System Resistance Curve in excel

42
x y value 0 0 0 0.15 0.017663 0 0 10 1 0.002778 0.15 0.017663 0.15727 0.001261 20 2 0.005556 0.15 0.017663 0.31454 0.005043 30 3 0.008333 0.15 0.017663 0.471809 0.011346 40 4 0.011111 0.15 0.017663 0.629079 0.02017 50 5 0.013889 0.15 0.017663 0.786349 0.031516 60 6 0.016667 0.15 0.017663 0.943619 0.045383 70 7 0.019444 0.15 0.017663 1.100889 0.061771 80 8 0.022222 0.15 0.017663 1.258158 0.080681 90 9 0.025 0.15 0.017663 1.415428 0.102112 100 10 0.027778 0.15 0.017663 1.572698 0.126064 110 11 0.030556 0.15 0.017663 1.729968 0.152538 120 12 0.033333 0.15 0.017663 1.887238 0.181532 130 13 0.036111 0.15 0.017663 2.044507 0.213048 0 0 0 0.25 0.049063 0 0 20 1 0.005556 0.25 0.049063 0.113234 0.000654 40 2 0.011111 0.25 0.049063 0.226469 0.002614 60 3 0.016667 0.25 0.049063 0.339703 0.005882 80 4 0.022222 0.25 0.049063 0.452937 0.010456 100 5 0.027778 0.25 0.049063 0.566171 0.016338 120 6 0.033333 0.25 0.049063 0.679406 0.023527 140 7 0.038889 0.25 0.049063 0.79264 0.032022 160 8 0.044444 0.25 0.049063 0.905874 0.041825 180 9 0.05 0.25 0.049063 1.019108 0.052935 200 10 0.055556 0.25 0.049063 1.132343 0.065352 220 11 0.061111 0.25 0.049063 1.245577 0.079076 240 12 0.066667 0.25 0.049063 1.358811 0.094106 260 13 0.072222 0.25 0.049063 1.472045 0.110444 280 14 0.077778 0.25 0.049063 1.58528 0.128089 300 15 0.083333 0.25 0.049063 1.698514 0.147041 320 16 0.088889 0.25 0.049063 1.811748 0.1673 340 17 0.094444 0.25 0.049063 1.924982 0.188866 360 18 0.1 0.25 0.049063 2.038217 0.211739 380 19 0.105556 0.25 0.049063 2.151451 0.23592 400 20 0.111111 0.25 0.049063 2.264685 0.261407 420 21 0.116667 0.25 0.049063 2.377919 0.288201 440 22 0.122222 0.25 0.049063 2.491154 0.316302

description

making system resistence curve with the help of excel and see the effect on system curve .making graph with the help of variable

Transcript of System Resistance Curve in excel

Page 1: System Resistance Curve in excel

x y value0 0 0 0.15 0.0176625 0 0

10 1 0.0027778 0.15 0.0176625 0.1572698 0.00126120 2 0.0055556 0.15 0.0176625 0.3145396 0.00504330 3 0.0083333 0.15 0.0176625 0.4718094 0.01134640 4 0.0111111 0.15 0.0176625 0.6290792 0.0201750 5 0.0138889 0.15 0.0176625 0.786349 0.03151660 6 0.0166667 0.15 0.0176625 0.9436188 0.04538370 7 0.0194444 0.15 0.0176625 1.1008886 0.06177180 8 0.0222222 0.15 0.0176625 1.2581584 0.08068190 9 0.025 0.15 0.0176625 1.4154282 0.102112

100 10 0.0277778 0.15 0.0176625 1.572698 0.126064110 11 0.0305556 0.15 0.0176625 1.7299678 0.152538120 12 0.0333333 0.15 0.0176625 1.8872376 0.181532130 13 0.0361111 0.15 0.0176625 2.0445074 0.213048

0 0 0 0.25 0.0490625 0 020 1 0.0055556 0.25 0.0490625 0.1132343 0.00065440 2 0.0111111 0.25 0.0490625 0.2264685 0.00261460 3 0.0166667 0.25 0.0490625 0.3397028 0.00588280 4 0.0222222 0.25 0.0490625 0.452937 0.010456

100 5 0.0277778 0.25 0.0490625 0.5661713 0.016338120 6 0.0333333 0.25 0.0490625 0.6794055 0.023527140 7 0.0388889 0.25 0.0490625 0.7926398 0.032022160 8 0.0444444 0.25 0.0490625 0.905874 0.041825180 9 0.05 0.25 0.0490625 1.0191083 0.052935200 10 0.0555556 0.25 0.0490625 1.1323425 0.065352220 11 0.0611111 0.25 0.0490625 1.2455768 0.079076240 12 0.0666667 0.25 0.0490625 1.358811 0.094106260 13 0.0722222 0.25 0.0490625 1.4720453 0.110444280 14 0.0777778 0.25 0.0490625 1.5852795 0.128089300 15 0.0833333 0.25 0.0490625 1.6985138 0.147041320 16 0.0888889 0.25 0.0490625 1.8117481 0.1673340 17 0.0944444 0.25 0.0490625 1.9249823 0.188866360 18 0.1 0.25 0.0490625 2.0382166 0.211739380 19 0.1055556 0.25 0.0490625 2.1514508 0.23592400 20 0.1111111 0.25 0.0490625 2.2646851 0.261407420 21 0.1166667 0.25 0.0490625 2.3779193 0.288201440 22 0.1222222 0.25 0.0490625 2.4911536 0.316302460 23 0.1277778 0.25 0.0490625 2.6043878 0.34571480 24 0.1333333 0.25 0.0490625 2.7176221 0.376426

Page 2: System Resistance Curve in excel

Column PColumn Q

Page 3: System Resistance Curve in excel

Column PColumn Q

Page 4: System Resistance Curve in excel

value0 0

0.001261 0.0006540.005043 0.0026140.011346 0.005882

I 0.02017 0.0104560.031516 0.0163380.045383 0.0235270.061771 0.032022

0 0.0418250.102112 0.0529350.126064 0.0653520.152538 0.0790760.181532 0.0941060.213048 0.110444

0.1280890.147041

0.16730.1888660.211739

0.235920.2614070.2882010.316302

0.345710.376426

Column PColumn Q

Page 5: System Resistance Curve in excel

Column PColumn Q

Page 6: System Resistance Curve in excel

x y value0 0 0 0.15 0.0176625 0 0

10 1 0.0027778 0.15 0.0176625 0.1572698 0.00126120 2 0.0055556 0.15 0.0176625 0.3145396 0.00504330 3 0.0083333 0.15 0.0176625 0.4718094 0.01134640 4 0.0111111 0.15 0.0176625 0.6290792 0.0201750 5 0.0138889 0.15 0.0176625 0.786349 0.03151660 6 0.0166667 0.15 0.0176625 0.9436188 0.04538370 7 0.0194444 0.15 0.0176625 1.1008886 0.06177180 8 0.0222222 0.15 0.0176625 1.2581584 0.08068190 9 0.025 0.15 0.0176625 1.4154282 0.102112

100 10 0.0277778 0.15 0.0176625 1.572698 0.126064110 11 0.0305556 0.15 0.0176625 1.7299678 0.152538120 12 0.0333333 0.15 0.0176625 1.8872376 0.181532130 13 0.0361111 0.15 0.0176625 2.0445074 0.213048

0 0 0 0.25 0.0490625 0 020 1 0.0055556 0.25 0.0490625 0.1132343 0.00065440 2 0.0111111 0.25 0.0490625 0.2264685 0.00261460 3 0.0166667 0.25 0.0490625 0.3397028 0.00588280 4 0.0222222 0.25 0.0490625 0.452937 0.010456

100 5 0.0277778 0.25 0.0490625 0.5661713 0.016338120 6 0.0333333 0.25 0.0490625 0.6794055 0.023527140 7 0.0388889 0.25 0.0490625 0.7926398 0.032022160 8 0.0444444 0.25 0.0490625 0.905874 0.041825180 9 0.05 0.25 0.0490625 1.0191083 0.052935200 10 0.0555556 0.25 0.0490625 1.1323425 0.065352220 11 0.0611111 0.25 0.0490625 1.2455768 0.079076240 12 0.0666667 0.25 0.0490625 1.358811 0.094106260 13 0.0722222 0.25 0.0490625 1.4720453 0.110444280 14 0.0777778 0.25 0.0490625 1.5852795 0.128089300 15 0.0833333 0.25 0.0490625 1.6985138 0.147041320 16 0.0888889 0.25 0.0490625 1.8117481 0.1673340 17 0.0944444 0.25 0.0490625 1.9249823 0.188866360 18 0.1 0.25 0.0490625 2.0382166 0.211739380 19 0.1055556 0.25 0.0490625 2.1514508 0.23592400 20 0.1111111 0.25 0.0490625 2.2646851 0.261407420 21 0.1166667 0.25 0.0490625 2.3779193 0.288201440 22 0.1222222 0.25 0.0490625 2.4911536 0.316302460 23 0.1277778 0.25 0.0490625 2.6043878 0.34571480 24 0.1333333 0.25 0.0490625 2.7176221 0.376426

Page 7: System Resistance Curve in excel

Column PColumn Q

Page 8: System Resistance Curve in excel

Column PColumn Q

Page 9: System Resistance Curve in excel

value0 0

0.001261 0.0006540.005043 0.0026140.011346 0.005882

I 0.02017 0.0104560.031516 0.0163380.045383 0.0235270.061771 0.032022

0 0.0418250.102112 0.0529350.126064 0.0653520.152538 0.0790760.181532 0.0941060.213048 0.110444

0.1280890.147041

0.16730.1888660.211739

0.235920.2614070.2882010.316302

0.345710.376426

Column PColumn Q

Page 10: System Resistance Curve in excel

Column PColumn Q

Page 11: System Resistance Curve in excel

1 Block flow

2 Design parameter

Item Unit ①Sewage Removal ② Screen Removal ③Bio

Flow m3/d 250 250

Flow m3/h - 250 - 250

Inlet time h/d - - -

Operation h/d - - -

pH - 7 to 7.5 7 to 7.5 6.5 to 8.5

BOD 0% 95% 20

kg/d 0% 100 95% 5

COD 0% 85% 180

kg/d 0% 300 85% 45

SS 50% 80% 100

kg/d 50% 125 80% 25

O&G 0% 90% 5

kg/d 0% 13 90% 1

T-KN 0% 50% 25

kg/d 0% 13 50% 6

A-N 0% 0%

kg/d 0% 0%

T-P 0% 50% 6

kg/d 0% 3 50% 2

TDS mg/L < 2000

3 Calculation1 Treatment system

1 Coase ScreenAverage flow 250 m3/d * 17 h/d * 1.0

250 m3/d * 17 h/d * 2.0 Specification 30 m3/h* 10 1

2 Sewage pit tankCapacity 30 m3/h * 0.25 hourSpecification 10 m3Accessory LS

3 Sewage pit pump

250

15

17

22

mg/L 400 400

100 mg/L 1,200 1,200

300 mg/L 1,000 500

250 mg/L 50 50

13 mg/L 50 50

13 mg/L 20

5 mg/L 12.0 12

3

Max flowmm *

Sewage ① BiologicalScreenRaw water ②

Sludge DewaterSludge Tank

Clarifier ③

Page 12: System Resistance Curve in excel

Specification 30 m3/h * 20 mH * 5.5

4 Capacity 250 m3/d * ( 17 h - 1/ 22

Specification 65 m3Accessory

8 Capacity 250 m3/d ÷ 22 h/d Specification 12 m3/h * 10 mH * 2.2

9 Fine ScreenSpecification 12 m3/h* 6 1

9 Aeration tank250 1 Line

BOD load 250 m3/d line* 400 mg/L ÷ 1,000 Conventional

0.3 CPHEEO 19932,000 mg/L CPHEEO 1993100 kg BOD/d ÷ 0.35 kg BOD/kg SS 2,000

HRT 6 12 6 h

Specification 160 m3Air diffuzer, Air flow indicator

10 Overflow rate 8 to 15 m3/m2/d CPHEEO 1993Area 12 15 24

Specification □4.4 1 Lineφ4.3 1 Line

Reduce gear, motor 1.5 MS bridge

11 Specification 12 m3/h

12 Capacity 12 0.5 Specification 7 m3

LS

13

Equalization tank

SFAC BackwashTotal

Air mixing pipe、LS

Equalization pump

mm *

Flow m3/d /

TypeF/MMLSSAeration tank VolumeBack check

CPHEEO 1993m3/h *

Accessory

Clarifier Tank

m3/h ÷( m3/m2/d÷

m *Rake Specification m *Accessory

Sludge return pumpAir lift

Filter feed tankm3/h * h

Accessory

Filter Feed pump

Page 13: System Resistance Curve in excel

Capacity 250 22 h/d Specification 11 25 5.5

14 Sand FilterLine 1 LineLV 10Area

Specification φ1.2 1

15 Activated Carbon towerm3/m2/hr

LV 10Area

Specification φ1.2 1 SV 6 1/HVolume

16 Capacity 250 22 2.0 Specification 25 m3

LS

17 LV 35Specification 40 15 5.5 B W water volume 40 60 10

18 Specification 22 40 7.5

2 Chemicals Chemical consumption Just for Reference

1 NaCLO 12.0 % 1.2 SGFeed volume 3 mg NaClO/L

30 m3/d * 3.0 g/m3 ÷0.1 kg/d÷ 12.0 1.2 0.6 L/d÷ 22 h/d ÷

Tank 0.6 L/d * 5 1 Specification 0.1 m3Pump Specification 20 mL/min * 0.2 Mpa *

3 Sludge Treatment1 Sludge tank

BOD SS Sludge 250 m3 /d * 400 mg/L * 0.3 SS sludge 250 m3/d * ( 500 10 Total DS volume

m3/d *m3/h * mH *

m3/m2/hr

m * Lines

Velocities 8to10m3/m2/hr

m * Lines

Treated water tankm3/d * h /d *

Accessory

Back wash pump m3/m2/hrm3/h * mH *m3/h ÷ min/h *

Treated water pumpm3/h * mH *

% ÷

d *

mg/L -

Page 14: System Resistance Curve in excel

Total Sludge Volume 152.5 kgDS/d÷ 2.0 %Volume 8 m3/d * 3.0 dSpecification 25 m3Accessory

2 DewaterType CentrifugalOperation 6 h/dCapacitySpecification 30

15.0

3 Sludge Feed pumpCapacity 25 2.0 %Specification 2 m3/h * 0.2 0.8

4 8 m3/d

7.6 0.4 19.1 1

22 7

4 Untility1 Mixing Blower

Ministry of land, Infrastructure, Transport and Tourism Japan10 m3 * 0.5

Equalization tank 65 0.5 25 1.0

TotalSpecification 120 m3/h * 50 Kpa * 11.0

2 Aeration BlowerO2 volume 100 kg BOD/d line ÷32×22.4÷0.21×(303/273)÷Air Volume 6,167 m3/d ÷ 24.0 h/d * 1.1

160 m3 * 0.8 VVHSpecification 220 m3/h * 50 Kpa * 22.0

3 CompressorSpecification 3 0.7 MPa * 0.8

4 Drain pit -2Specification 2.0 m3Accessory LS

5 Drain pit pump -2

Air mixing pipe, LS

kg DS/h *Solids contents of cake % WWCake volume

kgDS/h ÷mH *

Sludge Dry Bed For summer seasonTotal sludge volumeBed Area / d m3/d / m =Bed Area Total m2/d * days =Specification m2 * nos

Air ratio 0.5 to 1.0 m3/h/m3Sewage collection tank m3/h/m3

m3 * m3/h/m3Sludge tank m3 * m3/h/m3

BC

m3/h *Accessory Dryer, Filter, Regulator

Page 15: System Resistance Curve in excel

Specification 5 m3/h * 6 mH * 0.4

Page 16: System Resistance Curve in excel

Removal

250

250

-

-

6.5 to 8.5 6.5 to 8.5

50% 10 25

50% 3

70% 54 150

70% 14

70% 30 100

70% 7

50% 2 5

50% 1

10% 23

10% 6 BOD*5% Cut

0% 0 50

0% 0

10% 5 6.5

10% 1 BOD*1% Cut

<2000

Times = 14.7 m3/hTimes = 29.4 m3/h

Lines Manual type

= 8 m3

④Treated

TreatedSF AC

SludgeCake

④③

Page 17: System Resistance Curve in excel

kw * 2 Nos

h ) * 17 h = 57 m37

63

= 11.4 m3/hkw * 2 Nos

Lines Manual type

= 250 m3/d= 100 kg BOD/d

1,000 = 143

= 72 m3

= 19.2 4.38 m □

1 Nos

= 6 m3

m3/timem3

g/m3 ÷ m3

h/d) m2 Line

kw *

Page 18: System Resistance Curve in excel

= 11.4 m3/h2 Nos

11

1.1 m2φ1.18 m( 1.13

1.1 m2φ1.18 m( 1.13

1.8 m31.6 mH

h = 23 m3

40 1 Nos

= 7 m3

2 Nos

1,000.0 = 0.1 kg NaClO/d* 1 = 0.6 L/d

60 min/h = 0.5 mL/min= 3 L

kw * 2 Nos

÷ 1,000 = 30.0 kg DS/dmg/L ) ÷ 1,000 = 122.5 kg DS/d

152.5 kgDS/d

kw *

m3/h Line

m2 )

m2)

m3/hkw *

min

kw *

lines

Page 19: System Resistance Curve in excel

= 7.6 m3/d= 22.9 m3

25 kgDS/h1 Nos

1.02

= 1.3 m3/hkw * 2 Nos

19.1 19.1 m2

Ministry of land, Infrastructure, Transport and Tourism Japan= 5.0 m3/h= 32.5 m3/h= 25.0 m3/h= 62.5 m3/h

kw * 1 Nos

kg BOD/d line ÷32×22.4÷0.21×(303/273)÷ 0.06 = 6,167 m3/d Line= 283 m3/h= 128.0 m3/h

kw * 2 Nos

1 Nos

Ton/d

m2/d

kw *

Page 20: System Resistance Curve in excel

kw * 1 Nos Submersible

Page 21: System Resistance Curve in excel

1 Block flow

2 Design parameter

Item Unit ①Sewage Removal ② Screen Removal ③Bio

Flow m3/d 250 250

Flow m3/h - 250 - 250

Inlet time h/d - - -

Operation h/d - - -

pH - 7 to 7.5 7 to 7.5 6.5 to 8.5

BOD 0% 95% 20

kg/d 0% 100 95% 5

COD 0% 85% 180

kg/d 0% 300 85% 45

SS 50% 80% 100

kg/d 50% 125 80% 25

O&G 0% 90% 5

kg/d 0% 13 90% 1

T-KN 0% 50% 25

kg/d 0% 13 50% 6

A-N 0% 0%

kg/d 0% 0%

T-P 0% 50% 6

kg/d 0% 3 50% 2

TDS mg/L < 2000

3 Calculation1 Treatment system

1 Coase ScreenAverage flow 250 m3/d * 17 h/d * 1.0

250 m3/d * 17 h/d * 2.0 Specification 30 m3/h* 10 1

2 Sewage pit tankCapacity 30 m3/h * 0.25 hourSpecification 10 m3Accessory LS

3 Sewage pit pump

250

15

17

22

mg/L 400 400

100 mg/L 1,200 1,200

300 mg/L 1,000 500

250 mg/L 50 50

13 mg/L 50 50

13 mg/L 20

5 mg/L 12.0 12

3

Max flowmm *

Sewage ① BiologicalScreenRaw water ②

Sludge DewaterSludge Tank

Clarifier ③

Page 22: System Resistance Curve in excel

Specification 30 m3/h * 20 mH * 5.5

4 Capacity 250 m3/d * ( 17 h - 1/ 22

Specification 65 m3Accessory

8 Capacity 250 m3/d ÷ 22 h/d Specification 12 m3/h * 10 mH * 2.2

9 Fine ScreenSpecification 12 m3/h* 6 1

9 Aeration tank250 1 Line

BOD load 250 m3/d line* 400 mg/L ÷ 1,000 Conventional

0.3 CPHEEO 19932,000 mg/L CPHEEO 1993100 kg BOD/d ÷ 0.35 kg BOD/kg SS 2,000

HRT 6 12 6 h

Specification 160 m3Air diffuzer, Air flow indicator

10 Overflow rate 8 to 15 m3/m2/d CPHEEO 1993Area 12 15 24

Specification □4.4 1 Lineφ4.3 1 Line

Reduce gear, motor 1.5 MS bridge

11 Specification 12 m3/h

12 Capacity 12 0.5 Specification 7 m3

LS

13

Equalization tank

SFAC BackwashTotal

Air mixing pipe、LS

Equalization pump

mm *

Flow m3/d /

TypeF/MMLSSAeration tank VolumeBack check

CPHEEO 1993m3/h *

Accessory

Clarifier Tank

m3/h ÷( m3/m2/d÷

m *Rake Specification m *Accessory

Sludge return pumpAir lift

Filter feed tankm3/h * h

Accessory

Filter Feed pump

Page 23: System Resistance Curve in excel

Capacity 250 22 h/d Specification 11 25 5.5

14 Sand FilterLine 1 LineLV 10Area

Specification φ1.2 1

15 Activated Carbon towerm3/m2/hr

LV 10Area

Specification φ1.2 1 SV 6 1/HVolume

16 Capacity 250 22 2.0 Specification 25 m3

LS

17 LV 35Specification 40 15 5.5 B W water volume 40 60 10

18 Specification 22 40 7.5

2 Chemicals Chemical consumption Just for Reference

1 NaCLO 12.0 % 1.2 SGFeed volume 3 mg NaClO/L

30 m3/d * 3.0 g/m3 ÷0.1 kg/d÷ 12.0 1.2 0.6 L/d÷ 22 h/d ÷

Tank 0.6 L/d * 5 1 Specification 0.1 m3Pump Specification 20 mL/min * 0.2 Mpa *

3 Sludge Treatment1 Sludge tank

BOD SS Sludge 250 m3 /d * 400 mg/L * 0.3 SS sludge 250 m3/d * ( 500 10 Total DS volume

m3/d *m3/h * mH *

m3/m2/hr

m * Lines

Velocities 8to10m3/m2/hr

m * Lines

Treated water tankm3/d * h /d *

Accessory

Back wash pump m3/m2/hrm3/h * mH *m3/h ÷ min/h *

Treated water pumpm3/h * mH *

% ÷

d *

mg/L -

Page 24: System Resistance Curve in excel

Total Sludge Volume 152.5 kgDS/d÷ 2.0 %Volume 8 m3/d * 3.0 dSpecification 25 m3Accessory

2 DewaterType CentrifugalOperation 6 h/dCapacitySpecification 30

15.0

3 Sludge Feed pumpCapacity 25 2.0 %Specification 2 m3/h * 0.2 0.8

4 8 m3/d

7.6 0.4 19.1 1

22 7

4 Untility1 Mixing Blower

Ministry of land, Infrastructure, Transport and Tourism Japan10 m3 * 0.5

Equalization tank 65 0.5 25 1.0

TotalSpecification 120 m3/h * 50 Kpa * 11.0

2 Aeration BlowerO2 volume 100 kg BOD/d line ÷32×22.4÷0.21×(303/273)÷Air Volume 6,167 m3/d ÷ 24.0 h/d * 1.1

160 m3 * 0.8 VVHSpecification 220 m3/h * 50 Kpa * 22.0

3 CompressorSpecification 3 0.7 MPa * 0.8

4 Drain pit -2Specification 2.0 m3Accessory LS

5 Drain pit pump -2

Air mixing pipe, LS

kg DS/h *Solids contents of cake % WWCake volume

kgDS/h ÷mH *

Sludge Dry Bed For summer seasonTotal sludge volumeBed Area / d m3/d / m =Bed Area Total m2/d * days =Specification m2 * nos

Air ratio 0.5 to 1.0 m3/h/m3Sewage collection tank m3/h/m3

m3 * m3/h/m3Sludge tank m3 * m3/h/m3

BC

m3/h *Accessory Dryer, Filter, Regulator

Page 25: System Resistance Curve in excel

Specification 5 m3/h * 6 mH * 0.4

Page 26: System Resistance Curve in excel

Removal

250

250

-

-

6.5 to 8.5 6.5 to 8.5

50% 10 25

50% 3

70% 54 150

70% 14

70% 30 100

70% 7

50% 2 5

50% 1

10% 23

10% 6 BOD*5% Cut

0% 0 50

0% 0

10% 5 6.5

10% 1 BOD*1% Cut

<2000

Times = 14.7 m3/hTimes = 29.4 m3/h

Lines Manual type

= 8 m3

④Treated

TreatedSF AC

SludgeCake

④③

Page 27: System Resistance Curve in excel

kw * 2 Nos

h ) * 17 h = 57 m37

63

= 11.4 m3/hkw * 2 Nos

Lines Manual type

= 250 m3/d= 100 kg BOD/d

1,000 = 143

= 72 m3

= 19.2 4.38 m □

1 Nos

= 6 m3

m3/timem3

g/m3 ÷ m3

h/d) m2 Line

kw *

Page 28: System Resistance Curve in excel

= 11.4 m3/h2 Nos

11

1.1 m2φ1.18 m( 1.13

1.1 m2φ1.18 m( 1.13

1.8 m31.6 mH

h = 23 m3

40 1 Nos

= 7 m3

2 Nos

1,000.0 = 0.1 kg NaClO/d* 1 = 0.6 L/d

60 min/h = 0.5 mL/min= 3 L

kw * 2 Nos

÷ 1,000 = 30.0 kg DS/dmg/L ) ÷ 1,000 = 122.5 kg DS/d

152.5 kgDS/d

kw *

m3/h Line

m2 )

m2)

m3/hkw *

min

kw *

lines

Page 29: System Resistance Curve in excel

= 7.6 m3/d= 22.9 m3

25 kgDS/h1 Nos

1.02

= 1.3 m3/hkw * 2 Nos

19.1 19.1 m2

Ministry of land, Infrastructure, Transport and Tourism Japan= 5.0 m3/h= 32.5 m3/h= 25.0 m3/h= 62.5 m3/h

kw * 1 Nos

kg BOD/d line ÷32×22.4÷0.21×(303/273)÷ 0.06 = 6,167 m3/d Line= 283 m3/h= 128.0 m3/h

kw * 2 Nos

1 Nos

Ton/d

m2/d

kw *

Page 30: System Resistance Curve in excel

kw * 1 Nos Submersible

Page 31: System Resistance Curve in excel

1 Block flow

2 Design parameter

Item Unit ①Sewage Removal ② Screen Removal ③Bio

Flow m3/d 250 250

Flow m3/h - 250 - 250

Inlet time h/d - - -

Operation h/d - - -

pH - 7 to 7.5 7 to 7.5 6.5 to 8.5

BOD 0% 95% 20

kg/d 0% 100 95% 5

COD 0% 85% 180

kg/d 0% 300 85% 45

SS 50% 80% 100

kg/d 50% 125 80% 25

O&G 0% 90% 5

kg/d 0% 13 90% 1

T-KN 0% 50% 25

kg/d 0% 13 50% 6

A-N 0% 0%

kg/d 0% 0%

T-P 0% 50% 6

kg/d 0% 3 50% 2

TDS mg/L < 2000

3 Calculation1 Treatment system

1 Coase ScreenAverage flow 250 m3/d * 17 h/d * 1.0

250 m3/d * 17 h/d * 2.0 Specification 30 m3/h* 10 1

2 Sewage pit tankCapacity 30 m3/h * 0.25 hourSpecification 10 m3Accessory LS

3 Sewage pit pump

250

15

17

22

mg/L 400 400

100 mg/L 1,200 1,200

300 mg/L 1,000 500

250 mg/L 50 50

13 mg/L 50 50

13 mg/L 20

5 mg/L 12.0 12

3

Max flowmm *

Sewage ① BiologicalScreenRaw water ②

Sludge DewaterSludge Tank

Clarifier ③

Page 32: System Resistance Curve in excel

Specification 30 m3/h * 20 mH * 5.5

4 Capacity 250 m3/d * ( 17 h - 1/ 22

Specification 65 m3Accessory

8 Capacity 250 m3/d ÷ 22 h/d Specification 12 m3/h * 10 mH * 2.2

9 Fine ScreenSpecification 12 m3/h* 6 1

9 Aeration tank250 1 Line

BOD load 250 m3/d line* 400 mg/L ÷ 1,000 Conventional

0.3 CPHEEO 19932,000 mg/L CPHEEO 1993100 kg BOD/d ÷ 0.35 kg BOD/kg SS 2,000

HRT 6 12 6 h

Specification 160 m3Air diffuzer, Air flow indicator

10 Overflow rate 8 to 15 m3/m2/d CPHEEO 1993Area 12 15 24

Specification □4.4 1 Lineφ4.3 1 Line

Reduce gear, motor 1.5 MS bridge

11 Specification 12 m3/h

12 Capacity 12 0.5 Specification 7 m3

LS

13

Equalization tank

SFAC BackwashTotal

Air mixing pipe、LS

Equalization pump

mm *

Flow m3/d /

TypeF/MMLSSAeration tank VolumeBack check

CPHEEO 1993m3/h *

Accessory

Clarifier Tank

m3/h ÷( m3/m2/d÷

m *Rake Specification m *Accessory

Sludge return pumpAir lift

Filter feed tankm3/h * h

Accessory

Filter Feed pump

Page 33: System Resistance Curve in excel

Capacity 250 22 h/d Specification 11 25 5.5

14 Sand FilterLine 1 LineLV 10Area

Specification φ1.2 1

15 Activated Carbon towerm3/m2/hr

LV 10Area

Specification φ1.2 1 SV 6 1/HVolume

16 Capacity 250 22 2.0 Specification 25 m3

LS

17 LV 35Specification 40 15 5.5 B W water volume 40 60 10

18 Specification 22 40 7.5

2 Chemicals Chemical consumption Just for Reference

1 NaCLO 12.0 % 1.2 SGFeed volume 3 mg NaClO/L

30 m3/d * 3.0 g/m3 ÷0.1 kg/d÷ 12.0 1.2 0.6 L/d÷ 22 h/d ÷

Tank 0.6 L/d * 5 1 Specification 0.1 m3Pump Specification 20 mL/min * 0.2 Mpa *

3 Sludge Treatment1 Sludge tank

BOD SS Sludge 250 m3 /d * 400 mg/L * 0.3 SS sludge 250 m3/d * ( 500 10 Total DS volume

m3/d *m3/h * mH *

m3/m2/hr

m * Lines

Velocities 8to10m3/m2/hr

m * Lines

Treated water tankm3/d * h /d *

Accessory

Back wash pump m3/m2/hrm3/h * mH *m3/h ÷ min/h *

Treated water pumpm3/h * mH *

% ÷

d *

mg/L -

Page 34: System Resistance Curve in excel

Total Sludge Volume 152.5 kgDS/d÷ 2.0 %Volume 8 m3/d * 3.0 dSpecification 25 m3Accessory

2 DewaterType CentrifugalOperation 6 h/dCapacitySpecification 30

15.0

3 Sludge Feed pumpCapacity 25 2.0 %Specification 2 m3/h * 0.2 0.8

4 8 m3/d

7.6 0.4 19.1 1

22 7

4 Untility1 Mixing Blower

Ministry of land, Infrastructure, Transport and Tourism Japan10 m3 * 0.5

Equalization tank 65 0.5 25 1.0

TotalSpecification 120 m3/h * 50 Kpa * 11.0

2 Aeration BlowerO2 volume 100 kg BOD/d line ÷32×22.4÷0.21×(303/273)÷Air Volume 6,167 m3/d ÷ 24.0 h/d * 1.1

160 m3 * 0.8 VVHSpecification 220 m3/h * 50 Kpa * 22.0

3 CompressorSpecification 3 0.7 MPa * 0.8

4 Drain pit -2Specification 2.0 m3Accessory LS

5 Drain pit pump -2

Air mixing pipe, LS

kg DS/h *Solids contents of cake % WWCake volume

kgDS/h ÷mH *

Sludge Dry Bed For summer seasonTotal sludge volumeBed Area / d m3/d / m =Bed Area Total m2/d * days =Specification m2 * nos

Air ratio 0.5 to 1.0 m3/h/m3Sewage collection tank m3/h/m3

m3 * m3/h/m3Sludge tank m3 * m3/h/m3

BC

m3/h *Accessory Dryer, Filter, Regulator

Page 35: System Resistance Curve in excel

Specification 5 m3/h * 6 mH * 0.4

Page 36: System Resistance Curve in excel

Removal

250

250

-

-

6.5 to 8.5 6.5 to 8.5

50% 10 25

50% 3

70% 54 150

70% 14

70% 30 100

70% 7

50% 2 5

50% 1

10% 23

10% 6 BOD*5% Cut

0% 0 50

0% 0

10% 5 6.5

10% 1 BOD*1% Cut

<2000

Times = 14.7 m3/hTimes = 29.4 m3/h

Lines Manual type

= 8 m3

④Treated

TreatedSF AC

SludgeCake

④③

Page 37: System Resistance Curve in excel

kw * 2 Nos

h ) * 17 h = 57 m37

63

= 11.4 m3/hkw * 2 Nos

Lines Manual type

= 250 m3/d= 100 kg BOD/d

1,000 = 143

= 72 m3

= 19.2 4.38 m □

1 Nos

= 6 m3

m3/timem3

g/m3 ÷ m3

h/d) m2 Line

kw *

Page 38: System Resistance Curve in excel

= 11.4 m3/h2 Nos

11

1.1 m2φ1.18 m( 1.13

1.1 m2φ1.18 m( 1.13

1.8 m31.6 mH

h = 23 m3

40 1 Nos

= 7 m3

2 Nos

1,000.0 = 0.1 kg NaClO/d* 1 = 0.6 L/d

60 min/h = 0.5 mL/min= 3 L

kw * 2 Nos

÷ 1,000 = 30.0 kg DS/dmg/L ) ÷ 1,000 = 122.5 kg DS/d

152.5 kgDS/d

kw *

m3/h Line

m2 )

m2)

m3/hkw *

min

kw *

lines

Page 39: System Resistance Curve in excel

= 7.6 m3/d= 22.9 m3

25 kgDS/h1 Nos

1.02

= 1.3 m3/hkw * 2 Nos

19.1 19.1 m2

Ministry of land, Infrastructure, Transport and Tourism Japan= 5.0 m3/h= 32.5 m3/h= 25.0 m3/h= 62.5 m3/h

kw * 1 Nos

kg BOD/d line ÷32×22.4÷0.21×(303/273)÷ 0.06 = 6,167 m3/d Line= 283 m3/h= 128.0 m3/h

kw * 2 Nos

1 Nos

Ton/d

m2/d

kw *

Page 40: System Resistance Curve in excel

kw * 1 Nos Submersible