Page 1: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

System Conditions for Reassessment CF Service over

SOA path

Page 2: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

BPA-owned Transmission lines: • Keeler-Allston 500kV Line • Lexington-Ross 230kV Line • St.Helens-Allston 115kV Line • Clatsop 230/115kV Bk

PGE-owned Transmission Lines: • Trojan-St. Marys 230kV Line • Trojan-Rivergate 230kV Line

Pacificorp-owned Transmission Lines: • Merwin-St. Johns 115kV Line • Astoria-Seaside 115kV Line

2

South of Allston Path

For Discussion Purposes Only

Page 3: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

3

Operation of SOA

Developed a real-time dynamic TTC that takes into account several different generation scenarios; if the generation conditions in real-time are favorable, then the real-time dynamic TTC is raised appropriately, not to exceed 3,200MWs.

Hourly TTC Path Posting

For Discussion Purposes Only

Page 4: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

80 generation scenarios are studied to generate the table that the improved dynamic TTC uses Not posted on OASIS

4 For Discussion Purposes Only

Real-time SOA Dynamic TTC

Clark County Clark County

Page 5: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

5

Operation of SOA

For Discussion Purposes Only

Page 6: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

6

Operation of SOA SOA dynamic TTC

Actual SOA flow

For Discussion Purposes Only

https://transmission.bpa.gov/Business/Operations/Paths/default.aspx

Page 7: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

High load-center temperatures

Low to no wind High Canadian

imports High SW exports High I-5 generation Normally, not one of these causes high flows; it’s a combination of two or more that cause high flows across SOA. The likelihood of two or more occurring simultaneously is highest during the summer.

7

What drives high flow in SOA area?

SOA

SW exports

Canadian imports

For Discussion Purposes Only

Gen

Page 8: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Planned or unplanned outages • Unplanned outage events on SOA become

harder to manage when there is congestion. • If the 500kV line experiences an unplanned

outage, up to 2200 MWs of RAS trips generation to protect the rest of the path elements.

I-5 generation level • Low gen typically causes a lower TTC

8 For Discussion Purposes Only

What impacts the TTC across the SOA Path?

Page 9: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

9

What impact does an outage have on TTC?

• All lines in service system state

For Discussion Purposes Only

Page 10: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

OVE

RLO

AD!!!

OV

ER

LOA

D!!!

10

What impact does an outage have on TTC?

• A large 500kV Line planned/unplanned outage

For Discussion Purposes Only

Page 11: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Real-time assessments • BPA actions • External actions

–Reliability Coordinator –Another entity such as

an adjacent transmission operator.

11

Other Considerations in the SOA Area

For Discussion Purposes Only

Page 12: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

The system condition occurs when real-time analysis identifies curtailments on the SOA path to mitigate transmission constraints.

12

System Condition(s)

For Discussion Purposes Only

Page 13: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

System Conditions CF schedules are tagged as firm 7-F.

When BPA is curtailing on the SOA path to mitigate a transmission constraint, BPA system will treat those schedules as 6-CF for that curtailment. • Lower priority e-tags will be curtailed before 6-CF

tags • 6-CF priority status during a curtailment preserves the

higher priority 7-F transmission rights

13 For Discussion Purposes Only

What does this mean?

Page 14: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Even though flows have been increasing over the years, due to operational improvements, BPA has not had to curtail on SOA since 2014.

In addition, historical curtailments were based on system operating limit exceedances under the former SOL methodology.

14

Operation of SOA

0

1

2

3

4

5

6

7

8

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

# of

tim

es

Year

Curtailments on SOA

For Discussion Purposes Only

Page 15: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Service Attributes Interim SOA Service BPA Standard Practice

Mandatory for previously studied PTP TSRs on SOA − Maintains queue positon & eligible for next cluster study − Customer chooses between System Conditions or Number of Hours − Can convert to Bridge in queue positon

− All network impacts of TSR may be reassessed Subject to Biannual Reassessment

Customer can terminate upon reassessment

15

Conditional Firm – Interim vs Standard

For Discussion Purposes Only

Page 16: System Conditions for Reassessment CF Service over SOA path · 2020. 1. 27. · Operation of SOA Developed a real-time dynamic TTC that takes into account several different generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Yes

No

Process Flow for Studied TSRs

16 For Discussion Purposes Only

Studied TSR

TSR SOA Only?

TSR eligible for CF?

Offer Interim CF

CF accepted

Tender 2018 CSA

Offer non-SOA PEA

Customer signs PEA

Customer retains Reassessment CF

Remove Placeholder TSR from LTFPQ

Continued path to Firm (7F)

No

Yes

Yes

No

Yes

No

Yes

No

Remove TSR from LTFPQ

Customer signs CSA

SOA + non-SOA