One Gateway Plaza Los Angeles, CA 90012-2952 21 3-922 . L--- metro . net SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE JULY 17, 2014 SUBJECT: STAFFING REQUEST FOR EXPO LINE PHASE 2 AND GOLD LINE FOOTHILL EXTENSION PHASE 2A ACTION: APPROVE FULL TIME EQUIVALENT (FTE) POSITION INCREASE RECOMMENDATION A Authorize the Chief Executive Officer to amend the FY15 Budget to add 266 positions, as shown below: 1. Add 25 non-contract positions to manage and plan for integrated testing, system readiness drills, asset inspection and acceptance, turnover coordination, opening two new Maintenance Facilities and pre-revenue service testing of the Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A rail projects. 2. Add 241 contract positions to support training and certification, contractor oversight, asset inspection and acceptance, turnover coordination, integrated testing, system readiness drills, the opening of two Maintenance Facilities and pre-revenue service testing. B. Receive and file staff analysis of a comprehensive rail expansion staffing plan to add a total of 319 positions (266 positions in FY15 and 53 positions in FY16). The staffing plan includes a total of (a) 27 non-contract positions and (b) 292 contract positions, and it assumes a time-phased, milestone-based hiring construct using the best available current scope of work estimates. The FY16 baseline as well as any changes in FY16 FTE requirements will be brought forward for board consideration during FY16 Budget development. ISSUE The Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A rail projects are under construction and scheduled to commence revenue service in FY16. With these projects, Metro will receive two (2) new light-rail Maintenance Facilities, 18.2 new route miles for passenger service, 13 new stations, and 78 new light-rail vehicles, all of which

Transcript of SYSTEM SAFETY, SECURITY AND OPERATIONS...

Page 1: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

One Gateway Plaza Los Angeles, CA 90012-2952

21 3-922.L--- · ~ ·

metro. net

SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE JULY 17, 2014

SUBJECT: STAFFING REQUEST FOR EXPO LINE PHASE 2 AND GOLD LINE FOOTHILL EXTENSION PHASE 2A

ACTION: APPROVE FULL TIME EQUIVALENT (FTE) POSITION INCREASE

RECOMMENDATION

A Authorize the Chief Executive Officer to amend the FY15 Budget to add 266 positions, as shown below:

1. Add 25 non-contract positions to manage and plan for integrated testing, system readiness drills, asset inspection and acceptance, turnover coordination, opening two new Maintenance Facilities and pre-revenue service testing of the Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A rail projects.

2. Add 241 contract positions to support training and certification, contractor oversight, asset inspection and acceptance, turnover coordination, integrated testing, system readiness drills, the opening of two Maintenance Facilities and pre-revenue service testing.

B. Receive and file staff analysis of a comprehensive rail expansion staffing plan to add a total of 319 positions (266 positions in FY15 and 53 positions in FY16). The staffing plan includes a total of (a) 27 non-contract positions and (b) 292 contract positions, and it assumes a time-phased, milestone-based hiring construct using the best available current scope of work estimates. The FY16 baseline as well as any changes in FY16 FTE requirements will be brought forward for board consideration during FY16 Budget development.

ISSUE

The Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A rail projects are under construction and scheduled to commence revenue service in FY16. With these projects, Metro will receive two (2) new light-rail Maintenance Facilities, 18.2 new route miles for passenger service, 13 new stations, and 78 new light-rail vehicles, all of which

Page 2: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

must be fully-integrated into the existing Metro Rail network prior to the start of revenue service to ensure the new system meets Metro's safety standards.

These projects will increase Metro's light-rail system route miles by 26 percent and stations along the entire Metro Rail network by 16 percent. Additionally, the two (2) new light-rail Maintenance Facilities will increase Metro's total light-rail maintenance capacity by 75 percent.

There are currently no full time positions assigned to manage start-up and systems integration activities for Expo Line Phase 2 or Gold Line Foothill Extension Phase 2A. Given Metro's intention to operate full revenue service along both of the two new extensions no later than March 2016, there is an immediate need to hire staff to commence training and manage critical path activities to prevent project delays. The positions being requested will require one (1) to 12 months of training , thus placing additional time pressures on Metro to hire staff in advance of the milestones described in this report. Existing employees from functional departments are performing tasks connected to these projects on an as-needed basis in addition to their regular duties but cannot do so on a full-time basis. Metro must concurrently manage contractor oversight, testing activities including pre-revenue service, and asset inspection and acceptance before revenue service can begin.

With regard to the Kinkisharyo International, LLC, (KI) light-rail vehicle procurement, staff has developed and managed a delivery schedule that is unprecedented at Metro and the transit industry. In years past, rail vehicle deliveries, for as few as 50 to 52 rail vehicles, has ranged from 111 to 126 months from Notice to Proceed through Final Acceptance. The current delivery schedule for the 78 Kl light-rail vehicles is 53 months from Notice to Proceed through Final Acceptance.

The light-rail vehicle prototype is scheduled to arrive in October 2014. Metro expects light-rail vehicle deliveries to begin in mid-2015 at a rate of approximately four (4) per month. The initial 10 to 12 light-rail vehicles will be used for hands-on training on the operation and maintenance of these vehicles prior to entering revenue service. The Kl light-rail vehicle must undergo commissioning , acceptance, and receive California Public Utilities Commission (CPUC) safety certification before it can enter into revenue service.

The overall effort to prepare these line extensions, maintenance facilities, and light-rail vehicles for revenue service beginning no later than March 2016 will require a substantial amount of technical and support staff across several departments. For technical operations staff, Metro must begin recruitment well in advance of actual need in order to ensure adequate training and qualification requirements can be met. These positions will be phased in throughout FY15 and FY16 and recruitment will be aligned with system safety, critical path activities and project milestones.

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 2

Page 3: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

DISCUSSION

The Expo Line Phase 2 is a light-rail expansion project undertaken by the Exposition Line Construction Authority, which began construction during the summer of 2012. The 6.8-mile extension includes seven (7) stations and begins at the existing Culver City Station and terminates at a new station in Santa Monica, at 41

h Street and Colorado Avenue. According to the most recent project schedules, integrated testing , system readiness drills, asset inspection and acceptance, and turnover coordination are planned for FY15. This project also includes the opening of a light-rail Maintenance Facility (Division 14) in Santa Monica, which will have a capacity for 48 light-rail vehicles. This facility will support daily maintenance and servicing of light-rail vehicles. Construction of the facility began in July 2013 and is scheduled for substantial completion in February 2015. Pre-revenue service testing of the rail line could begin as early as October 2015 with revenue operations following no later than March 2016.

The Gold Line Foothill Extension Phase 2A is a light-rail expansion project undertaken by the Gold Line Foothill Construction Authority, which began construction during the summer of 2012. The 11.4-mile extension includes six (6) stations and begins at the existing Sierra Madre Villa Station and terminates at a new station in Azusa at E. gth

Street and Palm Drive. According to recent project schedules, integrated testing , system readiness drills, asset inspection and acceptance, and turnover coordination are planned for FY15. This project also includes the opening of a light-rail Maintenance Facility (Division 24) in Monrovia, which will have a capacity for 84 light-rail vehicles. The facility will support daily maintenance and servicing of light-rail vehicles . Construction of the facility began in December 2012 and is scheduled for substantial completion in March 2015. Pre-revenue service testing of the rail line could begin as early as October 2015 with revenue operations following no later than March 2016.

Authorization to add positions will allow Metro to proceed with start-up planning and recruitment, hiring and training of personnel required for systems integration for both line extensions, both rail Maintenance Facilities, and the new Kllight-rail vehicles. Activities include project monitoring and inspections, integrated testing , system readiness drills , asset inspection and acceptance, turnover coordination , the opening of two (2) new Maintenance Facilities and pre-revenue service testing.

This request is for agency-wide staffing needs and non-labor expenses for full systems integration with the Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A. This report includes milestones, staffing levels and next steps to deliver a safe and effective rail service.

Project Milestones connected to this authorization include, but are not limited to, the following:

1. July 2014: Establish Metro Rail Activation Team

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 3

Page 4: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

2. October 2014: Receive Kl Light-Rail Vehicle Pilot Car 3. March 2015: Accept and Integrate Two Maintenance Facilities (Divisions 14 and

24) 4. April 2015: Start Systems Integration Testing 5. July 2015: Begin Commissioning and Acceptance of Kl Light-Rail Vehicles (four

per month) 6. October 2015: Conduct Pre-Revenue Service Testing 7. March 2016: Launch Revenue Service

In total for systems integration, start-up, pre-revenue service and subsequent operations and maintenance, Metro is requesting authorization to add 319 positions, as follows:

A Amend the FY15 Budget to add 266 positions through this report; and

B. Add 53 positions in FY16 through the FY16 Budget process.

The comprehensive (FY15 and FY16) rail expansion staffing plan with related rationale is summarized in Attachment F: Agency-Wide Staffing Summary by Position.

The initial authorization to add positions will allow Metro to hire, provide training and manage critical path activities to prevent project delays. Metro will continue conducting a comprehensive review of budgeted FTEs for Rail Facilities Maintenance, Rail Fleet Services, Rail Transportation , and Wayside. Metro will report back to the Board as part of the FY16 Budget process detailing ongoing staffing needs and non-labor expenses for full light rail network integration of Expo Line Phase 2 and the Gold Line Foothill Extension Phase 2A.

DETERMINATION OF SAFETY IMPACT

The authorization to add positions will have a positive impact on safety. This authorization will add the staff needed to plan, manage, and implement start-up activities.

Metro staff will monitor and inspect third-party construction and installations. For example, Metro personnel will work closely with constructors during integration testing to check all systems for the ability to operate trains safely through stations, switches, ventilation zones, at-grade crossings or other systems. This testing will also include operating and testing multiple train scenarios to examine the integrity and redundancy of safety systems. This authorization will allow Metro to maintain existing revenue service levels on the existing rail network and achieve project milestones in parallel.

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 4

Page 5: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

FINANCIAL IMPACT

The projected hiring plan and milestones support a Revenue Operations Date (ROD) of March 2016. New staff will begin to arrive during the first three months of FY15. The FY15 annual budget impact is estimated to be $15,000,000.

Funding for Systems Integration and Pre-ROD testing are included in the Capital Life of Project (LOP) budgets for EXPO LRT Phase II (project 860301 - $6,500,000) and Gold Line Foothill Extension (project 860200- $1 0,700,000). A total of $17,200,000 is available to support these activities within these respective projects.

Since this is a multi-year effort, the cost center managers, project managers, and Executive Directors will ensure that planned resources are budgeted in future fiscal years. In FY16, it is anticipated that additional funds must be identified to complete and sustain the staffing plan . Staff will identify the funding and continuing Operations support requirements for Board consideration during the FY16 budget process.

Impact to Budget

Funding for this effort is Measure R Transit Capital New Rail 35%. These funds are eligible for new rail system integration and pre-revenue activities. No other funds were considered for these Measure R Transit Capital projects.

ALTERNATIVES CONSIDERED

Authorization to amend the FY15 Budget to add 266 positions will support Metro's mission for the continuous improvement of an efficient and effective transportation system for Los Angeles County. Delaying the recruitment, hiring , and training of personnel needed to plan, manage, and implement start-up activities could delay both projects.

One alternative would be to reassign existing Metro personnel from current duties to support both projects. This approach is not recommended because it would have a negative impact on Metro's ability to adequately provide the current level of rail service or maintain the existing rail network.

The impacts of not staffing at suitable levels include, but are not limited to, the following risks: lack of Metro oversight and inspection ; foregone opportunities to evaluate safety, design, and construction activities; third-party reliance for completion of systems to acceptable standards; failure to satisfy acceptance and delivery schedules; insufficient time to hire, recruit and train staff; and delays to project milestones including revenue operations.

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 5

Page 6: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

NEXT STEPS

If approved, Metro will immediately proceed with the recruitment, hiring and training of personnel. Additionally, Metro will advance start-up planning and activities to ensure timely delivery of both projects. This authorization will allow Metro to increase staffing levels through FY16 in order to meet project milestones and commence revenue operations on both the Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A no later than March 2016.

The authorized FY16 positions will be requested and added through the FY16 Budget process. The 53 positions to be added in FY16 include two (2) non-contract and 51 contract positions, as shown in Attachment A. These positions will be needed for Metro to manage operations and maintenance.

Metro will continue ongoing efforts to finalize plans for Public Safety Communications, Marketing, Rail Activation , Fleet Management and Operations for both the Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A projects. These plans document Metro's strategy including roles and responsibilities for directing and managing work through project closure and beyond. Said planning efforts take into account the potential for light-rail vehicle shortages in the first few months of revenue service and carefully examine a number of service options for each line. Service options may include varying train consist lengths, adjusting headway by time of day, short lining train operations, supplementing peak service or phased openings for each rail line.

ATTACHMENTS

A. Agency-Wide Staffing Summary by Department B. Agency-Wide Staffing Summary by Hire Date C. Agency-Wide Staffing Summary by Milestone/Hire Date, Group, and Position

Title D. Operations FTE Budget Base Increase Summary E. Support FTE Budget Base Increase Summary F. Agency-Wide Staffing Summary by Position G. Agency-Wide Staffing Milestone Chart

Prepared by: Luke H. Klipp , Budget Analyst, Office of Management and Budget Patrick Preusser, Deputy Executive Officer, Rail Operations

Staffmg Request for Expo Line Phase 2 and Gold Line Footh ill Extension Phase 2A 6

Page 7: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Nalini Ahuja Executive Director, Finance and Budget

~(Qz£= Interim Chief Operations Officer

Arthur T. Leahy Chief Executive Officer

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 7

Page 8: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

ATTACHMENT A

Agency-Wide Staffing Summary by Department

--Department Contract Non-Contract Contract Non-Contract Total Positions Positions Positions Positions

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 8

Page 9: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

ATTACHMENT B

Agency-Wide Staffing Summary by Hire Date

Page 10: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

ATTACHMENT C

Agency-Wide Staffing Summary by Milestone/Hire Month , Group, and Position Title

Milestone/Hire Month Positions by Group Positions by Title Group

Begin Monitoring Project & Inspections

14 Months Prior to Pre-Revenue Service

Expected August 2014

AFSCME: 38 ATU: 55 TCU : 25 UTU: 59

Non-Contract 13

Rail Facilities Maintenance: AFSCME 1 Facility Maintenance Instructor 3 Facility Maintenance Supervisor 3 General Services Supervisor 1 Non-Rev Equipment Maintenance Supervisor ATU 1 Air Conditioning Technician 1 Facilities Maintenance System Tech Lead 1 Locksmith 1 Machinist 2 Non-Rev Maintenance Mechanic 1 Plumber TCU 3 Custodian Lead 19 Custodian Non-Contract 1 Assistant Manager, Wayside Systems 1 Project Manager Rail Fleet Services: AFSCME 2 Equipment Maintenance Instructor ATU 34 Maintenance Specialist Rail Transportation: AFSCME 28 Rail Transit Operations Supervisors UTU 59 Train Operators Non-Contract 2 Transportation Manager 1 Transportation Planning Manager II 1 Transportation Planning Manager V Wayside: ATU 1 Rail Communications Inspector Lead 2 Rail Communications Inspector 1 Signal Inspector Lead 2 Signal Inspector 1 Track Inspector Lead 2 Track Inspector 1 Traction Power Inspector Lead 3 Traction Power Inspector Non-Contract 1 Assistant Manager, Wayside Systems Traction Power

Page 11: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Milestone/Hire Month Positions by Group Positions by Title Group

Support Positions (continued) Corporate Safety:

Non-Contract Begin Monitoring Project & 2 Senior Safety Specialists Inspections Human Resources:

TCU 14 Months Prior to 1 Employment Processing Specialist Pre-Revenue Service 2 Employment Records & Verification

Specialist Expected August 2014 Non-Contract

1 Principal Human Resources Analyst 1 Senior Human Resources Analyst Information Technology Services: ATU 1 Systems Electronic Communications Leader Non-Contract 1 Supervisor Engineer Risk Management: Non-Contract 1 Senior Workers Camp Analyst & PLIPD Analyst

Kinkisharyo Pilot Car ATU: 2 Rail Fleet Services: Arrives/Testing Begins UTU: 4 ATU

2 Warranty Equipment Specialist 12 Months Prior to Rail Transportation: Pre-Revenue Service UTU

4 Train Operators Expected October 2014 11 Months Prior to ATU: 12 Wayside: Pre-Revenue Service ATU

1 Rail Communications Inspector Lead Expected November 2014 1 Rail Communications Inspector

1 Signal Inspector Lead 2 Signal Inspector 1 Track Inspector Lead 2 Track Inspector 1 Traction Power Inspector Lead 3 Traction Power Inspector

9 Months Prior to ATU : 5 Rail Facilities Maintenance: Pre-Revenue Service ATU

Non-Contract: 3 5 Facilities Maintenance System Tech Expected January 2015 Rail Fleet Services:

Non-Contract 2 Manager Maintenance Support Positions Community Relations/Marketing: Non-Contract 1 Senior Community Relations Officer

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A II

Page 12: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Milestone/Hire Month Positions by Group Positions by Title Group

Santa Monica Maintenance Non-Contract: 1 Rail Transportation: Facility Completion Non-Contract

1 Assistant Transportation Manager 8 Months Prior to Pre-Revenue Service

Expected February 2015 Monrovia Maintenance AFSCME: 3 Rail Fleet Services: Facility Completion ATU: 4 ATU

TCU: 2 4 Warranty Equipment Specialist 7 Months Prior to UTU: 12 TCU Pre-Revenue Service 2 Clerks

Non-Contract: 1 Rail Transportation: Expected March 2015 UTU

12 Train Operators Wayside: AFSCME 1 Rail Communications Inspector Supervisor 1 Signal Supervisor 1 Traction Power Supervisor Non-Contract 1 SCADA Communication & Control Engineer

Systems Integration/Testing AFSCME: 1 Rail Facilities Maintenance: ATU : 14 ATU

6 Months Prior to TCU : 5 4 Electrician Pre-Revenue Service 2 Property Maintainer

Non-Contract: 6 TCU Expected April 2015 1 General Service Clerk

Wayside: ATU 3 Signal Inspector 2 Track Inspector 3 Traction Power Inspector Support Positions Inventory: AFSCME 1 Material Supervisor TCU 2 Storekeepers 1 Truck Driver Clerk 1 Stock Clerk Non-Contract 1 Material Inventory Analyst 2 Material Planner 1 Principal Inventory Analyst 1 Procurement Planning Administrator 1 Senior Buyer

4 Months Prior to Non-Contract: 1 Wayside: Pre-Revenue Service Non-Contract

1 Wayside Systems Manager Signal Expected June 2015

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 12

Page 13: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Milestone/Hire Month Positions by Group Positions by Title Group

Kinkisharyo LRVs Arrive AFSCME: 7 Rail Fleet Services: Commission/Acceptance ATU: 22 AFSCME Testing Teamsters: 7 7 Equipment Maintenance Supervisor

TCU:4 ATU 3 Months Prior to 3 Body/Paint Repairer Pre-Revenue Service Non-Contract: 2 19 Service Attendant

TCU Expected July 2015 Support Positions

Accounting: Non-Contract 1 Senior Accountant Revenue Collections: TCU 3 Revenue Collectors 1 Cash Clerk Non-Contract 1 Engineering Associate Transit Security: Teamsters 7 Transit Security Officer II

Start of Pre-Revenue Service TCU : 11 Rail Transportation: TCU

Expected October 2015 2 Stenographer Support Positions Inventory: TCU 8 Stock Clerks 1 Authority Relief Pool Storekeeper

Union Total AFSCME 49 ATU 114 TCU 47 Teamsters 7 UTU 75 Non-Contract 27

Grand Total 319

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 13

Page 14: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Operations FTE Budget Base Increase Summary

Facilities Maintenance

NON-REV EQUIP MECH/LDR

FACILITIES TECH/LOR

ELECTRICIANS

PROPERTY MAINTAINER

ADMIN/CLERICAL

CUSTODIAN/LEAD

SUPERVISORS

MANAGEMENT(NC)

A/CTECH

LOCKSMITH

MACHINIST

Rail Fleet Services

SERVICE ATIENDANT

BODY & PAINT

MAINTENANCE SPCLST

ADMIN/CLERICAL

INSTRUCTION

SUPERVISORS

MANAGEMENT (NC)

Maintain non-revenue vehicles

Facilities mech/electric maintenance

Maintain electrics of facilities

Maintain property of facilities

Maintain records and materials

Custodial work for all rail facilities

Maintain climate control equipment

Maintain/repair lock systems

Set up and operate machines

Clean LRVs

Maintain body and paint of LRVs

LRV preventive/corrective maintenance

Maintain dept records, incl personnel

Train skilled personnel

of new LRVs

6.00 2.00

18.71 6.00

3.94 4.00

3.37 2.00

1.60 1.00

83.50 22.00

8.92 8.00

1.30 2.00

1.00

1.00

1.00

71.00 19.00

11.00 3.00

128.94 34.00

6.75 2.00

5.10 2.00

22.75 7.00

9.00 2.00

ATTACHMENT D

2.00

6.00

4.00

2.00

l.OO I b d . . d f h . ncreases ase on pos1t1ons nee s or t e two new LRV ma1 ntenance 22·00 f T · h' d h' I . d . h ac1 1t1es, new mac mery an non-revenue ve 1c es associate w1t 8.00 h f T . d 13 . t ese ac1 1t1es, an new stations. 2.00

1.00

1.00

1.00

19.00

3.00

34.00

2.00

2.00

7.00

2.00

Increase based on projected increase in vehicle miles (both revenue

and non-revenue miles) in the light-rail system, which includes the

Metro Blue, Gold, Green, and Expo Lines. An additional six Warranty

Mechanic positions were added to conduct vehicle acceptance and

testing of the new Kinkisharyo vehicles.

Page 15: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Maintenance of Way

RAIL COMM LEAD/INSPCTR Maintain communications equipment 17.88 5.00

TRACTION POWER LEAD/INSP Maintain traction power systems 42.34 11.00

TRACK LEAD/INSP Maintain tracks 28.72 8.00

SIGNAL LEAD/INSP Maintain train control systems 35.08 9.00

ENGINEERING (NC) Assist w overall maintenance 1.24 1.00

SUPERVISORS 12.15 3.00

RAIL OPERATOR Operate LRVs 284.00 59.00

ADMIN & CLERICAL Maintain dept records, incl personnel 3.80 2.00

CCTV OBSERVER 19.55

SUPERVISORS 79.25 14.00

11.86 5.00

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A

5.00

11.00

8.00

9.00

16.00 75.00

2.00

14.00 28.00

5.00

Increase based on projected increase in route miles in the light-rail

m, from 69.6 to 87.8 total route miles.

Increase based on projected increase in revenue service hours in the

light-rail system. An additional16 Rail Operator positions were added

for vehicle acceptance and testing of the new P3010 vehicles. 14

additional Management positions were added for RTOS at both of the

new maintenance facilities and at the Santa Monica station.

15

Page 16: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Support FTE Budget Base Increase Summary

Support Departments

ACCOUNTING

COMMUNICATIONS

HUMAN RESOURCES

ITS

INVENTORY

Senior Accountant

Community Relations Officer

Prin/Sr Anlysts, Emplymnt Procsn/Recrds

Supv Engineer, Systems Tech Leader

Storekeepers, Stock Clerks, Analysts, etc

REVENUE COLLECTIONS Revenue Collector, Cash Clerks

SAFETY & RISK MANAGEMENT Workers Comp Analyst, Sr Safety Speclst

Transit Secu Officers II

n:utm,..nts Subtotal

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A

ATTACHMENT E

1.76 1.00 One accountant per ~315 FTEs agencywide

8.10 1.00 16% increase in number of stations

5.00 Required to recruit and hire for 400 new positions

6.95 2.00 26% increase in route miles

40.74 20.00 43% increase in maintainence facilities capacity

15.09 5.00 26% increase in route miles

12.05 3.00 16% increase in number of stations

33.47 7.00 16% increase in number of stations

118.16 44.00

16

Page 17: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Agency-Wide Staffing Summary by Position

Department Position Title Group

Rail Facilities Non-Contract Maintenance

Non-Contract

Air Conditioning ATU Technician

Custodian Lead I TCU

Custodian TCU

Electrician ATU

Facility I

AFSCME Maintenance Instructor Facility AFSCME Maintenance Supervisor

Facilities ATU Maintenance System Tech Lead

I

I

I

Total Positions

1

1

1

3

19

4

1

3

1

ATTACHMENT F

Position Description/Justification Months Prior to Anticipated Pre-Revenue Hire Date

Service Operations Positions I Manage personnel and oversee electro/mechanical I 14 I 08/2014 maintenance and housekee Manage projects, schedules, and plans related to facility 14 I 08/2014 construction and maintenance. Under moderate supervision, installs, maintains, I 14 I 08/2014 troubleshoots and repairs climate control equipment, fans, and blowers at all Metro facilities.

I Under moderate supervision, assigns, monitors, and reviews I 14 08/2014 tasks performed by work crew and maintains cleanliness of buildings, divisions, and stations. Leads direct activities for daily cleaning and servicing of facil ities and stations on multiple shifts including both standard and restorative maintenance activities.

I Under moderate supervision, maintains divisions, and I 14 I 08/2014 stations in clean and orderly condition . Daily cleaning and servicing of facilities and stations on multiple shifts inclusive of standard and restorative maintenance activities.

I Under moderate supervision, performs skilled electrical I 6 I 04/2015 construction , installation, and maintenance tasks on a variety of electrical s stems and e ui ment. Oversee the activities of the facilities maintenance instruction I 14 I 08/2014 function .

Supervise multi-skilled personnel and contractors in the 14 I 08/2014 repair, modification, upgrade, overhaul , and maintenance of any or combination of the following : buildings, facilities, grounds, and wayside structures, mechanical , electrical, or communications SJ~Stems , and egui~ment. Under moderate supervision, performs a variety of skilled and 14 I 08/2014 semi-skilled construction, installation , and maintenance procedures relating to mechanical and electrical components and

Page 18: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Maintenance ents.

(continued) 1 General Service I

TCU

I 1 I Under moderate supervision, maintain records and types I 6 I 04/2015

Clerk various materials at maintenance division offices. Perform and maintain all record keeping in support of mandated regulatory and safety standards. Also performs Timekeeping, Personal Protective Equipment issuance tracking , and other administrative tasks.

General Services

I AFSCME

I 3 I Supervise personnel engaged in janitorial and other building I 14 08/2014

Supervisor maintenance services for various Metro locations. Supervision and scheduling of daily cleaning and servicing of facilities and stations on multiple shifts including both standard and restorative maintenance.

Locksmith ATU I 1 Under moderate supervision, installs, maintains and repairs I 14 I 08/2014 lock s stems and related e ui ment.

Machinist I ATU I 1 Under moderate supervision, sets up and operates machines 14 08/2014 and precision hand tools to cut, shape, and finish ferrous & non-ferrous metals, plastics and other exotic materials for the manufacture, remanufacture, assembly, installation, and

Property Maintainer I ATU I 2 ir of vehicle and egui~ment ~arts and com~onents . 1

I Under moderate supervision, performs a variety of skilled and 6 I 04/2015 semi-skilled facilities maintenance duties.

Non-Rev AFSCME 1 Supervise personnel engaged in maintenance of non-revenue I 14 I 08/2014 Equipment vehicles and equipment in support of the expanded system Maintenance and its expanded inventory.

ATU 2 Provide maintenance and repair for automotive and heavy I 14 I 08/2014 Maintenance

I duty non-revenue service vehicles. Perform and maintain all

Mechanic regulatory, mandated, periodic, corrective, and routine maintenance of non-revenue fleet.

Plumber I ATU I 1 I Under moderate supervision, installs, maintains, and replaces I 14 I 08/2014 plumbing equipment, fixtures and irrigation systems and controllers.

Rail Facilities M

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 18

Page 19: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Services

Clerk TCU 2 3 07/2015

Equipment AFSCME

I 2 I Provide training in the maintenance and repair of rail vehicles 14 I 08/2014

Maintenance and other related equipment. Instructor Equipment AFSCME 7 Supervise rail maintenance personnel in the inspection, I 3 I 07/2015 Maintenance maintenance, repair, and operation of rail transit vehicles: Supervisor administrative duties inclusive of payroll , records

management, audits; provide guidance on troubleshooting and repairs ; and monitor compliance of safe work practices and codes/re ulations.

Maintenance ATU 34 Under moderate supervision, performs complex and I 14 I 08/2014 Specialist specialized troubleshooting and preventive and corrective

maintenance of rail transit vehicles: performs journey level diagnosis and repairs to railcars; utilize test equipment, schematics, and drawings to support maintenance repairs ; and conducts inspections, repairs , and testing . Main line and

eventsu Manager Non-Contract 2 Manage the overall activities of a rail equipment maintenance I 9 I 01/2015 Maintenance division: manage subordinate staff; administer preventive,

corrective, and heavy overhaul maintenance programs; and ensure safe, clean and reliable vehicles are available to meet daily service demands.

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 19

Page 20: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Services

(continued)

Rail Transportation

Warranty Equipment Specialist

Assistant Transportation Manager

Rail Transit Operations Supervisors

Train Operators

Transportation Manager

ATU

AFSCME

UTU

Non­Contract

6

28

75

2

Under close supervision, performs unskilled servicing and cleaning of revenue and non-revenue equipment, including automobiles, buses, rail cars, and non-revenue rail equipment. Clean, sweep, mop and remove graffiti from railcar interiors; operate cleaning machines; and cleans maintenance shops, restroom, locker rooms, offices, work

and vard areas. Main line support. Under moderate supervision, performs complex and specialized Quality Assurance/Quality Control functions and inspections of rail transit vehicle components including processing of parts and components that are covered under warranty: new railcar commissioning and acceptance testing ; conducts evaluations of testing programs; quality assurance inspections of overhauled equipment; and generates warranty claim

Manager will lead systems integration coordination and testing prior to Revenue Operations. This position will then transition into managing the overall activities of an operating rail transportation division.

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 20

12 (2 Positions) 7 (4 Positions)

14

14 (59 Positions) 12 (4 Positions) 7 (12 Positions)

14

10/2014 03/2015

08/2014

08/2014 10/2014 03/2015

08/2014

Page 21: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Transportation Non- 1 Perform journey-level technical planning and I 14 I 08/2014 Transportation I Planning Manager Contract programming support activities associated with Strategic

II Operating and Rail Fleet Management Plan development, (continued) I system-wide planning, rail project and program

im lementation, and technical Transportation Non- 1 Oversee, manage, and execute work activities associated I 14 I 08/2014 Planning Manager Contract with Strategic Operating and Rail Fleet Management Plan v development, system-wide planning, rail project and

program implementation, and technical analysis for assigned projects as well as coordinate the work of other staff on related ro·ects in rail.

Stenographer TCU 2 Maintains records. takes and transcribes dictation. and I 3 I 07/2015

--Rail Transpo

Wayside I Assistant Manager, Non- 1 Under direction, assists with the overall management of I 14 I 08/2014 Wayside Systems Contract traction power substations, power contact systems, tunnel Traction Power ventilation systems, and tunnel lighting systems. Rail AFSCME 1 Supervise personnel engaged in the maintenance of rail 7 I 03/2015 Communications communications equipment. Inspector Sup Rail ATU 2 Under moderate supervision, performs inspection,

I 14 ( 1 position)

I 08/2014

Communications testing, installation, maintenance, and repair of electronic 11 (1 position) 11/2014 Inspector Lead equipment on the right-of-way, publ ic area, while leading

Rail Electronic Communication Inspectors by assigning work and providing training .

Rail ATU 3 Under moderate supervision, performs inspection,

I 14 (2 positions)

I 08/2014

Communications testing , installation , maintenance, and repair of electronic 11 ( 1 position) 11/2014 Inspector equipment on the right-of-way, and public area. SCADA Non- 1 Provide technical support for computer based electronic I 7 I 03/2015 Communication & Contract communications and control systems. Control Engineer Signal Supervisor AFSCME 1 Supervise technical personnel in the maintenance, repair, 7 I 03/2015

and testing of signal systems.

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 21

Page 22: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Under moderate supervision, performs preventive and corrective maintenance and inspection of Train Control

(continued) I I 1 Systems and related signal equipment and interface while leading Signal Inspectors by assigning work and providing training.

Signal Inspector I

ATU I

7 1 Under moderate supervision, performs preventive and 14 (2 positions) 08/2014 corrective maintenance and inspection of Train Control 11 (2 positions) 11/2014

s and related signal equipment and interface. 6 (3 positions) 03/2015 Track Inspector

I ATU

I 2 I Under moderate supervision, performs inspection work on 14 ( 1 position) 08/2014

Lead rail transit systems, including preventive and corrective 11 (1 position) 11/2014 maintenance and construction of track work, platforms, and aerial structures while leading Track Inspectors by assi nin work and rovidin trainin .

Track Inspector ATU 6 Under moderate supervision, performs inspection work on 14 (2 positions) 08/2014 rail transit systems, including preventive and corrective 11 (2 positions) 11/2014 maintenance and construction of track work, platforms, and 6 (2 positions) 03/2015 aerial structures.

Traction Power AFSCME 1 Supervise personnel in the repair and maintenance of 7 03/2015 Supervisor traction power substations, power contact systems, tunnel

ventilation s stems, and tunnel li htin s stems. Traction Power

I ATU 2 Under moderate supervision, performs preventive and 14 (1 position) 08/2014

Inspector Lead corrective maintenance and inspection of traction power 11 (1 position) 11/2014 substations, overhead catena~. and contact rail

Traction Power

I ATU

I 9 I Under moderate supervision, performs preventive and 14 (3 positions) 08/2014

Inspector corrective maintenance to high, medium, and low voltage 11 (3 positions) 11/2014 electrical equipment and traction power substations, 6 (3 positions) 03/2015 overhead catena , and contact rail s stems.

Wayside Systems Non- 1 Manage the overall maintenance activities of one unit of 4 05/2015 Manager Signal Contract wayside including train control , grade crossing , electronic

ment installation and rail service su

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 22

Page 23: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Department Position Title Group Total Positions

Position Description/Justification Months Prior to Pre-Revenue

Service

Anticipated Hire Date

----------------- - ,----- ---------------------------------------, Support Positions

Accounting 1 Senior I

Non-I

1 I Handle payroll obligations connected to the 350+ new positions I 3 I 7/2015 Accountant Contract agency-wide. On average, Metro has one accountant staff person

per 315 FTEs in order to handle all associated payroll matters.

Communications I Senior Non- 1 Develop social media and messaging to explain service testing , I 9 I 1/2015 Community Contract start-up and operations to familiarize customers and others who Relations live, work, attend school and travel in the community along both of Officer the new line extensions. Messaging includes information on

operations, how to ride, and safety on/around the lines.

Corporate Safety I Senior Safety Non- 2 Under moderate supervision, perform system safety functions I 14 I 8/2014 Specialist Contract required by the CPUC to support project safety certification.

Support field acceptance testing and integrated testing; perform facility and systems inspections; enforce System Safety Program Plan requirements during revenue operations; support local safety committees; and conduct safet trainin

Human I Principal Non- 1 Oversee the recruitment and selection process in order to fill the I 14 I 8/2014 Resources Human Contract 400 Rail positions through the start of revenue operations on the

Resources two extensions. Perform complex technical and analytical work in su ort of the HR mana ement function .

Sr. Human Non- 1 Under minimal supervision, conduct recruitmenU selection and I 14 I 8/2014 Resources Contract hiring processes for mostly represented jobs and be supported by Analyst a staff of clerks and interns to fill all vacancies. Help design and

develop appraisal interview questions, rating sheets, and technical oral exercises, and administers the testin

Employment TCU 2 Under direct supervision, create, maintain and close out personnel I 14 8/2014 Records & and medical files for current and terminated employees. Prepare Verification files to be shipped to storage. Respond to verification of Specialist employment inquiries in writing and verbally. Maintain ATU , TCU,

UTU and AFSCME rosters. Employment TCU 1 Under direct supervision, work in the Employment Office and 14 I 8/2014 Processing answer inquiries from the public. Also, conduct pre-employment Specialist processing and verify employment eligibility and ensures all

necessary forms are received and filed . Conduct orientation for all new TCU and ATU personnel and proctors exams administered by

I I I 1 the H R Department.

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 23

Page 24: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Information Technology Services

Inventory

Supervisor Engineer

Systems Electronic Communicati ons Leader

Material Supervisor

Storekeeper

Truck Driver Clerk

Stock Clerk

Authority Relief Pool (ARP) Storekee

Non­Contract

ATU

AFSCME

TCU

TCU

TCU

TCU

1

2

1

9

1

Work with building and rail car management to define requirements, develop specifications, prepare project plans and provide project management for all installations and any light voltage equipment. Systems include: computers, services, data networks, telecom systems, communication and security, and data cablina and wireless c:\/c:tcmc:

Oversee and coordinate activities and performs installations, maintenance, repairs and modifications of advance communications systems carrying voice, data and video information. Systems include microwave, multiplex, data communications, radio base and repeater, fiber optic, computer­aided dispatch, automatic vehicle monitoring, alarm, and telephone

ms Supervise warehouse and distribution activities to ensure needs for materials, parts, supplies and safety equipment are met and that correct warehousing practices are applied. Oversee TCU Storekeepers and Stock Clerks to maintain the efficient processing of inventory receipts, the security of Metro inventory assets, and the timelv distribution of needed materials. Serve as lead, overseeing the Stock Clerk positions, in each of the two new rail facilities and oversee assignments. Provide oversight in the receiving, storing and distribution of materials, parts, supplies and safety equipment to Rail Technicians, Facilities,

Assurance and Maintenance of Wav Personnel. Transport parts materials and safety supplies to the two new rail facilities. Distribute parts, materials, supplies and safety equipment across Metro's rail system on a daily basis and in response to criticallv-needed materials as needed. Provide 24-hour, 365 days a year counter service at the two new rail facilities to receive, store, ship and distribute materials, parts, supplies, and safety equipment to Rail Fleet Services, Maintenance of Wav and Wavside Custodial Services. Provide coverage and counter service during relief shift at the two new rail facilities to decrease the use of overtime among Stock Clerks and Storekeepers. Provide direct labor to receive, store, shiP and distribute material. parts. SUPPlies. and safetv eauipment.

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 24

14

14

6

6

6

6 ( 1 position) 0 (8 positions)

0

8/2014

8/2014

4/2015

4/2015

4/2015

4/2015 10/2015

10/2015

Page 25: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Inventory 1 Material Non- 2 Forecast and plans material needs for the line extensions, I 6 I 4/2015 Planner Contract including oversight of demand planning for new parts,

(continued) I planning/scheduling of re-buildable components, and engaging Metro's supply chain partners to actively manage proper stocking levels over time.

Material Non- 1 Provide material support for facilities and inventory. Extract reports 6 I 4/2015 Inventory Contract from the M3 database and monitor individual material necessary Analyst for daily activities. Execute and monitor the plan created by the

Material Planners. Principal Non- 1 Establish and validate requests for maintenance and retirement of I 6 I 4/2015 Inventory Contract parts in the items catalog. Develop and administer the unit Control procedural documentation and insure data integrity in M3. Analyst Procurement Non- 1 Perform complex oversight, implementation, administration and I 6 4/2015 Planning Contract coordination of the strategic acquisition plan in support of Administrator supplying material requirements for the Maintenance of Way

operations. Develop material forecasting for Metro's overall supply and material requirements based on client input and historical records. Administer and execute contracts and contracts compliance issues to support the replenishment and delivery plans for o erational roducts and services.

Senior Buyer Non- 1 Plan, prepare and execute solicitations for competitive quotes and 6 I 4/2015 Contract carry out awards. Distribute work load and serve as team leader

covering daily activities of buying staff. Serve as Acquisition Management Services liaison to user departments in planning and coordinatin rocurement of necessa arts and materials.

Revenue I Revenue TCU 3 Collect revenues from and service and maintain Ticket Vending I 3 I 7/2015 Collections Collector Machines at the 13 new stations along both line extensions, which

add 18 miles of coverage to the Metro Rail network Perform coin sorting and counting, and currency counting and processing for revenues received from the TVMs.

Cash Clerk I TCU I 1 I Under close supervision, perform coin sorting and counting, and I 3 I 7/2015 currency counting and processing of revenues received from TVMs.

Engineering I

Non-I

1 I Support the installation and testing of various fare collections. I 3 I 7/2015 Associate Contract Examine and make repairs to TVMs and machines that perform

I I I 1 coin and currency sorting and countina .

Staffmg Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 25

Page 26: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Risk Management

Transit Security

Sr. Workers Camp Analyst and PLIPD Analyst

Transit Security Officer II

Non­Contract

Teamsters 7

44

319

Perform Workers compensation claims administration activities, including claims adjusting from inception to conclusion. Perform initial case review, preliminary investigation of new claims, and fact determination for liability decisions. Provide required benefits to injured employees in a timely manner and review investigative reports, legal correspondence and medical evaluations.

Patrol, monitor and safeguard Metro property and buildings; ensure safety of Metro employees; observe and report on security and safety problems; monitor handling of Metro monies at Cash Counting office and Ticket Offices; escort vault truck drivers; write memos regarding incidents of suspicious activity and vandalism on Metro property; and maintain, support and promote a safe work environment.

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Extension Phase 2A 26

14 8/2014

3 7/2015

Page 27: SYSTEM SAFETY, SECURITY AND OPERATIONS ...media.metro.net/board/Items/2014/07_july/20140724rbmitem...One Gateway Plaza Los Angeles, CA 90012-2952 213-922.L---· ~· metro. net SYSTEM

Expo 2 and Gold Line Foothill 2A Extensions Staffin& Milestone Chart

I .. I Support Positions

! 275Posltlons ] Operations Positions

I S:ut I = Total Positions

P3010 PlkrtC.r

Arrtvn/T utint Betlns

S oln i ,IMil llllol M o tu O\I I.J Sy~ t<?ms

Mo~tnlt' ll.ltl ( <' M.wll l' llolll t<? ln ll'll:r a teon/ I.J <tht y fo1 o hty

Compl••lto n Compl'-'t•o n Test tl'lg

IE!llml~~

P3010 LRVs

"""" Commission/

ATIACHMENTG

75

110

,.

44