SYSTEM INSTALLATION...3. Integrity and suitability of the structure to which this system is attached...
Transcript of SYSTEM INSTALLATION...3. Integrity and suitability of the structure to which this system is attached...
PROPRIETARY ACCESS SYSTEM FROM GROUND, THROUGH CEILING ONTO ROOF
SYST
EM IN
STAL
LATI
ON
M
ANUA
L
1300 301 755 SAYFA.COM.AU
MUST BE READ AND UNDERSTOOD PRIOR TO INSTALLATION
SYSTEM CONTENTS
In-Action 2
Features 3
Installation Requirements 4
Limitations 5
Design & Layout 6
Configurations 7
Tools & Equipment 8
Installation Procedure 9
Installation Checklist 25
Maintenance 26
Warranty 30
Specifications 31
VISTA®
FOLD DOWN LADDER
5
9
3
10
2
4
8
11
6
IT’S THE SAYFA WAY
4
1
Sayfa Group leads the industry in the design, installation and management of access and fall protection safety systems.
The In-Action model demonstrates access, fall and ground protection requirements for a commercial building design.
SayfaGrouprecommendationsfulfillcurrentworkplacerequirementsfor the safety of building maintenance subcontractors, employees and the general public.
# DESCRIPTION
1 3 SIXTY Fall arrest anchors
2 TRAVEL 8 Rooforwallmountstaticlines
3 SENTRY Roof mount guardrails
4 ON-TRAK Roofwalkways(yelloworgrey)
5 PROTEX Skylight protectors
6 RAPTOR Overhead fall arrest rails
For more information, please contact Sayfa Group directly.
# DESCRIPTION
7 KATT Modular fixed ladders
8 VISTA Modularfolddownladders
9 ALTO Step ladders & step bridges
10 ALTO Stairs & platforms
11 SKYDORE Roof access hatches
7
3
FOR MULTI -LEVEL BUILDINGS WHERE ACCESS FROM THE TOP FLOOR TO THE ROOF CAN BE EASILY & SAFELY ACHIEVED
FEATURES & BENEFITS
PROFILED RUNG - Ensures comfortable and firmgrip
SUITS ALL CEILING TYPES UP TO 4300MM
LANDING PLATFORM -Providesafirm,level base for ladder
STURDY HIGH STRENGTH ALUMINIUM CONSTRUCTION
SUSPENDED CEILING SYSTEMFOR USE WITH LIGHTWEIGHT, NON LOAD BEARING CEILINGS Theadjustable,easytoinstallfolddownladdersuspensionkitattachestotheroofsupportstructurewhichprovides structuralandlateralstabilitytotheladdersystem.Supportflangesaroundtheladderframeprovideaneasyandneatfinishtosuspendedorsolidceilingsystems.
PATENTS AND DESIGN REGISTRATIONS APPLY
UN
IQU
E PROD
UCT FEATU
RE
RETRACTABLE STILES FOR SAFE ACCESS
THROUGH ROOF HATCH
INDUSTRIAL RATED SKYDORE ROOF HATCH
ADJUSTABLE FEET INSERTS TO SUIT FLOOR LEVEL
VISTA LADDER SUSPENSION KIT SYSTEM
SUPPORTED OFF ROOF STRUCTURE
PRE-FINISHED HEAVY DUTY ALUMINIUM
CONSTRUCTION
SOFT CLOSE GAS STRUT ASSISTED DOOR
INSTALLATION REQUIREMENTS
4
MUST BE READ PRIOR TO USE
1. Thissystemmustonlybeinstalledbycompetentpersonstrainedintheselection,useandmaintenanceofaccesssystemswhoholdacurrentSayfaapprovedinstallercertificate.
2. PersonsinstallingthissystemarerequiredtohaveacomprehensiveknowledgeoftheAustralianStandards,codesofpracticeandindustryguidelinesthatrelatetotheselection,useandmaintenanceofaccessandfallprotectionsystemsandequipment.
3. Integrityandsuitabilityofthestructuretowhichthissystemisattachedmustbeapprovedbyastructuralengineerunlessitiscleartoacompetentpersonastothesuitabilityofconnectiontostructure.
4. Readinstallationandoperatinginstructionscarefullybeforecommencinganywork.Consenttodeviatefromtheinstallationguidemustbeobtainedinwritingfromthemanufacturer.
5. Conductaninitialwork/riskassessment,andtakeallreasonableprecautionstoeliminateorcontrolpotentialhazardsandrisksduringtheinstallationofthisproduct.
6. CompleteallnecessaryOH&Sdocumentation,includingaJobSafetyAnalysisandWorkMethodStatementandobtainconsentfromresponsiblepersoninworkplacepriortocommencementofwork.
7. Donotmodifyorremoveanyelementofthesupportstructure withoutpriorauthorisationbyaqualifiedengineer.
8. Decorativecoatingsandcoveringsmustberemovedtoensure correctevaluationofstructurepriortoattachmentofsystem
9. Anyre-routingofelectricaland/orotherservicesmustbecarriedoutbyqualifiedorauthorisedpersonnel.
10. Appropriatetemporaryaccessandsafetyequipmentmustbeusedduringinstallation,suchasplatformladdersorscaffoldingandfallprotectionanchoragepoints.
11. Incaseofemergencyaccessandfallprotectionsystemsmustbeinstalledbyaminimumoftwopersons.
12. Donottamperwith,modifyorremoveanypartthissystemunlessauthorisedbythemanufacturerinwriting.
13. Appropriatelabelsormarkingsmustbeattachedtoeachsystemandincludethefollowing:-Serviceentrydate-Nextexamination/serviceduedate-Maximumdesignedloadratings-Installer/Certifiercontactdetails
14. Documentationconfirmingcorrectuseandmaintenanceofthesystemandequipmentmustbeprovidedtotheworkplacemanageroncompletionofinstallation.(Seeoperationmanual.)
Sayfa Group instructions and recommendations, drawings and diagrams, and all other documentation are copyright, errors and omissions excepted, and must be carefully read and implemented. Any assistance or guidance given is without prejudice, and Sayfa Group cannot be held responsible for any inaccuracy or misinterpretation whatever. Failure to follow site installation requirements and warnings, may result in serious injury or death. Sayfa Group accepts no direct or indirect responsibility and/or consequential liability whatever, for any products and systems incorrectly installed or certified. Sayfa Group cannot warrant the integrity or suitability of the structure to which the products may be attached. Prior assessment must be made by a qualified structural engineer, unless the structure is authorised or approved by a competent person.
5
Sayfa recommends that persons using access and fall arrest systems do not work alone in case of an emergency and help is required.Should any part of the system/equipment have been subjected to abnormal loading, use must be discontinued until replaced/ recertified by a competent height safety inspector.
LIMITATIONS
MUST BE READ PRIOR TO USE
1. MinimumstructuralrequirementsforattachmentofVistaladders: -Steelpurlin100x1.5mmbasemetalthickness-Timbertruss90x35F7structuralgrade
2. Structuremustbedesignedtosupport200kgload.
3. VistaLaddersareforsinglepersonuseonlyratedto150kg.
4. Thissystem,undernormaluseandenvironment,hasalifeexpectancyofupto10years.Thiswilldependonlocation,usageandscheduledmaintenanceaspermanufacturerandlegislativerequirements.
5. Donottamperwithormakealterationstosystemcomponentswithoutmanufacturer’sconsent.
6. Thissystemisnottobeusedfortetheringorliftingmachineryorequipment.
7. Vistaladdersmustnotbeusedinthefollowingenvironments: -Externalareasexposedtotheelements -Moistordampareas -Corrosive/harshenvironments
DESIGN & LAYOUT
6
1
REVISIONS REMARKSDate
2345
SAYFA SYSTEMS CONFIDENTIAL MATERIALThis drawing is copyright© and all rights are reserved. The design and specifications contained herein are confidential and the property of SAYFA SYSTEMS. The information may not be divulged or used in any form or by any means, for any purpose other than that stated by SAYFA SYSTEMS. Storage, transmittal, forwarding to third party, copying, reproduction, viewing or scanning of this Drawing by any person or party, whether in whole or in part is prohibited, except with express prior written consent by SAYFA SYSTEMS. The perspective is only an indication of the planned installation.
Drawing No.
RepBySayfa Group1029 Mountain HighwayBoronia Vic 3155Tel:- 03 8727 9000Fax:- 03 8727 9002Email:- [email protected]:- www.sayfa.com.au
17/11/15
4009
...
...
...
...
Proofing MV
VISTA Manual Installation Details - Drawings
Material
ProductCode FAB NO:
A
B Min
Cei
ling
Spac
e Re
quire
d38
0mm
(Com
mer
cial)
/480
mm
(Max
i)
A1
Minimum Opening Clearance1950 (Commercial)/2300 (Maxi)
B1
A2
Roof Access Hatch
Ceiling LadderSuspension Kit
Ceiling
Floor
Main Ladder AreaB B1
2400 9002500 9302600 9602700 9902800 10102900 10403000 10703100 11003200 1130
Ceiling SpaceA A1 A2
400 280 1500800 390 16101200 500 17201600 600 18302000 710 19402400 820 20502800 940 21603000 970 2210N/A N/A N/A
Roof Level
All Dimensions are in mm
VISTA Commercial and Compact LaddersGuardrail
All Dimensions are in mm
VISTA MAXI LadderMain Ladder Area
B B13300 11803400 12103500 12403600 12703700 13003800 13303900 13604000 13904100 14204200 14504300 1480
Ceiling SpaceA A1 A2
400 280 1500800 390 16101200 500 17201600 600 18302000 710 19402400 820 20502800 940 21603000 970 2210N/A N/A N/AN/A N/A N/AN/A N/A N/A
75°
KEYA Ceiling heightB Distance from back of fold down ladder to front of ladder (folded out)C Internal ceiling heightD Distance between purlin hangersE Distance from purlin hanger to back of ladder frame * All measurements are in millimeters (mm) and approximate only. Note:On ceiling ladder, ladder cage required where total height of ladder system exceeds 3.5M.
Ceiling Space Floor Space
A A1 A2 B B1
400 280 1500 2400 900
800 390 1610 2500 930
1200 500 1720 2600 960
1600 600 1830 2700 990
2000 710 1940 2800 1010
2400 820 2050 2900 1040
2800 940 2160 3000 1070
3000 970 2210 3100 1100
N/A N/A N/A 3200 1130
INSTALLATION DIMENSIONS
TheVista/Skydoreroofaccesssystemiseasilyandrapidlyinstalledinallceilingtypes.ItisideallysuitedtosuspendedceilingswiththeVISTACommercialused forheightsbetween2200mmto3200mm,andVISTAMaxiusedforceilingsheightsbetween3200mmto4300mm.
CEILING OPENING SIZESLD462 COMPACT: 1230 x 570mmLD461 COMMERCIAL: 1230 x 785mmLD463 MAXI: 1630 x 785mm
It is critical that the offset between the fold down ladder and roof hatch (see dimensions) is complied with to maintain continuous/correct ladder angle.
Ceiling Space Floor Space
A A1 A2 B B1
400 280 1500 3300 1180
800 390 1610 3400 1210
1200 500 1720 3500 1240
1600 600 1830 3600 1270
2000 710 1940 3700 1300
2400 820 2050 3800 1330
2800 940 2160 3900 1360
3000 970 2210 4000 1390
N/A N/A N/A 4100 1420
N/A N/A N/A 4200 1450
N/A N/A N/A 4300 1480
CONFIGURATIONS
7
!
maximum ceiling height 3200mm
minimum clearance 380mm
minimum clearance 1930mm
1230mm x 785mm
!
rung spacing 300mm
rung width 525mm
frame width 778mm
DIMENSIONS
minimum clearance 380mm
rung width 312mm
maximum ceiling height 3200mm
minimum clearance 1930mm
1230mm x 570mm
rung spacing 300mm
frame width 565mm
DIMENSIONS
maximum ceiling height 4300mm
minimum clearance 480mm
minimum clearance 2300mm
1630mm x 785mm
rung spacing 300mm
rung width 525mm
frame width 778mm
DIMENSIONS
TOOLS & EQUIPMENT
Sayfa recommends that persons installing access and fall protection systems do not work alone in case of an emergency and help is required.
CORDLESS DRILL 8MM METAL DRILL BIT 3/8 NUT SETTER
DROP SAW (POWERED UNIT) CUT OFF SAW (USED WITH SUSPENSION KIT)
13MM SPANNER TAPE MEASURE
MARKING PEN SPIRIT LEVEL
8
INSTALLATION PROCEDURE
10 MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM
Side Mount Brace x 2
Front Purlin Hanger
Front Brace
Frame Extension x 2
Rear Purlin Hanger
Rear Brace
Suspension Hanger x 4
Suspension Tee - Piece x 4
Ladder Support Frame
INSTALL 2a/ VISTA SUSPENSION KIT - IN LINE WITH PURLINS
VISTA SUSPENSION KIT INCLUDES1 x Ladder Support Frame4 x Suspension Hangers2 x Purlin Hangers - 1600 mm (100 x 50 x 6 mm angle) 2 x Side Mount Brace - 3000 mm (50 x 50 x 3 mm angle) 2 x Front/ Rear Braces - 2400 mm (50 x 50 x 3 mm angle)2 x Frame Extensions - 1200mm (standard splice section)1 x Fixing Pack
FIXINGS4 x M12/30 mm Purlin Bolt Sets12 x 12g/30 mm Series 500 Tek Screws50 x 12g/20 mm Self Drilling Tek Screws
INSTALL 2a - SUSPENSION KIT
For installation of suspension kit with purlins at 90° - see page 12
1
REVISIONS REMARKSDate
2345
SAYFA SYSTEMS CONFIDENTIAL MATERIALThis drawing is copyright© and all rights are reserved. The design and specifications contained herein are confidential and the property of SAYFA SYSTEMS. The information may not be divulged or used in any form or by any means, for any purpose other than that stated by SAYFA SYSTEMS. Storage, transmittal, forwarding to third party, copying, reproduction, viewing or scanning of this Drawing by any person or party, whether in whole or in part is prohibited, except with express prior written consent by SAYFA SYSTEMS. The perspective is only an indication of the planned installation.
Drawing No.
RepBySayfa Group1029 Mountain HighwayBoronia Vic 3155Tel:- 03 8727 9000Fax:- 03 8727 9002Email:- [email protected]:- www.sayfa.com.au
17/11/15
4009
...
...
...
...
Proofing MV
VISTA Manual Installation Details - Drawings
Material
ProductCode FAB NO:
AL732 - 100 x 50 x 6 Angle@1600mm(L)QTY: 2
AL731 - 50 x 50 x 6 AngleQTY: 4
AL730 - 50 x 50 x 3 AngleBracingQTY: 2
AL730 - 50 x 50 x 3 AngleBracingQTY: 2
Suspension FrameAL766 - 58 x 38 RHS Welded 1 Piece
Frame ExtensionAL781 - Splice section @1550mm(L)QTY: 2
To be replaced with picture on P10
9
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 11
1
2
Mount front purlin hanger ± 50mm from front face of roof hatch. Fix temporarily with (2) 12g/30mm tek screws. Once fi nally aligned and positioned, drill (2) 12mm holes through purlin hanger and purlin.
Insert (2) M12/30mm purlin bolts, tighten securely.
Refer table on Page 6 for calculating mounting position of ladder in relation to hatch.
Determine direction of fold down ladder in relation to direction of purlins. If not in line with purlins, see Page 12.
Determine correct mounting position of rear purlin hanger.
Mount and fi x rear purlin hanger as per Step 1.
Front Purlin Hanger
Rear Purlin Hanger
See table on Page 6
INSTALLATION PROCEDURE
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 11
1
2
Mount front purlin hanger ± 50mm from front face of roof hatch. Fix temporarily with (2) 12g/30mm tek screws. Once fi nally aligned and positioned, drill (2) 12mm holes through purlin hanger and purlin.
Insert (2) M12/30mm purlin bolts, tighten securely.
Refer table on Page 6 for calculating mounting position of ladder in relation to hatch.
Determine direction of fold down ladder in relation to direction of purlins. If not in line with purlins, see Page 12.
Determine correct mounting position of rear purlin hanger.
Mount and fi x rear purlin hanger as per Step 1.
Front Purlin Hanger
Rear Purlin Hanger
See table on Page 6
Determine suitable location ensuring sufficient clearance for ladder to fold open correctly (see clearance table page 6.) Ensure any structure and services to be relocated are done by qualified personell.
Purlins
100 x 50 x 6 Aluminium Angle
M12 x 35 Bolt
M8 x 20 Cup Head Bolt
50 x 50 Aluminium Angle (Droppers)
860 mm
Splice Sections
Main Frame
20mm Tek Screw
Attach the angle ‘droppers’to the main support anglewith (1) M8 x 20mmcup head bolt. Space droppers at860mm apart.
Slide the splice sections into the ladder support frame. Then bolt the splice sections and the frame to the 'droppers'. Fix with (1) M8 x 55 cup head bolts. Fasten a 20mm tek screw through the frame, into the splice section to lock in position.
3
4
M8 x 55 Cup Head Bolt
10
.
To install roof hatches, installers must possess valid industry licences and comply with all relevant WHS requirements.
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 11
1
2
Mount front purlin hanger ± 50mm from front face of roof hatch. Fix temporarily with (2) 12g/30mm tek screws. Once fi nally aligned and positioned, drill (2) 12mm holes through purlin hanger and purlin.
Insert (2) M12/30mm purlin bolts, tighten securely.
Refer table on Page 6 for calculating mounting position of ladder in relation to hatch.
Determine direction of fold down ladder in relation to direction of purlins. If not in line with purlins, see Page 12.
Determine correct mounting position of rear purlin hanger.
Mount and fi x rear purlin hanger as per Step 1.
Front Purlin Hanger
Rear Purlin Hanger
See table on Page 6
INSTALLATION PROCEDURE
Purlins
100 x 50 x 6 Aluminium Angle
M12 x 35 Bolt
M8 x 20 Cup Head Bolt
50 x 50 Aluminium Angle (Droppers)
860 mm
Splice Sections
Main Frame
20mm Tek Screw
Attach the angle ‘droppers’to the main support anglewith (1) M8 x 20mmcup head bolt. Space droppers at860mm apart.
Slide the splice sections into the ladder support frame. Then bolt the splice sections and the frame to the 'droppers'. Fix with (1) M8 x 55 cup head bolts. Fasten a 20mm tek screw through the frame, into the splice section to lock in position.
3
4
M8 x 55 Cup Head Bolt
11
Purlins
100 x 50 x 6 Aluminium Angle
M12 x 35 Bolt
M8 x 20 Cup Head Bolt
50 x 50 Aluminium Angle (Droppers)
860 mm
Splice Sections
Main Frame
20mm Tek Screw
Attach the angle ‘droppers’to the main support anglewith (1) M8 x 20mmcup head bolt. Space droppers at860mm apart.
Slide the splice sections into the ladder support frame. Then bolt the splice sections and the frame to the 'droppers'. Fix with (1) M8 x 55 cup head bolts. Fasten a 20mm tek screw through the frame, into the splice section to lock in position.
3
4
M8 x 55 Cup Head Bolt
INSTALLATION PROCEDURE
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 9
Secure bracing to all four sides using (2) x 20mm Tek Screws for each connection.
20mm tek screw
Bracing
VISTA SUSPENSION KIT- PURLINS 90 DEG TO SUSPENSION FRAME
Purlins
Should the purlins run in the direction as shown, the main support angles will need to change direction.It may be possible to suspend the 'droppers' directly from the purlins without having to usethe main support angles.
Main support angles
Rear bracing to be fixed at least 500mm from bottom of suspension hanger to allow for ladder assembly clearance when closed.All assembly and fixing procedureas per ‘in line purlin’ option.
5
500mm
12
INSTALLATION PROCEDURE
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 19
VISTA FOLD DOWN LADDER VISTA FOLD DOWN LADDER KIT INCLUDES1 x Fold Down Ladder Assembly1 x Ladder Body (2nd Stage)1 x Ladder Body (3rd Stage)2 x Adjustable Splice Feet1 x Pull Stick1 x Eye Hook1 x Fixing Pack
FIXINGS6 x M8/75 mm Setscrew Sets4 x M10 /20mm Bolt & Nyloc Nut Sets12 x M10 Washers4 x 12g/20mm Self Drilling Tek Screws
Pull Stick
Eye Hook
Adjustable Splice Feet
Third Stage Ladder
Second Stage Ladder
First Stage Ladder
Fold Down Ladder Assembly
1
REVISIONS REMARKSDate
2345
SAYFA SYSTEMS CONFIDENTIAL MATERIALThis drawing is copyright© and all rights are reserved. The design and specifications contained herein are confidential and the property of SAYFA SYSTEMS. The information may not be divulged or used in any form or by any means, for any purpose other than that stated by SAYFA SYSTEMS. Storage, transmittal, forwarding to third party, copying, reproduction, viewing or scanning of this Drawing by any person or party, whether in whole or in part is prohibited, except with express prior written consent by SAYFA SYSTEMS. The perspective is only an indication of the planned installation.
Drawing No.
RepBySayfa Group1029 Mountain HighwayBoronia Vic 3155Tel:- 03 8727 9000Fax:- 03 8727 9002Email:- [email protected]:- www.sayfa.com.au
17/11/15
4009
...
...
...
...
P roofing MV
VISTA Manual Installation Details - Drawings
Material
ProductCode FAB NO:
Pull Stick
Eye Hook
Adjustable Splice Feet
Third Stage Ladder
Second Stage Ladder
First Stage Ladder
Fold Down Ladder Assembly
Pull Stick Locator
13
INSTALLATION PROCEDURE
Determine suitable location, ensuring all structure or services are relocated or disconnected appropriately (by authorised/qualifi ed personnel).
Mark out and cut opening in ceiling.
Vista Compact - 1230 x 570mmVista Commercial - 1230 x 785mmVista Maxi - 1630 x 785mm
1
Suspension frameattached to structure above
Suspension frameattached to structure above
Timber rafters
Plaster ceiling with rafters
Plaster ceiling with battens
Tee - bar suspension ceiling
OPTION 1: TEE - BAR SUSPENSION CEILING SYSTEM
OPTION 2: PLASTER CEILING WITH BATTENS
OPTION 3: PLASTER CEILING WITH RAFTERS
The above ceiling cut out dimensions allow for frame clearance including a 30mm cover on all four sidesprovided by the main frame extrusion.
Main ladder frame
Main ladder frame
Main ladder frame
14
INSTALLATION PROCEDURE
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 21
Remove complete assembly from box.
Be careful not to scratch prefinished surface of fold down ladderframe and door. Use packing box as a protective surface.
Remove any packaging material, and place second and third ladder sections of ladder assembly aside.
2
15
INSTALLATION PROCEDURE
22 MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM
INSTALL 3 - FOLD DOWN LADDER
OPTION 1 - IF SUSPENSION KIT IS NOT USED
Lift main ladder frame into position.
Fix unit to support structure (rafter/battens) utilising pre drilled holes with (6) M8 x 75mm set screwsor 14G type 17 timber fixing(3 screws per side).
3a
OPTION 2 - IF SUSPENSION KIT IS USED
Fix (4) ‘spring clips’ to fold down ladderframe with (8) M5 x 12mm countersunkbolts (2 bolts per clip).
‘Spring clips’ are not required,during installation if fold down ladder can be supported by any other device. ie ‘duct lifter’.Spring clips are temporary holdingdevice until structurally secured.
3b
Ensure ladder is facing thecorrect direction.
Support frame must be square.Failure to do so will causeladder door closure difficulties.
Spring clips
16
INSTALLATION PROCEDURE
Unfold first stage ladder section.
Check fi nal position, and make necessary adjustments.
Fix ladder to the suspension frame with (4) M8 x 75mm set screws utilising pre drilled holes (3 set screws per side.)
If ceiling opening is a boxed outdesign greater than 150mm thick(such as a concrete or trimmedout opeing), a 50mm gap isrequired at the head of the ladderto allow clearance for the protrudingladder assembly when stowed away.
5
Lift complete assembly into position - ensuring the ladder folds down in the correct direction.
Two person lift is recommended
Firmly push assembly until it ‘clicks’ into position. (Clips will hold assembly in position until structurally fi xed.)
Do not attempt to climb ladder until installation is complete.
4
Min 50mm
Spring Clips
1
REVISIONS REMARKSDate
2345
SAYFA SYSTEMS CONFIDENTIAL MATERIALThis drawing is copyright© and all rights are reserved. The design and specifications contained herein are confidential and the property of SAYFA SYSTEMS. The information may not be divulged or used in any form or by any means, for any purpose other than that stated by SAYFA SYSTEMS. Storage, transmittal, forwarding to third party, copying, reproduction, viewing or scanning of this Drawing by any person or party, whether in whole or in part is prohibited, except with express prior written consent by SAYFA SYSTEMS. The perspective is only an indication of the planned installation.
Drawing No.
RepBySayfa Group1029 Mountain HighwayBoronia Vic 3155Tel:- 03 8727 9000Fax:- 03 8727 9002Email:- [email protected]:- www.sayfa.com.au
17/11/15
4009
...
...
...
...
Proofing MV
VISTA Manual Installation Details - Drawings
Material
ProductCode FAB NO:
Allow 50mm gap to ensure ladder assembly does notimpact on the void end. Insert packer to close gap ifaesthetically required.
Place on P18 (bottom)
When ladder closes, top of ladder protrudes 45 mm beyond ladder frame
150m
m +
50mm
17
INSTALLATION PROCEDURE
24 MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM
Align first and second stage ladder sections. Insert (2) M10 x 20mm bolts through hinges - ensure (3) washers are in place.
Tighten bolts sufficiently. Ensure hinges still move freely.
6
Measure distance from bottom of secondstage ladder section and fl oor and thensubtract 50mm for adjustablefeet insertion.Cut third stage ladder section to suit required height.
Install third stage ladder section as per Step 6.
7Cut ladder to X less 50mm
X Dimension
INSTALL 3 - FOLD DOWN LADDER
Floor
18
INSTALLATION PROCEDURE
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 25
Insert (2) adjustable feet into third stage ladder section.
Fold out complete ladder - ensure all sections are fully unfolded.
Adjust feet to suit fl oor level.
Once adjusted correctly, fi x in place using (2) 12g x 20mm tek screws per foot.
Ladder feet must be positioned toensure 150kg working load isfully supported.
8
9
19
INSTALLATION PROCEDURE
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 25
Position the pull stick through the tube,
Open ladder system.
then locate the hook onto the top end of the tube.
Pull down the Vista ladder half way down towards you until you can safely pull the remainder of the ladder by hand and remove the pull stick from the tube.
Unfold the complete ladder, ensuring all hinges are fully extended and check all parts are safe/ secure before using the Vista ladder.
Position the pull stick locator in between the last 2 rungs of the third stage ladder section.
Fix in place with (4) 20mm tek screws.
Close ladder system and check allladder sections, door and componentsclose correctly.
10
11
Pull stick locator
20
1
REVISIONS REMARKSDate
2345
SAYFA SYSTEMS CONFIDENTIAL MATERIALThis drawing is copyright© and all rights are reserved. The design and specifications contained herein are confidential and the property of SAYFA SYSTEMS. The information may not be divulged or used in any form or by any means, for any purpose other than that stated by SAYFA SYSTEMS. Storage, transmittal, forwarding to third party, copying, reproduction, viewing or scanning of this Drawing by any person or party, whether in whole or in part is prohibited, except with express prior written consent by SAYFA SYSTEMS. The perspective is only an indication of the planned installation.
Drawing No.
RepBySayfa Group1029 Mountain HighwayBoronia Vic 3155Tel:- 03 8727 9000Fax:- 03 8727 9002Email:- [email protected]:- www.sayfa.com.au
17/6/14
4800
Added attachment holeDia Changed to 48mm......
Proofing MV
2/7/14 MV
1/8/14 MV
Plastic Sleeve for Vista Pull Stick
1509
H.D.P.E. Plastic (or similar)Material
ProductCode FAB NO:
Approx 250mm
Fix Sleeve to pole
INSTALLATION PROCEDURE
26 MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM
INSTALL 4 - CEILING LADDER
CEILING LADDERVISTA CEILING LADDER KIT INCLUDES1 x Ceiling Ladder (1200mm or 2400mm)2 x Fixing Angles1 x Fixing Pack
FIXINGS2 x M8/75mm Cup Bolt Sets4 x M8/55mm Cup Bolt Sets2 x RHS Plastic End Caps
1
REVISIONS REMARKSDate
2345
SAYFA SYSTEMS CONFIDENTIAL MATERIALThis drawing is copyright© and all rights are reserved. The design and specifications contained herein are confidential and the property of SAYFA SYSTEMS. The information may not be divulged or used in any form or by any means, for any purpose other than that stated by SAYFA SYSTEMS. Storage, transmittal, forwarding to third party, copying, reproduction, viewing or scanning of this Drawing by any person or party, whether in whole or in part is prohibited, except with express prior written consent by SAYFA SYSTEMS. The perspective is only an indication of the planned installation.
Drawing No.
RepBySayfa Group1029 Mountain HighwayBoronia Vic 3155Tel:- 03 8727 9000Fax:- 03 8727 9002Email:- [email protected]:- www.sayfa.com.au
17/11/15
4009
...
...
...
...
Proofing MV
VISTA Manual Installation Details - Drawings
Material
ProductCode FAB NO:
Place on P23 (top left)
Place on P22
21
INSTALLATION PROCEDURE
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 27
2
1 Fix ladder support angles to top of ladder support frame using (2) 12g x 20mm tek screws.(1 per bracket)
Fix ladder fi xing bracket to front purlin hanger, or to purlin trimmers, using (2) M8 x 25mm cup bolt sets.
20mm Tek Screw
1
REVISIONS REMARKSDate
2345
SAYFA SYSTEMS CONFIDENTIAL MATERIALThis drawing is copyright© and all rights are reserved. The design and specifications contained herein are confidential and the property of SAYFA SYSTEMS. The information may not be divulged or used in any form or by any means, for any purpose other than that stated by SAYFA SYSTEMS. Storage, transmittal, forwarding to third party, copying, reproduction, viewing or scanning of this Drawing by any person or party, whether in whole or in part is prohibited, except with express prior written consent by SAYFA SYSTEMS. The perspective is only an indication of the planned installation.
Drawing No.
RepBySayfa Group1029 Mountain HighwayBoronia Vic 3155Tel:- 03 8727 9000Fax:- 03 8727 9002Email:- [email protected]:- www.sayfa.com.au
17/11/15
4009
...
...
...
...
Proofing MV
VISTA Manual Installation Details - Drawings
Material
ProductCode FAB NO:
Place on P23 (top left)
Place on P22
22
28 MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM
3
4
Determine correct length of ceiling ladder at preferred angle of 75°, cut to suit.
Insert RHS end caps into top of stiles.
Distance from top of bottom rung of ceiling ladder to top of fold down ladder must not exceed 300mm.
Position ceiling ladder and drill appropriate fi xing holes through ladder fi xing bracket and ladder stiles.
Insert (2) M8 x 55mm cup bolts through holes, tighten securely.
Fix ceiling ladder to base support angle using (2) M8 x 55mm cup bolts.(1 per bracket)
.
Distance from back of ceilingladder to front of fold downladder must be not less than 100mm.
Max 300mm
Min 100mm
Max 300mm
INSTALL 4 - CEILING LADDER
75°
Ladder fixingbracket
Base supportangles
INSTALLATION PROCEDURE
23
1
REVISIONS REMARKSDate
2345
SAYFA SYSTEMS CONFIDENTIAL MATERIALThis drawing is copyright© and all rights are reserved. The design and specifications contained herein are confidential and the property of SAYFA SYSTEMS. The information may not be divulged or used in any form or by any means, for any purpose other than that stated by SAYFA SYSTEMS. Storage, transmittal, forwarding to third party, copying, reproduction, viewing or scanning of this Drawing by any person or party, whether in whole or in part is prohibited, except with express prior written consent by SAYFA SYSTEMS. The perspective is only an indication of the planned installation.
Drawing No.
RepBySayfa Group1029 Mountain HighwayBoronia Vic 3155Tel:- 03 8727 9000Fax:- 03 8727 9002Email:- [email protected]:- www.sayfa.com.au
17/11/15
4009
...
...
...
...
Proofing MV
VISTA Manual Installation Details - Drawings
Material
ProductCode FAB NO:
Place on P23 - bottom
Place on P25
INSTALLATION PROCEDURE
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 31
1 HATCH GUARDRAIL INFORMATION
Australian Standards recommend that an access hatch be protected by the installationof guardrails completely surrounding the hatch.Handrail posts fixed to roof deck using (4) 5mm Bulbtite rivets or (2) 8mm screwbolts for concrete attachment.Handrails fixed to posts using (2) 16mm tek screws.Kneerails fixed to posts using (2) 48mm tek screws.Kneerail to be positoned 450mm max below handrail.Distance between grabrails to be 600mm - 675mm
For detailed installation instructions, visit website sayfa.com.au (code: GW394 access guardrail kit).
--
--
------
INSTALLATION PROCEDURE
1 HATCH GUARDRAIL INFORMATION
Australian standard recommend that an access hatch be protected by the installationof guardrails completely surrounding the hatch.Handrail posts fixed to roof deck using (4) 5mm Bulbtite rivets.Handrails fixed to posts using (2) 16mm tek screws.Kneerails fixed to posts using (2) 48mm tek screws.Kneerail to be positoned 450mm max below handrail.Distance between grabrails to be 600mm - 675mm
For detailed installation instructions, visit website sayfa.com.au (code: GW394 access guardrail kit).
--
----------
1
REVISIONS
REMARKSDate
2345
S CONFIDENTIAL MATERIALt© and all rights are reserved. The s contained herein are confidential FA SYSTEMS. The information may n any form or by any means, for any
stated by SAYFA SYSTEMS. Storage, o third party, copying, reproduction, his Drawing by any person or party, art is prohibited, except with express SAYFA SYSTEMS. The perspective is planned installation.
Drawing No.
RepBy
17/11/15
4009
...
...
...
...
Proofing MV
VISTA Manual Installation Details - Drawings
Material
ProductCode FAB NO:
Place on P25
ACCESS HATCH GUARDRAIL KIT
24
ACCESS HATCH GUARDRAIL KIT
24
GW394D - ROOF DECK MOUNT GW396C - CONCRETE MOUNT
22 MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM
INSTALL 3 - FOLD DOWN LADDER
OPTION 1 - IF SUSPENSION KIT IS NOT USED
Lift main ladder frame into position.
Fix unit to support structure (rafter/battens) utilising pre drilled holes with (6) M8 x 75mm set screwsor 14G type 17 timber fixing(3 screws per side).
3a
OPTION 2 - IF SUSPENSION KIT IS USED
Fix (4) ‘spring clips’ to fold down ladderframe with (8) M5 x 12mm countersunkbolts (2 bolts per clip).
‘Spring clips’ are not required,during installation if fold down ladder can be supported by any other device. ie ‘duct lifter’.Spring clips are temporary holdingdevice until structurally secured.
3b
Ensure ladder is facing thecorrect direction.
Support frame must be square.Failure to do so will causeladder door closure difficulties.
Spring clips
MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM 25
Insert (2) adjustable feet into third stage ladder section.
Fold out complete ladder - ensure all sections are fully unfolded.
Adjust feet to suit fl oor level.
Once adjusted correctly, fi x in place using (2) 12g x 20mm tek screws per foot.
Ladder feet must be positioned toensure 150kg working load isfully supported.
8
9
INSPECTION CRITERIA COMPONENT TECHNICAL DIAGRAM CHECKED
1. Ladder location
-Ensuresufficientclearanceforladder tofoldoutcorrectly-Seepage6fordiagram(1950mm-VistaCommercial2300mm-VistaMaxi)
2. Structure suitability
-Ensurestructuretowhichladderisattached issuitableforrequiredloadings -Nonloadbearingceilingswillrequirea suspensionkitattachedtoroofstructure above
3. Ladderfixingtostructure-Ensureminimum(4)M8boltsetsor(6)14G screwssecuringladderframetostructure
4. Ladder bodies assembly
-Ensureladderbodiesarejoinedcorrectly using(2)M10x20mmboltswith3 washersprovided-Hingebolttobetightenedbutstillallowinghingetofunctioncorrectly
5.Adjustable feet correctly positioned
-Ensureadjustablefeethavebeenpositioned correctlytofullysupportworkingloadof 150kg
!
24 MODULAR, INDUSTRIAL RATED 4 IN 1 ROOF ACCESS SYSTEM
Align first and second stage ladder sections. Insert (2) M10 x 20mm bolts through hinges - ensure (3) washers are in place.
Tighten bolts sufficiently. Ensure hinges still move freely.
6
Measure distance from bottom of secondstage ladder section and fl oor and thensubtract 50mm for adjustablefeet insertion.Cut third stage ladder section to suit required height.
Install third stage ladder section as per Step 6.
7Cut ladder to X less 50mm
X Dimension
INSTALL 3 - FOLD DOWN LADDER
Floor
INSTALLATION CHECKLIST
PROJECT:
ADDRESS:
REF NO.:
INSTALLED BY:
PROJECT MANAGER:
INSTALL DATE:
SIGNED NAME/ /DATE
25
MAINTENANCE
1. TheVistafolddownladdersystemneedstobecheckedandrecertifiedbyacompetentheightsafetyinspectorevery12monthsfornon-corrosiveenvironmentsor6monthlyforcorrosiveorharshenvironments.(Tobedeterminedbycompetentpersondependingonseverityofsurroundingconditions.)
2. Nevercleanusingacidsorotherchemicalsthatcoulddamagethesystemcomponents.
3. Anydeteriorationordamagetothesystemorequipmentmustbereportedtothepersonincontroloftheworkplaceandrelevantcorrectiveactionundertaken.
4. Fixingandsupportstructureattachmentandsuitabilitymustbecheckedbycompetentperson.
5. Anysignsofdistortionorexcessiveloadtothefolddownladdersystemmustbeinspectedandrecertifiedbycompetentperson.
6. Theidentificationlabelmustbecompletedconfirmingcertification,maintenanceandrecertificationofthesystem.
7. Maintenanceinspectionsmustbeclearlydocumented.Any non-conformancemustbeclearlyidentifiedandtagged‘DoNotUse’untilcorrectiveactionbyacompetentpersonhasbeencompleted.
26
MAINTENANCE
The checklist below outlines key checking criteria required to ensure the safe use of this system. Any item of concern not shown on the checklist must be noted on the maintenance report and brought to the attention of the workplace manager.
Items PASSED - means they conform with the required checking criteria and are suitable for normal use until the next recertification date. System data plates must be updated showing current check date and next check date.
Items FAILED - means they do not conform to the required checking criteria. These items must be clearly tagged ‘ Do Not Use’ and the required corrective actions put in place. The maintenance report must clearly document all non-conforming criteria.
This system must be maintained by a competent height safety inspector trained in the safe use and maintenance of this system.
Installation must be in accordance with the checklist provided (page 25).
SYSTEM MAINTENANCE CHECKLIST
COMPONENT INSPECTION CRITERIA PASSED4
FAILED✖
CORRECTIVE ACTION COMPLETION DATE
• Check for any visible damage to the ladder which could cause failure or injury to operator.
• Check structure to which ladder is attached is suitable for the required loads - 150kg
1. Check fixing bolts (6) to structure are secure
2. Check door hinge bolts are secure
3. Check fixing bolts of red strut arms to ladder are secure.Note: These must be firm but still allow hinge to function correctly.
4. Check door mount fixings to primary ladder body are secure
5. Check all ladder body hinge bolts are secure.Note: These must be firm but still allow hinge to function correctly.
6. Check fixings into splice feet are secure and feet positoned correctly to support ladder.
1
2
3
5
5
6
3
3
4
5
5
3
4
27
NOTES
REF: COMMENTS:
28
29
INTERNAL ACCESS ONTO ROOFS ALLOWS FOR EASIER REGULATION & CONTROL OF MAINTENANCE PERSONNEL WORKING AT HEIGHT
WARRANTY
NEVER HAS SAFETY IN THE WORKPLACE HAD A HIGHER PRIORITY
DISCLAIMER Allproductspecificationsandtechnicaldescriptions,recommendationsandotherinformationprovided,aregivenasgeneralguidanceandadvice,andaretobereadinconjunctionwithSayfaGroupinstallationinstructionsandanyotherdataavailableandapplicabletoeachparticularstandardproductorsystem.Useofsuchdataishowevertheuser’ssoleresponsibility,takingintoaccounttheintendedapplicationandactualconditionsexistingontheparticularworksite.Consequentselectionoftherightproductforanyparticularuse,remainstheuser’sultimateresponsibility.SayfaGroupisthereforenotobligatedorliableforanydirectorindirect,incidentalorconsequentialdamages,lossesorexpensesinconnectionwith,orbyreasonofthesuitabilityanduseoforotherwise,anyproductorsystemforanypurpose.Impliedwarrantiesofmerchantabilityorfitnessforanyparticularpurpose,arespecificallyexcluded.
AllSayfaGroupproductsmustbeinstalledandusedbycompetentpersonneltrainedintheselection,safeuseandmaintenanceoffallarrestsystemsandequipmentbyaregisteredtrainingorganisation(RTO) InstallationnotinaccordancewithSayfaGrouprequirementsortheuseofnonSayfaGroupcomponentswillvoidallcertificationandwarranties.
SuitabilityofsupportstructureanddesignlayoutofsystemistheresponsibilityoftheinstallerandshouldbeverifiedbyacompetentpersontrainedbyaRegisteredTrainingOrganisation(RTO)intheselection,safeuseandmaintenanceoffallarrestsystemsandequipmentorapprovedbyastructuralengineertoensureconformance.
SayfaGroupmaintainsapolicyofcontinuousimprovementanddevelopment,andthereforereservestherighttomodify,amendorotherwisealterproductandsystemdesignsandspecifications,modelsandpartnumbers,coloursandpricingetcwithoutpriornotice.Errorsandomissionsareexcepted,andSayfaGroupacceptsnoliabilityforincorrectinformation,errorsoromissions.
WARRANTY PERIOD ON THIS SYSTEM - 3 YEARS FROM DATE OF PURCHASE
Shouldyouhaveawarrantyclaimasaresultofadefectthefollowingproceduremustbefollowed: Identifythefollowinginformation:
- Theproduct/systemnameandcodenumber.
- Thedateofpurchase/installation.
- Installationcompanydetails.
- Theinstallationidentificationnumber.
- Thenameofthecompanyusingthissystem.
- Adescriptionofthedefect/warrantyclaim.
- Theperiodicsystemmaintenancereport.
Forwardtheaboveinformation [email protected] helpline,1300301755.
TERMS & CONDITIONS
- Allwarrantyclaimsmustbemadeinwritingwithin14daysoftheappearanceofthedefect.
- IncorrectinstallationorworkdonebyanonaccreditedSayfasysteminstallerwillvoidallwarrantyrights.
- Systemsthathavebeeninstalledusingnonproprietaryequipmentwillvoidallwarranties.
- Systemroof/claddingpenetrationsealsarenotcoveredinthiswarranty.
- Systems/componentsthathavenotbeenmaintainedinaccordancewithmanufacturer’s/legislativerequirementswillvoidwarranty.
- Systemsusedbyincompetentpersonsorusewithnoncompatibleaccessoriesie.harnessgear,lanyards,travellers,fallarrestorsetc.willvoidwarranty.
- Systems/componentsusedforpurposesotherthantheirintendedusewillvoidwarranty.
- Generalwearandtearisexpectedandwilldependonthefrequencyofuseandisnotcoveredbywarranty.
30
SYST
EM IN
STAL
LATI
ON
M
ANUA
L
TECHNICAL SPECIFICATION
31
SYSTEM CODE
VISTA FOLD DOWN LADDER SYSTEMCOMPACT - LD 462, COMMERCIAL - LD 461, MAXI - LD 463
TECHNICAL DATA MATERIALS - Allcomponentsandaccessoriesmanufacturedfromhighgrade
structuralaluminiumwithoptionsforpowdercoating.
DIMENSIONSCOMPACT - LD 462
- Timbertrusswithplasterceilings
- FloortoCeilingHeight:2200mmx3200mm
- CeilingOpeningrequired:1230mmx570mm
- Weight:32kg(excludesaccessoryitems)
COMMERCIAL - LD 461
- Standardorsuspendedceilingtype
- FloortoCeilingHeight:2200mmto3200mm
- CeilingOpeningrequired:1230mmx785mm
- Weight:40kg(excludesaccessoryitems)
MAXI - LD 463
- Standardorsuspendedceilingtype
- FloortoCeilingHeight:2200mmto4300mm
- CeilingOpeningrequired:1630mmx785mm
- Weight:50kg(excludesaccessoryitems)
FIXINGS - Metalfixing–M8boltsetintosupportstructure
- Concretefixing–M10mechanicalconcreteanchor
- Metalpurlinfixing–M8bolt
(Refer instruction manual)
WORKING LOAD LIMIT Recommendedforsinglepersonuse–150kgrated.
Industrialrated,suitedtohighfrequencyusage.
Supportstructureintegrity,suitabilityandfixingmethodtobeassessed anddeterminedbyaengineerunlessitiscleartoacompetentpersonpriortoinstallation.
COMPLIANCE VistaLadderSystemisdesignedtoconformwithrequirementsofAustralianStandardsAS1657:2018andrelevantstatutoryOHSCodesofPractice/Guidelines.Note:FolddownladdersarenotspecificallydetailedintheAS1657:2018Standards.
TESTING TestingandperformancebasedonrequirementsforfixedrungladdersofAustralianStandardsAS1657:2018.
PRODUCT WARRANTY 3yearsfromdateofpurchasesubjecttocorrectinstallation,useandmaintenanceinaccordancewithmanufacturer’sspecificationsandrecommendations.
INSPECTION AND MAINTENANCE
Inspectionandcertificationrecommededevery12monthsbycompetentpersoninaccordancewithmanufacturer’sspecifications.(Refer instruction manual.)
IMPORTANT NOTE Failuretosupplyand/orinstallproprietaryproductinaccordancewithabovestandardsandcodes,specificationsandinstructionsvoidscompletesystemcertificationand/orwarranty.
Designed and manufactured by Sayfa Group. For all technical assistance contact Sayfa Group. SAYFAGROUP-16.05.2018
T 1300 301 755F 1300 881 092E [email protected]
FOR MORE INFORMATION VISIT SAYFA.COM.AU
GROUP ACCESS PROTECT EQUIP
GROUP ACCESS PROTECT EQUIP
1029 MOUNTAIN HWYBORONIA VIC 3155AUSTRALIAGROUP ACCESS PROTECT EQUIP
GROUP ACCESS PROTECT EQUIP
THE SAYFA GROUP WE SAVE LIVES! This is our Mission, and it drives our Vision to BRING EVERY WORKER HOME SAFELY.
Sayfa Group leads the industry in the design, installation and management of access, fall protection and ground safety systems. As an Australian owned company, we engineer and rigorously test our proprietary systems to exceed national and international standards. Simple installation and easy to use systems are our key drivers for ensuring maximum effectiveness, improved safety and compliance with Occupational Health and Safety standards in the workplace.
OUR VALUESWe are governed by the following principles in everything we do:
A – Accountability / Totally responsible and answerable for our actions.
L – Loyalty / Steadfast and dependable based on our values in our dealings with one another.
I – Integrity / Honest and sincere, we do what we say, on time every time.
V – Value Driven / Increase what’s of value in view of a win win plan for all.
E – Enthusiastic / Motivated and inspired to continuously perform better.
COMMITMENTWe are passionate about our work with every product a testament to our commitment of world class safety, quality and performance. Our obligation is to live up to our own high standards as well as those of our customers and stakeholders ensuring total peace of mind.
PRODUCT IS OWNED BY THE SAYFA GROUP. THE SAYFA GROUP CONSISTS OF: