T-76.115 Project Review
RoadRunners[PP] Iteration
30.10.2003
2
T-76.115 Project ReviewT-76.115 Project Review
Agenda
Project status (5 min) achieving the goals of the iteration project metrics
Used work practices (10 min) Completed work (15 min)
presenting the iteration’s results Plans for the next iteration (5 min)
3
T-76.115 Project ReviewT-76.115 Project Review
Status of planned goals of the iteration
Goal 1: Specify the goals of the project from all perspectives OK
Goal 2: Select and adapt work practices to be used in the project NOT OK, because all work practices are not needed yet. They are selected but
some will adapted during next iterations (for example practices considering coding and testing ).
Goal 3: Get to know the customer and project topic OK
Goal 4: Make project plan and requirement specification OK
Goal 5: Select Personal Software Engineering Assingment topics OK
4
T-76.115 Project ReviewT-76.115 Project Review
Status of planned deliverables of the iteration
Project Plan OK, except chapter 6.3 – 6.6 because iteration for use cases to implement are
not done yet. This is done during next iterations. Requirements document
OK in general level. Use cases will be refined next iterations.
5
T-76.115 Project ReviewT-76.115 Project Review
Realization of the tasks
Meeting (status/mentor) All group members have not participated
all meetings. Project review and preparation
Hours are reported after project review
6
T-76.115 Project ReviewT-76.115 Project Review
Working hours by person
Some group member haven’t done all tasks in this iteration yet or haven’t participated all meetings.
Realized hours in this iteration Plan in the beginning of this iteration
Member Real Plan Diffjkatajal 37 50,5 -13,5jpvalima 45 45,5 -0,5kmannist 81 80,5 0,5pnoponen 56 57,5 -1,5rraisane 48,5 61,5 -13stanabe 39 48,5 -9,5tpkoski1 33 45,5 -12,5
Member PP IM1 IM2 IM3 DE Totaljkatajal 50,5 39 43 52 5,5 190jpvalima 45,5 42 42 54 6,5 190kmannist 80,5 31 27 29 22,5 190pnoponen 57,5 36 39 51 6,5 190rraisane 61,5 41 46 36 5,5 190stanabe 48,5 41 39 56 5,5 190tpkoski1 45,5 34 42 59 9,5 190
7
T-76.115 Project ReviewT-76.115 Project Review
Changes to the project
There is no major changes to the project
8
T-76.115 Project ReviewT-76.115 Project Review
Risks
Risk management is done by Risk management team. Team members are:
Kirsi Männistö Reetta Räisänen Petri Noponen Jussi Katajala
Identified risks: Customer requirements are too vague and do not stabilize enough before I1 Distributed development Java -competence is distributed unevenly New tools Timetable
The current situation regarding the risks: None of risks have been realized yet
9
T-76.115 Project ReviewT-76.115 Project Review
Work practices
In this phase following practices are used: Time reporting Version control personal SE assignments
Topic selected and presented to the mentor. Iteration planning Documenting and document delivery Project review Requirements priorization Requirements management Use cases
10
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration
Project plan
Requirement specification
11
T-76.115 Project ReviewT-76.115 Project Review
Project plan (1/3)
Background of the project is to: Develop Roadmapping tool for software development organizations. Project is
part of customer's own CORE research project. Iterations:
Project planning phase Implementation phase 1 Implementation phase 2 Implementation phase 3 Delivery phase
Project organization:
C em o Tim u c inM en tor
Tero K o joC u s tom erS ob erIT
P etri N op on enA ccou n t M n g r
R eetta R ä isä n enU ser In te rface M n g r
Ju ss i K a ta ja laS ys tem A rch itec t
Ju h a V ä lim ä k iD ocu m en ta tion M n g r
Tom i K osk in enP rog ram m er M n g r
S a ik i Tan ab eP rocess M n g r
K irs i M ä n n is töP ro jec t M an ag er
Jou ko K osk iTech n ica l A d visor
S ob erIT
12
T-76.115 Project ReviewT-76.115 Project Review
Customers project goals are:
Goal Verification criteria
1. Usability User without experience has no difficulties to use this program.
2. Easy to install Customer can install and start work with the program by using manual.
3. Reliability 95 % of all test cases are passed.
4. Functional program Program fills its expectation and customer is able to demonstrate it further.
5. Program can be in drawing mode and in review mode
User can use program for editing and also just for reviewing.
6. Different layers can be defined. User can add, edit and remove layers with Roadmapping tool.
7. Portability of program's output User can easily transfer output to the other program (for example to PowerPoint)
8. Analyzing and categorizing of information
Items can be grouped together for better categorizing.
9. Performance Using program does not require new equipment or hardware for customer.
10. Possibility to add links to the other documents
Link to the other documents can be created and opened.
Project plan (2/3)
13
T-76.115 Project ReviewT-76.115 Project Review
Goals of the project group
Deliver valuable tool for Roadmapping in schedule
Passing the course with grade 3 or higher
Learn more about SW projects
Develop communicational skills
Test driven implementation (Module testing for critical parts/components)
Good design and architecture
Easy to use software
Learn more about Java
Project group’s goals are:
Project plan (3/3)
14
T-76.115 Project ReviewT-76.115 Project Review
Requirement specification (1/9)
Customer’s wide expectations were gathered during meetings Documentation from customer and WWW were processed Customer’s desires were interpreted and iterated to goals and activities Activities and goals were refined and grouped Limitation of reality defined the structure of activities and goals Structure was divided smaller parts as use cases
15
T-76.115 Project ReviewT-76.115 Project Review
Requirement specification (2/9)
Functional requirements Categorized according to customer goals
mandatory (must have features) optional (additional features) supplementary (adds value)
Categories will be implemented in priority order to product Functional requirements are modelled using Use cases Mandatory features will result in a coherent product Each requirement has a requirement ID
16
T-76.115 Project ReviewT-76.115 Project Review
Requirement specification (3/9)
Mandatory requirements 1/3
Roadmapping tool
Viewer
Save roadmap
Open roadmap
Create new roadmap
Edit roadmap
Creator
17
T-76.115 Project ReviewT-76.115 Project Review
Requirement specification (4/9)
Mandatory requirements 2/3
Roadmapping tool
Viewer
Create layer
Remove layer
Edit layer
View layers
Creator
18
T-76.115 Project ReviewT-76.115 Project Review
Requirement specification (5/9)
Mandatory requirements 3/3
Roadmapping tool
Add artifact
Add activity
Remove artifact
Remove activity
Edit artifact
Edit activity
Creator
19
T-76.115 Project ReviewT-76.115 Project Review
Requirement specification (6/9)
Optional requirements
Roadmapping tool
Change layer order
Creator Adjust timescale
Focus layer
Viewer
20
T-76.115 Project ReviewT-76.115 Project Review
Requirement specification (7/9)
Supplementary requirements
Roadmapping tool
Add document
Remove document
Create link to documentCreator
Launch document
Export roadmap
Export document
Viewer
21
T-76.115 Project ReviewT-76.115 Project Review
Requirement specification (8/9)
Properties Three categories that have significant value to customer
Usability emphasis on low learning curve familiar user-interface (windows-like)
Reliability focus on test first programming robust
Performance short response time to user actions
22
T-76.115 Project ReviewT-76.115 Project Review
Requirement specification (9/9)
Constraints Standards
MS Windows development platform Export to MS Powerpoint
Software constraints Developed using Java 1.4.2 Platform independent solution XML for persistency
HW constraints usable with a 1 GHz desktop PC
23
T-76.115 Project ReviewT-76.115 Project Review
Plan for the next iteration (1/3)
Goals in priority order: Goal 1: Designing core
architecture Goal 2: Implementing core
architecture Goal 3: Testing core
architecture Goal 4: Implementing user
interface Goal 5: Testing user interface Goal 6: Writing system test
plan document Deliverables
Updated project plan Updated requirements
document Technical specification (core
architecture) Test case specifications Test report Progress report (slideshow)
24
T-76.115 Project ReviewT-76.115 Project Review
Plan for the next iteration (2/3)
Risks / uncertainties Distributed development Java -competence is
distributed unevenly New tools Timetable
Planned tasks for next iteration
25
T-76.115 Project ReviewT-76.115 Project Review
Plan for the next iteration (3/3)
Schedule