city of EI• Options: ECS1 - 6• Criteria:
– Technical feasibility: available (1), under development (2),
does not exist (3)– Technical efficiency: >95% (1), 80-95% (2), <80% (3)– Costs: <100M€ (1), 100M – 1000M€ (2), >1000M€ (3)– Environmental impact: results of the SFA
• Allocation of scores – pollutant and context specific• Development of weights – this afternoon’s task!
ScorePP MCA matrix for Cd
• EI – emerging economy building technological and institutional capacity, elevated background levels of Cd
• ECS1 - Baseline • WWTP services 90% of the population • IWW is 468M m3; 3% is BAT treated• 0.005% (2.5 ha) covered by stormwater ponds• All systems paid off so only O&M costs
• ESC2 - Legislation
– 100% connection to WWTP
– BAT applied to 12% IWW
Matrix for Cd: assumptions made (1)
• ECS 3 – ECS2 + Voluntary initiatives - successful campaign to reduce use of Cd in artists’ paints
• ECS 4 – ECS2 + BAT applied to 100% IWW
• ECS5 – ECS2 + surface area covered by range of stormwater BMP types increased to 0.05% (25 ha)
• ECS6 – ECS2 + Advanced WWT applied to 50% of WW
Matrix for Cd: assumptions made (2)
Matrix for Cd in EI: ‘raw data’
ECS1 Baseline
ECS2 Legislation
ECS3 Voluntary Initiatives
ECS4 BAT ECS5 Stormwater
BMPs
ECS6 Advanced
WWT
Technical feasibility
Default scenario
Legislation but exemptions
Successful campaign
Covered in BREF
Data available
Removed by nanofiltration
Technical efficiency
Elevated background levels, PHS
Building technological capacity
Emerging ‘green’ awareness
Heavily industrial-ised
Selected BMPs with high removal
e.g. 90% removal by nanofiltration
Financial aspects
WWTP O&MBMP O&MIWWT O&M
WWTP - plant, connection,O&MIWWT capital, O&M
e.g. Publicity campaign to install battery recycling technology
IWWT capital, O&M
BMP capital, O&M
e.g. nanofiltration capital, O&M
Environmental impact
Results of SFA
Results ofSFA
Results of SFA
Results of SFA
Results of SFA
Results of SFA
Matrix for Cd in EI
ECS1 Baseline
ECS2 Legislation
ECS3 Voluntary Initiatives
ECS4 BAT
ECS5 Stormwater
BMPs
ECS6 Advanced
WWTTechnical feasibility
1 2 1 1 1 1
Technical efficiency
3 3 3 2 3 2
Financial aspects 1 2 2 3 2 2
Environmental impact
3 2 2 2 1 2
Total score 8 9 8 8 7 7
Scores: range from 1 (best performance) to 3 (worst performance)
Order of preference: Advanced WWT and Stormwater BMPs BAT and Voluntary Initiatives
Matrix for Cd in EI
ECS1 Baseline
ECS2 Legislation
ECS3 Voluntary Initiatives
ECS4 BAT
ECS5 Stormwater
BMPs
ECS6 Advanced
WWT
Weightings (%)
Technical feasibility 1 2 1 1 1 1 10
Technical efficiency 3 3 3 2 3 2 10
Financial aspects 1 2 2 3 2 2 60
Environmental impact
3 2 2 2 1 2 20
Total weighted score
160 210 200 250 180 190 100
Order of preference: Stormwater BMPsAdvanced WWTVoluntary InitiativesBAT
Matrix for Cd in EI
ECS1 Baseline
ECS2 Legislation
ECS3 Voluntary Initiatives
ECS4 BAT
ECS5 Stormwater
BMPs
ECS6 Advanced
WWT
Weightings (%)
Technical feasibility 1 2 1 1 1 1 10
Technical efficiency 3 3 3 2 3 2 50
Financial aspects 1 2 2 3 2 2 20
Environmental impact
3 2 2 2 1 2 20
Total weighted score
240 250 240 210 220 190 100
Order of preference: Advanced WWTBATStormwater BMPs Voluntary Initiatives
PROS
• Structured, traceable and auditable analysis
• Copes with large amounts of data/information in differing forms and reporting units
• Can incorporate a variety of stakeholder interests
• An understandable communication tool
CONS
• Dynamic problems simplified
• Is it too subjective?
• Static picture: lacks time dimension
• How are outcomes to be interpreted? Best or preferred option need not necessarily be that which provides the most e.g. cost-benefits
MCA – pros and cons