Systems Lay Out
description
Transcript of Systems Lay Out
1
1
Accelerometers Cables&conduits
Reactor Building Containment Penetration
VMS Software
Data Acquisition System
Signal Conditioning System
1
8
Moderator Circulation System 4 sensor
Priary Heat Transport System 4 sensor
Industrial ComputerIndustrial Computer
Signal Conditioning SystemSignal Conditioning System
Industrial Computer
Industrial Computer
DAQ
C – Header (02 Sensors)
U – Header (01 Sensors)
MH Discharge Header (01 Sensors)
MH Expansion Joint (01 Sensors)
PWT Discharge Header (01 Sensors)
RBV Exhaust 01/02 (05 Sensors)
RBV Suction 01/02 (05 Sensors)
VMS Softwar
e
Industrial
Computer
Power Supply
Signal Condition
er & Controlle
r
MH Pump -01(08 Sensors)
MH Pump -02(08 Sensors)
MH Pump -03( 08 Sensors)
VMS Softwar
e
Power Supply
Signal Condition
er & Controlle
r
Sensors Cable (16 online, 08 standby)
Industrial
Computer
C – Header (02 Sensors)
U – Header (01 Sensors)
MH Discharge Header (01 Sensors)
MH Expansion Joint (01 Sensors)
PWT Discharge Header (01 Sensors)
RBV Exhaust 01/02 (05 Sensors)
RBV Suction 01/02 (05 Sensors)
VMS Softwar
e
Industrial
Computer
Power Supply
Signal Condition
er & Controlle
r
Junction Box
MCR
Containment
Penetration
Vibration Severity Criteria (Based on ISO IS 2372)
RMS Overall velocity Level Measured
in 1000 Hz Bandwidth
Vibration Severity Criteria
Mm/ s In/ s Class I Class II Class II I Class IV 0.28 0.01
Good
Good
Good
Good 0.45 0.02 0.71 0.03 1.12 0.04
Satisfactory 1.8 0.07 Satisfactory 2.8 0.11
Unsatisfactory Satisfactory 4.5 0.18 Unsatisfactory Satisfactory 7.1 0.28
Unacceptable
Unsatisfactory 11.2 0.44
Unacceptable Unsatisfactory
18 0.71 Unacceptable 28 1.10 Unacceptable 45 1.77
Class I. Small-sized machines (powered from 0 to 15 KW)Class II. Medium-sized machines (powered from 15 to 75 KW)Class III. Large-sized machines (powered > 75 KW) mounted on "Rigid
Support" structures and foundationsClass IV. Large-sized machines (powered >75 KW) mounted on "Flexible
Support" structures