SYSTEM OF SELF-SUFFICIENCY OF ELECTRICITY IN PEAK HOURS
The generation system has a design capacity of 7.24 MW, to operate during peak hours and during times when there is no provision for the commercial network, composed of four generators operated with diesel and synchronization boards.
![Page 2: SYSTEM OF SELF-SUFFICIENCY OF ELECTRICITY IN PEAK HOURS The generation system has a design capacity of 7.24 MW, to operate during peak hours and during.](https://reader036.fdocuments.in/reader036/viewer/2022070605/5a4d1ace7f8b9ab05997072c/html5/thumbnails/2.jpg)
Emergency mode:
-In case there is a power outage in the commercial network, the generators start at eight seconds and synchronized taking charge 100%Upon return of utility power, the system synchronizes with the network generators transferring the load smoothly without any variation in energy parameters (voltage, frequency and current)
Peak shaving operation mode (peak times):
- The system turns on automatically according to a schedule based on the times tips the utility.Generators are synchronized by a 4160 V and the voltage transformer rises to 23 KV and connected to the commercial network in transferring the load smoothly generators such that there are no changes in energy parameters (voltage, frequency and current) during the transition between the commercial network and the autogenous group.
MODES OF OPERATION
![Page 3: SYSTEM OF SELF-SUFFICIENCY OF ELECTRICITY IN PEAK HOURS The generation system has a design capacity of 7.24 MW, to operate during peak hours and during.](https://reader036.fdocuments.in/reader036/viewer/2022070605/5a4d1ace7f8b9ab05997072c/html5/thumbnails/3.jpg)
SINCRONIZACIÓN
TC 1
MO
TOG
ENER
ADO
R 1
TC 2
MO
TOG
ENER
ADO
R 2
TC 4
MO
TOG
ENER
ADO
R 4
TC 3
MO
TOG
ENER
ADO
R 3
Red comercial 23 KV
Carga Site Tultitlan23 KV
Transformador
Tablero eléctrico de sincronización
Tablero eléctrico de transferencia
Tanques de Diesel
Grupo de generadores
Peak Shaving System
4 kv23 kv
2000’KW 2000’KW2000’KW 2000 KW
10 000 lt10 000 lt
10 000 lt10 000 lt
10 MVA